How to Run a Cost Estimate with Budgeted Values parallel to the Std Cost Estiamte

Hi Experts,
My client want to run a parallel cost estimate with Budgeted values for each type of cost in a similar process like standard cost estimate(currently only Std business run only the std. cost estimate). Below will be provided to run the said cost estimate.
     1. Budgeted Cost for cost elements against each cost center
     2. Re-posting/distribution will be required run to allocate and apportion the cost from service cost centers to Production cost centers
     3. All Planned(future) Material Cost will be provided. (note that the valuation strategy of costing variant of standard cost estimate has below sequence
     4. Budgeted activity quantities will be provided. (Cost and activity qty for Kp06 and Kp26)
Based on the above data business need to run a cost estimate with budgeted values parallel to the standard cost estimate(based on planned values), which will be compared with actual then Budget at each months.
Simply an alternative cost estimate with budgeted values for a given period for all materials.
Kindly advice the possibility of such a cost estimate in the system and if possible pls. mentioned the Process in order and configuration steps for the same.
Thanks in advance.
Aziz

Hi..
You can define costing variants which have valuation variant for budgeted values parallel to the standard cost estimate  in Customizing for Product Cost Controlling.
You can define target cost versions using above costing variants under the customizing transaction OKV6 as below picture.
When you calculate variances, you can check “all target cost version” flag to calculate variances  for all target cost versions in the controlling area as below picture.
You can analysis the difference between actual cost and several budget cost using target cost version as below picture.

Similar Messages

  • Material Cost Estimate with Quantity Structure (How to download)

    Is there a standard report or feature available in SAP to download the material cost estimate with quantity structure?
    Currently we have to print screen and it is very tedious and can't do analysis with those screenshots.
    Please advice.

    Hi,
    There is a standard report you can use - S_P99_41000111 - Analyze/Compare Material Cost Estimates .
    With this report, you can report the standard cost estimates for a range of materials.
    Good Luck!!!  Assign points if this was a useful input to you.
    Thanks and Regards,
    Bhuvaneswari.S

  • Re: create material cost estimate with ck11n without

    hi gurus,
    i need to do create material cost estimate with ck11n without cost result but before i need to check the BOM with material component 11111, and also instruct me how to correct maintain BOM list to get the standard cost
    if anybody do the same scenoria giveme your golden inputs
    thanks in advance,
    kumar.b

    Hi,
    As note 351835 explains, calculation needs an inforecord to calculate prices from purchasing. Prices from outline agreements are generally not taken into account. According to note 499699, the system may consider entries in the source but it will ignore entered agreements (before this correction, any source list entries with agreement were ignored).
    Prices from agreements could only be considered either via a modification or by using the user exit for material valuation (COPCP005).
    This unfortuntely is a restriction resulting as a side-effect from note 499699. As soon as an agreement is entered in the source list, the fixed indicator will not be considered anymore.
    You therefore have two options to overcome this.
    1) You create a second source list entry without an agreement; then the fix indicator will be reflected; report Z_CREATE_EORD from note  409960 could be used to do this automatically
    2) You are using user-exit EXIT_SAPLMEQR_001 in order to 'overrule'   the standard search for source of supply (enhancement LMEQR001)
    regards
    Waman

  • Material cost estimate with quantity structure (tcode: CK11N)

    Hey dear friends.
    I donu2019t know in which forum I should put my question above.
    In fact, Iu2019m new to SAP PM module.
    Iu2019m trying to create material cost estimate with quantity structure (tcode: CK11N) for a material u201CXu201D.
    This material is manufactured.
    While running the transaction CK11N, I got an error message.
    After analyzing this error message, Iu2019ve realised that somebody had assigned wrong activity types to cost centers which are linked to this material in tcode: CR03, tab: costing.
    So Iu2019ve changed and assigned the right activity types.
    Then, Iu2019ve tried to run the tcode CK11N again. But the system still brings the wrong activity types and seems to ignore the ones that Iu2019ve assignedu2026
    It seems like the old activity types still linked to the cost centers somewhere else than in tcode CR03u2026
    Any idea about what am I mising ?
    Thank's in advance.
    Bahia.

    Dear Bahia,
    If its rate routing means,i guess you must be working in REM scenario.
    So goto CA22,delete the existing operation and then assign the same work center in a new
    operation,check what activity types is it proposing in the rate routing,if its reflecting correctly means
    save the datas.
    Also goto KKF6N--->click the change mode icon and then calculator button to create a preliminary cost
    estimate and then save the datas.
    One of our forum friend has asked you to check the production order read PP master data once
    again,but understand there is no production order concept in REM scenario,only planned orders.
    Then come back with your queries.
    Regards
    Mangalraj.S
    Edited by: Mangalraj.S on Jun 17, 2009 12:05 PM

  • Error  - Material cost estimate with quantity structure

    Hello Gurus!
    Can anyone please help with the following problem:
    I’m trying to do the material cost estimate with quantity structure, but the system is throwing back the message  " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR". 
    This happens because I have a subcontratation in my routing in CHF, and in transaction OB08, and I don’t had defined that rate (type P CHF –EUR).
    I need to know if there is any solution to the system assumes other Type of Exchange Rate (the last real exchange rate that I have introduced in my system, not the planned!)
    Points will be assigned to the suitable answer.
    Thanks in advance.
    Mary Jane

    Hi Sridhar
    Thanks for your reply.
    In OKEQ for the version 0, I have the rate type M.
    I don't understand why the system throwing back the message  " There is no exchange rate for exchange rate type P on 1.01.2008: CHF -> EUR".!
    Do you know why?
    Thanks and regards
    Mary Jane

  • Material cost estimate with Quantiy structure

    Hello All,
    Can anyone please help in the following problem. When we do material cost estimate with quantiy structure, system is throwing message as "source of supply cannot be determined".
    Maximum points will be assigned to the suitable answer.
    Thanks in advance.
    Srinivas

    Hi, Srini,
    Please check in material master data whether this material is in-house produced or externally procured, which can be found in MRP view.
    Please also check your costing variant and valuation variant for material cost estination, I think possibly you chose stratey L FROM Purchasing Info Record. If not, ignor it.
    If it's externally procured, SAP logic is that firstly it will check the source list, then determine the quota arrangement and find proper vendor for the selected material. The error message is possibly caused by missing vendor or wrong quota reason. So please follow the SAP logic to check data one by one.
    Please check the following link on vendor determination in online help document.
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    Please specify if you also used mixed costing for material.
    Good luck!

  • Material cost estimate and mateiral cost estimate with quantity structure

    Hi sap guys,
    What is the difference between material cost estimate and material cost estimate with quantity structure

    Hi
    Both are in one way the same.
    Material cost estimate can be calculated as
    1. Material with quantity structure
    2. Material without quantity structure
    You can get more insight into it at the following link
    http://help.sap.com/saphelp_47x200/helpdata/en/7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    Regards,
    Suraj

  • How to Run a SCSI Scanner with Firewire In OS X?

    Does anyone know how to run a SCSI scanner with Firewire in Mavericks?
    I have unsuccessfully tried the RATOC FR1SX SCSI-to-Firewire converter. The Ratoc is recognized as a Firewire device in the System Profiler (see pic below). However, the VueScan scanning software does not recognize the scanner.  I know the scanner works because I have been using it in an old HP PC. As such I  installled Windows 7 64 bit via Boot Camp to see if I could use the scanner, but had no luck.
    I have an iMac 21.5-inch, Mid 2010.
    ANY HELP?

    The Mac scanner driver is not seeing it as a native SCSI device assuming VueScan supports the model of scanner you have. (You did not list the scanner model.)
    Other than getting a modern non-SCSI scanner, a possible option would be to get a Thunderbolt PCI expansion chassis and a 'real' SCSI interface card. There is no guarantee this will work though as SCSI has been discontinued in the Mac world for years and years. If you then want to look at a SCSI card for use with the expansion chassis then look at the following.
    Hmm, just looked the AttoTech SCSI cards have been discontinued as well, as I said SCSI is ancient history in the Mac world.

  • CK11N (Cost estimate with qty structure) Set Up time calcualtion

    Greetings..
                      I have an following activity data for operation 10  with base qty 40.33 kg
    Op.10   Set Up Time    10 min
    Op. 10  Machine Time  20 min.
    Now for this material when i create Cost Estimate with qty structure (CK11N) for this material, i m getting the result of costing itemization for costing based on COSTING LOT SIZE as 1 kg
    Set Up time coming 10 min along with its cost.
    Op. Time coming 0.496 min along with its cost.
    But when i change costing based on USER ENTRY with entry equal to base qty of routing as 40.33 kg
    Set Up time coming 403.33 min along with its cost.
    Op. Time comming 20 min along with its cost.
    Why set up time is multiplied by USER ENTRY qty.
    It should give the set up time  as 10 Min for USER ENTRY  40.33 kg.
    Formula for Setup requirement is SET UP TIME (SAP005 = SAP_01)
    Edited by: SAP PP on Sep 15, 2009 2:22 PM
    Edited by: SAP PP on Sep 15, 2009 2:23 PM

    HI,
    Request you to check the Setup fromula in the work center Costing Tab screen. Also chech whether you are using any formula in the routing details in the User defined fields (which will be picked from the WORK center data.
    Hope this will help you.
    regards
    radhak mk

  • Saving cost estimate with errors

    Hi Gurus!
    When I create a cost estimate with errors, I'm still able to save it (ck11n)
    but later I can't release it (ck40 or ck24) wich is OK.
    Is there any way to block the saving of cost estimates with errors in tc CK11n?
    Cheers
    matej

    HI,
    Go to t code OKKN> select related costing variant> MISC tab>U  can find error management>select 'Log message but do not save them, mail inactive".
    The above will match with ur expectation
    Vijay

  • Standard cost estimate could not be found for the material

    Dear All,
    We have 4 manufacturing plants and 30 sale depots. We are maintaining price control (S) for FG and SFG in Manufacturing plants,price control (V) at depots for the same material code. we are getting an error message " standard cost estimate could not be found for the material" while doing billing at depot.
    Please give me suggestion.
    Your suggestion should be appreciate.
    Thanks in advance............
    AND
    My client want to see profitability at manufacturing plant level and need break up for the COGM. So how can i get the values of depot sales.
    please let me know how to do........

    Hai
    Price control should be S for Depot also. You need to run standard cost estimate in DEPOT after entering additive cost under CK74N for frieght, excise duty etc. To transfer the standard cost from the source plant you  need to make configuration  in OMD9 defining the receiver and sender combination so that system can pick up the cost from source plant. This special produrement type needs to be asigned in the material masters of DEPOT under MRP 2 view.
    Pushkala

  • How to run an X11 app as a normal icon on the dock?

    How to run an X11 app as a normal icon on the dock?
    I don't want to have to go through the X11 app than up to the command, etc. I want it to run as a normal osx app

    I've only got one X11 application, Wireshark. I have its icon on my dock -- I just dragged it to there from its location in the Finder. When I click on it (Wireshark's dock icon), X11 starts, then Wireshark starts inside X11's environment. Have you tried doing it that way with your app, or is Wireshark's behavior in that regard just a different animal from all the other X11 apps that are out there for Mac?

  • How can I edit multiple clips with different frame rates on the same timeline

    how can I edit multiple clips with different frame rates on the same timeline

    You do not want to edit material from different frame rates on one timeline. You CAN do this, but it is a very bad idea - and this is why.
    Once you establish the sequence frame rate - lets say it is PAL material at 25fps, any material that you drop into the sequence other than 25 fps will have to be changed to play at 25 fps. If the material you add is NTSC (29.97), FCP will DROP 5 frames per sec to bring the frame rate down to 25 fps. Which 5 get thrown away? Every 6th one. This yields a funky cadence that becomes even more complex as as there are also interlaced fields (DV/NTSC is an interlaced format). Oh, and by the way, the image sizes are different as well. DV/PAL has 576 lines of resolution and DV/NTSC has 480. FCP has to scale up the NTSC to fit the PAL frame.
    You do not want FCP adjusting these things on the fly. You want to do a thoughtful (and time consuming) conversion so that you end up with all your material in one format with the best possible image from the conversion process. Compressor can do an adequate job with Frame Controls turned on. The Natress Standards Conversion FCP plugin is another way to go. A third option is to find a post house that can do the conversion for you using a hardware based process.
    The good news is, once everything is in the same format, editing it will be painless and the output process very quick.
    Whatever frame rate/ image size you select, I'd suggest using ProRes for the codec. It is 4:2:2 color and will withstand color correction and composting with much more grace than any variant of DV based codecs.
    Have fun.
    x

  • How do I sync two ipods with two different IDs on the same computer?

    How do I sync two ipods with two different IDs on the same computer?

    Simply connect them.  One computer with one iTunes can manage multiple devices.  They're tracked by S/N but you might wish to assign them unique names so that you can track them yourself.
    The only minor issue is app updating and purchases while on the computer.  It's necessary to log out and back in to the "correct" ID.  Much easier to do these things from the iPods.

  • How can I sync my iPod with my computer without deleting the songs that are on my ipod

    how can I sync my iPod with my computer without deleting the songs that are on my ipod

    See this post by forum regular Zevoneer on transferring files from the iPod to your computer.
    tt2

Maybe you are looking for

  • Error  while running the project

    This is my first project. I am able to make the project succesfully. But I run into warning and err messages. Any help is appreciated WARNING: J2EEComponent.logging NameNotFoundException: Unable to find/read deployment info for C:\oracleDevDay\JDevel

  • How do I get podcasts on my iPod touch 4th gen

    I tried to get a podcast on y iPod T4. It the  prompted me to download the Podcasts app, but since the Podcasts app requires iOS 7 and the iPod T4 can only get iOS 6.1 I can't get podcasts.

  • Elements 9 startup problem

    I had to restore my computer and re-installed Elements 9.  When I click the icon I get a Welcome page, not the program. It has an organize block and an Edit block on the left and something about creating an Adobe id to register the software which was

  • Why is iTunes 64bit showing as 32bit?

    I've been meaning to ask this for awhile now. I've been using 64bit Windows 7 since the day it launched, and whenever there's been an update to iTunes, I've installed it.  But I've been very careful to download the 64bit version.  Install that, and i

  • W/1.4.1_01 plugin jmf ClassNotFound

    I installed latest JDK 1.4.1_01, then JMF 2.1.1b, then latest Windows 2000 patches. The patches actually got the native Microsoft plug-in to run the sample JMF apps with MS Internet Explorer 6.0. But I still get a ClassNotFound error from the 1.3 or