How to replace a clip in timeline whilst maintaining in/out points

Hi
I've been working on editing some interview footage in FCPX. I have a bunch of clips put together in the timeline. Now I wanted to do some editing to the audio, which I did in Audacity. I re-imported the fixed audio and synced it with the original video clip. Now I want to replace the old clip in the timeline with the new clip with fixed audio. The problem is that when I do a replace, it inserts the whole of the new clip. Can I get it to match my existing in/out points?
Yes I'm new to this.
Thanks very much

Thanks Tom. I actually figured a way to do what I wanted. In the timeline I right clicked the clip I wanted to replace, choose open in timeline, then you can just drag and replace the entire clip but it keeps the in/outs. I was sure you could do it somewhere!

Similar Messages

  • Cannot delete clips in timeline using in and out points

    Can't delete or trim clips clips in the timeline when I use the in and out points. Can't figure out this flaw. Its as if final cut does not recognize the ine in and out points. I 've been using the razor to make edits, but when a come across a flash frames and need in and out points to delete the flashframe, I'm in trouble.
    Thanks

    Hi -
    You are missing a step.
    Set the in and out points on the section you want to delete:
    Then type Option-A to select the area within the In and Out Point:
    Then press the small delete key or Shift+ Regular Delete Key and it will delete the section you've designated with an In and Out and pull up the rest of the edit:
    MtD

  • How to replace a clip that is part of a multicam clip in FCPX 10.0.9

    I am having an issue with a project drifting out of sync in FCPX 10.0.9.  In the time line everything is in sync, however when I export a master .mov file the video drifts out of sync.  I believe this is because my main audio is an mp3 file.
    MY plan is to convert my mp3 audio to an AIFF file and replace it with the mp3 in my project.  The only problem is that this audio file was imported as part of an hour long musical performance and I took the part I needed  and made it a sub clip.  I then took the sub clip and made that part of a multicam clip.
    Is there anyway to replace this MP3 sub clip with my new AIFF file in the multicam clip?
    Any help is greatly appreciated.

    jfriedman93n3h wrote:
    … I took the part I needed  and made it a sub clip.  I then took the sub clip and made that part of a multicam clip.
    never good practice to 'bundle' clips, sticking compounds into compounds... and in very rare cases needed/could be done 'better' using the tools 'n features FCPX offer....
    Why not simply adding the new audio to your project timeline and synch it?
    http://help.apple.com/finalcutpro/mac/10.1/?lang=en#verc1fabc30
    When done, erase the track in your MC ...

  • How do I lock clips to timeline?

    Hey everybody. I am a new 4 user and am not used to the way that it 'thinks' so much and am not enjoying the self adjusting that it does to your timeline when you make any adjustments to clips or pictures earlier in the time line.
    Ex1: Want to swap out a picture used in beggining of timeline - result: cuts soundtrack, and moves all pic/videos over to fill in gap by it self
    Ex2: Want to shorten a clip, all other clips move over to adjust.
    When I shorten a clip, I want it to stay put on the timeline (not adjust others so that there is not a gap).
    Can you guys suggest a best process to do this? I might still be caught up in old school, but anything would be helpful.
    Thanks

    Brian,
    I agree that there *should* be a lock for all Tracks, like in Premiere Pro. I have seen what you describe and it is not fun. A "feature request" would be good for this. Do not know if PE7 has added Lock Tracks.
    For multi-camera editing, you might want to look at Pro. It handles multi-camera quite well. There are not THAT many reasons to spend the extra $ to go to Pro, but this is one. From time to time, Adobe offers some sweet deals with upgrades from Elements to the Pro versions of the programs in the suites: Premiere, Photoshop. Some folk have gotten the CSx upgrades are wonderful prices from the Elements versions. Do not know of any "special offers" right now, but wouldn't hurt to check out the Adobe Store and see what's shaking, especially with PE7 being released, and CS4 coming real soon. Deals might abound. If I found one, I might even be tempted to upgrade from PE4 to get another additional license for CSx.
    Hunt

  • How to cut the clips in Timeline ?

    I have placed a clip into the Timeline. I have keyframed on the 2nd last frame instead of the last frame.
    So, I double-click the clip on the timeline & placed the playhead on the 2nd last frame on the clip (in the timeline). Then I use the blade tool. I wanted to cut away the clip at the 2nd last frame.
    When I placed the blade onto the playhead & click, the clip doesn't seem to be cut. Instead, vertical lines appear on the clip (placed on the timeline) instead.
    Any tips on cutting clips using the blade tool ?
    Thanks

    skalicki` wrote:
    I still don't know about these vertical lines that are appearing, but try this process:
    1. Select the clip in the timeline.
    2. Place a marker on the selected clip's second-to-last frame using the "M" key.
    3. Zoom way in on the clip in the timeline using the zoom slider in the lower left.
    4. Select the ripple tool from the tool palette (rr)
    5. Drag the right side of the clip until it snaps to the marker.
    P.S. the blade tool is used in the timeline, not the viewer. You could start after step 3 and use the blade tool instead of the ripple tool to make the cut on the marker if you wanted.
    Message was edited by: skalicki`
    Thanks David & Skalicki.
    Yes my mistake was to open it in the viewer.
    I have figured out what the vertical lines are. It was because I keep on clicking the blade tool. The vertical lines are fragments of the clips that I cut. I expand the timeline, select the fragmented clips then do a delete and it is gone !!
    Problem solved.
    Thank you.

  • Replace a clip preserving filters

    In FCP 7.03 , how to replace a clip preserving filters already applied?
    I know how to do it if I didn't import the files yet ( using reconnect media). But how to do it from clip what I already have
    in my project?

    "Or you can select the new clip and hit command-c (copy) and then select the clip in the timeline and hit option-v and choose content."
    Perfect!! Thx very much!!

  • Copy In to Out points in timeline?

    If i'm in the timeline and have in and out points set over a portion of a clip how can i copy the portion between the in to out points to paste else where like you can in fcp?
    Thanks

    Curious (and also wondering if CS3 is different from CS4):
    I was very confused until I realized that Patrick must be referring to Sequence in/out points.
    Patrick, why are you using Sequence in/out points? I'm not suggesting you shouldn't, just curious. Help files address these as relevant to 3 and 4 point edits, or doing lift/extract operations. I couldn't understand why you weren't simply copying and pasting the clip, since a clip with in/out points will paste just as is (i.e. Jim's method).
    > Set your in/out points on the clip in the timeline
    Jeff, can you put clip in/out point while it is in the timeline (other than dragging the end)? And if you drag the clip, then all you need to do is copy/paste.
    Harm, there's no short cut to setting the in and out points your way, is there?
    Another option:
    Select the clip in the timeline
    Go to Sequence in marker.
    Add a clip marker
    Go to Sequence out marker.
    Add a clip marker
    Double click clip (opens in Source Monitor)
    go to markers and set in/out points on clip
    Move CTI to new clip location
    Add clip to timeline

  • Sequence plays right on canvas but exports clips at wrong in/out points!

    This is driving me nuts.
    I've made a 90 second sequence the way I always have: previewing the clip in the viewer, setting in/out points, then dragging it down to the time line. It plays perfectly when I watch it from the time line/canvas but when I export to QT the clips are all wrong (sometimes a whole second off)! The cuts all happen in the right places in regards to matching the music, but the clips inside the cuts have become skewed one way or another.
    I hope that made sense.
    I'm working with files from a 7D, it's my first time messing with HDSLR stuff.
    Any help would be appreciated.

    I couldn't figure out MPEG Steamclip (it was a little late haha), so I imported into iMovie as a HDV 720p project and then pulled the converted files from inside the project. It came into FCE fine with no rendering needed so I figured it was fine until I watched the sequence after it was exported to QT.
    Sequence is good in FCE "canvas" but all wrong in the exported QT movie. I don't understand how it would get screwed up between the perfect preview and the final output.
    Another note... the thumbnails in the time line are wrong in regards to the canvas. What the canvas shows as the first frame of a clip is not the first frame on the time line clips thumbnail. The thumbnail is the actual first frame that is exported to the final QT file though. I'm bewildered.

  • Cuts, timelines and in / out points

    Can insertion points be specified digitaly rather then by mouse movements?

    I belive that The TC Capture is only effecting importing assests.
    Not true.
    TC is used to identify the precise time you are at within a clip or a timeline.
    It can be typed in to the TC windows to locate an exact frame in clip or timeline
    I think you should stick with the mouse mean time.
    Expand your timelines and source monitor up so that you can work more minutely within frames. (Use the Bars in the Monitors or the timeline)
    Work in the source monitor with your source clip.
    Mark the in and out points with the icons or the shortcuts keys I gave you.
    Drag them to the timeline (or use the shortcut keys for Insert /overlay)
    Note.  You do one at a time. ie mark in and out on the source clip then send to timeline...do the next one the same way... etc...
    Doesnt matter what order you do them because you can Insert or overlay
    Suggest you spend sometime with the pdf CS5 Manual as well.

  • How I can to replace a clip in the timeline?

    Is there a command for to replace a clip in the timeline? In a recent project I have replaced some clips to hand, deleting the previous and draging the one new in the gap, but this method is dangerous because it is possible moving the edit also.

    You could drag the new clip to a track above the one you want to replace. This gives you a bit more security before deleting the old one.

  • How do I move clips in one pane of iMove (10.0.3) into the timeline?  iMovie somehow doesn't realize I'm trying to edit the clips.

    How do I move clips in one pane of iMove (10.0.3) into the timeline?  iMovie somehow doesn't realize I'm trying to edit the clips.

    Try this:
    Select a small portion of the clip in the event (Above the timeline)
    Click and hold and drag that section into the timeline, it should snap into place but if you drag it above another clip, it will not replace it but will be placed on top and the sound from the other clip will still play. Also this will allow you to use Blue/Green screen modes as well as picture in picture.
    The best way is to drag it to the far right

  • How to delete the transparent frames that Pluraleyes adds to replaced audio clips in an event ?

    Hi there,
    I have a workflow issue working with Pluraleyes 3 and FCPX.
    MY CONTEXT
    So I imported all my clips into FCPX (about 300 from camera 1, about 300 from camera 2 and separate audio which ran almost with only very few interruptions on set).
    I synced everything with PE which gives me back the following :
    1. a new Event with replaced audio clips.
    2. a new Event with one giant multicam clip.
    3. a new project completely synced BUT with the non-replaced audio clips
    MY PROBLEMS
    1. Problem is that the clips have additional transparent frames before and after their actual video (i.e. PE makes new clips from video and longer bits of audio that do not begin/end at the same time).
    2. The giant multicam clip has plenty of chunks where audio was recorded but where no video was.
    MY QUESTIONS
    PE has created plenty of useless clip lengths. How can I get rid of them with some batch process ?
    OR if I say that another way
    How can I create an EVENT that contains clips with the exact same length as the originals, only with the corresponding audio replaced ? (Please remind that I have LOTS of clips)
    Moreover, the clips within the new events created by PE have (not surprisingly) lost all keywords I gave to the clips before syncing with PE. Is there any way to fix this ?
    Thank you so much because it feels like PE's job is kinda useless  :-/

    It's the Shift key. It's not a button. It's shifts from lower case to upper case when typing. It's been called the Shift key since the 19th century.

  • How do I simply replace a clip in this situation...

    I have a video clip in my timeline that has been trimed at head and tail. It has a couple of pieces of audio attached to it. I want to replace it with a newer version of the clip witout disrupting my timeline. None of the Replace options put it in the same place, at the same length, with the same in and out points:
    • Replace - Starts new clip at 0:00 and makes it longer, pushing down the timeline.
    • Replace from Start - Starts new clip at 0:00 rather than the inpoint of the clip being replaced
    • Replace from End - Lines up last frame of new clip with the edit rather than the last frame of the clip being replaced.
    • Replace and add to Audition does a combination of the above.
    So I wrote down the in point, used Replace From Start, then tried to shift the clip to the right place with the Trim tool. But this now shifts the audio clips along with it, so they must be shifted back.
    What am I missing? There must be a better way to do this.
    tracy

    Tracy E wrote:
    Thanks for your patience Tom. It is confusing to explain in words.
    I dare to say, I understand what you try to accomplish, and where your problem is:
    you have a clip in your Project.
    in the Project, it is not the whole 'raw' clip from the Event, just a selection.
    the selection is 60sec ahead of the beginning in the Event.
    you now have a 2nd clip, which has the same length in the Event lib as clip#1
    what you want is, that FCPX does the same selection in the Event as in clip#1 and replace the content of #1 by #2.
    savy?
    all YOU have to do, is simply select manually an IN-point in the Event/clip#2 and then follow advice given before (drag onto #1/replace)
    the OUT-point will be calculated by FCPX (3point edit)
    beat by the minute, too late ... the Master was faster!

  • I have recently had my hard drive replaced due to a fault whilst in Germany working. Happy with the replacement, however when i go to log on as a user that screen is in German? Any idea how to change the language?

    i have recently had my hard drive replaced due to a fault whilst in Germany working. Happy with the replacement, however when i go to log on as a user that screen is in German? Any idea how to change the language?

    Greetings Lex,
    Kind of you to comment ... but you are also adding years to my signature!   I know I'm 76 but I don't want to think about it. 
    Regards  71.

  • Background noise removal takes about 3 seconds into each clip in timeline to kick in, so each clip has noise in the first few seconds.  How do you get this to remove noise from the very start of the clip?

    Background noise removal takes about 3 seconds into each clip in timeline to kick in, so each clip has noise in the first few seconds.  How do you get this to remove noise from the very start of the clip?

    insert a 5 second gap in the beginning of the timeline.

Maybe you are looking for

  • Pricing Condition is Duplicating on Changing the Variants in Quotation !

    Hi, I have a requirement, where the Pricing Condition (Custom Pricing Condition Specific to the Variant Pricing) is duplicating on changing the Variants in Quotation to be stopped or deleted.  I suppose, the variant pricing condition should not be ne

  • IPhoto 6 - STILL freezing on a Dual G5 with 370 images

    What is it with iPhoto?! I've paid for another upgrade after promises of finally sorting out the sluggishness. Yet, with a library of only 370 images, each not bigger than 2MB, I can STILL only scroll through half of the thumbnails before the beachba

  • Adobe PDF Form: Include text in table

    Hi, Im kinda new to Adobe Forms, and this may seem like a very basic question. I have copied a standard SAP VAT invoice adobe form and Im making changes to it. I have added an "include text" (which has multiple lines) to an already existing table wit

  • ARD sees remote computer but won't connect

    I previously used ARD 2 to connect to my Mom's Mac and all worked well. She recently had to replace her router due to a bad power supply and during that time frame I also upgraded to ARD 3. Ever since I have been unable to gain access to her computer

  • Software could not be verified, software could not be verified

    While installing the Lion, I am getting an error that the software cannot me installed as it could not be verified. Please help