How to schedule multiple BDLS

Hi
Logically, we should be able to schedule multiple BDLS jobs for different selection of tables. But when I schedule second job, it either runs into error or completes without considering the table selection.
Is there any procedure for scheduling multiple BDLS jobs or the parallel BDLS execution functionality does not exist ?
Thanks & Regards
Madhu

No Roel,
I think I took the wrong term.  We have several logical system landscapes in 1 maintenance cycle.
For instance:
Maintenance cycle 1 contains:
  landscape R3
     DEV
     QAS
     PRD
  landscpae BW
     BD0
     BA0
     BP0
  landscape SRM
     ED0
     EA0
     EP0
If I want to schedule an import job to import all transports of maintenance cycle 1 in all systems, I have in the above example to schedule 3 jobs. (1 in PRD, 1 in BP0 and 1 in EP0)
The question is whether I can do this by 1 action. Schedule the import of all PRD systems on the maintenance level in stead of the landscape levels separately.
kind regards,
David

Similar Messages

  • How to schedule multiple reports with different local to change static field language ?

    Hi all,
    we have requirement that we will place multiple schedule request on same server ,This schedule request will be different local setting with parameter value like: en-GB,en-US,Chinese...etc .We used translation Manager for this and it takes this parameter and change report language for static fields.
    problem is that ,on server it is not working properly,we tested for one report .if we pass prompt value to change local setting in report the we need to log off and login again in CMC to reflect new local or on BI Launchpad we need to refresh page then it shows new language.
    How we can do this with multiple scheduled report which will have different local value like en-GB,en-US,Chinese,German....?These schedule request are getting placed in server by one user .
    Please help us with sample code.
    Thanks
    Madan

    Hi,
    The only approach I can think of is to create a template report which uses variables
    For each column you would need to variable
    v_columnAName and v_columnAValue
    v_columnAName would have a if statement in it
    =if([client]="clientA" or [client]="clientC";NameOf([firstName]);if([client]="clientB";NameOf([SSN]);NameOf([lastName]));
    v_columnA would have a if statement in it
    =if([client]="clientA" or [client]="clientC";[firstName];if([client]="clientB";[SSN],[lastName]));
    This would only work when you had a small set of clients.
    This might be more managable if it was done in the universe
    Regards
    Alan

  • How to schedule multiple backup job through windows server backup in windows server 2008 R2

    hi expert,
    need your help, In my small  environment I am using windows 2008 R2 as a domain controller. and installed windows server feature for backup.
    Now i want to create backup at a different time.
    1. System state backup at 5.00 PM on saturday only
    2.  finance and hr data backup on daily basis at 5.00 PM.
    so how i create different job schedule through windows server backup.
    Regards,
    Triyambak
    Regards, Triyambak

    Scenario #1
    The following command will create a Task Scheduler task named
    DailyFolder1Backup with the start time of 23:00.
    This task will run DAILY with the HIGHESTprivileges. It will run the Windows Server Backup CLI to backup
    g:\folder1 to target volume
    F:.
    SCHTASKS /Create /SC DAILY /TN
    DailyFolder1Backup /RL HIGHEST /ST 23:00/TR
    "wbadmin start backup –backupTarget:F: -include:g\folder1
    -vsscopy -quiet"
    Scenario #2
    The following command will create a Task Scheduler task named
    DailyFolder2Backup with the start time of 24:00.
    This task will run DAILY with the HIGHESTprivileges. It will run the Windows Server Backup CLI to backup
    h:\folder2 to target volume
    F:.
    SCHTASKS /Create /SC DAILY /TN
    DailyFolder2Backup/RL HIGHEST /ST 24:00/TR
    "wbadmin start backup –backupTarget:F: -include:h:\folder2
    -vsscopy -quiet"
    Please feel free to let us know if you have any question or concern.
    Please VOTE as HELPFUL if the post helps you and remember to click “Mark as Answer” on the post that helps you, and to click “Unmark as Answer” if a marked post does not actually answer your question. This can be beneficial to other community members reading
    the thread.

  • How to schedule multiple wakes up with Terminal

    Hello,
    I would like to schedule mutliple wakes up for my iMac, in order to keep the network connection, because after 6 hours of innactivity, it disconnects.
    I've read that I could type:
    pmset [repeat] [wake] [<MTWRFSU> <6:00:00>]
    That way, eveyday at 6am it will wake from sleep. But is it possible to add other ones? If I want to wake my iMac every 4 hours during the day. And if so, how can I manage those settings if I want to remove some schedule wakes?
    Regards,

    You should be able to do this with either Carbon Copy Cloner or SuperDuper!, which allow you to set up scheduled backups:
    http://www.bombich.com/index.html
    http://www.shirt-pocket.com/SuperDuper/SuperDuperDescription.html
    I use both, but prefer CCC as it also clones the Recovery HD.

  • How to schedule multiple imports in one time?

    Hi all,
    I've got a simple question, which hopefully has a simple answer
    Is it possible in the task list (trx SCMA) to schedule imports for all attached logical systems to that maintenance cycle in 1 time, in stead of scheduling imports for each logical system separately?
    We've got 10 logical systems in 1 maintenance cycle.  And the imports have to be scheduled on the same timings for all of these systems, so eg. from today untill the 14th of June we want a daily import in all attached logical systems of that maintenance cycle.
    Is this possible to do this in 1 action?
    kind regards,
    David

    No Roel,
    I think I took the wrong term.  We have several logical system landscapes in 1 maintenance cycle.
    For instance:
    Maintenance cycle 1 contains:
      landscape R3
         DEV
         QAS
         PRD
      landscpae BW
         BD0
         BA0
         BP0
      landscape SRM
         ED0
         EA0
         EP0
    If I want to schedule an import job to import all transports of maintenance cycle 1 in all systems, I have in the above example to schedule 3 jobs. (1 in PRD, 1 in BP0 and 1 in EP0)
    The question is whether I can do this by 1 action. Schedule the import of all PRD systems on the maintenance level in stead of the landscape levels separately.
    kind regards,
    David

  • How to Schedule Multiple projects

    Hi All,
    I hav a scenario in which there are almost 50 projects live in the system and suddenly 2 new projects come up which are to be taken at priority no.2 & 3 w.r.t the 50 present. These two projects would be consuming the existing resources. Is there a way by which the system would reschedule these two along with the other 50 and assign priority to these.
    Regards
    Abhishek

    hi abhishek,
    i am learning sap-ps , plz send me any PS end user or config documents as it would help me in my carrer .
    regards
    pushpa

  • How to schedule webi report in bulk (multiple report in one request)

    hi,
    I am little bit new to BOXI. I have little bit work experience in Crystal X on scheduling which was used in one of our enterprise java application. We are exploring options in BOXI.
    Currently i am scheduling a report with following api
    infoStore.schedule (webiDocs);
    This will schedule one report instance.
    My question is
    Is there any way to schedule multiple instances of a same report in one request.
    Is there any way to schedule multiple instances of a different report in one request.
    If above things are possible please provide the apis for the same.
    thanks in advance
    Shreenidhi

    Scheduling multiple Webi reports in one command:
    infoStore.schedule takes 1 arhgument of type IInfoObjects which is a collection of InfoObject. IInfoObjects is retrieved by the query. So if you to retrieve all the Webi Docs you want to schedule , then with infoStore.schedule(WebiDocs), it will schedule them all in 1 shot. Scheduling Info properties for each Webi Docs should also be set. Please refer to the samples on scheduling at link below.
    https://boc.sdn.sap.com/node/3211
    Scheduling one Webi Doc multiple times in one command:
    I donu2019t think it can be done in one command. Do you want to schedule the object multiple times each time running it with different prompts? Or do you want it to be sent to different destination in each schedule? Otherwise you can schedule it once and then access the scheduled instance multiple times.
    I hope this helps.
    Regards
    Aasavari

  • [Forum FAQ] Schedule multiple versions of System Image Backup in Windows 8.1

    As we known that there is no UI for user to configure Image backup in Windows 8.1, this is a guide for your to schedule multiple versions of System Image Backup.
    Step 1: Create a task to schedule an image backup with following command:
    SCHTASKS /Create /SC WEEKLY /D MON /TN WeeklyFullBackup /RL HIGHEST /ST 13:00 /TR “wbAdmin Start Backup -backupTarget:F: -include:C: -allCritical -quiet”
    Step 2: Schedule a robocopy to backup the saved image with BAT file:
    Please create a new folder (in this example, the new folder is e:\test2) to save your multiple copies of image backup:
    Write following batch file to copy backup and rename with backup date:
    *****************BAT********************
    @echo off
    robocopy e:\test1\ e:\test2\ test.wim
    ren e:\test2\test.wim  test_%date:~10,4%%date:~7,2%%date:~4,2%_%time:~0,2%%time:~3,2%.wim
    NOTE: e:\test2 is my location to save multiple copies of image backup; e:\test1 is the location I create the system image backup.
    This BAT can also help to rename the copy of image backup with date and time like below:
      3.  Set up a basic task in Task schedule:
    Note: please make sure the time you configured follows the time you set for image backup in Step 1.
    Action -> Create basic task (Name you task) -> Trigger (Set how often this task should be run) -> Action (Start a program) -> Under Program/script, point to your bat file you create in Step 2.b -> Finish
    At the end, you can know more about SCHTASKS and Robocopy via following links:
    Robocopy
    http://technet.microsoft.com/en-us/library/cc733145.aspx
    Schtasks
    http://technet.microsoft.com/en-us/library/cc725744.aspx
    Welcome to your feedbacks.
    Please click to vote if the post helps you. This can be beneficial to other community members reading the thread.

    Hi,
    Thanks for posting in Microsoft TechNet forums.
    I will try to involve someone familiar with this topic to further look at this issue. There might be some time delay. Appreciate your patience.
    Regards,
    Kelvin Xu
    TechNet Community Support

  • How to schedule a job from r3 to BI daily ?

    Please let me know how to schedule a job frm bi to r3, that is i want to load data from a sd ds to a sd cube in bi. I do not want to use a PC and can i schedule a job daily without a PC, which can run daily after 10pm ,remember its not a manual schedule. Do we have any option to schedule in hourly, weekly, daily from bi to r3. If yes HOW ? i know we can do it thru infopackage group but will the infopackage group accept if its only a single load....I think it should have multiple infopackage rite to add it to a group or can it b a single job as well.
    Edited by: Manohar P on Oct 16, 2008 3:14 PM

    An infopackage group can only run infopackages, and unfortunately, you will need an ABAP program to trigger the event in R/3.  There is plenty of ABAP code in this forum to show you exactly how to do this. 
    Try this:
    Triggering a Process Chain From R/3 pgm
    R/3 Jobs Triggering  BW job
    You can also review OSS Note 135637.  This note will show from R/3 to BI (BW).  But you can reverse the logic to go from BI to R/3.
    Hope this helps.
    My suggestion would be to replace the infopackage group with a process chain, because you can call an ABAP program from a process chain.  You also have many more processes at your disposal using process chains.

  • Regarding ssis - schedule multiple packages at a time

    Hi,
       how do we schedule multiple packages at a time in ssis

    You could create a master package with Execute Package Tasks to execute child packages and then use SQL Server Agent to schedule the master package.
    Please mark the post as answered if it answers your question | My SSIS Blog:
    http://microsoft-ssis.blogspot.com |
    Twitter

  • How to update multiple calling hours based on business partner

    Hi All,
    please help me in this issue : how to update multiple calling hours based on business partner in SAP CRM.
    Regards,
    Siva kumar.

    Check maintainance view V_TB49, add new scheduling type.

  • Schedule Multiple Startups.

    Hello
    I want to schedule multiple startups, and was wondering how to do it. For example I want my mac to start up at 4pm on weekdays and 9pm on weekends.
    Is this possible?
    Thanks
    Nat

    Hello Nat,
    Only way I see to do it is to write a Startup Script that checks the day, the manipulates this file...
    /Library/Preferences/SystemConfiguration/com.apple.AutoWake.plist

  • How to use multiple ipods on one account

    I have an Ipod classic and just bought my sons two nano's how do I use these on the same account without changing my account info?

    Take a look here:
    How to use multiple iPods with one computer
    Forum Tip: Since you're new here, you've probably not discovered the Search feature available on every Discussions page, but next time, it might save you time (and everyone else from having to answer the same question multiple times) if you search a couple of ways for a topic, both in the relevant forums, in the User Tips Library and in the Apple Knowledge Base before you post a question.
    Regards.

  • How to register multiple ipods on same email account

    how do register multiple ipods using the same email account?

    Maybe here
    How to use multiple iPods, iPads, or iPhones with one computer
    You can have an unlimited number of devices that you own or control for private use tied to one iTunes account. But you have only have five tied to one iCloud account.
    To alllow FT and Messagibng between them see:
    MacMost Now 653: Setting Up Multiple iOS Devices For Messages and FaceTime

  • How to handle Multiple attachments in sender Mail Adapter

    Hi,
         In our requirement is mutiple documents send through mail adapter, In custom java module we read the each document details and do it bussiness process. But now i am not able to read the multiple files at a time. we are able to read single file only. So plz give the solution for that.
    1) How to send multiple attachments(like word, PDF, JPG etc..) using mail apapter.
    2) How to read multiple attachments in custom java module.
    Thanks & Regards
    Vijay

    Hi Vijay,
    Go through this weblog this explains steps to multile attachments.
    /people/sravya.talanki2/blog/2006/01/12/xi-triggering-e-mails-with-multiple-attachments--problems
    Regards,
    Ashwin.

Maybe you are looking for