How to push the data from PSA to Data Target in 3.5 version

Hi Experts,
I'm currently working on BI 7. I have some master data load being maintained in 3.5 version.
The infopackage has an option to load the data to psa and data target when extracted.
I want to stage the data at PSA only.
Later I want to trigger it to the target.
In 7 version we use DTP but I'm not very sure what should I do here.
Can anyone please help me to push the data to the target please using 3.5 version.
Thanks

Hi pathak,
Thanks for your reply. I'm able to do it.
Can you please tell me how do I filter the load to target.
We have filter in DTP where i can restrict the load.
Do we have any option in 3.5.
Please advice.
Thanks

Similar Messages

  • Updating data from PSA to Data Target

    Hi,
    I just want to update data from PSA to data target.
    There is a process chain running daily it will updating Master Data in to 0Vendor object. This process chain is updating only upto PSA not the data target. I just want to update from PSA to data target.
    There is a update rule for 0Vendor but itu2019s not active at the movement and also it is not properly mapped with the 0Vendor.
    Is there any other method which I can update data from PSA to Data target with in the same process chain.
    Thanks
    Ganesh

    If this is BW 3.5, change the infopackage setting to load to data target as well.
    This is a other w ay than using the update from infopackage.
    if this is 7.0, Use the DTP to load from PSA(datasource) to Target.
    Let me know if this helps.
    Thanks
    Sachin

  • Error while loading the data from PSA to Data Target

    Hi to all,
         I'm spacing some error while loading the data to data target.
    Error :  Record 1 :Value 'Kuldeep Puri Milan Joshi ' (hex. '004B0075006C0064006500650070002000500075007200690
    Details:
    Requests (messages): Everything OK
    Extraction (messages): Everything OK
    Transfer (IDocs and TRFC): Errors occurred
          Request IDoc : Application document posted
          Info IDoc 2 : Application document posted
          Info IDoc 1 : Application document posted
          Info IDoc 4 : Application document posted
          Info IDoc 3 : Application document posted
          Data Package 1 : arrived in BW ; Processing : Data records for package 1 selected in PSA - 1 er
    Processing (data packet): Errors occurred
          Update PSA ( 2462  Records posted ) : No errors
          Transfer Rules ( 2462  -> 2462  Records ) : No errors
          Update rules ( 2462  -> 2462  Records ) : No errors
          Update ( 0 new / 0 changed ) : Errors occurred
          Processing end : Errors occurred
    I'm totally new to this issue. please help to solve this error.
    Regards,
    Saran

    Hi,
    I think you are facing an invalid character issue.
    This issue can be resolved by correcting the error records in PSA and updating it into the target. For that the first step should be to identify if all the records are there in PSA. You can find out this from checking the Details tab in RSMO, Job log , PSA > sorting records based on status,etc. Once its confirmed force the request to red and delete the particular request from the target cube. Then go to PSA and edit the incorrect records (correcting or blanking out the invalid entries for particular field InfoObject for the incorrect record) and save it. Once all the incorrect records are edited go to RSA1>PSA find the particular request and update to target manually (right click on PSA request > Start update immediately).
    I will add the step by step procedure to edit PSA data and update into target (request based).
    In your case the error message says Error : Record 1 :Value 'Kuldeep Puri Milan Joshi '. You just need to conver this to Capital letter in PSA and reload.
    Edit the field to KULDEEP PURI MILAN JOSHI in PSA and push it to target.
    Identifying incorrect records.
    System wont show all the incorrect records at the first time itself. You need to search the PSA table manually to find all the incorrect records.
    1. First see RSMO > Details > Expand upate rules / processing tabs and you will find some of the error records.
    2. Then you can go to PSA and filter using the status of records. Filter all the red requests. This may also wont show the entire incorrect records.
    3. Then you can go to PSA and filter using the incorrect records based on the particular field.
    4. If this also doesnt work out go to PSA and sort (not filter) the records based on the particular field with incorrect values and it will show all the records. Note down the record numbers and then edit them one by one.
    If you want to confirm find the PSA table and search manually."
    Also Run the report RS_ERRORLOG_EXAMPLE,By this report you can display all incorrected records of the data & you can also find whether the error occured in PSA or in TRANSFER RULES.
    Steps to resolve this
    1. Force the request to red in RSMO > Status tab.
    2. Delete the request from target.
    3. Come to RSMO > top right you can see PSA maintenace button > click and go to PSA .
    4.Edit the record
    5. Save PSA data.
    6. Got to RSA15 > Search by request name > Right click > update the request from PSA to target.
    Refer how to Modify PSA Data
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40890eda-1b99-2a10-2d8b-a18b9108fc38
    This should solve your problem for now.
    As a long term you can apply some user exit in source system side or change your update rules to ensure that this field is getting blanked out before getting loaded in cube or add that particular char to permitted character list in BW.
    RSKC --> type ALL_CAPITAL --> F8 (Execute)
    OR
    Go to SE38 and execute the program RSKC_ALLOWED_CHAR_MAINTAIN and give ALL_CAPITAL or the char you want to add.
    Check the table RSALLOWEDCHAR. It should contain ALL_CAPITAL or the char you have entered.
    Refer
    /people/sap.user72/blog/2006/07/23/invalid-characters-in-sap-bw-3x-myths-and-reality-part-2
    /people/sap.user72/blog/2006/07/08/invalid-characters-in-sap-bw-3x-myths-and-reality-part-1
    /people/aaron.wang3/blog/2007/09/03/steps-of-including-one-special-characters-into-permitted-ones-in-bi
    http://help.sap.com/saphelp_nw04/helpdata/en/64/e90da7a60f11d2a97100a0c9449261/frameset.htm
    For adding Other characters
    OSS note #173241 – “Allowed characters in the BW System”
    Thanks,
    JituK
    Edited by: Jitu Krishna on Mar 22, 2008 1:52 PM

  • Push data from PSA to info target in bi 7.0

    Hi,
    i am doing delta update with option only PSA,
    now data is coming in to the PDA but how to pass it that data form here to res info target?
    Best regards,
    dushyant.

    Hi Dushyant,
    Creation of data targets
    • In left panel select info provider
    • Select created info area and right click to create ODS( Data store object ) or Cube.
    • Specify name fro the ODS or cube and click create
    • From the template window select the required characteristics and key figures and drag and drop it into the DATA FIELD and KEY FIELDS
    • Click Activate.
    • Right click on ODS or Cube and select create transformation.
    • In source of transformation , select object type( data source) and specify its name and source system Note: Source system will be a temporary folder or package into which data is getting stored
    • Activate created transformation
    • Create Data transfer process (DTP) by right clicking the master data attributes
    • In extraction tab specify extraction mode ( full)
    • In update tab specify error handling ( request green)
    • Activate DTP and in execute tab click execute button to load data in data targets.
    cheers
    sunil

  • How to push the config from WCS to WLC

    Hi Everyone
    sorry a total noob here. I had to reset factory my WLC. how can I download the config from WCS? Cisco Prime? I have the config backed up there but I cant see an option to push the config
    thanks alot

    If the device is already in the Prime Infrastructure, you can open it in Device work center and select the device > use the configuration archive option > scheduled deploy.
    Also, the Prime Infrastructure Plug and Play feature allows you to perform an initial provisioning of a software image and configuration on a new device. For more details check :
    Automating Device Deployment Using Plug and Play Profiles
    Working with Device Configurations
    -Thanks
    Vinod

  • Need help to load data from PSA TO deta targets

    Hello BW Gurus,
    I have done the INIT for 2LSI_11_VAHDR and data target I have selected is OSD_CO3. after doing INIT I realized that I have other two ODS which I want select as data target with same datasource.
    My question is
    1) Is it possible / recommended to create another infopackage and do the INIT for pending ODS.
    2) If I want to add the remaining two ODS in existing
      request, can you please suggest me how I can do that.
    Thank you very much
    Krish

    Hi Krish,
    I don't think it is necessary to create another InfoPack to load the other two DataTargets(ODS. Instead you can delete the Initialization for source systems from the cube and then delete the same from the InfoPack (scheduler option -->Init for Source system) and then check the other two ODS as Datatargets and then schedule with Initialization option.
    Otherwise also you can create IPack for the 2 ODS as datatargets and then do the Init. But i prefer the 1st way unless you have huge data in the cube for the init request.
    Hope it helps...
    Best Regards,
    DMK
    *Assign points if it helps...

  • How to update data from PSA to target in BI 7.0

    Hi all,
    can you pls tell me the procedure/process to load data from PSA to data target. We got a load failure while activating the data in DSO.We made necessary changes to the incorrect data in PSA and we saved. When i run the DTP again it gives me 0 records. Is there any option like in 3.5 where we can select the PSA right click.....schedule the update/start the update immediate. or any other process which solves my problem.
    Thank you all,
    Regards,
    Praveen

    A new object concept is available for the ETL process as sap Net Weaver 2004. To implement the EDW layer paradigm, sap has changed the concept of the ETL data flow and process design.
        The most important innovations in the modified object concept are as followes.
    1. When a Datasource is activated, a PSA table is generated in the inbound laywr of the BI so that data
       can already be loaded.
    2 The infopackage is only used to load the data from the source system into PSA.
    3 This is followed by the data transfer proccess (DTP) step to transfer data within the BI from one
       persistent object to another by using transformation and filters,
    4 The definition for which data targets the data from the Datasource is to be updated into occurs in  
       transformations.  this is also where fields of Datasource are assigned to infoObjects of the target
       objects in bi.

  • How to push a perticular request from PSA to Data target using DTP in BI

    Hello all.
      I have mulitple requests in PSA & wanted to move only perticular requests (Randomly,  say first request & last request ) to data target using DTP in BI 7.0. How can we do this.. ? Is there any option in DTP (BI 7.0)for selective loading of requests from PSA to Data Target..
      Thanks in advance..
    Cheers,
    sami.

    Hi,
      It is possible by using 'zero fetch' in DTP
    If you want only the recent req to be loaded.
    1. In PSA, change the status of the recent request to red
    2. Do a zero fetch
    that is processing mode - No data transfer; delta status in source: fetched
    With this processing mode you execute a delta without transferring data.
    3. change the particular request status back to green
    4. Run a delta load
    Regards,
    Priya.D

  • How to delete the duplicate data  from PSA Table

    Dear All,
    How to delete the duplicate data  from PSA Table, I have the purchase cube and I am getting the data from Item data source.
    In PSA table, I found the some cancellation records for that particular records quantity  would be negative for the same record value would be positive.
    Due to this reason the quantity is updated to target but the values would summarized and got  the summarized value  of all normal and cancellation .
    Please let me know the solution how to delete the data while updating to the target.
    Thanks
    Regards,
    Sai

    Hi,
    in deleting the records in PSA table difficult and how many you will the delete.
    you can achieve the different ways.
    1. creating the DSO maintain the some key fields it will overwrite the based on key fields.
    2. you can write the ABAP logic deleting the duplicate records at info package level check with the your ABAPer.
    3.you can restrict the cancellation records at query level.
    Thanks,
    Phani.

  • Unable to load the data from PSA to INFOCUBE

    Hi BI Experts, good afternoon.
        I am loading 3 years data( Full load ) from R/3 to Infocube.
       So loaded the data by monthwise. So i created 36 info packages.
      Everything is fine. But i got a error in Jan 2005 and Mar 2005. It is the same error in both months. That is Caller 01and caller 02 errors( Means invalid characteristics are there PSA data )
    So i deleted both PSA and Data target Requests and again i loaded the data only to PSA.
      Here i got data in PSA without fail.
      Then i tried to load the data from PSA to Infocube MANUALLY.
    But its not happening.
      One message came this
           SID 60,758 is smaller than the compress SID of cube ZIC_C03; no        request booking.
       Please give me the solution how to solve this problem.
      Thanks & Regards
         Anjali

    Hi Teja,
       Thanks for the good response.
      How can i check whether it is already compressed or not?
      Pls give me the reply.
      Thanks
              Anjali

  • How to load data from PSA to CUBE & DSO at a time using DTP in BI 7 ?

    HI all,
    I am new to BI 7 . How to load the data at same time to DSO & INFO CUBE using DTP.
    Please provide me steps to load & plz specify which update mode I have to use ( FULL OR DELTA ) which one is best.
    Plz Suggest me.
    Thanks & Regards,
    Kiran m.
    Message was edited by:
            kiran manyam

    Below are the basic steps which we follow in any BI 2004S system:
    1)Create datasource. Here u can set/check the Soucre System fields.
    2)Create Transformation for that datasource. (no more update rules/transfer rules)
    2.1) While creating transformation for DS it will ask you for data target name, so just assign where u want to update ur data.
    DataSource -> Transformation -> Data Target
    Now if you want to load data into data target from Source System Datasource:
    1) Create infopackage for that data source. If you are creating infopackage for new datasources, it will only allow you update upto PSA, all other options u can see as disabled.
    2)Now Create DTP (Data Transfer Process) for that data source.
    3) NOw schdule the Infopackage, once the data is loaded to PSA, you can execute your DTP which will load data to data target.
    If you are loading data from one one data target to other, no need to use PSA, you can directly execute DTP in that case.
    Data Source -> Transformation (IP/DTP) -> Data Target1 -> DTP ->Data Target 2
    Use the below link for detailed example:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/fc61e12d-0a01-0010-2883-e2fc63ef729b
    Infosources are no more mandatory with BI 7.0, below is the link to scenarios where we use infosources:
    http://help.sap.com/saphelp_nw04s/helpdata/en/44/0243dd8ae1603ae10000000a1553f6/content.htm
    Full or delta depends on your requirement...
    chk the below thread to know better
    difference between the various loads
    hope it helps
    Message was edited by:
            sriram viswanathan

  • Error when loading the data from PSA to ODS......

    Hi BW guru's,
    i am facing one problem while loading the data from PSA to ODS.so please help me in this regard.
    Please give a step by step guidelines for me...
    the error while loading the data from PSA to ODS is "There are no PSA tables for these selection criteria","An error occurred when reading PSA data".
    thanks in advance,
    ashok.

    hi ashok,
    u can push data from  psa to ods, for this goto the psa in rsa1>psa>goto that request>rightclick>select " schedule update Immediately ", then data will moved from psa to ods.
                                                 or
    In ods > delete the failed request>goto the processing tab-->select 3rd option   " psa and then subsequentially to data targets ", --> schedule the infopackage.
    bye
    sunil

  • I have multiple devices backed up to the same computer each with different data. how do i keep them from syncing all data when i back up or transfer stuff from the computer to a device?

    i have multiple devices backed up to the same computer each with different data. how do i keep them from syncing all data when i back up or transfer stuff from the computer to a device? one is an iphone 6 and the others are ipad mini first gens, each ipad has 64gb and the iphone has 128, need to keep the data seperate as they are not all mine

    Itunes content and pics are NOT part of the backup that itunes performs.
    Backing up, updating, and restoring iPad, iPod touch, and iPhone software
    You should transfer any purchases from iphone regularly:  File>Transfer Purchases  , if they fail to be transferred when you sync.
    You buy one and only one download.  It is your responsibility to move/copy/backup your purchases.
    You can try contacting itunes support and asking for an exception, but they are under no obligation to allow.
    http://www.apple.com/support/itunes

  • How to get the first day in the month from a domain date ?

    Hi,
    I like to know how to get the first day in the month from a domain date?
    Thanks
    Stephen

    Hi Gokul...
    Instead of using the funtion module you can just write the 3 statements of code to get the first day of the week.
    Its similar to the above one but instead of writing case statement you can achive the following.
    data : w_res type i,
             w_data type d,
    w_res = w_date mod 7.
    w_date = w_date - w_res.
    write w_date.
    This works.
    Regards,
    Siddarth

  • How to load data from PSA in BI 7.0

    Hi,
    Gurus
    I'm trying to load data from PSA to my InfoObject masterdata but I can't get the change mode, so I change the processing to data Target.Right now its on PSA only
    I will reward poaints
    Regards
    Alex

    Hi,
      I am just a beginner in 7.0, i had the same issue I loaded the master data in PSA but couldn't load in Data target i.e. info object (correct me if my understanding of your problem is wrong).
    Try these steps:
    1) Create and activate Transformation.
    2) Create and activate DTP first then in DTP itself in <b>Execute tab</b> click "execute" ,go to infoobject right click on the info object you have created and select "maintain info object" , the datas will be loaded into info object
    *Please assign points if useful.

Maybe you are looking for

  • Windows vista and Adobe

    I have windows Vista 32 bit, and am having problems downloading Adobe. I have read that the only Adobe version that will work with Vista is Adobe 7; what is the reality, Thx, Jim

  • My iphone 5 is not compatible with my MacBook or iTunes!

    I have a 2008 MacBook, running OS X 10.5.8, and itunes 10.6.3. I have just received a new iPhone 5, and downloaded the latest version of itunes, but the installer won't run on my computer, as it requires OS X 10.6.8 or later. Tried to install the 10.

  • HOW TO INSTALL ROUTING IN SOLARIS 10

    I have already installed my Solaris 10 Server, I was tryin to implement the routing in the file /etc/init.d/inetsvc (/etc/rc2.d/S98inetsvc) as in Solaris 8. !! this file does not exists!! How install routings in Solaris 10 6/06 ?? thanks

  • Can't even open new (trial) install of indesign CS4

    Installed trial version of InDesign CS4 on 2.4 GHz MacBook Intel Core 2 Duo, 2.0 GB RAM, 250 GB hard drive, running OS 10.5.6. This machine is less than a month old. No other non-system software installed besides OpenOffice. Can get through registrat

  • How to obtain a list of a manager's direct employees and the manager

    Hi Currently I am using the evalutaion path "MSSDIREC" for various reports, i.e. phonelist. We now want the reports extended so they not only shows the employees directly under the manager, but also the manager him-/herself. Is there a standard evalu