Hi All,
I am new to this Hyperion Workspace.
Can anyone please guide me how to schedule a report on workspace?
What are the things need to be considered before uploading the report on workspace or during the process?
Can I schedule a report which will save the report with result after the job is complete?
Thanks In Advance.
Ujjawal
Edited by: [email protected] on Mar 26, 2009 2:04 AM
Hi Ujjawal,
To run or schedule the reports in the workspace first we need to have a connection file which is the OCE. See the below steps.
--Launch IR studio and create a OCE file which connects to the source database and save the file (By default it will be .bqy file)
In the Hyperion server Goto StartPrograms--Hyperion--Interactive Rporting--Utilities and Administration and Launch service configurator.
--Now click on 3rd icon which is the Local service configurator and login with an admin account (Default: admin, Password: password).
--Select DAS_SERVERNAME and goto properties there will be a tab for Datasource selct it and add a new datasource.
--restart your Hyperion Core and IR and workspace services.
--Launch workspace
Navigate to the folder in which to place the file.
2 Select File > Import > File.
The first Import dialog box opens.
3 Click Browse, navigate to the folder where the desired Interactive Reporting connection file is located, select
the file and click Open.
The name of the selected Interactive Reporting connection file populates the File field on the
Import dialog box.
4 Click Next.
The second Import dialog box opens.
Click Finish
Now import a BQY as a File as Job and select and browse the file and next give your OCE connections and go next and select the time would like to run the job by selecting the Custom Event.
If you want to schedule a job, you can right click on the file and then add a schedule.
Hope this helps.
Do let me know if you have any queries.
Thanks,
BHANU
Similar Messages
-
How to schedule the process chain fr the report
hai experts,
i have a query which i need to generate for every five hours? i know that we can generate the report thr process chain but i dont know how to build that..
my question is how to schedule the report,how to build the process chain,....
can any one plz tell me how to start this generating report for every five hours
thanks in advance..points will be alloted surely ,i need this urgently..
SuriFirst of all you need to Identify the InfoObjects if you want to take up Master Data Loads, and if you want take up transaction loads then select the Data Targets to which the data has to be updated. Then plan the dataflow accordingly.
You want to create a Process Chain, Go to RSPC, and then select the create option and from the Process categories available on the left handside drag and drop the Start process, then define the Variant for the same. In the same way you need to identify the other Process Types available on the lefthand side. For Eg: Start Process>Load to ODS>Activation of ODS Data>Delete Indexes for the InfoCube>Load to InfoCube>Create Indexes>Delete Overlapping Req-->Agg. Rollup.
This is how you need to specify the dataflow, several other Process Types also included based on the requirement For Eg: Sending Mail Alerts when the Job is Success or Terminated.
Also, have a look at this links to make urself clear about the steps in creating Process Chain.
http://help.sap.com/saphelp_nw04/helpdata/en/67/13843b74f7be0fe10000000a114084/frameset.htm
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/events/sap-teched-03/using%20process%20chains%20in%20sap%20business%20information%20warehouse
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
Hope it helps.
Regards,
Archna -
How to download Taxonomies For XBRL to develop reports in Hyperion FR?
Hi All !
Can anyone pls help me in developing Reports in Hyperion Financial Reporting Using XBRL?I believe that you 'll need to use the UK IFRS Taxonomy if you need to create reports according to UK GAAP.
Consider that the IFRS Taxonomy is a global taxonomy. The UK made its own extension from the IFRS Taxonomy.
Please check at: [http://www.ifrs.org/XBRL/Resources/XBRL+Illustrative+examples.htm] for some IFRS reports example.
As far as i know the only institution requiring to fill in XBRL is the HRMC, so you better check the HRMC Taxonomy and consider too that HRMC will request XBRL reports using Inline XBRL.
Please let me know if you need additional info.
Cheers.
Sergio Quiroz
XBRL Quality Review Team - IFRS Foundation
Oracle Corporation
Santiago, Chile -
SAB BO 4.1 SP1
Does it have an RESTful API to schedule a Webi report with the parameter to specify a group of users ("Schedule For" to "Schedule for specified users and user groups" with one or more users/groups)?Hello Ricardo,
have you try a call like this one ?
<schedule>
<name>"test"</name>"
<format type=\"webi\"/>
<destination>
<inbox>
<to>userId1,userId2,userId3,groupId1,groupId12</to>
</inbox>
</destination>
</schedule>
Regards
Stephane -
What are new features of interactive reporting in hyperion 9.3 release
hi
what are new features of hyperion system 9.3 interactive reporting over hyperion system 9.Here is a link to Reporting and Analysis New Features pdf for 9.3
http://download.oracle.com/docs/cd/E10530_01/doc/epm.931/hs_new_features.pdf
Brian Chow -
How To Schedule an Hyperion Interactive Reporting Dashboard
Hi . Can somebody let me know on how to schedule an Interactive REporting Dashboard Report and Export the output in PDF and Email the user.i can see the output in HTML when i schedule a pivot, Chart but i dont see anything when i try to schedule a Dashboard . Any pointers in Greatly appreciated
Once you have the dashboard scheduled to run/ process your queries.
Go to run the job. In there you will need to edit the cycle by clicking on Modify
(This will open another page)
Under the Actions sections there is a part that says
Add a(n) select the drop down that says Email Section.
This will take you to anther window where you can select the section you want to output (in your case the Report)
who to send it to and what format you want to send it in (default shows Microsoft Office Web archive).
Hopefully this will help you. -
How to schedule a concurrent request to run at a specified time/day?
Hi All,
How to schedule a concurrent request to run at a specified time/day (ex: Sunday 12pm)?
Thanks,
Chiru
Message was edited by:
Megastar_ChiruIs this to run periodically ?
During the request submission, click schedule, choose the specific days, and click on S = Sunday.
Change the start date on the date of the sunday you want to run, eg : 15-JUL-07 14:00:00, change the end date as well. -
How to schedule a report in background
could anybody inform me
how to schedule a report in background
if possible plz send the entire step by step process
thanx
regards
kals.HI,
Use transaction SM36
For step by step process refer this link...
http://help.sap.com/saphelp_bw30b/helpdata/en/c4/3a7f87505211d189550000e829fbbd/content.htm
Hope this helps!!
Cheers
Alfred -
Hi,
anyone can help me what transaction to be used and how to schedule a report program.
the exact requiremnet is like i have a report program which is to be scheduled at a partticular time to be run how can i do itHi,
Goto
SM36 tcode
and provide
Job Name , Job class
( depends on the priority whther A,B, or C).
and then choose
start condition
on the application tool bar
and then choose
Date/Time
button in the new window appeared.
Provide Schedule start data and time.
if you want to execute periodically then select
Periodic job
check box..
then SAVE button to be pressed to save the these settings.
then choose
STEP button
on the application toolbar and provide
Program name and variant name and lang ..
Press the SAVE button.
so program is scheduled to runn in BG mode at the specified time.
but while giving time we have to give server time not the system time
Thanks
Parvathi -
How to schedule the back job scheduling
how to schedule the back job for bdc , can we use it for both call transaction and session method . how to schedule the back job schedulinng for lsmw
hi,
Use t-code SM36 for scheduling.
<b>Do reward.</b> -
How to schedule the job to run evry Sunday at 12 P.M IST.
Hi Experts,
I want to schedule a job which will run evry Sunday at 12 P.M IST.
I have written the below script.
[code]BEGIN
SYS.DBMS_SCHEDULER.CREATE_JOB
job_name => 'SERVICE_SAL_FS.SAL_MESSAGE_BUFFER_PURGE_JOB'
,start_date => SYSTIMESTAMP
,repeat_interval => 'FREQ=WEEKLY; BYDAY=SUN; BYHOUR=12;BYMINUTE=0; BYSECOND=0;'
,end_date => NULL
,job_class => 'DEFAULT_JOB_CLASS'
,job_type => 'STORED_PROCEDURE'
,job_action => 'SERVICE_SAL_FS.SAL_MESSAGE_BUFFER_PURGE_PROC'
,comments => 'Run at 12 P.M.IST every Sunday'
,enabled => TRUE
END;[/code]
But the server in US.
[code]SELECT sysdate from Dual;
6/11/2013 3:58:58 AM
--But the time in India is 02:28 PM [/code]
How to convert the timezone to IST.
Please help me how to schedule the job to run evry Sunday at 12 P.M IST.
Thanks.Did you read DBMS_SCHEDULER docs:
The calendaring syntax does not allow you to specify a time zone. Instead the Scheduler retrieves the time zone from the start_date argument. If jobs must follow daylight savings adjustments you must make sure that you specify a region name for the time zone of the start_date. For example specifying the start_date time zone as 'US/Eastern' in New York will make sure that daylight saving adjustments are automatically applied. If instead the time zone of the start_date is set to an absolute offset, such as '-5:00', daylight savings adjustments are not followed and your job execution will be off by an hour half of the year.
When start_date is NULL, the Scheduler will determine the time zone for the repeat interval as follows:
It will check whether the session time zone is a region name. The session time zone can be set by either:
Issuing an ALTER SESSION statement, for example:
SQL> ALTER SESSION SET time_zone = 'Asia/Shanghai';
Setting the ORA_SDTZ environment variable.
If the session time zone is an absolute offset instead of a region name, the Scheduler will use the value of the DEFAULT_TIMEZONE Scheduler attribute. For more information, see the SET_SCHEDULER_ATTRIBUTE Procedure.
If the DEFAULT_TIMEZONE attribute is NULL, the Scheduler will use the time zone of systimestamp when the job or window is enabled.
SY. -
How to schedule a program in background after 5 or 10 sec
Hi All,
Can anyone tell me how to schedule a program after 5 or 10 sec in background after the transaction is completed.
It is not a custom transaction. I want to execute a Z program in background in a BADI
Regards
Yathish
Message was edited by:
Yathish GundlupetProgramattically? You can add this code to the end of your transaction(if it is custom, of course).
report zrich_0004 .
data: sdate type sy-datum,
stime type sy-uzeit,
l_valid,
ls_params like pri_params,
l_jobcount like tbtcjob-jobcount,
l_jobname like tbtcjob-jobname.
start-of-selection.
* Get Print Parameters
call function 'GET_PRINT_PARAMETERS'
exporting
no_dialog = 'X'
importing
valid = l_valid
out_parameters = ls_params.
* Open Job
l_jobname = 'THIS_JOB'.
call function 'JOB_OPEN'
exporting
jobname = l_jobname
importing
jobcount = l_jobcount.
* Submit report to job
submit <your_program_name
via job l_jobname
number l_jobcount
to sap-spool without spool dynpro
spool parameters ls_params
and return.
* Kick job off 10 seconds from now.
sdate = sy-datum.
stime = sy-uzeit + 10.
* Schedule and close job.
call function 'JOB_CLOSE'
exporting
jobcount = l_jobcount
jobname = l_jobname
sdlstrtdt = sdate
sdlstrttm = stime
Regards,
RIch Heilman -
How to schedule a job in SAP CPS
Hi,
I am new to SAP CPS.
So please tell how to schedule a job in SAP CPS. And which kind of job cam be schedule means BAP report.
Thanks
AnurodhHi,
In the installation and administration guide you'll probably find some examples.
The Job Definition you need is SAP_AbapRun to run any ABAP.
You submit this, specify the parameters as desired, and scheduling information, and that should do the trick.
That is assuming you have already connected CPS to an SAP system.
Check the topics in the docs within the product and on SDN on:
- Connecting to an SAP system
- Submitting Jobs
- SAP_AbapRun
Regards,
Anton. -
How to schedule a job occurring time for 1 1/2 hour in sql server
how to schedule a job occurring time for 1 1/2 hour in sql server
Hi,
This is a known issue in the previous SQL Server version and has been fixed in SQL Server 2012. You should be able to set 90 minutes and the change would be saved in SQL Server 2012.
http://connect.microsoft.com/SQLServer/feedback/details/346786/ssms-does-not-support-job-schedule-frequencies-greater-than-60-minutes
Currently, you may schedule the job to occur every 1 hour or you may refer to the suggestion by Latheesh to get around this.
Thank you for your understanding.
Tracy Cai
TechNet Community Support -
How to schedule job to execute after 5 seconds gap using the program
Hi ALL,
How to schedule the program to run after 5 seconds to execute using JOB_OPEN,JOB_CLOSE,SUB_SUBMIT function modules in which parameter I should give this 5 secnods?
Regards
maheshHi,
You can use the import parameters of function module JOB_CLOSE
SDLSTRTDT & SDLSTRTTM
to pass the required start date and time (respectively) of your background job. That is, if you want the job to be scheduled and start at a fixed time (as in your case 5 seconds in the future), you can determine the start date and time as 5 seconds ahead of sy-uzeit and pass the resultant values to the mentioned importing parameters.
Cheers,
Aditya
Maybe you are looking for
-
Monitor not able to connect with Dell Laptop
Hi, I have a dell Laptop Dell inspiron 3521 this has got only an HDMI Port as output, I can connect this laptop to other monitor, & TVs with HDMI but cannot do so with my HP2311F Part number LA176AA. I have also tried to connect the latptop using a H
-
How can I record what the sound card is outputting?
I have an app. that I need to be able to capture what the sound card is outputting. That is I want to record anything that plays from the sound card. I don't want to have to route the speaker out to the mic in. Is there a way to "capture" the soun
-
What is the configuration for freezing of assets or shut down of an asset in a Global Template SAP 5.0 version? Thanks & Regards, Divya
-
Am just using this on a page, but using some icons. At the moment it : looks like this Is it possible to move the images into the tabs, so that they change from the faded image to the colour one of each as they're moused over? I see it working if the
-
WHy does my iPhone not show up in my iTunes when I plug it in?
WHy does my iPhone not show up in my iTunes when I plug it in?