How to run costing for materail 'X'

Hi,
my client is it is make to order business process, descreate manufacturing.
         1. My client is having the productionn of finished product of 'x' in two plants- 0001 & 0002.
         2. before 'X' there are 12 Processes of semi finished material process.
         3. in between semi finished material process of 4th stage materail will be sending to some service.
         4. upto stage of material 4 th stage material in Plant 0001.
         5. After coming from service the semifinished material will be receiving in plant 0002.
         6. Finished material will be from plant 0002 so i have to run costing in plant 0002 of finished material of 'x'.
         7. How i have to run the Costing run for finished product of material 'X' by the both plants?.
         8. is it possible to run finished product of 'x' in plant 0002.
         9. will it be takeing BOM&Routing or any configueration in Product costing
Thanks
Nagaraju

Hi ,
I have only one BOM .... But two different valuation types for single materail. or one valuation type only...
I need to fetch the price in the both valuation type.....
how to do that.. Suggest

Similar Messages

  • How much it cost for replacement of ipad mini 2 lcd with retina and touch screen

    how much it cost for replacement of ipad mini 2 lcd with retina and touch screen

    Apple's Limited Warranty http://www.apple.com/legal/warranty/ for iPad excludes coverage for damage resulting from accident, disassembly, unauthorized service and unauthorized modifications.
    The warranty will apply to the country of purchase. And if there is a problem needing repair you have to return it to the country of purchase.
    Out-of-Warranty Service
         If you own an iPad that is ineligible for warranty service but is eligible for Out-of-Warranty (OOW) Service, Apple will replace (Apple doesn't repair) your iPad with an iPad that is new or equivalent to new in both performance and reliability for the Out-of-Warranty Service fee listed below. (The replacement will most likely be a refurbished iPad in a brown box, however, it has a new screen, back and battery.)   
    iPad model
    Out-of-Warranty Service Fee
    iPad mini
    $219
    iPad 3rd, 4th, Air
    $299
    iPad 2, iPad
    $249
    A $6.95 shipping fee will be added if service is arranged through Apple and requires shipping. All fees are in US dollars and are subject to local tax.
    Certain damage is ineligible for out-of-warranty service, including catastrophic damage, such as the device separating into multiple pieces, and inoperability caused by unauthorized modifications. However, an iPad that has failed due to contact with liquid may be eligible for out-of-warranty service. See http://support.apple.com/kb/index?page=servicefaq&geo=United_States&product=ipad
    iPad Repair and Service
    http://www.apple.com/support/ipad/repair/
    Make a Genius Bar Reservation
    http://www.apple.com/retail/geniusbar/
    You may can get the iPad repaired at 3rd party repair sources for less $, however, any remaining Apple warranty will be voided.
    iCracked - Broken iPhone, iPod or iPad
    http://www.icracked.com/
    iReVamp Electronics Screen Repair ($99)
    http://www.irevampelectronics.com/ipad-2-broken-glass-screen-repair.html
    iPad Repair & Screen Replacement Services
    http://www.ifixyouri.com/16-ipad-repairs
    RepairZoom iPad Repair
    http://www.repairzoom.com/ipad-repair.html
    Mission Repair
    http://www.missionrepair.com/Apple_iPad_Repair_Services_s/431.htm
    iGadgetResQ
    http://www.igadgetresq.com/ipad-repair/
    Do It Yourself iPad Repair
    http://www.ifixit.com/Device/iPad
     Cheers, Tom

  • How to run MRP for Bulk Material without using LTP

    Hi, how can I run MRP for BULK material without using LTP.
    Thanks in advance
    BK

    Hi,
    Use trasnsaction code OPPQ and goto BOM Explosion and selection depends on
    Field selected
    No dependent requirements are created for informational purposes for bulk material items in the plant selected. This can improve system performance.
    Field not selected
    Dependent requirements are created for bulk material items in the plant selected. These dependent requirements are displayed in the planned order for informational purposes only. They are not considered in the net requirements calculation; that is, they are not included in material requirements planning (MRP) and are not displayed in the stock/requirements list
    Reg,
    Deepak.
    Edited by: deepak k b on Nov 11, 2008 6:56 AM

  • How to run MRP for BOM as well as ROL items

    We have only one plant. I  want to run MRP for BOM items as well as ROL items.  MRP can be  run plant wise thru tcode MD01.  I want to run mrp for only ROL items.
    Please suggest
    Regards,
    ( Rajneesh Gulati )
    Edited by: Rajneesh  Gulati on Jun 20, 2008 11:33 AM

    As I understand for Quartz, I think you should create a security subject for it in your code. I guess the background tasks in Quartz work in separate threads. It is not recommended in EJB application. you can use EJB timer service instead.
    -Albert

  • How to run a for loop for an array value

    Hello
    I got an array of value(for ex 1,4,6,10),depending on the array value i need to run the porgram in the case structure(as the examaple values given earlier case1,4,6,10)the program needs to run once for all the values in the array(i mean the program needs to run 1st for case1,then case4 and so on)
    Any suggestions pls.

    Can you describe exactly what you want to do?  In most cases, you do not need a loop to deal with arrays.  Many functions are polymorphic and will deal with arrays directly. 
    R

  • How to run cost estimate for the purchased materials to updt Pln prices?

    Hello Experts,
    Can any body explain how to upload the plan prices through cost estimate in purchased materials..
    Regards,
    Ravan

    Hi Ajay,
    Thank you for reply
    I do agree update plan prices through LSMW or Manually in Material Master
    I am trying to  update planed price1 and 2 through cost estimate, for this I configured like below
    New costing type:G1
    here I selected for prices update as "prices other than standard price" and valuation view as Legal valuation
    New valuation variant :GG1
    here I given MAP as a first priority in strategy sequence
    Regards,
    Ravan

  • How to run save for web and contact sheets at the same time

    Hi
    my question is simple and a means to save time-
    Lets suppose I have 3 camera images and I want to run either save for web applications on 2 cameras at the same time, how/can i do that to save time or lets say contact sheet action on 1 and save for web on the other to save time or photoshop files and this runs in the background?
    would really help save me time.

    Even if you could run the three process in the background at the same time I do not think the duration of the total execution time would be any shorter. You would still be executing the same number of processor instruction reading and writing the same number of files. If the whole processor was constrained by the processing power running them cuncurrenly may increase the processing time because of contention for the processor. If the processes are IO bound that will not change a overlaping the processes may cause more hard disk seaking because of contention of the hard disk arm.

  • What are the steps and how to run payroll for a person?

    Hi all,
    I have hired a person.  Hired with begda 01/01/2009.
    I have assigned the person to 0001, 0002, 0006, 0008.
    For this person how can I run payroll?
    Help me with the steps from begin of employee hiring to the employee payroll run.
    So that I can check the hired person payroll results in pc_payresult tcode.
    Thanks,
    Venkata

    Hi,
    Please check
    http://help.sap.com/saphelp_47x200/helpdata/en/69/317235acfa2b5ee10000009b38f839/frameset.htm
    Regards,
    Param

  • How to run Profiler for Mobile Application on adevice.

    I would like to see Performance issue for my mobile application. This application is using StageVideo object and StageVideo is unavailable in emulator.
    So, I would like to run Profiler in device.
    Could anyone please help me ways to run Profiler on device using FlashBuilder.
    I'm using FlashBuilder4.6.

    Hi Divya,
    I am implementing application given on
    https://www.sdn.sap.com/irj/sdn/mobile link which is
    "Model-driven Design of Mobile Applications New! "
    According to document, I have configured server and frontend, developed model and deployed successfully. But there is no option or documentation available to run the application.
    If I get simulator/emulator to run mobile application.. how can I run?
    Or should I run through browser with some link?
    Please help. Thnaks in advance.
    Mehul

  • How to run trigger for each affected row in delete query

    Hello every body, can anyone help me ?
    I will describe my problem. First, i have 2 table name tbStock and
    tbSalesDetail. Column in tbStock and tbSalesDetail is like this :
    CREATE TABLE tbStock (
    idStock INT PRIMARY KEY,
    nameStock VARCHAR(250) NOT NULL,
    qtyStock FLOAT NOT NULL
    GO
    INSERT INTO tbStock (idStock, nameStock, qtyStock) VALUES (0, 'Apple', 100);
    INSERT INTO tbStock (idStock, nameStock, qtyStock) VALUES (1, 'Banana', 80);
    GO
    CREATE TABLE tbSalesDetail (
    idData BIGINT IDENTITY(0,1) PRIMARY KEY,
    invoiceNumber VARCHAR(20) NOT NULL,
    idStock INT NOT NULL,
    qtySales FLOAT NOT NULL
    GO
    INSERT INTO tbSalesDetail (invoiceNumber,idStock,qtySales) VALUES ('JL001',0,10);
    INSERT INTO tbSalesDetail (invoiceNumber,idStock,qtySales) VALUES ('JL001',1,5);
    GO
    Then, i want to update qtyStock in tbStock when data insert into tbSalesDetail or delete from tbSalesDetail with trigger. (In this case, i use delete from tbSalesDetail). So, i create trigger like this :
    CREATE TRIGGER tbSalesDetail_Trigger_Delete ON tbSalesDetail
    FOR DELETE
    AS
    BEGIN
    DECLARE @idStockX INT, @qtySalesX FLOAT;
    SELECT @idStockX=idStock, @qtySalesX=qtySales FROM deleted;
    UPDATE tbStock SET qtyStock=qtyStock+@qtySalesX WHERE idStock=@idStockX;
    END
    GO
    The trigger is run. I hope if i run delete command like :
    DELETE FROM tbSalesDetail WHERE invoiceNumber='JL001';
    will make the quantity of stock become like this :
    Product Apple (idStock=0) = 100+10=110
    Product Banana (idStock=1) = 80+5=85
    But in the fact, Quantity Apple is True (110) and Quantity Banana is
    False (still 80).
    I know this problem because trigger only run for first row. So how can i update each data in affected row with trigger ? (I use Windows 7 SP1 32 bit and SQL Server 2012 SP1 Express Edition)

    Your DDL violates ISO-11179 rules and needs to be fixed. You even use camelCase (look up the research; it does not work because of eye movement to the Uppercase letters). The prefix “tb-” is a design flaw caller “tbling” in the literature (Google some
    of Phil Factor's columns at Red Gate). 
    Why did you use FLOAT for a quantity? Do you really have 3.141592653 bananas so you can make banana pie? 
    Why is the stock id a numeric? What math do you do on it? It should be an industry standard, like UPC, EAN or GTIN. 
    Why is there no reference in the weak entity (Sales_Details) to it's strong entity (Stock)? 
    Why do you think that IDENTITY is a key?? It is the count of physical insertion attempt to a table in one schema! It has no place in DBMS. Why don't you use the current ANSI Standard INSERT statements? 
    Let's fix this mess:
    CREATE TABLE Stock 
    (gtin CHAR(15) NOT NULL PRIMARY KEY, 
     item_name VARCHAR(250) NOT NULL, 
     onhand_qty INTEGER NOT NULL);
    INSERT INTO Stock (gtin, item_name, onhand_qty)
     VALUES ('000000000000000', 'Apple', 100), 
            ('111111111111111', 'Banana', 80);
    If there is a Sales detail table, there has to be a Sales table in a valid design. This is the strong-weak entity rule. 
    While IDENTITY is fundamentally wrong, using BIGINT is an error made worse. Then looking at the data, this is a table of purchase invoices, not sales details. 
    CREATE TABLE Purchase_Orders 
    (po_nbr CHAR(20) NOT NULL PRIMARY KEY, 
     gtin CHAR(15) NOT NULL
        REFERENCES Stock(gtin)
        ON UPDATE CASCADE, 
     purchase_qty INTEGER NOT NULL);
    INSERT INTO Purchase_Orders (po_nbr, gtin, sale_qty)
     VALUES ('JL001', '000000000000000', 10),
            ('JL001', '111111111111111', 5);
    >> I want to update onhand_qty in Stock when data is insert into Invoices or delete from Invoices with trigger. (In this case, I use delete from Invoices). So, I created trigger like this : <<
    Why? A trigger is procedural code and SQL is a declarative language. An SQL Programmer might use a stored procedure to update stock levels instead.
    The simple one item purchase would be:
    CREATE PROCEDURE Apply_Purchase_Orders
    (@in_gtin CHAR(15),
     @in_purchase_qty INTEGER) 
    AS
    UPDATE Stock 
       SET onhand_qty = onhand_qty + @in_purchase_qty
     WHERE gtin = @in_gtin;
    But if you want to apply a table of purchase orders:
    CREATE PROCEDURE Apply_Purchase_Orders ()
    AS
    MERGE INTO Stock AS S
    USING Purchase_Orders AS P
    ON S.gtin = P.gtin
    WHEN MATCHED 
    THEN UPDATE 
         SET onhand_qty = onhand_qty + @in_purchase_qty;
    Your problem is that you have not gotten education or training, so instead of writing RDBMS and good SQL, you are mimicking your old procedural language and a file system. This is more than we can do in a Forum. What you will get is advice to “help” you kludge
    a cripple system. 
    --CELKO-- Books in Celko Series for Morgan-Kaufmann Publishing: Analytics and OLAP in SQL / Data and Databases: Concepts in Practice Data / Measurements and Standards in SQL SQL for Smarties / SQL Programming Style / SQL Puzzles and Answers / Thinking
    in Sets / Trees and Hierarchies in SQL

  • How to run setup for new datasources without breaking old datasources?

    Hi,
    I am wondering how to install some more data sources (2LIS_05_Q0NOTIF, 2LIS_17_10NOTIF and 2LIS_18_10NOTIF) without breaking the delta mechanism for other data sources when I start to use the new datasources.
    I have installed some QM cubes (0QM_C04, -05, -08 and -11) and delta loads run every night.  Now I want to add two more cubes (0QM_C02 and -03). The new cubes use datasources that are not yet available.
    If I now activate the needed datasources, delete the content of the setup tables again and run 'Application-Specific Setup of Statistical Data' for 'Quality Management', 'Plant Maintenance' and 'Service Management', I am afraid that I will re-initialize the delta queue for the datasources that are already in use... In other words: I am afraid of breaking all datasources in application 05, 17 and 18...
    I cannot find documentation addressing this problem. Any input, anyone?
    Best regards,
    Christian Frier

    Hi all,
    if I understand you all correctly, I can use the following plan:
    0) Wait until no documents are posted on the R/3 side.
    1) Run the delta loads and check that the queues are empty (RSA7 and LBWQ).
    2) Delete the setup tables.
    3) Run the 'Application-Specific Setup of Statistical Data'
    4) Create and execute infopackages for initial dataload (for the new datasources).
    5) Create and execute infopackages for delta loads      (for the new datasources).
    6) Run the infopackages for delta load from the 'old' datasources without running a new initial dataload.
    So basically 6) is the step I worry about.
    That is that I can start to use 2LIS_05_ITEM, 2LIS_17_ITEM and 2LIS_18_ITEM without breaking the delta sequence for 2LIS_05_TASK, 2LIS_17_TASK and 2LIS_18_TASK.
    regards,
    Christian

  • How much to cost for replace a hard drive and trackpad for MacBook Pro retina 15

    I Am in Japan right now, and some how my laptop was broken. Is the price in Japan similar to United State?

    Check the iFixit.com and Powerbookmedic.com web sites for trackpad parts and prices (plus instructions).  HDD prices can be found from web sites of numerous vendors.
    Ciao.

  • How to track cost for different Vendors through SAP PM

    Hi
    Maintenance needs to discuss with SAP PM Consultant for tracking the different vendor for civil, painting and external services jobs from asset locations and class. It means that total expenses of Civil, Painting and external services jobs for different locations should be easily gathered.
    Also ,As temporary solution of identifying posting for different vendors, how maintenance will be able to find actual amount posted for different vendors
    Regards
    chand

    Hi
    can you tell me where we can make control
    When RFQ is created the PR is not allowed to change when the PR is manually created & it is working perfectly.
    but when PR is created thorugh work order then even if RFQ is created/released  it is allowing to change PR when created throogh work order
    Please tell me where is control
    Regards
    chand

  • How to reduce cost for SAP Fiori Trial on CAL?

    Hi,
    I have created an account in Cloud Appliance Library with AWS as per OpenSAP  Course.
    It's showing the cost per hour as 3.30 USD  and per month 2379.20 USD.
    Can anyone suggest me how to reduce this cost per month to the minimum.
    I can't pay this much amount.
    Please guide how to utilize this at the optimum w.r.t to the cost.
    Regards,
    Ramana.

    Hi Ramana,
    The easiest way to optimize the costs is to suspend the instance when not used. The scheduling options in SAP CAL could help here.
    Best regards,
    Stanimir

  • How much it cost for xperia z2 lcd replacement in malaysia??

    i need to know how much xperia z2 lcd replacement...because mine cracked..nothing problem with the display...but i cant touch it anymore...or if any of u know how to fix it..just let me know how to...help me

    Hey there!
    Please contact Sony Mobile Support in Malaysia!
    Here is the link to Sony Mobile Global Support: http://www.sonymobile.com/global-en/support/contact-us/contact-info/
    First, click on the link.
    When you are on the website, you will see in big black letters: Global contacts.
    Under Global Contacts, you can choose from:
    Americas
    Asia-Pacific
    Europe
    Middle East and Africa
    Now, please click on Asia-Pacific.
    Once you've done that, you will see several countries.
    Now, look for Malaysia.
    You will see a phone number under Malaysia.
    Please call that number for best assistance regarding your concern!
    Thank you!
    Sony's #1 Fangirl, Esther Smit

Maybe you are looking for

  • Error while releasing the web service

    Hi, I am using a FM to be used as WS se37->diplay->utilities->moreutilities->create ws. In i wizard all steps were sucess except the last. I am getting an error  "error while realising web service". Also I could not see the ws in TC wsadmin. Kindly C

  • IPod Touch cannot connect to my Wi-Fi router.

    I have a 16GB iPod Touch that I got about two months ago. I upgraded it to 2.0, and everything has been going smoothly. Suddenly, my internet just stopped working (Not because of the 2.0 version upgrade). I am using a Netgear router. I was able to go

  • Code placement for drop down menu within an animated button

    I have a main menu comprised of 7 buttons; 6 of which are all straight forward with an animation. (The animation is that when the buttons are rolled over the button extends itself out to the right. On the rollout the button returns to its original st

  • Error while sending bulk data

    Hi, I am doing one scenario in which SAP sends Material Number to Oracle and in turn Oracle fetches data for that Material Number and send it back to SAP. Here when I am executing the scenatio in SAP with Material Number as 1* . I am getting an error

  • Trouble with Export Layers to Files

    I'm trying to export all layers and want to keep the original name.  I left the field: "File Name Prefix" blank so it would keep the name, but after exporting it adds: '_0001_' , '_0002_' etc in front of the name, and adds an extra .jpg so files name