How to set delivery complete in scheduling agreement automatically

Hi. I would like to request for help on how to flag delivery complete in an scheduling agreement?
When creating a goods receipt against a scheduling agreement, do we need a user-exit  or how is it configured in order to check the quantity receivedthe quantity in the goods receipt and compare it with the quantity in the scheduling agreement (/- de tolerance) and, in case the full ordered quantity has been received, set the flag Delivery completed in the scheduling agreement.
Thanks.

Hi,
We regret that the functionality  setting of "delivery completed"       
indicator automatically for a scheduling agreement is not included in   
the SAP standard system.                                                
For scheduling agreements, you must maintain the final delivery              
indicator only in the scheduling agreement item.                             
A maintenance from the goods receipt is useless for scheduling               
agreements since the current schedule line situation is generally not        
final. Even if all schedule lines are supplied, this does not mean that      
no new schedule line might be added. Therefore, for scheduling               
agreements,maintenance of final delivery indicator is planned only from      
the document item.                                                                               
Regards,
Edit

Similar Messages

  • How to set delivery block in va01 by not use delivery block reason.

    Dear SAP Gurus.
    I have one scenario. I need to do delivery block on sales order while i create sales order via VA01.
    Normally, I use delivery block reason in header and set delivery block in schedule line.
    In addtion, i dont want to use above method and not use complete delivery (Tick on it)
    So, I would like to know it has other way to do delivery block.
    The cause is my manager do not allow to use  this field from company's policy.
    Please help me to solve this problem.
    Thank you in advance for your kindly help.
    Best Regards,
        Surakit

    Surakit,
    Well, do you want to say that user should not manually user delivery block at header or sch line to block the doc or any other method manually done before saving the sales order.
    In that case, for making default delivery block at header, in Sales doc type (TCode VOV8) in Shipping section, maintain a delivery block as 22-Statutory Compliance(even any other option available) or for Item based block on Sch line cat (TCode VOV6) maintain default delv block there.
    Or if I misunderstood your requirement then we can wait & see other solution coming for the same.
    Thanks & Regards
    JP

  • How to set delv. completed in 2nd line item which created in PO by default

    Dear guru,
    When creating 1st line item by default the 2nd line item has been created. I understand that the 2nd line item is free because no net price has been stated but free good check box in not ticket. Further more the 2nd line is grayed out including all tab in item details. Meaning we can't do any changes in this line item.
    User set delivery completed in 1st line item but couldn't set in 2nd line item. This caused to this PO show still pending for delievery when run the report. How we can set this 2nd line item has delivery completed eventhough GR haven't done fully.
    rgds,
    nantha

    Dear Mahesh,
    The 2nd line is free good that assign with 1st line item. This has been set in purchasing info record under condition view. Thus when I create PO for 1st line item, system created 2nd line item as auto default. The issue here is the 2nd line item & all the field that in item details in PO become grayed out eventhough I go to ME22N. I cant do any changes on 2nd line item. I believe there would be some control maintain for free good. Please advice. Thank you.
    rgds,
    nantha

  • Delivery issue about scheduling agreement

    Dear experts,
    Case:
    There're 2 delivery dates in scheduling agreement: One is July 28 (delivery quantity 10K), the other is July 30 (delivery quantity 20K). If July 30 is entered in the field "selection date" (VL01N), delivery only captures the second one (quantity 20K). The first one (delivery date July 28, quantity 10K) is not delivered at all.
    Q1: Why the first one (quantity 10K) cannot be captured in delivery? You know, delivery for sales order can capture those items as long as "selection date" is July 30.
    Q2: Any chances to make delivery of scheduling agreement capture the first one (delivery date July 28, quantity 10K) as well?
    Plz help. Many thanks.

    Try tcode VL10A with either following CalcRuleDefltDlvCrDt (By default it is 2-Today and tomorrow) option with relevant date interval.
    (Blank) - Everything Up To Maximum Number of Days
    3 - Due for shipment by the end of next week ( past-due delivs)+
    4 - Due for shipment tomorrow (includes past-due deliveries)
    9 - User Exit
    CalcRuleDefltDlvCrDt is rule for determining default value for deliv. creation date. i.e., rule for determining the default value for the selection interval for the delivery creation date.
    The following are implemented:
    1. All documents due for delivery today
    2. All documents due for delivery today and tomorrow
    3. All documents due for delivery up until the end of next week (includingthose that were due before today)
    4. All documents due for delivery up until and including tomorrow(including those that were due before today)
    Hope this can assist you.
    Thanks & Regrads
    JP

  • Correction delivery in the scheduling agreement.

    Coundnt able to create the correction delivery in the scheduling agreements.
    Where can i see
    Thanks in advance for your assistance.......
    Message was edited by:
            tiru

    To create a correction delivery (document type LFKO):
    Choose Corr. delivery on the delivery schedule tabstrip.
    The system displays a dialog box in which you enter a:
          --> Correction delivery date
                For help on deciding where you want to position the correction delivery, choose Display. The system lists delivery dates in chronological order.
         --> Correction quantity
               Enter a negative correction quantity by placing a minus sign after the quantity.
    Choose Enter and save the scheduling agreement.
    <b>Result</b>
    When you save the correction delivery, the system updates the cumulative quantities in the delivery schedule.
    To display correction deliveries, choose Deliveries on the delivery schedule tabstrip, or Environment --> Display document flow.
    Thanks
    G. Lakshmipathi

  • No create Plant button at the Set "Delivery Completed" Indicator" config

    Dear Gurus,
    I would like to do the configuration to set the Delivery Completed indicator. Therefore, I went to the following menupath:
    SPRO -> Materials Management -> Inventory Management and Physical inventory -> Goods Receipt -> Set "Delivery Completed" Indicator"
    The problem is, I can't find the button to add Plants. Is there even one in the first place ? If yes, where is it ? If no, why not ?
    Currently, the only Plant that I can see over here is 0001 - Plant 0001. The delivery completed checkbox is ticked.
    Please take note that all the Plants have been setup and the system has Gone Live.
    Thanks.

    Hi ,
    It seems that the plant is not configured properly.Anyhow u can create ur own at  the following path.
    Spro-MMInventory Management and Physical InventoryPlant Parameters
    Set all the indicators applicable to that plant for IM.
    Regards
    Ramesh Ch

  • How to block large number of scheduling agreements?

    How to block large number of scheduling agreements (Purchasing doc type 'LPA') ?

    Hi
    You can use T.code MASS and choose scheduling agreement and you see field LOEKZ there (deletion indicator) You can mark it for deletion and it can be undelete if you want in future.
    If you want to block it with source list, you need to do LSMW or BDC for ME01 and for your agreement block it in a validity period for a plant
    Regards
    Antony

  • Setting final delivery indicator on scheduling agreements (ELIKZ)

    Hello ALL,
    Based on note 199749 SAP does not set the delivery complete indicator for scheduling agreements during goods receipt processing.   We're employing thousand line scheduling agreeements where new schedule items are added to the scheduling agreeement items via MRP.   When the delivery complete indicator is manually set MRP proposes requisitions instead of schedule lines which is our desired processing but we need the final delivery indicator to be automatically set.  Does anybody know the user exit to set this indicator during goods receipt processing including any other helpful information.
    Thanks so much for your time.

    Hello Walter,
    this should be possible in BADI 'MB_DOCUMENT_BADI' ,
    method MB_DOCUMENT_UPDATE.
    Regards Wolfgang

  • Delivery notes in scheduling agreements

    Hello,
    we send scheduling agreement (ME38) to our supplier. Now we create delivery notes with vl31n, which should reduce the open quantity of our schedules. Unfortunaly the delivery notes will not reduce the quantity and we send the supplier a wrong open, too high quantity. How can we solve this problem?
    SPRO > Material Management > Purchasing > Confirmations > Set Up confirmation control
    We set already the parameter for "Confirmation is Relevant to Materials Planning".
    Regards
    Andreas

    Hi
    You should use creation profile which has General data "Determine Backlog/Imm. Reqt" ticked for both JIT and Forecast . T.code is OMUP
    Regards
    Antony

  • Delivery from sales scheduling agreement with one item per schedule line

    Hi all,
    I have a sales scheduling agreement where the same part number has 3 different JIT schedule lines and I need to create a delivery with 3 item lines: every item line of the delivery has to be referred to one schedule line of the scheduling agreement.
    When I create the delivery with transaction VL10E it has only one item line and its quantity is the sum of the 3 schedule lines of the sales scheduling agreement.
    I've tried to change the customizing of the User Role, choosing the Split Schedule Line = 2 ("One item per schedule line") but the delivery is created again with only one item line.
    How can I solve this issue?
    Thanks in advance for reply

    Dear Alex
    The SAP standard behaviour is that all schedule items with delivery date in the past have to be rescheduled anyway to one date and are combined therefore.
    Partially this behaviour can be influenced in VL10* by 2 parameters in
    the user role : Split per sched.line and Rule (delivery qty).
    Please find below informations about these different parameters
    "Split per sched.line propose you 3 Rule for creating one delivery item
    per schedule line. In a delivery list in item view with multiple
    schedule lines, you can decide for the same document item whether you
    want to generate one delivery item per schedule line or whether you want
    to deliver the cumulated quantity of the last schedule lines selected.
    About rule for delivery quantity, the following rules are currently
    implemented:
    1. No cumulation
    The open schedule line quantity to be delivered is the quantity at which
    the list line is delivered.
    2. Sum of all open schedule line quantities to be delivered that fall
    before the chronologically latest date in the to field (following the
    Deliv. creation date field) of the selection criteria.
    3. Sum of all open schedule line quantities to be delivered whose
    delivery creation date falls within the selection time frame (between
    the dates in the Deliv. creation date and to fields, respectively),
    making the calculation of the quantity to be delivered consistent with
    selection criteria. However, calculationof the quantities delivered with
    the order's schedule line quantities is not affected."
    Hope this helps.
    Regards
    Tonia

  • GR qty is updated in future delivery date in Scheduling agreement

    Dear All,
    In one of our Scheduling agreement  delivery schedule, the Goods receipt qty got updated in  future delivery date (ie., 30.07.2011 & 19.10.2011). Any idea how this got updated wrongly? or is there any standard functionality that controls this GR qty field.
    Thanks in advance
    Benny

    HI,
    Both  Planned delivery time and GR processing time are having 1 day , please let me know any other factor influencing this data.
    Thanks
    Benny

  • SD create Collective delivery document against scheduling agreement.

    Dear freinds,
    I have created  scheduling agreements for single material , and updated forecast deliery agaisnt IDOCS,
    now I want to make a single delivery agaisnt four different materials.
    I use Transaction VL 10 for Delivery due list and  selected diff. materials four items,executed  backgroud run,
    system is creating two delivery documents instead of one.
    Please advise me how to get single delivery document against multiple delivery due items.
    in customer master i marked to order combination, partial delivery allowed up to 9 deliveries
    Regards
    Dilip

    Excellent information !
    I understood what you have mentioned .
    Just I need your clarifications for my below queries to fix this issue .
    There are 6 line items in this scheduling agreement .
    For 3 line items , delivery schedule date is 02/08/2008 . for another 2 line items, delivery schedule is 05/07/2008 . due to this different delivery schedules for line items  in scheduling agreement . whenever  user creates delivery , delivery split is happening .
    In order to avoid this problem , can ask user to change delivery schedule for another 2 line items to 02/08/2008 from 05/07/2008 . ?
    If user change this delivery schedule  for this line items , is there any ramification in anyway ?.
    Thanks In Advance

  • Over Delivery Tolerance for schedule agreements

    Hi,
    we have overdelivery tolerance of 10%  in schedule agreement and system is allowing to do GR for more the the over delivery tolerance.
    can any one tell me how to get the error message while doing GR for more than the over delivery tolerance in case of schedule agreements.

    See OSS Note 874264 - MB01/MIGO: Default quantity for goods receipt posting
    3. The basis used for calculating the over or under delivery tolerance is the quantity ordered, in case of purchase orders, and the suggested quantity, in the case of scheduling agreements. If you want the system response to be the same for scheduling agreements as it is for purchase orders (that is, you need more generous tolerances) see also the SAP Consulting Note 741385.
    For items with a confirmation control key, the basis for the calculation of the over or under delivery tolerance is the quantity ordered or the total of the schedule line quantities.

  • How to compare delivery date in schedule lines and PGI in outbound delivery

    Hi,
    I want to create a report to monitor and compare different dates in sales and delivery process.
    One of my key figure is the comparison between date confirmed to the customer, that I can find in the schedule line of the sales order, and the actual goods issue date from the outbound delivery.
    But I can't succeed in making the link between delivery and schedule lines, means between LIKP and VBEP.
    Would you have any idea?
    Thank you.

    It seems there's no exact (table) connection / link between delivery item and schedule line item.
    Those who were searching for this thing (link / connection between delivery item and schedule line) were recommended to use FM "RV_SCHEDULE_CHECK_DELIVERIES".
    This FM calculates the delivered quantity for each schedule line, so it makes link between the delivery item and schedule lines - however if you check the code it's quite sophisticated...
    (if you put a breakpoint in the FM and display a SO in VA03, you can check how the parameters have to be populated with data).
    Schedule Line and Delivery Link
    Edited by: Csaba Szommer on Aug 5, 2011 12:03 AM

  • Planned delivery time in Scheduling agreement and MRP

    Hello,
    Do you know is it possible to determine system so that MRP run will consider the planned delivery time from the scheduling agreement line instead of material master? Now the system read planned delivery time from material master when creating schedule lines automatically by MRP-run.
    Regards, jaana

    This can be customized in
    SAP Customizing Implementation Guide
    -> Production
    --> Material Requirements Planning
    ---> Planning
    > Procurement Proposals
    > Define External Procurement
    Here you can select the indicator "Scheduling according to purchasing info record or agreement" either at plant or MRP group level.

Maybe you are looking for

  • Videos app only plays sound through Airplay

    Hi, When I airplay a video using the 'Videos' app on my iPhone 4S or my iPad Mini I only get sound through my Apple TV.  I understand that I can use Mirroring to see the video as well, but other apps show audio and visual without having to mirror.  I

  • Why is outgoing mail rejected by the Exchange server?

    Hi all. One in every 10 emails sent via Mavericks Mail is being rejected by my Exchange server. It's more like one in two emails with attachments. Shutting down Mail and re-opening doesn't help. Eventually I get the rejection window and list of serve

  • Photoshop v3 had a photo gallery automated action. Where would I fine one for v2014?

    Photoshop v3 had a photo gallery automated action. Where would I fine one for v2014?

  • Export Controller has stopped working

    Help, Whenever I try to export a video, Quicktime crashes and gives me the following error, "Export Controller has stopped working". I'm running a dual core app with Vista premium. I have uninstalled and reinstalled Quicktime. My system has also cras

  • Where is the new lens correction in ACR 6?

    I see the new lens correction filter in PS CS5, although it looks a bit different than it does in some of the pre-release videos that I saw, but I cannot find it when I open up the ACR window? This is all that I can find and it does not have the new