How to resctrict delivery creation in fractions.

How we can prevent delivery note creation in fractions.In my case we have Sales unit is maintained in  material master is PAC and base unit of measure is EA.1 PAC is 90 EA.In the supplying plant WM is active.WM unit of issue is also PAC.So when there is not enough stock available delivery is created in fraction of PAC.user wants that the delivery should be created in whole nos of 10 EA, regardless of the stock situation.Kindly advise how to achive this.
Thanks in advance.

One Option is
Go to Tab: Sales: sales org.1 in material master where you can see a field "Delivery unit".    There you need to maintain in what multiples, order quantity should be saved.  In your case, it is 10.
Also go to OVAH, select message no.V4-081 and change it to "E". By default "W" will be there.
Let me know whether this will meet your requirement.
thanks
G. Lakshmipathi

Similar Messages

  • How planned delivery time effects delivery creation?

    Dear All,
    Some time before, while placing order thro' CRM, we came across a typical error (hard error).
    "date (11/12/2011) lies afterthe end of validity calendar". 
    we could not place order in CRM but in SAP we could create save the order despite of same error but soft. However system didn't allow to create delivery for same order & same error message populated"
    Later it was found that it is because for material  " Planned Deliv. Time  maintained for say "X "days in material master MRP2 view" & was corrected.
    How planned delivery time effects delivery creation?
    For material even though planned delivery time was maintained as say for 500 days, sales order requested delivery date & delivery date in order schedule line got determined as order date (Considering avaliability of funds & material).
    i.e order date/req. delivery date/delivery date in schedule line are same as date on which order is placed.
    Regards
    Suhas W

    Hi,
    Extended your factory calender in SCA3.
    Regards,

  • Problem related to Outbound Delivery creation via Background Job

    Hi ,
    We are using the program RVV50R10C for creating OBD incase of STO .
    Z variant is created to take care of selection parameters which inlcudes Shipping Point , Delivery creation date , Calc Rule, Delivery priority and shipping conditions.
    The job is scheduled to run for every 10 minutes .
    As planned the job is running for every 10 minutes but the OBD are created after 1 hour .
    What are possible causes of this error.?
    Please note that there exists enough stock.
    Regards
    Ramesh Ch

    I think you will have the same problem when doing it manually with VL10B.
    The creation is based on entries in an index. there is a userexit where you can influence how and when an entry goes into the index.  E.g. you can speed up the overall performance if you do not update the index all the time, instead you are doing this with a background job from time to time.
    Check if this is the case in your system.
    this note may give you some hints:
    Note 356061 - Incorrect index compilation caused by own checks

  • Outbound delivery creation with inbound IDOC transfer from Java system

    Dear Experts,
           The scenario we are having is really very interesting. Hopefully its a good learning for me and also for others also.
    The scenario is,
                   After sales order creation the details will be sent to one Non SAP system (Java) for performing some tasks related to forwarding agent decision, shipping date and etc. Once the details are finalized in that Java system then, the details needs to be transferred to SAP as "Inbound IDOC" process. For this proposed to use the SAP Jco middle ware.
                 Once the details transfered from Java system to SAP then, the outbound IDOC needs to get generated automatically. Assuming the stock for that sales order line item is available. Also one more complexity is, our client is using custom transaction (ZVl10C) for delivery creation.
    Now Query is,
                   1. Which IDOC, message type and Functional module needs to be used for creating the delivery automatically..??
                   2. As per assumption, stock of that sales order line item should be available. Due to some business reason the stock was removed during inbound IDOC transfer then, what will happen to the IDOC..?. How to avoid this situation..??
                   3. As we told we are re going to use SAP Jco b/w SAP & Java system. In this case, how the data will get transfered from Java system to SAP..?
    Thanks in advance for the replies I am going to get
    Regards,
    VEL

    Didn't get any feedback from experts for long time. So we are closing the question

  • Check amount of transition stock during inbound delivery creation

    I want to move stock between plans, therefore I have the following steps:
    1. Stock Transfer Order (STO), e.g. 500 pieces
    2. Sending plant: MIGO (GI for STO) with MT 351 to post to transition stock,  e.g. 100 pieces
    3. Receiving plant: Inbound Delivery with reference to STO VL31N
    4. process Inbound delivery in warehouse (SAP-WM)
    The question is:
    During step 3, when accessing VL31N the system proposes the full order quantity (e.g. 500 pc.)
    I can change the amount to any amount I like, e.g 240 pieces.
    How can I tell SAP, that Inbound delivery creation is only possible for the amount
    which has been posted to stock in transition (100 pieces)
    I want an error/warning message in case user wants to create Inbound delivery quantity higher than the amount that has been posted to transition stock.
    Any ideas?

    MIGO in sending Plant?
    How it is possible? MIGO means, Goods receipt. This should be in Receiving plant.
    Sending plant should do the PGI
    MIRO in receiving plant
    Billing in sending plant
    Payment from Receiving palnt and clearing in sending plant
    Correct me if i am wrong
    Thanks

  • Delivery creation based on Customer Preferred Days

    Hi,
    We are on SAP 4.7 version.
    My requirement is to have delivery create date (i.e. schedule line date) to be based on certain specific days of the week. For example one customer picks up their goods on Wednesdays only. I want all deliveries due before wednesday to be created on wednesday. These days are specific by customer. I therefore cannot set up shipping point calendars.
    How can this be achieved ?
    I tried, Unloading points -- calendar assignment in customer master. It does not help is determining the schedule line date. I only get a warning message saying "customer will accept delivery on dd/mm/yyyy".
    Any suggestions are highly appreciated.
    Regards,
    Ron

    Hi,
    You should be able to do it via route scheduling - I haven't used it myself yet, but see an extract below from SAP Help about Route Scheduling. In Route Scheduling you can specify by customer what dates and times the customer can receive a shipment. The system does backward scheduling based on the date and time that the customer can receive the shipment, and the delivery creation date should be based on the route schedule. The key is to ensure that the route schedule is used to determine the delivery creation date. Like i said, i havent done this before, but it is worth investigating.
    =================================================================================================
    Processing a Route Schedule  
    Implementation Options
    Wholesale trade customers and stores can receive goods at regular intervals. These delivery rhythms have an influence on the workload in the warehouse. To help delivery planning, the route schedule serves as a tool for planning regular, repetitive customer deliveries on a particular route. At the time of planning, potential deliveries that have not yet been created are grouped in the route schedule. When the deliveries are created, the system can automatically determine a route schedule and assign it to the delivery. All deliveries with the same route schedule and the same date can be processed together in the shipping point. All these deliveries leave the shipping point together at a particular time. They are distributed along the same geographical route.
    · Deliveries for route schedule MO10H leave the shipping on Mondays at 10:00 in the direction of Philadelphia.
    · Deliveries for route schedule MO10M leave the shipping point on Mondays at 10:00 in the direction of Boston.
    · Deliveries for route schedule MO10S leave the shipping point on Mondays at 10:00 in the direction of New York.
    You can print picking lists for all deliveries that belong to route schedules MO10H - MO10S together.
    Maintenance of the itinerary should be uniform for all the route schedules used. To ensure exact planning, maintain the itinerary for all the route schedules. If rough planning is sufficient in this case, you do not need to maintain the itinerary for a route schedule.
    If you do not define any goods accepted times in the customer master for the unloading points of the ship-to party, the system assumes that the goods acceptance is possible at any time. The system determines the delivery time from the departure time in the route schedule plus the required traveling time to the ship-to party, as set in the itinerary (specific move time). This delivery time must be within the goods acceptance time of the unloading point of the ship-to party. If not, the respective route schedule is not determined during delivery creation.
    For more information on route schedules, refer to the Implementation Guide (IMG) under Route Schedules.

  • Inbound Delivery creation in ECC6.0 through IDoc (DELVRY03.DESADV)

    Inbound Delivery creation in ECC6.0 through IDoc (DELVRY03.DESADV)
    From SCM ICH system Supplier creates ASN on the WEBUI & sends it ECC 6.0 using XI.
    This is Proxy (DespatchedDeliveryNotification) to IDOC (DELVRY03.DESAV) scenario
    But at the receiver end i.e. ECC6.0 its giving me error at Tcode WE02 as action is not supported.
    Can you suggest me how to tackle this issue.
    Thanks in Advance.
    Regards,
    N>B.Shanmukha

    hi,
    >>>giving me error at Tcode WE02 as action is not supported.
    there are many segments in delvry03 with a first field - action (like, delete, create, 001,002, etc)
    check all of them as probably you're using one which is not supported
    and this is the real cause of the error
    you can check it like this:
    open this IDOC in We19
    then open action field and F4 and see if the one you use in the idoc is in F4
    change the wrong one and it will work :for 100%
    Regards,
    Michal Krawczyk

  • Delivery creation date under shipping tab in STO

    Dear Experts,
    please explain me how the Delivery creation date is calculated IN STO order, and the same date is carried to the MRP date of Supplying plant in MD04.
    thanks
    Satya

    Please check these answered links:
    Delivery Creation date in STO
    Re: Delivery dates in STO
    STO Delivery date
    Edited by: Afshad Irani on Apr 29, 2010 10:04 AM

  • Incorrect delivery creation date in stock transport order

    Hi,
    I've checked SAP notes and forums but no answers to this one....hope you can help.
    I have 2 plants, in separate company codes.  One orders from the other using a full inter-company process.
    The issue is, when i raise a PO the delivery date (shipping tab) is updated correctly, using the agreed lead time (planned delivery days)
    However, the Delivery Creation Date is usually updated with 'todays' date.  It's as though the planned delivery days on the material master or PIR is being interpreted as a transit time between the plants.
    This has 2 undesirable effects:
    1.  The supplying plant has no notice, requirement date is NOW
    2.  Delivery creation batch jobs create deliveries which aren't really due yet
    I really need the Delivery creation date to be a true material availability date  ie the date the goods are required to be available in the supplying plant.  For us this would be 3 days (transit time between plants) before the delivery date. 
    Any help greatly appreciated.
    Regards
    Guy

    Guy,
    true lead time.
    is a bit ambiguous.  The system does exactly what you tell it to do.  'True Lead time" is not defined in SAP.  What do you mean by this term?  Are you talking about "Total replenishment lead time" in the material master?
    Anyhow, you are telling me you want the delivery creation date to be "three days prior to Delivery date".  No problem, set PDT to 3 days.  So, if you today created an STO with a delivery date of July 30, and the PDT was 3 days, the delivery creation date would be July 27.  If you also want cushion, then today convert the STPRs with a delivery date of July 30.  Don't wait until July 27 to convert these PRs.
    How are you creating STOs today?  You mentioned delivery dates being populated by the system.  How? What transaction/what program?  If your current process is to automatically convert all existing STPRs into STOs, then you probably need to consider adding some time to Purchase Req processing time.  OMEW in config.
    Rgds,
    DB49

  • Automatic Delivery creation through VMS

    Dear Automotive wizards,
    We are using the Vehicle Management system for or automotive process as a distributor and retailer.
    The sales order - delivery settings are NOT for automatic delivery creation. However, in some cases, the delivery is getting created aytomatically in the background.
    Have done some introspection in thes 'some' cases and found that they pertain to our 'used care business'. Therein we are using only standard document typesand no changes have been done in their settings. But in some of those cases whenever a sales order is created from the VMS the R3 is also creating a delivery. This delivery doenst show in the vehicle history hence has to be dug out by looking in the dpcument flow for the sales order. The order / delivery setting are NOT for automatic creation.
    Do advise how to go about resolving this unnecessary 'speed breaker' in the IS AUTO highway!
    Thanks and regards,
    Tariq

    Thanks for the pointers but I have explored that earlier and the info therein shows that the delivery was created by the same ID and at the same time when the order was created.
    In fact the user is oblivious of the situation too since he/she is working in the VMS and from there they are supposed to move on to create the order after the delivery. But this delivery gets created by itself in the R3, and you would recall that the R3 docs dont get reflect and hence do not update the VMS vehicle status. thereby the vehile status is still as "sales order created" in VMS but the R3 has as "delivery created" there being a mismatch the VMS stops further processing.
    By the above you woujld have also got to know that we dont have batch processing or anything like that, pure simple and manual creation of dlivery through the VMS.
    The strangest thing is that it happens for only some of the times, and for only some of the users. I have tried comparing he roles for access but all have the same access. Would there be any settings for storage location specific in R3 for delivery creation? or likewise?
    Thanks and regards,

  • Updating Batch Number while delivery creation from sales document

    Hi Experts,
         I have to write code inside user exit MV50AFZZ which updates batch number during delivery creation. Suppose I have a sales having more than one line items. Each line item have different material numbers, and one material number may have more than 1 batch number. And all these batch numbers have to be updated for their corresponding material numbers. Batch  number corresponds to LIPS-CHARG. So how we can maintain values for this field more than once for a particular material number?

    Hi Pankaj,
    Were you able to update the Batch Number?
    What is the function Module that you used? and where exactly did you code in the logic?
    Thanks,
    RV

  • Avoid the delivery creation in MIGO/MB1B at the time of goods movement

    Hi All
    Can anyone please help me to know, How to skip the delivery creation step in MIGO/MB1B at the time of goods movement (311) indebug mode.
    In which part of the code the delivery creation logic would be written...?
    Thanks and regrds
    Karuna

    Hi:
             It looks like to me if there is validation working in background . Please check in GGB4  there will validation active for this asset class . Low value asset check restricts you from posting an amount as specified in OAYK. Please check.
    Br

  • Credit block at delivery creation

    Hello  all,
    we  have  following  scenario:
    We  perfrom  Credit check at delivery creation  and  if the  customer  is  over  100 %  of  the  limit the  user  is  not  able  to save  the  delivery  note....Fine so  far...
    Then  they  release  via  VKM3/VKM4  and  they  are  able  to  save  the  delivery  note.
    Once  after some  days  they  try  to post  the  goods  issue ,the  delivery  note  is  blocked  for  goods  issue.
    Is  this  normal  SAP  behavior?How  can  I  avoid  it?
    Thanks  in  advance  and  BR
    L

    Hello,
    the  number  of  days  is  30.THe  reason  cannot  be  that  delivery  is  already  another  document  in the  document  flow?
    Because  the  document  released  is the  original  sales  order and  later  on  the  delivery  gets  blocked  for  GI....
    Thanks and  best  regards
    L

  • Very urgent : shipping point and delivery creation date

    Hi :
    I have a custom table with fields :
    belnr, posnr, btyp, aufnr, ebeln, ebelp, livbeln, liposnr,matnr,wadat,kunnr,werks,bmeinh,getri,inaktiv,wabukz,erdat,aedat,loekz.
    Custom Transaction with fields :
    vbeln (field name belnr) , aufnr, delivery vbeln ( field name livbeln ),werks, mat .avail.dat ( mbdat ), transport.plan date(tddat),
    matnr, and sales order item (posnr).
    I have to select sales order , item from custom table based on plant (werks) shipping point , and delivery creation date.
    how can i relate shipping point and delivery creation date to my query.
    For delivery creation date, it should be selected based on current date+-2 and should choose MBDAT OR TDDAT which ever is earlier based on current date.
    I would appreciate if anyone can give me som idea and full points r rewarded.
    Thx.
    Rag

    Hi,
    Try this:
    select a1belnr a1posnr vbep~etenr into corresponding fields of table itab from a1 inner join vbap
    on a1belnr = vbapvbeln
    inner join vbep
    <b>on vbapvbeln = vbepvbeln and vbapposnr = vbepposnr</b>
    where a1~werks = p_werks
    AND vbap~vstel = p_vstel
    AND vbep~edatu = p_edatu
    AND (vbep~mbdat <= p_edatu OR
    vbep~tddat <= p_edatu ).
    regards,
    Anji

  • Shipping point , delivery creation date

    Hi :
      I have a custom table with fields :
    belnr, posnr, btyp, aufnr, ebeln, ebelp, livbeln, liposnr,matnr,wadat,kunnr,werks,bmeinh,getri,inaktiv,wabukz,erdat,aedat,loekz.
    Custom Transaction with fields :
    vbeln (field name belnr) , aufnr, delivery vbeln ( field name livbeln ),werks, mat .avail.dat (  mbdat ), transport.plan date(tddat),
    matnr, and sales order item (posnr).
    I have to select sales order , item from custom table based on plant (werks) shipping point , and delivery creation date.
    how can i relate shipping point and delivery creation date to my query.
    For delivery creation date, it should be selected based on current date+-2 and should choose MBDAT OR TDDAT which ever is earlier based on current date.
    I would appreciate if anyone can give me som idea and full points r rewarded.
    Thx.
    Rag

    Hi Pankaj,
    Please try to use BAPI 'BAPI_DELIVERYPROCESSING_EXEC' for creating delivery form sales order , you can pass value and create delivery.
    you can refer below code, it may be helpfull for you to create delivery.
    DATA: BEGIN OF t_vbap OCCURS 0,
            vbeln LIKE vbap-vbeln,
            posnr LIKE vbap-posnr,
      zmeng LIKE vbap-kwmeng,
            matnr  LIKE vbap-matnr,
            werks  LIKE vbap-werks,
          END OF t_vbap.
    DATA: t_request TYPE STANDARD TABLE OF bapideliciousrequest
          WITH HEADER LINE.
    DATA: t_created TYPE STANDARD TABLE OF bapideliciouscreateditems
          WITH HEADER LINE.
    DATA: t_return TYPE STANDARD TABLE OF bapiret2 WITH HEADER LINE.
    SELECT vbeln posnr zmeng matnr werks
           INTO TABLE t_vbap
           FROM vbap
           WHERE vbeln = v_vbeln.
    LOOP AT t_vbap.
      t_request-document_numb = t_vbap-vbeln.
      t_request-document_item = t_vbap-posnr.
      t_request-quantity_sales_uom = t_vbap-zmeng.
      t_request-quantity_base__uom  = t_vbap-zmeng.
      t_request-id = 1.
      t_request-document_type = 'A'.
      t_request-delivery_date      = sy-datum.
      t_request-material = t_vbap-matnr.
      t_request-plant = t_vbap-werks.
      t_request-date = sy-datum.
      t_request-goods_issue_date = sy-datum.
      t_request-goods_issue_time = sy-uzeit.
      APPEND t_request.
    ENDLOOP.
    CALL FUNCTION 'BAPI_DELIVERYPROCESSING_EXEC'
         TABLES
              request      = t_request
              createditems = t_created
              return       = t_return.
    READ TABLE t_return WITH KEY type = 'E'.
    IF sy-subrc = 0.
      MESSAGE e208(00) WITH 'Delivery creation error'.
    ENDIF.
    COMMIT WORK.
    Regards,
    Prasenjit

Maybe you are looking for

  • Replication Pricing in CRM from R/3.

    Hi, We are currently trying to replicate pricing from R/3 to CRM, and we have downloaded the pricing procedures, condition types(Standard and Custom) into SAP CRM 6.0through middleware. We would like to know how to replicate the calculation formulas(

  • New mac linked to existing xsereve account

    Our xserve was set up by someone who no longer works for the company. We had a break in the other night and 2 of our macs were stolen. When the replacements arrive how do  I set them up to log in to the existing xserve user accounts?

  • Applet to Applet communication between two seperate threads and jsp pages

    Hi, have two java applets running on two separate jsp pages. I am trying to have one applet talk to the other applet. I have tried putting the applets in a static hashtable, but I found out (through trial and error) that the memory is not shared betw

  • Which sound driver to use ILSR, MSI, Nvidia or Realtec

    Which sound driver is working best with the K7N2 Delta? I am using the one that comes on the Nvidia unified drivers right now but am wondering which one is really better. Thanks in advance.

  • Call function from button

    hello, i have a jsp page and i want to call a java function when the user presses a button, how can i do that? Thanks