How to modify  industry sector of material master data

dear all:
i have already created a material master data using a wrong industry sector through tcode MM01.
and i have created BOM&ROUTTING for this material.
now ,i want to modify the  industry sector of  this  material.
what should i do for this case?
thank you!
best regards!

Hi,
Industry sector is at client level & once you create the material you can't change the industry sector.
However, if you have debug rights then you can change it directly in the table MARA with field MBRSH.
Hope your query get resolved.
Thanx

Similar Messages

  • How to keep Industry sector and Material Type in Display for Tcode MM01

    How to keep Industry sector and Material Type in Display for Tcode MM01( create material Initial screen)
    Thanks,

    Hi
    Yes, your requirement is possible using screen variant
    1. use tcode SHD0
    2. give transaction as MM01
    3. goto screen variant tab - assign some name - enter program name and screen name
       (from mm01 - F1 help)
    4. goto transaction variant tab - assign some name - assign already defined screen variant name
    5. goto standad variant tab - transaction variant name already fetched automatically - click on active button (it was placed after transaction variant name
    Raju

  • How to find Industry sector and material type of created Material

    I have created a material by choosing Industry Sector and Material type as "Retail" and "Finished Product".
    After creating the material I want to know, what is Industry Sector and Material Type of the created Material?
    Please provide the corresponding T-code or solution.
    Thanks in ADVANCE.

    hi
    for single material
    u can go to mm03 material then basic data1
    then click i icon in blue
    u will get all details
    for range of materials
    go to se16
    ive table MARA
    then enter
    go to settings >field selection here select
    MTART                           Material Type
    MBRSH                           Industry Sector
    and then click ok
    then execute
    u will get list of material with ind sec and mat type
    regards
    kunal
    award if helpful

  • Industry sector in material master

    Dear all,
    May I know what are the guide lines to select Industry sector to configure material master.
    What are all the SAP standard Industry sector available?
    Can we use any indutry sector for any type of business. How to choose this.
    please advise.
    Thanks
    Udaya

    Hello Udaya,
    Branch of industry.
    The industry sector groups together companies according to their activities (for example, plant engineering and construction, mechanical engineering, the chemical industry, and the pharmaceutical industry).
    Table-driven program support is provided according to industry sector; for example, for the selection of data fields on-screen, for the sequence of the screens, and for the allocation of a material to a material type.
    Industry Sector :
    Key that specifies the branch of industry to which the material is assigned.
    Use
    When you create a material master record, the industry sector you specify determines
    which screens appear and in what order
    which industry-specific fields appear on the individual screens.
    Thanks
    Geeta

  • Material master data and Asset

    Hello Guys
    Considering the every material master data that I am buying will end up been an Asset in my company.
    I would like to know how can I alredy related the material master data that I am creating with a possible hierarchy to make it esier at the time of creating the asset?
    Some one could briefly explain to me how can I related the material master data and a creation of an asset in SAP?
    thanks

    Hi guys
    Jignesh Thakkar
    That was really good answer you gave it is according with the Help instruction that I read, but the main point for me is that I will not know the asset description or capitalized date or serial number,  location, etcu2026 until I goods receipt the individual material creating serial nods and the equipment master data.
    In this scenario from the equipment master data is there any way to create an Asset master data, create the asset master data with the information of the GR equipment master Data or populate the Asset AS01 with the equipment master data?
    Otherwise I will need manually create the Asset and manually synchronize the equipment with the asset?
    Thanks Guys it have been incredibly helpful this network I hope I can help some one in future as it have been helpful for me at the moment.
    Carlos

  • How to maintain material master data in plant....

    Hi all,
    while creating BOM I am getting an error "no material master data in plant'  can some one help me how to maintain the material master data in plant
    Regards,
    Balu

    Hi,
    Please check the below link for MMR creaion .
    http://web.mit.edu/sapr3/windocs/bpmdb01m.htm
    Regards,

  • How to maintain the material master data in plant

    Hi all,
    while creating BOM I am getting an error "no material master data in plant' can some one help me how to maintain the material master data in plant
    Regards,
    Balu

    Check the material available in MARC table in SE11 transaction against your plant.If it is not available please maintain through MM01 transaction.

  • How to upload PO text of material master ?

    dear gurus,
    how to upload PO text in material master in mass , can i use LSMW or BDC ? if yes then how?
    I have done the recording but LSMW is not working for PO text.
    Upesh khairnar.

    Hi!
    try using Purchasing Inforecord for this. in here you maintain master data linkage for Material Master and Vendor Master. You will just have to input the Material Number, the Vendor Account, and the Purchasing Org. In here you can maintain the PO text defaulted per Material Number. After the maintenance of Inforecord, the PO text will be reflected on the PO document.
    Here is the ff Transaction Code:
    - ME11 (Create Inforecord)
    - ME12 (Change Inforecord)
    - ME13 (Display Inforecord)
    Hope this helps, Thank you.
    Mik

  • How to Change Batch Classification of material master

    Hi,
    How to Change Batch Classification of material master  in a production system,Pl note that there is no stock and no open qty still system is not allowing me to delete the old Classification and add my new classification.
    Guys any solution for this.
    Thanks in advance
    rgds
    bijaya pradhan

    I believe there is a FM VB_CHANGE_BATCH for this, any body tried this FM?

  • How to delete MRP view data after create in Material master data ?

    Hi all ,
          After user  create a useless MRP view data in Material master data , how to remove it ?

    Hi
    Material master once created cannot be deleted.Only thing u can do is to mark it for deletion
    Go to Logistics > Materials management > Material master > Material > Flag for deletion > Immediately.
    Give the necessary data that is needed for the view you want to delete.
    Press and flag the view you want to delete.
    Now the view is flagged for deletion. This means that it's use is limited and it will be cleaned up or really deleted at the next clean up of the system.
    regards
    Anand

  • How to reset planned price in material master

    Hi Gurus,
    Can anyone tell me how to reset planned price in material master.
    my user has run ck40n with wrong values, but i am not able to reverse costing run by using ckr1 or ck44. what could be the reason behind this.
    even after executing tcode ckr1, i can still see the standard cost in material master.
    how to reverse the costing run.
    Thanks in advance
    Suresh

    Hi,
    If you want reset you can delete the cuurent planned price in the material master for the cuurent period,
    Use t.code CKR1,  you have to enter comapny code, plant,material
    In control parameters you have to choose radio button Current Standard Cost Estimates
    Current Standard Cost Estimates
    If you set this indicator, the system will select the current standard cost estimates for deletion.
    If you also set the Additive cost estimates indicator, then additive cost estimates will be selected for deletion.
    Regards,
    Rama Mohan Bangaru

  • ALE:Material Master Data Distribution

    Hi
    I am new to ALE Material Master Data Distribution and if the questions are incorrectly worded, please accept my apologies. It is due to lack of knowledge.
    I am doing Material Master Data distribution and I am using standard basic type MATMAS03. The standard TCode MM01, MM02 has SAP tables and 3 custom tables.
    I have turned the active on using BD61 and change pointers to message type.
    Q: Is the change pointer, applicable to entire material master? i.e. if I change a field in Z table or standard material tables, can an IDOC be created for the entire material record?
    Q: What is the function of BD52? Does this override the option Activate Change pointers for message type? Does it mean, if the changes are made to those fields in BD52 a change pointer is created?
    Q: If I change Z table only, will there be a change pointer created? If not, how could I accomplish this using BD52.
    Q When do we use the enhancement MGV00001?
    Also, If you could add anything in addition to above queries, it will be helpful to me and I appreciate it.
    With regards,
    William

    Thank you Sudhakar.
    Your tips are good, but, I was not able to get the problem resolved.
    Let me explain what I have done based on your tips.
    1.  MATMAS uses MATMAS03. The basic type has NOT been modified to have z fields yet.
    2.  Using BD52, i have created the following fields
         MATERIAL    ZEMM_MARA_TECH   IM_ADVISORY_CODE
         MATERIAL    ZEMM_MARA_TECH   KEY.
    3.  Modified the MMR for IM_ADVISORY_CODE.
    I did not see a change pointer for this change.
    Q:  When I created above entry using BD52, was asking the table name. The table name is stored in TCD0B. What TCode is available the entries in TCDOB. For the time being, i created using SQL.
    Q. Is there a follow up configuration required to capture the changes?
    I will award the points in a couple of days time, even if I do not get the solution, because you have spent your precious time for the community. I will wait for a couple of days for other suggestions and close the Problem.

  • LSMW--Create Material master data

    Hi,
    When I use LSMW to create material master data, I set up all step, but when I go to last step "13 Run Batch Input Session", there is error message like "Select at least one view" in moudle SAPLMGMM, screen 0070, anybody can tell me what is problem, thanks a lot.

    Hi,
    This is due to error while recording for MM01,
    Please do a Repeat recording and ensure that once the material number, industry sector and material type is entered, on the next screen you need to select all or at least a single view to create the MMR.
    Regards
    Merwyn

  • Set default value for price unit when creating material master data

    HI: Every
    could you tell me how to use user-exit or else ways to set default value(such as 1000) for field "Price unit" (MBEW-PEINH) when creating material master data(MM01)?
    I have try to use Exit:EXIT_SAPLMGMU_001. However, this way cannot respones it.
    thanks
    Henry

    Hi: Ihave find out a solution
    Use BADI: BADI_MATERIAL_REF
    SPROlogistics general enhancement supplement or change default data (industry)
    And then creating a Implementation Name
    Double click method: CREATE_MATERIAL
    And then write code as below:
    method IF_EX_MATERIAL_REFERENCE~CREATE_MATERIAL.
              c_mbew-peinh = '1000' .
    endmethod.
    However, SAP still store '1000' in database evenif we change the default value such as 100 when we use TCode MM01.
    in additional, we still use MM02 to change the default value such as '100'
    can anybody tell me how to do?
    thanks
    Henry

  • Message Type for Material Master Data Changes

    Hi all
    I'm managing Message Types for Material Master Data extraction from R\3 system to BW system, in order to load on BW only the changes done to some fields of MARA table that are delta relevant.
    Now from R/3 BD50 Transaction I can see that there is a message type that refer to changes done on MARA fields: RS0044.
    I would like to replace this message type with another one (RS0020) in order to align different systems.
    Now changes to material master data in R/3 system are recorder with both message types but only those with RS0044 message type are processed and loaded into BW system.
    So I would like to know:
    1. How is the message type related to the DataSource 0material?
    2. is it possible to replace a message type for BW?
    3. if yes, how can I do it?
    Thanks in advance.
    Elisa
    mail: [email protected]

    Hi Oscar!
    At the moment I'm using Delta queue of 0MATERIAL. I know that in the queue there are all the new and changed records.
    But I would like to be able not to load all the changed records, but only those that refer to some fields of MARA table.
    E.g. if the gross weight of a material is modified I don't want to load this change on BW with Delta loading .
    I've seen that from R/3 Transaction BD52 you can set only delta relevant fields referred to a specific message type and to delete the other fields.
    As I'm able to do this directly in the Development system and Test System, I haven't got the authorization of doing it in the Production system.
    That's why I need to include this setting in a CR and then ask to transport it from Test to Production system.
    But message types referred to MARA field changes are different between the two systems.
    And it seems they are automatically created.
    Is it true?
    Thanks
    Elisa