How to release project for CHARM?

Hi Experts,
I am very new to solman and stuff. I am configuring the CHARM process for first time. So far, I have got the TMS and other domain controller related activities done from Basis. In addtion, I have also maintained systems in the transaction SCC4 with appropriate roles (Dev having Customizing Role & PRD being the Test). I also activated the integration with Change Management in SPRO.
Later, in SOLAR_PROJECT_ADMIN I created a project of type maintenance. Added systems in the system landscape tab using the logical componenets. As I have only Two BW systems i.e. Dev & PRD, I set Dev. System = BW DEV, Test Syster = BW DEV again & Production Syster = BW PRD system. In the IMG Projects tab, I added the project and it's in GREEN state as of now.
Now, in the Change Managment Tab, I checked the check-box - Activate Change Req. Management. Upon this I received a popup saying: Warning: Problems occurred during syunchronization of the system landscape.
However, I still went ahead with the configuration and clicked on Create Task List. At this point, I am getting following message:
Project is not released, hence cycle  can not be created.
As I said, I have no expertiese in Solman so I am kinda lost here. I need smoeone to tell me if whatever configurations I have done so far are correct or something is missing? And How should I release the project so that I can create the task list.
Please help,
Ameya

While activation you have recieved errors
so goto log button next charms activation or task list tab and see for the errors occured remove it and press the refresh again
if there are no errors then only you can create task list
more info as you are new read this
First steps to work with Change Request Management scenario in SAP Solution Manager 7.0
and
http://wiki.sdn.sap.com/wiki/display/SM/ChangeRequestManagement
hope above helps
regards
prakhar

Similar Messages

  • Premiere Elements 9 - Releasing Project for Burning DVD

    Disc burning interrupted at 99%. Problem:\Vobulator\BlockPlanner.ccp,Zeile215. How can I solve this problem?

    Thank you very, very much for your help. Stop marker removed - problem
    solved!!!
    Before crying out for help I had several (failed) runs sorting out
    various probable "suspects" but never even thought of that harmless
    looking little red mark.
    By the way, it's PREL 11 I'm working with(I was wrong) but when it comes
    to problems the version seems to make no difference.
    Am 13.11.2013 23:01, schrieb A.T. Romano:
    >
          Re: Premiere Elements 9 - Releasing Project for Burning DVD
    created by A.T. Romano <http://forums.adobe.com/people/A.T.+Romano> in
    /Premiere Elements/ - View the full discussion
    <http://forums.adobe.com/message/5839967#5839967

  • How to release lock for TP?

    Hi,
    can any one pls tell me how to release lock for TP

    Hey Raja
    Can you be more specific of what is TP?
    Btw, there is a transaction called SM12 where we can lock unlock entries of table or transactions. Check if that can help.
    Kind Regards
    Eswar

  • How to decide the number of project for CHARM?

    We want to use only one project for all normal change requests(CR).
    But some CRs are very quickly moved into the PRD while some others are slower.
    Should we create 2 projects : one for fast moving corrections and another for slower ones?
    Above is for normal corrections only. The shortcoming of above plan is that it hard to know the CR is going to be fast or not.
    U r gent correction:  We have a dedicated project for u r gent corrections which are usually moving very fast.
    Could you tell us your practice on this?
    Thanks and regards.

    Dear Sneha:
    So roughly speaking, 3 projects are needed for CHARM:
    one for fast moving normal corrections
    one for slow moving normal corrections
    one for u r gent corrections
    Would you please confirm?
    Thanks!

  • How to configure TMS for ChaRM with Customizing routes?

    Hi Experts,
    We have succesfully configured three system landscape TMS for ChaRM for several pipelines already. Now we are facing a situation where TMS is as follows:
    DEV to QAS contains routes:
    Customizing: ZEBP => 100
    Transport: ZDEV => 100
    Customizing: ZSUS => 200
    Transport: SAP => 100
    The question with these is how to add ZEBP and ZSUS to ChaRM configuration?
    QAS to PRD:
    Delivery: 200 => 200
    Delivery: 100 => 100
    Here the question is how to enable transports between 200s alongside 100?
    When looking at SMSY in SolMan, SUS is a logical system only.
    Has anyone of you come across a situation like this? I'm glad for any hints you may give me!
    Our SolMan is 4.0 SP13.
    Best Regards,
    Auli

    Hi
    in my opinion you can configure it the following way:
    Customizing: ZEBP => 100
    Transport: ZEBP => 100 (not ZDEV)
    Customizing: ZSUS => 200
    Transport: SAP => 100
    Then assign ZEBP as default transport layer for client 100 and ZSUS for client 200.
    It is not possible to configure ZEBP and ZDEV for client 100 if you want to use charm
    regards, Andy

  • How to finish project for uploading

    I edited a video in the project area, then clicked finalize and now when I try to upload to blogger or youtube it says an error has occured.
    wht did I do wrong?
    Is there somethingelse  I need to do to the clip to get it ready to share?
    thanks

    Finalizing a movie is not a step that you "must do". It is a convenience that renders the movie in all available sizes all at once, so when you go to save it to YouTube or iTunes later, it happens much quicker. If you don't need all sizes, you can just go to the Share menu and Share in the size you need.
    When you Share to Youtube, you can get errors in two ways.
    1) There was a problem with rendering. This should not happen if you finalized and waited until it finished (could be an hour or more)
    2) There is a problem connecting to YouTube. This is usually caused by using the wrong User ID and Password for YouTube. A couple of years ago, YouTube changed the way you log in. You now usually have to use your GMail email address and password to log in to YouTube.
    To see if your movie finalized correctly, try SHARE/TO iTUNES in a size you like. Then see if you see your movie in iTunes and can play it. If so, you know it rendered (finalized) OK. And it is more likely that #2 above is your issue.  However, if you get an error message when sharing to iTunes, it may indicate a different problem.
    There is a more fiddly way to determine if you previous "Finalize" completed correctly. Do this only if you are comfortable navigating through a Mac's file system, because you run a risk of harming your Project if you don't do it right...
    You can go to your Project in the Finder. Go to Movies/iMovie Projects/<your project name>. Right-click on the Project Name. Select Show Package Contents. Go to the Movies folder within the package. There you should see your finalized movies. Pick one and tap the space bar. It should start playing. That tells you that the Finalization worked correctly. 
    If you tried the Share to iTunes suggesstion above, it would have found this copy in the Project Package and copied it to iTunes, so it should have been very quick to get to iTunes.
    You could copy one of these movies in the size you want and paste it on your desktop. Then try to upload through the YouTube website.

  • How to input Projects for Input Tax in AP Invoice

    Hi Experts,
    I am trying to maintain a Balance Sheet wherein for each account I have to state the corresponding Project Code. When creating an AP Invoice, the Input Tax Account does not automatically carries the Project Code with it. I already encode the Project Code in Row details as well as in Accounting Tab of the AP Invoice. Still, the automatic tax code does not show the Project Code in the Journal Entry Preview.
    Can you help me with this?
    Thanks in advance.
    Arlene

    hi
    check bellow query
    SELECT T1.[AcctName],(sum(T0.[Debit])-sum(T0.[Credit])) "Cumulative Balances",T0.[Project] FROM JDT1 T0  INNER JOIN OACT T1 ON T0.Account = T1.AcctCode WHERE T1.[AcctName] =[%0] AND T0.[refdate] >= [%1]  AND T0.[refdate] <= [%2] GROUP BY T0.[Project],T1.[AcctName]
    the above query output balance is not  assigned any project then open GL Account and update it

  • Project Plan for ChaRM implementation help

    Hi everybody,
    I am creating a Project Plan to implement ChaRM in a new project.
    This is the first time i am doing that task and i must deliver that plan to a team soon.
    So i would like to ask you about comments, idea, missing items on my current plan please
    (I voluntarily did not mention Estimated Duration, team to perform, requestor, etc..)
    Pre-Check :
    - Validate System Component and SP Level
    - Request Ids & roles on satellite systems / Build USER IDs & roles created on all satellite
    - Verify TMS settings for ChaRm
    - RFC Connection creation / RFC TEST
    - Activation of cross system Object Locking - CSOL
    Project :
    - Determin type of project for ChaRm (implementation / Maintenance)
    - Create project
    - Activate project for ChaRm
    - Activate project for task lists
    - Id's created in SolMan & satellite
    - Establish Business Partners
    - Approvals (Change Control process)
    - Test creation of Change Request
    - Test :Import transports between dev - QA  / QA to prod
    Thank you in advance
    and thx for all the things i understood with all the topics of this forum.

    Hi,
    Follow RUN SAP Roadmap for Implementing your solutions. Go through [this link.|https://websmp109.sap-ag.de/runsap] This explains Run SAP and how you can plan to implement your SAP solutions (including ChaRM).
    Run SAP has 5 phases.
    Assessment and Scoping
    Define Operations
    Setup Operations
    Handover into Production
    Operations and Optimization
    Hope this solves your problem.
    Feel free to revert back.
    -=-Ragu

  • How to configure evaluations at level task only for released projects?

    Hi,
    Does anyone know how to configure evaluations at level task only for released projects?
    What we need is that the evaluation will be executed only when project has released status. Is that possible?
    Thanks a lot,
    CAMILO URIBE

    Hi CAMILO,
    After the notes 1422722 & 1465106 is a service method  available, which allow the customer to dis-able the evaluation.
    CL_EVE_EXTRACT_FACTORY        SET_ACTIVE
    You can put a codes in some BADI method, which is called during save. Within the Badi-Implementation, call the SET_ACTIVE method, so that the evaluation not be tiggered (until the project get released.)
    KInd regards,
    Zhenbo

  • System Status of newly added project objects for a RELEASED Project.

    Hi Experts
    During the course of execution of project, we may need to add new activities.
    However, as the project is released, the newly added activtity or project object attains REL status.
    How to ensure CRTD status for the newly created object so that can ensure subsequent release by Higher Authority.
    I think user status may be useful here but i do not know how to set. Please suggest feasible solution.
    Warm regards
    ramSiva

    Release status is PS pass on for PS  Objects. So,  Create two no. of Level one  WBS Element in your PS Structure. One for which you want release that structure you create under that WBS  and Second WBS don't Release and use the same leg for your created status structuring.
    And do not Release Project Definition, Let it be max. PREL only, Till your structuring process is over.
    I think User status cannot help you in this  case.  ( Because user status reside between the System Status )
    With Regards
    Nitin P.

  • Unable to prepare project for publishing The project could not be prepared for publishing because an error occurred. (Error in user parameter list) How do I fix this???

    Unable to prepare project for publishing
    The project could not be prepared for publishing because an error occurred. (Error in user parameter list)
    How do I fix this???
    I have downloaded my family movies captured on Hi8 video through a Dazzle hollywood DV-bridge to the iMac. Everything went well until I tried to finalize the project.

    I'm having the same problem. 
    When I export (and I want HD quality) I get the error message that
    Unable to prepare project for publishing The project could not be prepared for publishing because an error occurred. (Error in user parameter list)
    How do I free up more space on my startup disk?  My hard drive has 158.61 GB free.  Do I need to free up more space?

  • How to setup a release strategy for store generated purchase order

    Hi there,
    Does anybody know how to setup a release strategy for store/plant generated purchase order? I have a request from our client, but I never cross this before. Please help and let me know the step with every single detail.
    Greatly thank for your help.
    Kind Regards,
    2tea

    Please go thru the below Release Procedure and check whether you have maintained all the settings properly.
    PO RELEASE STRATEGY
    The release code is a two-character ID allowing a person to release (clear, or approve) a requisition or an external purchasing document. The release codes is basically controlled via a system of authorizations (authorization object M_EINK_FRG).
    Use SE12, structure CEKKO to check all the fields available for controlling the Purchase Order.
    e.g. If the total value for the Purchase Order exceeds 10,000, release strategy 01 is assigned to the Purchase Order. There is only one characteristic created in this example. For controlling the Purchase Order type, create characteristic for CEKKO-BSTYP and the value NB.
    CT04 - Create Characteristic e.g. NETVALUE
    Click Additional data Table name CEKKO Field name GNETW and press enter
    (for currency dependent field, you are prompt to enter the currency which the system then converts the currency of the Purchasing document into this currency)
    In the Basic data (X refers to tick),
    X Mutliple values
    X Interval values
    In the Value data, in the Char. value column, type >10000 and press enter
    Save your data
    CL02 - Class
    Class - Create REL_PUR
    Class type - 032
    Click Create
    Description - Release Procedure for Purchase Order
    In the Same Classification section, click Check with error
    In the Char. (characteristic) tab, type NETVALUE to assign your characteristics to the class
    OMGS - Define Release Procedure for Purchase Order Type
    Release Group - New entries
    Rel.group Rel. Object Class Description
    02 REL_PUR Rel. Strategy for PO
    Release codes - New entries
    Grp Code
    02 01
    Release indicators
    Release indicators Release Description
    0 Blocked
    1 X Release
    Release Strategy
    Release group 02
    Rel.strategy 01
    Release codes 01
    Release status 01
    Classification Choose your check values
    OMGSCK - Check Release Strategies
    (make sure there are no error messages)
    Once the Purchase Order is not release, buyers will not be able to print the Purchase Order.
    Goods Receipts will be shown with Message no. ME 390 - Purchasing document XXXXXXX not yet released.
    In 4.6c, Purchase Order with Release Strategy have a tabs at the end of the Header. This allowed the buyers to check the release status of the Purchase Order.
    The person with the release authorization have to use ME28 to release the Purchase Order.
    Regards,
    Ashok

  • How to configure release procedure for rate contracts release

    Dear all,
    How to configure release procedure for rate  contract following are the requirements
    they are two release codes c1 & c2 <=100000,>=100000
                    if  c1 is not there c2 has to be approved
         Change in the value of the rate contract contract
         Change in the validity of the rate contract
         Addition of deletion of line items
    While using a non u2013 released rate contract in the PO an error message should shoot out.
    Also the logic should be changed while using the rate contract in the PO.
    The usage of the rate contract should be till the validity of the rate contract. i.e. the measurement should be end date of the rate contract and the PO creation date and not the delivery date of the PO. &
    It should be possible to refer existing valid rate contracts in purchase orders.
    Regards,
    bhaskar

    Hi,
    In SAP rate contract is known as value contract denoted with wk. The release procedure for rate contract is same as that of other contracts and scheduling agreements. The tables  for contracts will vary with SA (Scheduling agreement) .You may try and maintain condition records based on the customer combination and maintian the validity date of condition records as per your requirement.For contract and PO will have the same header/item table as EKKO/EKPO, and the release
    class in standard is the same FRG_EKKO, you can use the same for contract.
    To distinguish if it's a contract or PO, EKKO-BSART can be used.
    For contract EKKO-BSART will be MK or WK, while PO will have NB/UB etc..
    You can restrict the document type to set up the release strategy for only contract.
    Of cause, you can also create your own release class Z* for contract copying standard
    one FRG_EKKO via CL01/Class type 032, and then assign the class Z* to customizing:
    OLME:
    -> contract
    ->Release Procedure for Contracts
    ->Define Release Procedure for Contracts
    ->Release Groups
    If you have already created the PO release class.
    Assign a new chracteristic of Document Category -BSTYP
    Please check below link for detailed release procedure. I hope this wil help you out .Thanking you.
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/RELEASE+PROCEDURE#RELEASEPROCEDURE-TABLESUSEDFORRELEASEPROCEDURES

  • How to install downloaded Oracle Forms Developer/Services 6i Release 2 for linux

    Hi folks,
    I downloaded d2k6irelease2.tar (Oracle Forms Developer/Services 6i Release
    2 for linux) from
    http://otn.oracle.com/software/products/forms/htdocs/linuxsoft.html
    I untar the file on my linux machine however the extracted files don't
    seem to contain any installing program. I didn't find products.jar in the
    files and there are no script to install the software. I read the attached
    doc, however it only assumes that the installation is from CD-ROM. The doc
    doesn't help anything for this downloaded software. I wonder if anyone
    here know how to install it. Thank you so much.
    Best regards,
    Kai Huang

    There should be a text based installer in the /orainst sub-
    directory
    In that directory, just run the script:
    ./orainst
    The installer seems to require libXm.a, which wasn't included in
    my RH 7.1 installation, so I had to install the motif-
    development libraries before the full install would complete
    successfully.

  • How to call external jar files in EJB project for CE

    Hi,
    I would be thankful if someone could help me with this -
    I need to call the external jar files into my EJB project - Here is what I have done and am getting runtime exception as  -
    java.lang.RuntimeException: java.lang.NoClassDefFoundError: com/glance/pdf/pt/PTDoc
    1. Created a EJB  project" HelloWorld "  using Java perspective in NWDS 7.1 called with client as HelloWorldClient and EAR project as HelloWorldEAR.
    2. Am working on HelloWorld project (1st one).
    3. In my code I am instantiating a class which is a class in one of  the external jar file that I need to refer in my project.
    4. I have set the Java Build path but it works only for the compile time and fails during runtime.
    5. Have read I need to create external library DC and refer in my project "HelloWorld".
    Can anyone help me with exact steps what needs to be done - during creation of external library project and then for my "HelloWorld" EJB project. How would I be able to reference or set the external library project in my EJB project?
    Looking forward to hear from experts.
    Thanks,
    Shiv
    Edited by: Shiv Khullar on Aug 30, 2010 9:39 PM

    Hi Edson,
    I tried it , but it still gives me runtime exception.
    javax.ejb.EJBException: nested exception is: java.lang.RuntimeException: java.lang.NoClassDefFoundError: com/glance/pdf/pt/PTDoc
    java.lang.RuntimeException: java.lang.NoClassDefFoundError: com/glance/pdf/pt/PTDoc
    Steps I performed are -
    1. Created a library project and created 2 Public parts "Compilation" and "Assembly"
    2. Build the library project.
    Now in my EJB project using Project Explorer - set the classpath and added both compilation jar and assembly jar files.
    This is how the classpath entries for external library looks like -
    <classpathentry kind="lib" path="/LocalDevelopmentLocalDevelopmentexternallibrarypdftoolsforwatermarkingdemo.sap.com/gen/default/public/WatermarkAssembly/lib/java/demo.sap.comexternallibrarypdftoolsforwatermarking~WatermarkAssembly.jar"/>
         <classpathentry kind="lib" path="/LocalDevelopmentLocalDevelopmentexternallibrarypdftoolsforwatermarkingdemo.sap.com/gen/default/public/WatermarkCompilation/lib/java/demo.sap.comexternallibrarypdftoolsforwatermarking~WatermarkCompilation.jar"/>
    I have also added the jar files I used in my external library project as "User Library" from Java Build Path . I dont do it , then the code fails during compilation itself.
    Regards,
    Shiv

Maybe you are looking for

  • How do I uninstall programs from my MacBook Pro?

    I am new to Mac and don't fully understand how to uninstall a program from my Macbook Pro. I've been having some problems with the Sims 3 (Probably some custom content that was bad) and I want to completely uninstall The Sims 3 from my laptop. How do

  • Discoverer Viewer problem

    Dears , When I am trying to edit a worksheet , it is unable to edit it because the folder that this sheet use appears as active but you can't expand its items and if you choose to select the all folder items then the error "Model manipulation via sta

  • How to Hide f:subview using javaScript

    Hi In our application i have to hide and show the subview using javascript is it possible i tried like this.. but its not working <f:subview id="viewid" > // view contents </f:subview> In java script document.getElementById("viewid").style.visibility

  • Adobe Flash 10

    Hi, I have downloaded a video onto my web site & want to remove it. It's a flash video. How in the heck do I get rid of it? Thanks Karen

  • How can I make the popup with empty fileds and create new record?

    I would like to use a popup to create new record. I created a af:popup by drag and drop a VO from data control to jsff. then, I created a button and place a af:showPopupBehavior. I was able to popup window by click the button. however, the window fil