Hi all,
I am using the webi report which is based on BW query or cube.
I want to schedule the webi report  which should get refreshed automatically.
how to set the date parameter for that webi report at universe or report level.
or shall i should create a variable at bw side i.e., (sysdate -1)  and tht variable should i use in the report or any idea..
i am using BOE 3.1 SP3
Integration Kit SP3
BW 7.1
Thanks & Regards,
Ravi Sarma
Edited by: Ravi Sarma on Dec 6, 2011 6:09 PM

Hi,
it won't be at "report-level" . those local variables are formulae used for formatting, not for user inputs / responses.
Easiest is to use the SAP KEYDATE variable in the BEx query.
This SAPVAR will come through as a WebI prompt like any other, and has a default value of sysdate (if not answered differently)
As for the Scheduling mechanism, this is the same as always - done in Infoview / BILaunchPad - select the webi instance, and click Schedule .
Regards,
H

Similar Messages

  • #Unavailable in WEBI Report - Using OLAP Universe

    Hi,
    I am using BEX query (OALP Universe) to create a WEBI report, when I run the report, it shows #UNAVAILABLE in Key Figures values.
    I am not using the database delegation in Key figures properties in Universe, it is default to SUM
    and if i create a new report based on this universe it is displaying correct, only if i open the existing report it shows the #unavailable.
    and i tested this report in webi rich client, i.e. i imported this report in WEBI rich client and ran it , it was working fine, then again i exported this report into infoview and it is working fine in Infoview, the Key figures are showing values.
    I am strange of this issue...
    Please let me know if you guys have any idea on this issue
    Thanks in Advance.
    Regards
    Ram

    Hi,
    I am not sure if it is the same problem, but I had similar issues with measure objects coming out of the universe that were defined as "database delegated" in the universe object's properties. Basically it then forces you to always refresh when you have changed anything on the report, so that it can recalculate the measure. I am not aware of differences regarding this in Rich Client vs. InfoView, but there could be. I have seen other similar issues between the two before.
    Check to see if the measures are database delegated, and change them if you can to sum or count or whatever they should be.
    Hope that helps.

  • Schedule webi report using  BW data source and send through email..

    Hi  all,
    I want to schedule webi report and send it through email.
    I am able to send through email.
    here im  got stopped how to schedule the report from bw data source . i have to schedule in webi infoview how to give date format in universe the report sholud run for (sysdate-2) daily
    eg. today is 02-DEC-2011 if i schedule the report it should run for 30-NOV-2011.  iam trying in both BW qyuery and CUBE im not getting how to give date format in
    let me knw is there any solutions..
    im using XIR3 3.1 sp3
    bw 7.1
    Integration kit sp3
    Regards,
    Ravi Sarma.

    it is resolvede by keeping sysdate-2 variable at bw query side i have solved my issue.
    Regards
    ravi

  • Error When Trying to Schedule Webi report using SAP authentication

    Hii,
    We are trying to Schedule Webi report in CMC for Group of Users using SAP authentication(SSO) ,While Trying this we are geting error Unable to Connect to SAP BW server Incomplete Logon Data ..(IES 10901) .
    Authorization done at BI side and Its working properly.Users are able to login into BI Launchpad and View Report as per authorization
    Some Webi reports are created using BICS connection and some  are created using Universe Design Tool (.UNV) which are migrated from BO 3.1 to BO 4.0
    Server Status:
    BO server and Client Tools-:BO 4.0 SP6
    BW System-7.01
    Please refer attach Screen Shot

    Hi Rupesh,
    Please check the below note:
    Seems issue with SNC/STS settings.
    1798197 - Schedules fails with error "Database error: Unable to connect to SAP BW server Incomplete logon data.. (IES 10901)" in BI 4.0
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui_entry/entry.htm?param=69765F6D6F64653D3030312669765F7361…

  • Can create Webi report using multiple universe (multiple datasource)

    Hi All,
    Can we create a Webi report from multiple universe (can say multiple dataprovider & datasource)?
    Please suggest.
    Regards,

    You can bring as many sources together into one report as you like.
    However, to use them together you must have some common dimension, such as a particular Sold To Party, Business Partner, etc. You can then use merge dimensions to develop your report but you will need to be aware that dimensions that are NOT Common to both data providers cannot be used in a table combining two data providers.
    So, if data provider one has dimensions Resort, Product and Year and a  measure object Sales Value
    while  data provider one has dimensions Resort and Year and a  measure object Cost Value, you cannot use Product in a report but you can display Resort, Year, Sales Value and Cost Value together to show you how much revenue each resort is generating each year and how much it is costing you to do so. To have product in the report table, you would need to add it to data provider two.
    Hope that clears it up for you.
    Regards,
    Mark

  • Schedule Webi report using RESTful API

    We are using BO 4.0 (SP2) and looking to schedule reports using our intranet application. I have searched for APIs avaialble and was able to find RESTful API for SP4 but not SP2.  How can we do it in BI 4.0, SP2?
    Quick help will be really appreciated.
    Thanks

    you can schedule Webi documents with prompts using the following:
    URL: http://<servername>:6405/biprws/raylight/v1/documents/<docid>/schedules
    Method:POST
    Request Body:
    <schedule>
    <name>Enter values for City:</name>
    <format type="webi"/>
    <destination>
    <inbox/>
    </destination>
    <once retriesAllowed="2" retryIntervalInSeconds="60">
    <startdate>2013-08-26T15:58:51.000+02:00</startdate>
    <enddate>2013-08-27T15:58:51.000+02:00</enddate>
    </once>
    <parameters>
    <parameter optional="false" type="prompt" dpId="DP0">
    <id>0</id>
    <technicalName>Enter values for City:</technicalName>
    <answer constrained="false" type="Text">
    <values>
    <value>Austin</value>
    </values>
    </answer>
    </parameter>
    </parameters>
    </schedule>
    Using the above request you can schedule the Webi document with prompts to inbox destination  and set for once. The schedule can be sent in different formats to several destinations and set just for once, daily,
    hourly or monthly.
    BUT, its broken if you want to schedule a weekly report (Calendar Date) with prompts in BI 4.1 and SDK has been deprecated.

  • How to schedule webi report in bulk (multiple report in one request)

    hi,
    I am little bit new to BOXI. I have little bit work experience in Crystal X on scheduling which was used in one of our enterprise java application. We are exploring options in BOXI.
    Currently i am scheduling a report with following api
    infoStore.schedule (webiDocs);
    This will schedule one report instance.
    My question is
    Is there any way to schedule multiple instances of a same report in one request.
    Is there any way to schedule multiple instances of a different report in one request.
    If above things are possible please provide the apis for the same.
    thanks in advance
    Shreenidhi

    Scheduling multiple Webi reports in one command:
    infoStore.schedule takes 1 arhgument of type IInfoObjects which is a collection of InfoObject. IInfoObjects is retrieved by the query. So if you to retrieve all the Webi Docs you want to schedule , then with infoStore.schedule(WebiDocs), it will schedule them all in 1 shot. Scheduling Info properties for each Webi Docs should also be set. Please refer to the samples on scheduling at link below.
    https://boc.sdn.sap.com/node/3211
    Scheduling one Webi Doc multiple times in one command:
    I donu2019t think it can be done in one command. Do you want to schedule the object multiple times each time running it with different prompts? Or do you want it to be sent to different destination in each schedule? Otherwise you can schedule it once and then access the scheduled instance multiple times.
    I hope this helps.
    Regards
    Aasavari

  • Webi reports using MSAS universe

    I am using BO XI R3.1. I have created a universe by connecting it to Microsoft Analysis services 2005. In connection, I used OLE DB for OLAP providers for MSAS 2005. I used user specified user name and password and provided a domain service account that has access on the cube. Connection is successful and it brought all objects and classes from the cube. I exported the universe and tried creating reports in Webi using it.
    In Webi, I can access the universe and see all classes and objects. But when I run the report it gives and error "Could not find data provider msolap.3 (WIS 10901)".
    I tried to investigate and changed BO service "Server Intelligent Agent" to run on the same domain account instead of local system account. In CMC I changed the user properties to enable database credentials and gave same domain user account. Still the report does not run.
    As a background, BO server is running on a separate windows 2003 server and MSAS 2005 is on a separate windows 2003 server.
    Can someone please help me on this. Does it have anything to do with kerberos setup to pass security credentials across the servers?
    Thanks
    Tarun

    Sorry Didier.
    For some reason if i save the file it is saved as 0 bytes and if i try to open directly , the zip archive is empty.
    Can you please attach this as a pdf or word document?

  • Can Tivoli (TWS) be used for scheduling WebI reports in BO XI 3.1?

    I am trying to figure out if it is possible to schedule WebI reports to refresh using TWS?
    We are using BO XI 3.1 SP2 deployed on unix and would like to use TWS to refresh WebI reports that are built on SAP BW Bex queries.  Does anyone have any experience scheduling WebI reports using TWS with XI 3.1?  Any information you can provide would be appreciated!
    Thanks,
    Derek

    Hi
    I can think of two options:
    1) You define in BO CMC external events  and schedule your reports to wait for them. In the TWS you can schedule an OS script to create the file that triggers the BO external event. The reports will run only after the file is created.
    2) You write  a java program that uses the BOBJ SDK in order to schedule immediately your reports. In the TWS you create a scedule that starts the java program. (You can find examples how to use the SDK here http://www.sdn.sap.com/irj/boc/samples )
    Regards,
    Stratos

  • Scheduling WebI reports in BusinessObjects 4.0 date prompts

    will SAp Business Objects 4.0 include some kind of feature to allow people to schedule webi reports in an easier way if the report conatins date prompts? For example if my report has 2 dates start date and end date prompts, it's logical if I want to schedule it to be refreshed every month I don't want to keep it scheduling with the same start date and end date for ever.  I want them to change depending on the month.
    I know there are some things that can be done at universe level, but what if a user doesn't have rights to modify the universe? It would be more useful to have some option in the schedule window to make the values change depending on some basic conditions.
    Or at least if profiles settings could help to do that by selecting in the list objects instead of fixed values from the list, it could help too.

    Hi,
    This looks like to be a request for future product enhancements.
    You need to log an Enhancement Request via Idea Place for the feature/functionality you would like to see in BI4.0.  Please follow steps in the attached SAP note [1515837 - How To: Enhancement Request Process - Idea Place |https://bosap-support.wdf.sap.corp/sap(bD1lbiZjPTAwMQ==)/bc/bsp/sno/ui_entry/entry.htm?param=69765F6D6F64653D3030312669765F7361706E6F7465735F6E756D6265723D3030303135313538333726]. If this idea is already submitted, you will need just to add your vote to it.
    Regards,
    Jeff

  • Scheduling WebI reports for Dynamic Date Ranges

    Hello Everyone,
    Our Env is BOBJ XI 3.1 SP2 FP2.5 integrated with SAP NW  BW 7.02 EPH1
    We are trying to schedule few WebI reports which can be used on ad-hoc basis as well. Some reports need to get data from starting of the month to today (like MTD) and few are with dynamic date ranges.
    In case of relational universes i used to do Magic Date as mentioned here :  http://www.dagira.com/2008/07/21/using-a-magic-date-value-in-prompts
    But for OLAP Universes i have written a MDX filter prompt as :
    <FILTER KEY= "@Select(Debit Memo Date\Debit Memo Date LOV)">
    <CONDITION OPERATORCONDITION= "Between">
    <CONSTANT CAPTION= "IIF (@Prompt('Enter\Select DM Start Date: ','D','First day of Current Month\First day of Current Month',mono,free,not_persistent,{'First Day of Month'},,User:0)='First Day of Month','First day of Current Month\First day of Current Month',@Prompt('Enter\Select DM Start Date: ','D','First day of Current Month\First day of Current Month',mono,free,not_persistent,{'First Day of Month'},,User:0))"/>
    <CONSTANT CAPTION= "IIF (@Prompt('Enter\Select DM End Date: ','D','Date2\Today',mono,free,not_persistent,{'Today'},,User:0) > '1/1/2100 12:00:00 AM',''1/1/2010 12:00:00 AM'',(@Prompt('Enter\Select DM End Date: ','D','Date2\Today',mono,free,not_persistent,{'Today'},,User:0))"/>
    </CONDITION>
    </FILTER>
    We are getting MDX erros because IIF can only return numeric values. So are there any other approaches for dynamically scheduling the reports or can the above MDX prompt be modified to make it work ?
    - Vamsi Ch

    Ingo,
    When we schedule the WEBI report we use the BEX query with a variable based on a customer Exit .
    There are good examples in
    https://wiki.sdn.sap.com/wiki/display/profile/Surendra+Reddy
    In order to avoid providing a hard coded date restriction in the BEX query we want to have a flexible date range solution (e.g. data from 1.1.2011 until yesterday).
    Is the folloing scenario possible:
    Scheduled webi report with a hard coded date e.g. 1.1.1900 (for the BEX variable)
    The BEX query should return the data from 1.1.2011 until yesterday (dynamically)  if date = 1.1.1900
    else it should return the data (for the e.g. adhoc reporting)
    Is a customer exit like this possible ?
    Pseudo code:
    IF date = 1.1.900 then return sysdate-1 else return entered date
    For a relational universe I always used a magic date condition

  • Webi report on OLAP Bex query -  Cost element Hierarchy not working Drill down

    Hello,
    We have a BO report on Bex query, Not on universe, we have a Hierarchy for Cost Element Group, and we are expecting the Drill down functionality for that in BO report, but it does not.
    Webi report on OLAP Bex query -  Cost element Hierarchy not working Drill down
    Any pointers how to do it please
    Thanks
    Krishna

    Hi,
    WebI reports on BEx source don't use same Drill feature as other sources, it's replaced by expland/collapse of hierarchy nodes (documented in WebI user guide in § "24.1 Drill defined"). This means you have to create query which selects all hierarchy sub-tree you plan on exploring later in report, otherwise if no data is available under a node there will be no '+/-' sign to visit this part of tree.
    You could try first to select "All members" from hierarchy in QueryPanel and see if behavior in report suits your needs. Then you should restrict hierarchy member selection to what's really needed to avoid performance issues.
    Regards,
    Loic

  • Date error when scheduling webi reports

    Hi,
    When i click the prompt option in re schedule the scheduled webi report, i got the error "while trying to invoke the method java.util.date.gettime() of a null object loaded from a local variable 'date' "
    The BI version is 4.1 SP03
    The scheduled webi reports failing and got the error as "Unparseable date: "01/01/1900" "
    How to solve this issues?
    Regards,
    Kathir

    This might fix it from the note http://service.sap.com/sap/support/notes/1981477
    Create a WebI report that uses a date object in the Query Filters
    Schedule the report
    Reschedule by manually entering date value which shows only date and no timestampExample: 12/31/2007
    Reschedule by selecting date value from the calendar which shows date timestampExample: 12/31/2007 12:00:00 AM
    Create a biar file using the Import Wizard and migrate to BI 4.1 SP2
    BI 4.1 SP2 BILaunchPad, navigate to and Right click the report and go to “History”
    Right click the instance without a timestamp for the date parameter and select “Reschedule”
    Click on “Prompts” on the left menu and note an error is produced:This error occurred: while trying to invoke the method java.util.Date.getTime() of an object loaded from local variable ‘date’
    Attempting to schedule this instance (as Run Now or Reschedule) without selecting a Prompt value fails with the error:  Unparseable date: “12/31/2007”
    Using the instance with a timestamp works as expected

  • Rolling month for webi report using Univ based on BEX Query

    Dear Experts,
    I'm new to OLAP universes.
    We have a requirements of having last 12 months rolling  for given measure(Key figure) in webi report using Univ based on Bex Query.
    We require a calmonth (time dimension) object  (restricted for last 12 months) where user can drag and drop on column section of cross-tab table.  User should drag more than one Key figure ( for ex. sales rev and & qty sold) for each month
    Could you please provide me the solution to do this?
    Thanks
    Akshara

    Hi Henry,
    Thank  you for your response.
    BEx query has not been created yet. we need to create accordingly and require your help in creating the same.
    Regarding reporting requirements,  User wants to have adhoc reporting  with rolling months ( 12 months or 6 months) functionality. Users want to link any KF to this rolling months dimension.
    If we can't have this, what is the alternative that we can propose to user.
    Thanks
    Akshara.

  • Scheduled webi reports fail, why? If I restart BO services they work again

    Hello.
    I'm having a problem with my scheduled Webi reports and I don't know what is causing it.  I have some reports scheduled to run at 8:00 am, and are supposed to be sent to a determined e-mail. Last week it worked well and the reports were sent to their destination successfuly, then this week the same reports didn't reach their destination.  I verified in the History option and all of them showed a Failed status.  I checked the detail and this is what it shows:
    Unexpected exception caught. Reason: [java.lang.NullPointerException: i_statusInfo is null.]
    If I try to reschedule these reports or any other report or a new report I get the same error.  The only way I can make the schedule option work again  for my webi reports is restarting  BusinessObjects services.
    But I guess this is not the right solution.
    What can I do? How can I determine what is causing my scheduled webi reports fail?
    What does  this java.lang.NullPointerException: i_statusInfo is null message mean?
    Is there a way I could track the service that is failing? which BO service is the service that manage the Schedule reports?
    Any help is welcome.
    Edited by: Erika Atencio on Sep 1, 2010 6:27 PM

    >
    Efstratios Karaivazoglou wrote:
    > Which version of BOBJ (incl. SP and FP) are you using?
    >
    > Regards,
    >
    > Stratos
    BusinessObjects XI 3.1 SP2
    FixPack 2.6
    Edited by: Erika Atencio on Sep 1, 2010 8:46 PM

Maybe you are looking for

  • UCCE Unable to mix logical operators in a single step (PQs)

    Hi, I'm trying to configure this expression on a single step  (A&C)||(B&C). After setting the first logical operator the remaining ones get greyed out with the option you chose at the begining (attached). How can you get the result of the expression

  • Using ATV as a media streamer

    I wish to use an ATV as a streamer. Basically i'm looking at purchasing an ATV to stream media (music, photos and movies)from my network drives. I have 2TB of media stored on my network drives and wish to use access these via the ATV. Please let me k

  • Photo Booth & Graphic Card

    I have a MacBookPro with a 3.06 GHz processor, 4GB memory, and a NVIDIA GeForce 9400M graphics card running OSX 10.5.8. I've used Photo Booth without incident in the past but today when I tried to open it it gave me an error message stating that Phot

  • How to resolve sharing issue

    I have an AEBS, 3 MPB's, a MacMini, an iMac20, and an iMac27 all are running Mavericks 10.9.2. All have File, Printer, and Screen Sharing turned on, but I can't seem to get to connect via "Share Screen" or "Connect As" when I select the computer name

  • Change images/content within PDF using controls?

    Hi, Sorry about the title of the question -- not sure how to phrase it. Basically I need to know: Is it possible, within a PDF, to give the viewer an option to switch content using a dropdown list, or radio buttons or some other form of control. So,