How to record production loss

I have issue raw material 100 kg to make a product A.
Upon completion, I received finish good eg Product A = 90 kg (10% loss on account of weight).
No scrap / waste generated.
To reconcile the qty of raw material v/s FG, can any body explain as how to do it in SBO 8.8?
Regds,
OPS

Hi Ashish / Rahul,
As I already mentioned, this activity not possible through BOM as there are 100 items / day and all items
are one time. making Item Master and then BOM for each item not possible in this scenario.
What I want is, I have to receive item qty in WH1 then it will be go to WH2 and then WH3.
at each stage there is weight loss and item remain the same. finally it will goes to FG.
eg 100 kg recieve at WH1 then it will be issue to WH2 (90 kg, as 10 kg loss at WH1),
then it will issue to WH3 ( eg 85 kg as 5 kg loss at WH2). Then it will issue to WH3
(82 Kg, 3 kg loss at WH3).
                      Received              Issued            Loss
WH1                 100                        90                  10
WH2                   90                        85                    5  
WH3                   85                        82                    3
FG                      82
It is just movement of item from WH to WH.
Pls suggest.
OPS

Similar Messages

  • [HELP] How to records user who use SQLPlus or SQL editor?

    Dear Gurus,
    Is onyone know how to record user who use SQLplus or any SQL editor?
    for instance...
    user1 using SQLplus on monday august 9.30.21 PM...and I have table which record this for audit user.
    Or..
    Can I block user who connect to oracle using SQLPlus?
    If anyone know how to do this..please inform me...
    Thanks and Regards
    Erie

    You can enable Auditing (AUDIT_TRAIL) and audit at the Session Level to record Logon and Log off of a required user. This can be enabled to be recorded in the audit table or operation system file. You can also audit user statements etc.
    For example, to enable auditing connect for user UGONIC
    SQL>audit connect by UGONIC;
    TO disable it
    SQL>noaudit connect by UGONIC;
    Check in the SQL Reference for the AUDIT statement and requirements.
    If you do not want the user to connect at all via SQL*Plus, you can use PRODUCT_USER_PROFILE to disable a users access to SQL*Plus or at the lower level, disable specified SQL*Plus and SQL commands for the user. You need to run the PUPBLD.SQL script as system user (if not run yet) and add records to it as required.
    Example: After running PUPBLD.SQL. This entry stops the user UGONIC from using the drop command at the backend in SQL*Plus.
    INSERT into product_user_profile (product,userid,attribute,char_value,date_value)
    values('SQL*Plus','UGONIC','DROP','DISABLED',NULL);
    Note that if a user is already connected by the profile entry, it is not activated on that session, but on subsequent logons. Again read the requied security documentations for this.
    For both auditing, you need to set the required database intialisation parameters and know where to get the audit records (in tables, views or OS file). For instance, when using tables, you maintain and query tables like audit$ to view the logs. When using OS type logging, it is recorded on the path specified in the AUDIT_FILE_DEST init parameter (In Windows, it is logged in the Windows Event and you can view it from the event viewer).

  • How is the product allocation  work?

    How is the product allocation  works? (material master: Basic Data 1,) where is the place to maintain the parameters?
    point will given

    Product Allocation
    Configuration Overview; Allocation Specific Usage
    1.Allocation Procedure (OV1Z) The product allocation procedure is the parent of the entire allocation process. All materials that are to be included in the allocation scheme are required to have an allocation procedure assigned to it in the material master. In addition, as of release 4.0, it is in the procedure that the method of allocation is defined. The user has the opportunity to set an indicator to identify their choice of two different methods (discrete and cumulative allocation) to evaluate the quantities to be considered for product allocation.
    2.Allocation Object (OV2Z) The allocation object is the root level of the allocation process where actual data is entered and planned in LIS. The object allows the user to further break down a procedure into smaller parts for future validation of components comprising a specific material
    3.Allocation Hierarchy Mapping (OV3Z) Primarily, this transaction permits the assignment of an allocation procedure to an LIS information structure. Secondly, a character is assigned to the information structure to permit collective planning. Finally, the user can assign a step level to the procedure and information structure to sequence the order in which allocation quantities are checked. This functionality allows the user the opportunity to check product allocation against several product allocation scenarios, before the required quantity is confirmed
    4.Define Consumption Periods (OV5Z) The allocation consumption periods functionality is only valid if the allocation method flag has been set (OV1Z). If you have de-selected the method field, this functionality is not available. The consumption window indicates the number of past and future periods to be used in the allocation check.
    5.Control Product Allocation (OV4Z) In order for the allocation process to function properly, allocation control records are created primarily to map allocation procedure steps to their corresponding objects so that the allocation data records can be located for validation. Secondly, validity periods must be established to indicate when the allocation control records are active. Finally, the user has the option of establishing a conversion factor per allocation control record to accommodate BOM listings of constrained materials
    6.Activate Allocation for Requirement Class (OVZ0) In order to turn on allocation in the standard order processing functionality, the requirements class must have a flag indicating that allocation is relevant.
    7.Activate Allocation for Schedule Line Category (OVZ8) In order to turn on allocation in the standard order processing functionality, the schedule line must have a flag indicating that allocation is relevant
    8.Create Planning Hierarchy (MC61) In order to adequately establish allocation quantities, the user must initially determine the level at which the allocation is to take place and the aggregation factor of the allocation quantities. In this step, the levels for the collective allocation search procedure are also identified.
    9.Generate Masking Character (OV7Z) Upon completion of the level determination for the planning hierarchy, the collective allocation masking character must be generated to allow aggregation indicators to be established. This transaction simply reads the hierarchy established in the planning table and then generates a collective mask character for each level of the hierarchy
    10.Modify Planning Hierarchy (MC62) This step is a repeat of MC61 where the initial hierarchy was established. In order to complete the hierarchical set up, the collective allocation (mask character) hierarchy must now be maintained with the appropriate aggregation factors
    11.Allocation Procedure Assignment to Material Master (MM02) At the root level of the allocation process are the materials. Each material that is to be considered in allocation scenario must be mapped to an allocation procedure. In order entry, then, when a material is entered with a valid allocation procedure in the material master, the allocation data is verified prior to confirming the line item ordered
    12.List of Suitable Structures (OV9Z) This report is used to identify potential LIS information structures that can be used in the product allocation process. This report simply reads through the data dictionary and selects all the active information structures that contain the field product allocation object (KONOB) as the first field. This data can then be utilized in the mapping transaction (OV3Z) to link the allocation procedure step to an information structure (previous step).
    Regards
    Jitesh

  • Can someone tell me step by step how to record from audio tape to mac book with the help of xitel import deluxe

    Can someone tell me step by step how to record from audio tape to mac book with the help of xitel inport deluxe system.  Somebody had mentioned that we do not have to download the software - so I did not, but the computer does not recognize the connection.  How can I know it is connected - can someone please tell me step by step as teaching a layman.  Thanks.

    It seems this question is best posed to the makers of "xitel".
    I looked up A product and it is out for Windows but does not mention Mac OS X:
    http://www.xitel.com/USA/prod_inportpro.htm

  • How to record vinyl at 24bit?

    Hi guys,
    I have some vinyl records Id like to record using audition. Normally I record at 16bits and just burn on cd but I recently read that you can record at 24bits and burn it to dvd for better sound. Can someone please tell me what I need to do this? I know I can record using audition but do I need special burning software to do this. I use Roxio Easy Media Creator 7 for burning usually. Any help would be great!
    MaxQ

    Okay, it doesn't take much telling, and of course it's not in the book, so here's
    Vinyl Processing 101
    >Where do I tell Audition to record in 32bit float before I start recording...
    In Edit View (which is fine for recording vinyl) you get the option in the 'New Waveform' pane that pops up when you hit the record button - so you select 44.1k, stereo and under Resolution, 32-bit Float.
    In Multitrack View, it's a preference. So you go to Edit>Preferences>Multitrack and set the Rec Bit Depth default to 32-bit, and whilst you are there make sure that Auto Mixdown is set to 32-bit as well. But quite frankly, unless you have a specific reason for recording in MV I wouldn't bother when it comes to vinyl - you have to do most of the processing in EV anyway.
    The only valid reason that I can think for recording in MV of would be perhaps to save a little time at the end of the side of a disk; if you record in Multitrack it's direct to file, but in EV recording's still to a temp file that then has to be saved to a permanent one, by you, as a discrete operation. And if you are worried about cockups that might involve re-recording (which can be time-consuming) then save two copies and only work on one of them
    >Can you type me out a quick list of how to record and what order I should do conversions from 32bit to 16.
    >should I EQ and remove noise in 32bit or do it after I convert to 16?
    The whole idea is that you only convert
    to a 16-bit file once - just for the listening copy. So it's absolutely the last thing you do after
    all processing.
    For a side of vinyl, (an LP with several tracks) the usual - but not only - order to process is to record in EV, normalize the whole side to about -1dB or thereabouts and then do scratch removal, and after that, do noise reduction. The reason for normalizing the whole side first is that this way, you retain the relative mastering levels between the tracks - assuming that these decisions were actually made, of course. You don't
    have to do that - you can split the tracks out first and deal with them individually if you want, normalizing each one separately. Your choice.
    If you feel that you need to alter the EQ, or do any other sort of mastering, like harmonic enhancement (be careful with this; it's very easy to overdo it) or stereo widening, then do this after all of the click and noise processing - subjectively, a lot of clicking alters your perception of the sound, so you need to get that out of the way first. I wouldn't bother with loudness maximising or any other sort of compression - this gets pretty tiring to listen to, but you may like, under some circumstances, to add just a little reverb - often processing can reduce the effects of the original, so putting just a touch back is, on a lot of 'commercial' tracks, quite an acceptable thing to do IMHO.
    Having done all of that, then the last thing you need to do is to make sample rate converted copies that you can write to a CD. This is the point where you get the option to dither, and whatever setting you choose, it's going to be a lot better than not choosing one at all. There's a lot of stuff in the old Syntrillium forum about the best dither to use for vinyl, but personally I don't think it makes a huge difference which noise-shaping option you use, although if I recall correctly, either C1 or C2 was popular. I use the dither provided in the full-blown iZotope Ozone, so for me it's not an issue.
    There's stuff all over the forum about the correct process for creating CDs with or without gaps, etc so I won't rehash that. But for most vinyl work, the above will do. You might, according to what you end up processing, though, want to look up references to Younglove's decrackling script - this can often improve results, although we don't hear so much about it these days - I wonder why?
    Of course, there's more - there's
    always more. Most of it, though, is to do with dealing specifically with the vinyl, but you do also have other processing options that I haven't dealt with - mainly because they are slightly more esoteric. Options here include sum and difference processing for noise (aka Mid-Side) and using external processors like Har-Bal for more subtle corrections. But as I said, that's more esoteric and most of the time, you don't need it to get acceptable results.
    * You have options here - quite often I take a chance and normalize a file before I save it, either as a working or a safe copy, as that's absolutely undo-able if it's 32-bit, with no loss at all.

  • How much recording time on my iphone 4 voice memo?

    How much recording time on iphone4 voice memo?

    I would suggest that it depends on how much free space you have on the phone. I have done voice memos of over an hour before, and have read of other users reporting larger ones. I do not believe there is any documented source of what size you can do.

  • How to record my voice by headphone on mac mini

    Hi all,
    How to record my voice by headphone on mac mini. The headphone have a microphone. It can record on window 7, but on mac mini, it's not working.
    I don't know why. Please help me.
    Thanks.

    Open Quicktime Player
    File Menu: New Audio Recording....
    However... if the headphone/microphone combination has two 3.5mm jack plugs (pink and green) then the microphone output (pink) is "mic.level" - which is TOO QUIET for the audio input on a Mac, which is expecting the much stronger "line.level" signal strength.
    Solutions: get a microphone pre-amplifier between the mic and the Mac (not cheap); or a different microphone with a USB interface.

  • How to trace production order history

    Hi,
      how to trace production order history, with all information like some addtion and deletion of components in production order.
       I need the history like how we are doing ECM in master data history.
    Regards,
    S.Suresh.
    Edited by: suresh subramanian on Jul 16, 2008 7:31 AM

    Dear Suresh,
    Please refer the link,[http://help.sap.com/saphelp_46c/helpdata/en/35/ce8d378d0302cae10000009b38f9b7/frameset.htm]
    Regards,
    R.Brahmankar

  • How to block production order creation when maintenance order is generated.

    Hi All,
    Kindly share how to block production order generation when maintenance order is generated.

    Integration between PP module and PM module
    PP/PM Workcenter Integration
    There are many threads & documents available. Please do some search.

  • How can I set limitations on how many records a report can return

    I have a report on the web using Oracle Reports builder and I have the client enter in date parameters for the report that they want.
    Well with date ranges for different clients a different number of records are returned. Because of time it can take the report to return I want to limit the number of records that report can return.
    How can I go about doing that? I don't want to limit with date parameters because date won't really work for me. I need to limit on how many records can be returned. If it exceeds 10,000 records I want the client to refine the date range of schedule the report to run later. Meaning we will run that report. So I would have two check boxes if the count was over 10,000 do you want to define your date or schedule the job to run later.
    Can any one help me with this? How would I go about this?

    To know if the report is going to return more than 10,000 records, you first have to run the query with a 'select count(1) from ... where ...' (with the same from and where clauses as you normal query). Since this takes about the same time as runnng your report, I wonder if you really gain anything (although formatting may take some time too).
    You may simplify the select count(1) query by omitting all the lookup tables that are only needed for formatting. That way your query may run a lot faster. You can put this in your after parameter form trigger.

  • How to record a phone call in my iphone?

    how to record a phone call in my iphone?

    That's not a feature of the iPhone. You would have to route your calls through a 3rd party service to do so.

  • CAN YOU PLEASE TELL ME HOW TO RECORD AN ACTION IN PSE 7?  I WANT TO DO SAME ACTION ON WHOLE BATCH.

    COULD YOU PLEASE EXPLAIN  HOW TO RECORD AN ACTION IN PSE 7?  I AM WANTING TO PUT MY BUSINESS NAME ON ALL MY PHOTOS & WANT TO DO IT @ THE SAME TIME INSTEAD OF INDIVIDUALLY.  I KNOW IT WILL SAVE A LOT OF TIME.  THANKS SO MUCH!!

    Check this out:
    http://www.easysector.com/index.php

  • How to Changing Productive Client in an ABAP+Java System?

    How to Changing Productive Client in an ABAP+Java System?

    1. Log on to the ABAP system.
    2. Call transaction SPRO.
    3. Go to SAP Solution Manager Implementation Guide -->
    SAP Solution Manager --> Basic Settings --> SAP Solution Manager
    System --> General Settings --> Client Copy
    4. Perform the following steps:
    a) Maintain Profile Parameters
    b) Create Client
    c) Copy Client 000
    d) Convert UME

  • How to record from the video in or S-video Ports on Qosmio G40?

    Can anyone tell me how to record from the video in or S-video ports, because i've tried the Ulead DVD factory program and the only capture device it could see was the webcam, and it did capture from it
    After that i've downloaded the update file that was provided by the support website
    The devices that the program could see are the TV tuner and the webcam (which it couldn't access anymore for some reason)
    After that i've downloaded a newer update which simply is the same as the last update and seems that someone in the support website directed the link of the new update which they don't have to the file of the previous update which doesn't really do anything.

    Hi
    There are 2 s-video ports; s-video out port is not designed to capture the signals from any external source. The name of this port says everything; its an OUT port!
    The s-video-in port must be placed at the right side of the notebook. Dont mix the both ports. But note; this port receives only the video signals. To hear the sounds, use a video cable to connect the sound terminals of the audio device and your computer.
    Red: sound right channel
    White: sound left channel
    The Ulead DVD Movie factory can be used to capture this signal.

  • How to record a simple sidebar video as in Adobe Presenter 7

    In Adobe Presenter 9, how to record a video with my webcam to put as a sidebar video for one slide ?
    In Presenter 7 we could do that easily.  Now with the new video editer we can make great videos and capture the screen.  But that's not what need...
    How to do a simple sidebar video without capturing the screen...
    Look at the point 4 on this website: http://help.adobe.com/en_US/Presenter/7.0/WS56318F3C-65A7-477b-8CAA-2CBF0902BA5B.html
    3-...Capture video...
    4-...then select... ...sidebar video to record video for the Presenter image area.
    It was easy in Presenter 7 !!!!!!!!!!!
    Thanks

    When you use the video recording feature in Presenter 8+, it does record a stand alone WMV of your webcam. While the workflow isn't as clean as before, it can be inserted back in just as a sidebar video, without the background screen capture. Here is how you can do it:
    Use the Presenter Video Creator to record your video. Disregard that your screen is being captured, you won't use it.
    After you record your video, Save your project. Don't publish it, as the published output is useless to you.
    Back in Presenter, choose to Insert Video.
    Browse to your webcam capture (My Documents > My Adobe Presenter Video Projects > {What ever you named the capture} > mt). Should be named something like presenter_video1.wmv
    Presenter will convert it to FLV, you can select the quality and location, slide or sidebar, as in previous versions of Presenter.
    If desired, you can use a 3rd part video conversion tool to convert the WMV video, but that may not be necessary.

Maybe you are looking for

  • Cannot able to assign Operation number for Order for Change cost assignment in Travel

    All dear Gurus, During the creation of travel request in NWBC suppose if an employee opted to change cost assignment. And he selected order from Accounting Object and given an order. He is not able to select it because he is getting an error when he

  • More Faulty documentsfound than the tolerated 0000000000

    Hi All, When I am filling SD Billing Setup Table in Tcode OLI9BW Iam getting below error More Faulty documentsfound than the tolerated 0000000000 Message no:M2222 I have gone though the threads present in SDN and found how to loade the data by ignori

  • Save As Draft  for UDO

    Hai ...    I have using SAP Business One 2005 . PL-39.  I Need to Create the Document Draft for UDO Screen. Is it able to Create ??? How to Use the     Save As Draft Menu( File->Save as Draft)  for our UDO Screen. ??? Thanks & Regards       Madhu ..

  • Can anyone explain this query.?

    Can anyone explain this query.? select nvl(s.p_id,q.p_id),nvl(s.p_type,q.p_type),nvl(s.p_line,q.p_line), nvl(s.sales2004,0),nvl(s.sales2005,0),nvl(q.quota2004,0),nvl(q.quota2005,0) from sales s full outer join quota q on(s.p_id = q.p_id and s.p_type=

  • Question concerning java...

    Java applets will not work on my adminstrator account. I read on another post to try and see if java works when I create another account - it does. My question is how do I get java to work on my original account? Any help would be greatly appreciated