How to Print Project Edit Logs incl info on start and end of clips

I would also be interested in how to share these electronically.

If you are re-capturing then you must have used Capture Now to get the clip first time round or you would have run into the same trouble with pre-roll. You'll have to capture the clip again using the same method. Of course, the chances of getting the same start and end code using Capture Now are slim, but if you can get in earlier and out later then you should be able to manually re-connect the clip.
rh

Similar Messages

  • How do I find S Log 2 LUT (Sony F55) and apply to clips?

    I watched the tutorial on using LUTS in CC, hoever I cannot find any for the Sony F55 camera and Slog2 profile. Does it exist and if not then what is the usual procedure for applying a LUT in this case? My first experience with this process so forgive my ignorance.

    Hi Bretacious1,
    Check out the LUTs on the Sony Community site: http://community.sony.com/t5/F5-F55/NEW-3D-LUT-s-for-F55-and-F65/m-p/135617#U135617 Those should get you started.
    To apply the LUT, add a Lumitri effect, and then navigate to the LUT to select it. Click OK and you will be able to see the LUT working on your footage.
    Hope that helps.
    Thanks,
    Kevin

  • How to remove firefox remembering log in info on bank cards

    ''Duplicate post, continue here - [https://support.mozilla.com/en-US/questions/783121]''
    how to remove firefox remembering log in info on bank cards

    The following link shows how to remove entries from the form autocomplete feature - https://support.mozilla.com/kb/Form+autocomplete

  • How to get the current logged in username from windows and put it into an AS var

    Hello,
    I was hopeing someone would know how to get the current logged in username from windows and put it into a var, so I can create a dynamic text box to display it.
    Thanks in advance
    Michael

    Just for everyone’s info, this is the script I have used to get the logged in windows username into flash ---- not and air app.
    In the html page that publishes with the .swf file under the <head> section:-
    <script language="JavaScript" type="text/javascript">
    function findUserName() {
         var wshell=new ActiveXObject ("wscript.shell");
         var username=wshell.ExpandEnvironmentStrings("%username%");
         return username;
    </script>
    The ActionScript:-
    import flash.external.ExternalInterface;
    var username:String = ExternalInterface.call ("findUserName");
    trace (username); // a quick test to see it in output

  • Changing Media Start and End of Logged Clips

    This should be really simple, and I'm sure I'm just overlooking something. I am trying to recapture some clips in Final Cut Pro and it was fine until I came to a clip that gave me the "timecode error - pre roll, post roll, etc" message. The Media Start on the problematic clip is at 00:00:01:04 - I want to manually change this time to allow pre-roll. The timecode in the "In" and "Out" sections isn't making a difference and seems unrelated - no matter what I put it to.
    So I just want to edit the Media Start time as I'm sure this would remedy my timecode error when trying to capture... but I can't edit that field. What am I doing wrong? How do I change the Media Start time?
    I could recapture the whole tape independently but I already have sequences edited based on my previously logged clip. Any help would be greatly appreciated. Thanks!

    If you are re-capturing then you must have used Capture Now to get the clip first time round or you would have run into the same trouble with pre-roll. You'll have to capture the clip again using the same method. Of course, the chances of getting the same start and end code using Capture Now are slim, but if you can get in earlier and out later then you should be able to manually re-connect the clip.
    rh

  • Project Start and End Features - Can Captivate Phone Home and Expire ?

    Hi,
    I am looking at selling a course which the client will host for a limited time
    We want the course to expire and we would like to receive anonymous user data back with their permission.
    Send data back to use : Phoning home
    I was looking at the Project->start and end-> Project end options-> execute javascript    
    With our clients permission could we use this to open a URL and phone home or would we crash into a firewall and burst into flames ?
    Why ?
    ============
    We want to monitor anonymous data such as time on course , score and number of users to improve the course for all customers.
    My other thought was to use this widget
    http://captivatedev.com/shop/adobe-captivate-6-x-google-lms-widget-with-email-reporting/
    Maybe I can run this at the same time as my customers normal LMS
    Expire
    I was looking at the Project->start and end-> Project expiry date.
    Is this relatively secure and stable ?
    Our other alternative was to throw a widget in which said this course has expired
    Or could I have the course check a website to confirm the course is licensed ?
    Any ideas or advice would be appreciated
    rgds Renovator
    Message was edited by: renovator99

    Hi Rod,
    Thank-you for your reply from Western Australia ( which I just realized is the closest point to Madagascar and King Julian) 
    I like the graphs on A3C but
    http://blogs.adobe.com/captivate/2012/06/course-companion-for-adobe-captivate-6.html
    - I couldn't work out how to get the A3C viewer to it display more than the first 20 pages.
    - it had a 3 month limit on the course based on an  Adobe comment on the blog
    http://blogs.adobe.com/captivate/2012/06/course-companion-for-adobe-captivate-6.html
    - I wasn't sure whether the reporting works with advanced actions because some of the reports run on item name
    - Nobody seems to be commenting on it on the forums :-)
    - There was a distraction % on the table which I couldn't work out what it was
    - it was unclear what port had to be open for the A3C communication
    rgds Paul

  • How to get start and end time of an ESB instance in SOA 10.1.3.4

    Hi All,
    I am using soa 10.1.3.4 and want to track the esb instance start and end time. (For example, in case of bpel we can query the cube instance table to get creation and modify time of an instance. )
    How to get that in esb?
    Thank you.
    Regards,
    Satish

    Hi Satish
    You may enable instance tracking option on the ESB Console and track the instances audit information and also from the logs(log.xml) when ESB loggers are set to DEBUG mode.
    Regards
    A

  • How can I control the video playback start and end time?

    I'd like to be able to start a video/audio playback at a particular point in time say 3 seconds from the starts of the video and play it for only 3 seconds. How can I set the unique start and end points rather than play the whole video. I'd also like to be able to do this using the SeriesElement so I can set the start and end play points for a series of stacked videos. How can this be achieved?

    Not sure I understand the question.  Can't you just append the param to the URL?  Like so:
    var url = new URL("http://video-research/video.f4v?start_time=500");
    If your question is more about playing a subclip of a progressive video, that's not something OSMF has support for.  You'd need to write a server script which checks for that parameter and then returns the relevant portion of the requested file.  (This is typically referred to as "pseudo-streaming", if you Google that term you'll find a wealth of info.)

  • PowerShell - Get-MessageTrackingReport how to specify start and end time of current process

    could you please help me? I need to specify start and end time of current process with Get-MessageTrackingReport command. I know you
    can do it with Get-MessageTrackingLog:
    $start = (Get-Date).Addhours(-1)
    $end = (Get-Date)
    Get-MessageTrackingLog -EvenId Receive -Start $start -End $end
    But for my purposes I really need to do it with Get-MessageTrackingReport command, so how can I do it?
    Thanks in advance!

    That's not the context you would use
    Get-MessageTrackingReport in,
    Get-MessageTrackingReport is used to get extra information on messages that you have found in the MessageTracking log using Search-MessageTrackingReport . That's why the most common example you see will look like
    $Temp = Search-MessageTrackingReport -Identity "David Jones" -Recipients "[email protected]"
    Get-MessageTrackingReport -Identity $Temp.MessageTrackingReportID -ReportTemplate Summary
    The most important parameter for that cmdlet and the reason it won't work like your trying to use it is the
    Identity ""The Identity parameter specifies the ID of the message tracking report ID to retrieve.You should run the Search-MessageTrackingReport cmdlet
    to find the message tracking report ID for the specific message you're tracking, and then pass the value of the MessageTrackingReportID field
    to this parameter." see http://technet.microsoft.com/en-us/library/dd351082%28v=exchg.150%29.aspx
    It's more appropriate to use Get-MessageTrackingLog when you want to search the log based on time or use
    Search-MessageTrackingReport and then limit the results this returns before you pass the MessageTrackingReportId to get-MessageTrackingReport
    Cheers
    Glen

  • Editing Loop Start and End times via automation / MIDI controllers?

    I'm trying to play a sample in EXS24 and have the Sample Start, Loop Start and End times manipulated over the course of the song. I've tried to open up the EXS sample editor, click on the numerical value of the Loop Start, and then attempt to Learn Automation. All it does is assign the knob for the instrument Volume Level. Is there any way to do this? It's basically how an Akai S612 works: http://www.vintagesynth.com/akai/s612.shtml
    I switched gears and tried it also with Battery, and there's a way to map the Start and End times in there, but it's not seeming to work as I've intended. I can't seem to make the loops move as they should and there's ways to use up to 4 loops, but not a way to target each loop's start and end points via separate controllers.
    I could use my S-612 [and probably will], but in moments where I don't have one available, I'd love to find a solution to this.
    Thanks,
    +odd

    Anyone with any thoughts? would be great to solve this.

  • Is there a way to enter an event time in Calendar as a reminder for me and NOT have Calendar erase it in the info as it reads it into the event start and end times?

    Calendar can recognize and derive event start and end times from the text description entered.  However, when it seizes on a time (start and/or end) and automatically enters it as the start and/or end time, it also (sigh) deletes the time from the text.  I enter the times as reminders for me, how can one prevent them from being deleted by Calendar??

    I am having the same darn problem. I really dislike this auto feature in Calendar.
    Can anyone help us please?

  • How do I stop calendar inserting 'starts' and 'ends'

    I have recently bought a new laptop ( OS Yosemite version 10.10.2) and find the automatic entering of 'starts' and 'ends' times on my entries in calendar very irritating.
    How do I stop it doing this ?
    The previous version I used did not do this automatically by default.

    I had the Integrated Gmail 2.5.5 addon enabled.
    After disabling the addon the problem is gone.
    Hope it works to you guys.

  • How can I make a brush that starts and ends in a thin line?

    I am looking to make a brush that I can use for cartooning in CS6 that starts out thin, gets thicker with pressure (I have a cintiq), and ends in a thin line. Does anyone have the expertise to make one?
    Thank you.

    I watched the first half of the tutorial from your link and some parts of the rest. It is a good tutorial. He is using an art brush which profile was created from an elliptical shape with sharp corners which gives that ink kind of appearance which is good for this kind of style. Most of the time though I prefer the appearance of the rounded ends of the calligraphic brushes. Also one advantage of the calligraphic brushes is that it can change its size or the size of the selected strokes with the [ and ] keys on the keyboard while with the art brushes this is done by changing the stroke weight which also can change the weight of calligraphic brushes in addition to the [ and ] keys.
    Like in the tutorial I often use a similar workflow ending up with the brush strokes converted to filled paths but I simply use expand appearance then remove the unwanted parts with the Eraser brush which can be made pressure sensitive in the options that you get when double clicking the Eraser tool. This is less precise than the technique the guy is using in the video tutorial but it is quick, I like  the hand touch appearance of the imperfections, and it also allows me to paint the white (transparent) highlights like for example the highlights on the booths of my cowboy. The Blob brush is the tool above the Eraser in the Tool panel and works basically the same like the Eraser but it adds to the fill of a path and it also has these and more options when you double click it. I use it most of the time in a combination with the Eraser to add or remove final details of illustrations started initially with brush strokes and then expanded. And like in the video tutorial I also like to keep a copy with the stage before expanding the brush strokes in case I need some changes on brush stroke level.
    I also use a different technique for adding new color fills on the illustrations instead of cutting paths with the knife. I don't like the knife because I often do not like the first cut which I may realize later when undo is not the best workflow. What I do is copy paste in front the path and use the pencil tool set to edit the selected paths and change the shape of the selected path similar to using the knife but the pencil has to start and end on the path. The advantage of this for me is that the new fill with the different color is overlapping the original fill behind and when later I decide to change its shape I don't get gaps between the two colors which is what will happen if the knife was used.

  • How to determine current period start and end dates

    Hi All,
    If given previous period start date and end date, how to determine current period start date and end date?
    Suppose if given previous period start and end dates are 12/28/08 - 01/30/09, then current period start date and end date will be 01/30/09 - 02/27/09. (where 12 is the previous period, 28 is the day, 08 is the year......)
    Can you please suggest an FM to determine the current period dates?
    Thanks & Regards
    Gowthami

    >
    gowthami karunya wrote:
    > If given previous period start date and end date, how to determine current period start date and end date?
    > Suppose if given previous period start and end dates are 12/28/08 - 01/30/09, then current period start date and end date will be 01/30/09 - 02/27/09. (where 12 is the previous period, 28 is the day, 08 is the year......)
    Hello,
    I am assuming you have the Company Code with you & proposing this solution.
    TABLES: bkpf.
    PARAMETERS:
    p_bukrs TYPE bukrs.
    SELECT-OPTIONS:
    s_date FOR bkpf-budat.
    DATA :
    l_perio LIKE bkpf-monat,
    l_poper TYPE poper,
    l_year  LIKE bkpf-gjahr,
    l_spmon TYPE spmon,
    l_periv TYPE periv,
    l_date1 TYPE datum,
    l_date2 TYPE datum.
    CALL FUNCTION 'BAPI_COMPANYCODE_GET_PERIOD'
      EXPORTING
        companycodeid = p_bukrs
        posting_date  = s_date-high
      IMPORTING
        fiscal_year   = l_year
        fiscal_period = l_perio.
    CONCATENATE l_year l_perio INTO l_spmon.
    * Get the next period
    IF l_perio < 12.
      l_perio = l_perio + 1.
    ELSE.
      l_perio = '01'.
      l_year = l_year + 1.
    ENDIF.
    MOVE l_perio TO l_poper.
    SELECT SINGLE periv INTO l_periv
    FROM t001
    WHERE bukrs = p_bukrs.
    IF sy-subrc = 0.
      CALL FUNCTION 'FIRST_DAY_IN_PERIOD_GET'
        EXPORTING
          i_gjahr        = l_year
          i_periv        = l_periv
          i_poper        = l_poper
        IMPORTING
          e_date         = l_date1
        EXCEPTIONS
          input_false    = 1
          t009_notfound  = 2
          t009b_notfound = 3
          OTHERS         = 4.
      IF sy-subrc <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
      CALL FUNCTION 'LAST_DAY_IN_PERIOD_GET'
        EXPORTING
          i_gjahr        = l_year
          i_periv        = l_periv
          i_poper        = l_poper
        IMPORTING
          e_date         = l_date2
        EXCEPTIONS
          input_false    = 1
          t009_notfound  = 2
          t009b_notfound = 3
          OTHERS         = 4.
      IF sy-subrc <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
      WRITE: / l_date1, l_date2.
    ENDIF.

  • How to input my own Validity Start and End Dates in ME21N

    Hi All,
    I have to change the Validity Start and Validity End date in Addiitional Data Tab of ME21 transaction( PO Create ) using default Customer Values.How Can i accomplish it?
    I have used the BAdI ME_PROCESS_PO_CUST and implemented it, I have coded in the method PROCESS_HEADER.First I retrieved the data using get_data( ) method, changed the values with Customer Values and called the method set_data( ).
    However my validity start and End Dates and not changing.
    Even in ME21N if I create the PO with my own Validity Start and End dates, and go to ME23N to display the created PO, still in the additional data tab, the start and End dates are current date and Next date respectively.why its happening?
    Thanks in advance

    Hi,
    Can you please let us know in which business scenario this is required.
    SAP has provided separate functionality of Outline Agreement for considering validity period.
    If you let us know the business scenarion some solution/workaround can be suggested.
    Regards

Maybe you are looking for

  • 4G weak but won't switch to 3G

    My phone is constantly getting stuck between a weak 4G signal and 3g.  This occured after the last software update and conspiracy theory 101 tells me that this is Verizons way of trying to limit my unlimited data.  There should be an option to stay o

  • System cache on CITRIX

    Has anyone out there got the system cache working on a citrix server. Have set it up on xp boxes with no issues but on Citrix it just will not recognise that the system cache has been configured

  • Using sql loader to load data

    Hi, My name is Roshan. I'm pretty new to Oracle. I'm trying to load some rows from a comma delimited ascii file to a table with 3 varchar2 fields using sql*loader. Can anybody give me an example ? Thanks, Roshan.

  • Now that Logic can be run in 64 bit is there any use for Plogue Bidule?

    Hi all. I have seen some videos of composers with Digital Performer running Plogue Bidule as some way to optimize their Mac's performance with large instances of Kontakt, millions of VSL instruments etc. I am wondering what the practical uses of a mo

  • TS1292 trying to redeem itunes gift card

    Hi, I am trying to redeem an itunes gift card. After entering code and signing in I am told to setup 3 security questions and answers. How do I do this?