How to sinck data between  production and R12 instance

Hi,
I am working on Oracle Apps up-gradation project.
Now I have upgrade 11.5.7 to R12 (12.0.4) successfully. I started up-gradation task with 1 May of production data (backup) on new machine.
Client wants to live R12 from 1/August/2009.
Please suggest how to sinck data between production and R12 instance.
Thanks
Anup

Hi,
It is not possible to do what you propose (sync data from an 11.5.7 system to a 12.0.4 system). You will need to re-run the upgrade against the August 1 data, following your original upgrade procedures.
Regards,
John P.
http://only4left.jpiwowar.com

Similar Messages

  • How to  pass data between JDialog and its parent window ?

    Hi,
    I am new to swing. I want to know how pass data between a JDialog and its parent window.
    If you have any information please reply with example code.
    Thank You

    hi Encephalopathic ,
    I was looking for something like as it was given in the link provided by you.
    Thank you for reply It really helped me.

  • How to exchanging data between SAP and P3?

    could use BAPI directly between SAP and P3? And if we use XI as middleware, which protocols or methods should we use?
    any answer should be appreciated.

    Hi,
    U havent mentioned what exactly ur P3 system is.
    Considering it to be Primavera P3 system, the integration could not be done directly using a BAPI since the structure of Projects (as well as the rules to define the projects) are different in SAP and Primavera P3.
    Thats y XI is required. U have to use Idoc/RFC interfaces. Have a look about what Primavera wants to say about this integration
    http://www.primavera.com/newsroom/primavera_sap_051007.asp
    Regards,
    Prateek

  • How to configre printer  at linux and R12 instance

    Dear all,
    Please guide me.how to configure printer at linux and configure at R12 also.
    Regards
    Dharma

    933950 wrote:
    Dear all,
    Please guide me.how to configure printer at linux and configure at R12 also.
    Regards
    DharmaThis topic was discussed many times in the forum before, please see old threads for details.
    https://forums.oracle.com/forums/search.jspa?threadID=&q=Printer&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    https://forums.oracle.com/forums/search.jspa?threadID=&q=Printer+AND+R12&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    https://forums.oracle.com/forums/search.jspa?threadID=&q=Printer+AND+Setup&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    Thanks,
    Hussein

  • Copy data between productive and test system

    Hi everybody,
    I need to copy data from one cube in productive system into the same cube in the test system.
    How can I do it?
    Regards
    Erwin

    If you need to copy data from one system to another maybe you can do a Data Refresh or a SAP_DATA System Copy.
      If you wan't only to copy data from 1 Cube to another in other system you shoul'd try transforming the data on the Cube to a Report or maybe an ODS and then dowload it to a CVS archive, and then make a Transformation From PC_FILE to ODS and Cube o from PC_FILE to Cube.
    Hope it's work.
    Grettings.
    Ignacio.

  • How to validate date between Header and Detail Block..

    Hi All,
    I was trying to find a way where, suppose I enter 'from date' and 'to date' in the header block.then in detail block all 'from dates' and 'to dates' should be restricted between the dates entered in the header block.
    Thank you

    Or U Can Simply set in the child item lowest / highest Allowed Value
    Invoke Property pallete for child date item and set the following
    lowest Allowed Value :header.from_date (must be prefix with :)
    Highest Allowed Value :header.to_date
    siju.koiply

  • How to syncronize data between resource and IdM?

    I created a form (assign to proxy administrator) for reconciliation, and it gets executed when I imported new user into IdM through full reconciliation. In this way I can assign email of user to waveset.email.
    But later when the email gets updated in resource directly, how can I propagate the new value to IdM (without activeSync). By running a full reconciliation again doesn't seem to re-run the proxy administrator's form. I always thought full reconciliation would do the trick, but only now I realize it does not work at all !!?
    What should I do then to synchronize the data?

    Recon was not really designed to automatically synchronize attributes. Typically, this is implemented via ActiveSync. With that said, there is an option in Recon to "Attribute-Level Reconciliation". This allows you to provide a list of resource attributes to watch and if there is a change, Recon calls a workflow, where you can execute any changes you would like.
    I believe this workflow is called "Audit Native Change To Account Attributes". Look at wfrecon.xml located in /sample.
    Edited by: R1100SLA on Dec 21, 2007 12:12 AM

  • How to Reconcile Data Between SAP Source Systems and SAP NetWeaver BI

    Hi,
    I just read "How to Reconcile Data Between SAP Source Systems and SAP NetWeaver BI".  While I'm waiting for  more authorisation to r/3 to carry it out and test this functionality.
    I'd like to ask a question to anyone who has implemented this type solution.  On page 10 it talks about creating a view then setting up the datasource. The solution talks about runnig a query.  I suspect when we run a query I would run it for only a period(using variable) to reconcile.
    My question is this.  Will the datasource extractor on /r3 only select the period in our variable or will it do a full selection of the data which would then be passed to BW for filtering?
    Regards

    DEar Mark,
    There are several avenues where you can see and reconcile your data with source system, u can see data in by tcode RSA3 for a datasource, and compare the values with actual document posted into the R/3 system. Respective fuctional consultant canhelp you a lot to confirm the data.
    On BW side u can see the data in PSA and then check tranformations which subsequent change/update/reject data records based on the selective conditions.
    hope this helps.
    Kindly assign the points if it works.
    Revert back if u need futher help/information.

  • How to pass series of dates (between startdate and enddate) to subreport, which takes only one date as parameter

    Relatively new to Microsoft report services. I have created a report which takes a single parameter named 'SelectedDate'. This report runs fine (uses complex query of hours of the selected date and complex joins & aggregate calculations between SQL
    database tables). I created a new report with two parameters, namely, StartDate and EndDate. Also created a sql stored procedure which gives all dates between StartDate and EndDate. Added subreport to this report which calls my first report and defined 'SelectedDate'
    parameter to get the value as "=First(Fields!dt.Value, "DataSet1") - where dt is the resultset of procedure called in DataSet1. When I run this report, in the subreport, all I see is the report for 'StartDate' which is the passed
    value of the first parameter. I can't find a way to pass entire array of dates as parameter, to which user can browse forwards and backwards. Any idea? Thanks in advance for your help!

    HI Visakh16..Never mind my comment..I tried it again. This time I went to the completion of previewing..and noticed that the table with DataSet1 does display dates and first report underneath but once I click any other date, it displays the subreport on
    full page and navigation back arrow (with hint 'back to Parent Report) solution is not bad..so unless you a way to achieve my desired layout mentioned above - I am good for now! Thanks for your pointer in right direction!
    One small observation for thread readers: When I published the report to the report server, the back button (back to Parent Report) which was available to me at design time, is not displayed at client's browser. Upon checking pertinent threads, concluded
    that this is known issue for years and recommendation I concluded from various threads is: Use back button of browser and it should (& did) keep the parent report page, with table with selected dates intact. A few have noticed different behaviour
    for older browser versions. 

  • Events limit can only be dates between 1 and 9 on the day field

    Im an student, and im trying to put my timetable into ical as did last year
    it goes ok, i set it up to repit every week mondays lessons for example
    but when i am trying to set up a limit for this event to repit itself ical only allows me to
    put a date between 1 and 9 on the day field.
    Does anyone know why is that?
    sorry is my english is not so good im from spain and i might not explained very well
    thank you

    The x86 architecture has a standard formatting for disks that uses up to four primary partitions on a disk. On DOS or UNIX, you can view the partitions with 'fdisk'.
    This is layer that Windows and Linux tends to use for filesystems.
    Solaris though uses only one of those partitions for its own use (marking it a Solaris partition) and places a label similar to that on a SPARC disk (VTOC). So within the single x86 partition are several further subdivisions (slices).
    On solaris, the disk might be /dev/dsk/c0t0d0. You could access one of the Solaris (VTOC) slices as /dev/dsk/c0t0d0s0. As far as I know, Linux does not understand how to address the Solaris VTOC slices (If this isn't true, I'd love to know what the syntax for doing so is).
    You'd access the (non-Solaris) x86 parititions like /dev/dsk/c0t0d0p1 or so. While Linux can address extended x86 partitions, Solaris can only address primary partitions.
    Darren

  • New tab for Contract for data about products and product sales.

    Looking for ideas to implement a new tab on the Contract (RECN)
    We have some basic data about products and product sales that we want to have implemented on a screen tab for a contract.  The user needs to be able to enter information about a product, quantity, year grown, and tax info. And then each of these products may have one or many sales records showing date of sale, quantity sold, and a brief note.
    So a contract can have 1 or many products and a product can have one or many sales records.
    The user needs to be able to enter, update and delete any one of these records.  And, ideally, enter multiple of each before saving.
    Do any of you have ideas about how to go about this?  Using ALV grids? or table controls? I'm still wet behind the ears regarding doing screen development in SAP so am open to any and all suggestiions.
    SAP 6.4 is the version we are at.
    Thanks
    Laurie

    Maybe the original order to renew and keep unlimited data was cancelled because it was not an option. It wasn't a "bait-and-switch" The order was cancelled, it wasn't switched. When you called to reissue the order they told you the correct options so they did not switch you without your knowledge. The second rep was correct, he didn't lie, the first rep did. Verizon cancelled the order because if they didn't you would have been set up w/ new 2 year agreements on a tiered data plan, which would have been illegal. Thats why they cancelled it. So you can either not make the change, keep the unlimited data and buy the phones outright. Or switch, go to a tiered plan, and get new phones. By glitch they meant the system accidentally allowed you to keep the unlimited plan, though it was not an option. Verizon has had this rule since they removed the unlimited plan back in '11.
    << Full name of rep removed >>
    Message was edited by: Verizon Moderator

  • Performace tuning: how to pass data between different batch job programs?

    Hi everyone,
        now i have one problem about performance tuning using threading in SAP programs: split one big program into two programs - one is main program and the other is sub program. using batch jobs, we can submit multi jobs of sub program at the same time.
        does anybody know how to pass data between different batch jobs? I don't want to use temp files. can ABAP memory can implement this?
        thanks!

    Wei,
    Yes we can transfer the data by using
    SAP Memory OR ABAP Memory.
    Ex:  V_count TYPE i.
      V_count = 100.
    LOOP AT  itab.
    IF v_count EQ 25.
    Here For every batch job
      EXPORT data TO MEMORY ID 'ABC'
       Function module
        JOB_OPEN
       JOB_SUBMIT
       JOB_CLOSE.
      ENDIF.
    ENDLOOP .
    IN your 2nd program.
    INITIALIZATION.
    IMPORT data FROM MEMORY IF 'ABC'.
    FREE memory if .---When you free the memory you will get recent data.
    Don't forget to reward if useful.

  • SAP threading-how to pass data between different batch job programs?

    Hi everyone,
        now i have one problem about performance tuning using threading in SAP programs: split one big program into two programs - one is main program and the other is sub program. using batch jobs, we can submit multi jobs of sub program at the same time.
        does anybody know how to pass data between different batch jobs? I don't want to use temp files. can ABAP memory can implement this?
        thanks!

    Passing Data Between Programs
    [http://help.sap.com/saphelp_47x200/helpdata/en/9f/db9df735c111d1829f0000e829fbfe/frameset.htm|http://help.sap.com/saphelp_47x200/helpdata/en/9f/db9df735c111d1829f0000e829fbfe/frameset.htm]

  • How does the integration between CRM and SD occur

    How does the integration between CRM and SD occur?  Is only via ALE and are there config steps in CRM to ensure the correct data mapping between CRM and SD?
    So, if I create an order or quote in CRM how is it then created in SD?  Or do they share the same data store.
    thanks

    Hi John,
    Here is good documentation regarding Data Exchange for Sales Transactions: the CRM Enterprise and the ERP System are two different repositories, If you create the Sales Order in CRM then they will be replicated into SD (using CRM Middleware, BDoc's)
    http://help.sap.com/saphelp_crm60/helpdata/en/52/2d0c38941e5666e10000009b38f8cf/frameset.htm
    Also you can check the best practice guide for CRM 2007 there you have plenty of information
    http://help.sap.com/bp_crmv12007/CRM_DE/HTML/index.htm
    Hope this help,
    Regards,
    Ramon

  • Definition of the best approach on how to do reporting between BPC and BW

    Hi,
    I need your opinion in the definition of the best approach on how to do reporting between BPC and BW.
    For example if we want to do reporting using BW on Actuals Vs Budget how should we manage this since technically BPC Model and BW InfoCube is different?
    BPC Models have the Budget and BW has the actuals, but the InfoObject that is used for Account is different. What is the best approach to do the reporting?
    Thanks in advance,
    JA

    Hi Gersh
    I already thought in that option, but the problem is the Yellow requests in the Infocube that are not used by VP.
    In the past I used Report RSAPO_CLOSE_TRANS_REQUEST_ALL3 in the virtual function module to close the requests, but now I didn't want to use VP based on function module.
    Is there any option to use data in Yellow requests in VP based on DTP?
    Best regards,
    JA

Maybe you are looking for

  • 10.10.3 breaks support for ATI video cards

    The 10.10.3 update has broken support for a bunch of ATI video cards that worked just fine under 10.10.2. This is for my Mac Pro 5,1. Some folks also reported issues with breaking support for Nvidia cards, but have mentioned that the latest Nvidia be

  • Why can. I not view contacts on webcam

    Why can I not view contacts cam on messenger

  • Use of Logbook in SAP Plant Maintenance

    Hi Experts, Can anybody tell me the use of Logbook in SAP PM module. How can we activate this ? Is there any specefied procudure for the same? Thanks in advanve VT

  • Why MBP heats when working in target disk mode?

    I connect my MBP to iMac using target disk mode through Thunderbolt interface, close the lid and work on iMac booted from MBP's disk. My understanding is that in this mode MBP should consume very little energy because CPU and GPU are mostly inactive.

  • Problem with sizing

    I have this problem I cant figure out. I have this class that extends JPanel called Container. It's layout is BoxLayout (Y_AXIS), and has two components. One of the components is a JPanel with just a picture drawn in it, and the other is a control pa