How to skip the Analysis level in the workflow for manual investigation?

Hi Experts,
My requirement is to bypass the Analysis level for manual investigation in the workflow template number WS15100038. I tried to set the 'skip first decision step?' step as true to bypass the analyst level by setting the container element  "IMMEDIATE_LEVEL1" as 'X' then I created a claim but it still went to the analysis level . Not sure what i'm missing. Help, pls!

Hello !
         Take the copy of the standard workflow and delete the analysis step(container step too).
         Now save and activate the workflow.By this way, you will able to accomplish the requirement.
Regards,
S.Suresh

Similar Messages

  • How to find the workflow for Change Request for the PO's

    Hi All,
    We have a PO which is pending and we can't receipt it again nor make payment on this. After checking the Approval history for that PO we found that the change request has been made. The change request was to change the amount to be paid to R39196 instead of R58237.00. We don't know where to check the workflow for the change request to identify the cause.
    what i need to know is how to find the workflow for that change request? The other workflows can be checked using the po_header_id for the PO's but i am confused with the change request workflow
    Your input will be highly appreciated.
    Thanks in advance
    Rgds,
    Sonia

    For 11.5.10.2 run this query to determine the keys to search on:
    Select wf_item_type, wf_item_key from APPS.po_change_requests where document_type = 'PO' and Document_num = 'put-PO-number-here'
    Then use the keys returned by the query to look up the Workflow in
    Workflow Administrator Web Applications / Administrator Workflow / Status Monitor
    Search using the results returned in fields "Type Internal Name" and "Item Key" in Status Monitor
    The query for change requests on a specific Requisition would be:
    Select wf_item_type, wf_item_key from APPS.po_change_requests where document_type = 'REQ' and Document_num = 'put-Req-number-here'

  • How to change the workflow agent manually ?

    Hi,
    We encountered a situation where the workflow was received in error by a person. We are unable to determine the root cause of the problem as it was the first and last time we encountered this situation and we are unable to replicate the same error again.
    I want to remove this workflow from that person's inbox manually and assign it to the intended recipient, how do I do this ? Could someone help me out with this situation, thanks.

    Yes i agree with rick,
    Dont think that WF log can be deactivated also if this is the case then how can you see workitem, may be the case that you dont have auth to view wf log (or if are using latest ECC versions then when u execute transaction SWi1 and open any workitem then type ctrl+p this will lead you to workfow log).
    Try using SWI1, as workaroung you can use transaction SWIA to forward workitem to desired agent.
    -Swapnil

  • How to map the workflows for a project?

    We are developing a mini ERP package for a customer on Oracle 9iAS & Forms 9i. The business process contains lot of workflow process for ex:-Approval of purchase request etc. I am unable to understand how we have to map these flows using Oracle workflow in the project and integrate these using Forms 9i and Oracle Db.

    Ramesh,
    All the business processes can be modeled using the Workflow Builder tool which gives you a graphical UI of the business process. This is where you will model your approval process etc.
    Once you have defined the business process you can invoke the workflow from your application and let workflow take over the business process.
    You have API's in PL/SQL and java to invoke these processes.
    Use the workflow guide on OTN to get more information on this..
    Hope this helps
    Raja

  • How to skip the date in breakdown maint order

    Dear PM Guru's,
    please suggest me how to skip the date inbetween the two working days. please check the below scenario: based on factory calendar (production ) saturday was holiday. one breakdown maintenance order was opened on friday afternoon and its closed on sunday afternoon. now user wants only breakdown hours of production running days/ hours. production was produced upto saturday earlymorning and its renewed sunday morning. where as saturday producion was not planned and its not produced , so user wants to skip that time from the breakdown duration calculation. please suggest me is it right practice? if its right how we have to do in SAP? please let me know it.
    thanks in advance to all the PM guru's
    regards
    Jalu

    Hi,
        check this link Equipment Downtime
    I believe u may have to recalculate the breakdown hrs using some FM in user exit QQMA0014 QM/PM/SM: Checks before saving a notification

  • How to skip the header rows of the file using UTL_FILE?

    Hi,
    I created a procedure to read the file from shared location using UTl_FILE package. But, I stucked why because I don't know how to skip the header rows as those rows are headings for one of the report.Since, please help me.
    Regards,
    Vissu.....

    vissu wrote:
    Hi,
    I created a procedure to read the file from shared location using UTl_FILE package. But, I stucked why because I don't know how to skip the header rows as those rows are headings for one of the report.Since, please help me.
    Regards,
    Vissu.....UTL_FILE just reads data from the file. It has no concept of what could be a "header" or "body" or "records" or "footer" or any other data based concept. If you want to skip lines of a file, you will just need to read them using UTL_FILE and ignore them.

  • How to get the date for the first monday of each month

    Dear Members,
    How to get the date for the first monday of each month.
    I have written the following code
    SELECT decode (to_char(trunc(sysdate+30 ,'MM'),'DAY'),'MONDAY ',trunc(sysdate+30 ,'MM'),NEXT_DAY(trunc(sysdate+30 ,'MM'), 'MON')) FROM DUAL
    But it look bith complex.
    Abhishek
    Edited by: 9999999 on Mar 8, 2013 4:30 AM

    Use IW format - it will make solution NLS independent. And all you need is truncate 7<sup>th</sup> day of each month using IW:
    select  sysdate current_date,
            trunc(trunc(sysdate,'mm') + 6,'iw') first_monday_the_month
      from  dual
    CURRENT_D FIRST_MON
    08-MAR-13 04-MAR-13
    SQL> Below is list of first monday of the month for this year:
    with t as(
              select  add_months(date '2013-1-1',level-1) dt
                from  dual
                connect by level <= 12
    select  dt first_of_the_month,
            trunc(dt + 6,'iw') first_monday_the_month
      from  t
    FIRST_OF_ FIRST_MON
    01-JAN-13 07-JAN-13
    01-FEB-13 04-FEB-13
    01-MAR-13 04-MAR-13
    01-APR-13 01-APR-13
    01-MAY-13 06-MAY-13
    01-JUN-13 03-JUN-13
    01-JUL-13 01-JUL-13
    01-AUG-13 05-AUG-13
    01-SEP-13 02-SEP-13
    01-OCT-13 07-OCT-13
    01-NOV-13 04-NOV-13
    FIRST_OF_ FIRST_MON
    01-DEC-13 02-DEC-13
    12 rows selected.
    SQL> SY.

  • How to Find the Runtime for any workitem.

    Hi,
    Could you please tell how to find the runtime for any workitem.
    Thanks,
    Bhanu Gattu.

    Hi,
    I think, your query is pertaining to Workflow.
    Please explain your requirement little more.
    If you need Runtime Analysis:  Then the transaction Code: SE30 must be used.
    Thanks.
    RamaniN
    Edited by: Ramani Nagarajan on May 21, 2009 12:33 PM

  • In VB Programming code -- How to access the formula for suppressing a field

    In VB Programming code -- How to access the formula for suppressing a field
    I am using Crystal Reports 2008 v1
    Using VB code, I am attempting to modify a Crystal Report before exporting it into a PDF format and then displaying it on the Web.
    My problem is that I am unable to access the formula used to dynamically suppress a field.
    The following code is working:
    mySections = rd.ReportDefinition.Sections
    For Each mySection As CrystalDecisions.CrystalReports.Engine.Section In mySections
       ' myFieldToChange is a String set to the text of the field I need to adjust the Suppression
       iloop = 0
       For Each RecObj As CrystalDecisions.CrystalReports.Engine.ReportObject In mySection.ReportObjects
               If mySection.ReportObjects.Item(iloop).Name.ToLower = myFieldToChange Then
                   myTextObject = CType(mySection.ReportObjects.Item(iloop), CrystalDecisions.CrystalReports.Engine.TextObject)
                   myTextObject.Text = "new field text goes here"
                   mySection.SectionFormat.EnableSuppress = True
                   '  Here is where I want to change the formula for the Suppression
                End if
                iloop = iloop + 1
        Next
    Next
    I can not find any reference to the actual suppression formula in the SDK help file.
    Note, the EnableSuppress can be set to True for False, but if there is a formula for dynamic suppression, the True or False value is overwritten.  The results of the formula determine the suppression.
    Is there a way to reference this formula.  I know that I can put on in using the Crystal Report Designer software, I need to modify this formula using VB code and the SDK.

    Hello, Mark;
    If you are using the ReportDocument object you do not have access to the Conditional Suppression formula. You can get around it by using a formula field in the report for the supression and then using the FormulaField code to change it at runtime.
    If you want to change the supression condition directly at runtime you need to use RAS and the ReportClientDocument.
    Elaine

  • How to purge the workflow which is in process

    Hi Friends,
    I am facing one problem in the AME Workflow.
    when a user submit a page for approval process, workflow engine invokes . and in the hr_api_transcations table transacation id is created for that workflow transacation. now the problem is, if i purge that workflow process using concurrent program 'PURGE OBSELETE WORKFLOW RUNTIME DATA' . it is deleting the workflow. but when i see the hr_api_transacation table still the transacation id for that workflow is active.
    Example :-
    when i see through through the responsibility (workflow administrator web applications)=>Administrator workflow=>Status monitor
    when i type the item key say some x and search for the workflow status i cant see the workflow status. i can see it is deleted.
    but when i type the same item key in the hr_api_transacation
    like :- select * from hr_api_transactions where item_key='X' i can see the status of this transacation is active and workflow is in pending.
    can anyone explain me why system is behaving like.. how to stop the workflow process and how to delete the transacation id from the table.
    Thanks in advance

    Please check below nots
    453137.1 (Oracle Workflow Best Practices Release 12 and Release 11i) sections titled "Choosing Not to Use E-mail Notifications" and "Cleaning Up the WF_NOTIFICATION_OUT Queue"
    How to purge e-mail notifications from the workflow queue so the e-mail is not sent [ID 372933.1]
    264191.1 describes how to Purging Oracle Workflow tables of obsolete workflow runtime information for completed workflow processes is a required regular maintenance tas
    Notification Mailers Unavailable
    How to delete undelivered notifications from WF mailer

  • How to obtain the license for the mentioned products.

    Hi All,
    Please help me in below licensing issues.
    1) Our functional team got the below error while accessing "Job Scheduling Workbench".
    Error: The Workbench is inaccessible because Oracle Manufacturing Scheduling has not been licensed. Please work with your Account Manger to purchase the license.
    2) Another error message while accessing the navigation Flow Manufacturing --> Product Sync --> Flow Routings
    Error: APP-BOM 20972: You cannot access this form
    Cause: You do not have a license for Oracle Flow Manufacturing.
    Action: Obtain a license for Oracle Flow Manufacturing.
    Please guide me how to obtain the license for the above products.
    Environment: eBS R12.1.3 on Linux 5.8
    Regards,
    Siva

    Thanks for providing the document. I follow the document and get back to you for any issues.
    Regards,
    Siva.

  • A^b = n ,How to get the value for a ?

    a^b = n ===> n = Math.pow(a,b)
    How to get the value for a ?
    dose Java have API to get the value for a ?
    Thanks for help~~~

    a^b = n
    =>
    a = n^(1/b)
    So,
    a = Math.pow(n,1.0/b)

  • Reading from a file. How to ask the user for file name at run time????

    I have the code to read from a file but my problem is how to prompt the user for the file name at run time.
    import java.io.File;
    import java.io.FileNotFoundException;
    import java.util.InputMismatchException;
    import java.util.Scanner;
    public class FileRead {
        public static void main(String args[]) {
            Scanner scan = null;
            File file = new File("Results.txt");
            String number;
            try {
                scan = new Scanner(file);
                while (scan.hasNext()){
                number = scan.next();
                System.out.println(number);}
            catch (FileNotFoundException ex1){
                System.out.println("No such file");
            catch (IllegalStateException ex2){
                System.out.println("Did you close the read by mistake");
            catch (InputMismatchException ex){
                System.out.println("File structure incorrect");
            finally{
                scan.close();}
    }Any hints would be greatly appreciated. Thank you in advance

    I have read through some of the tutorials that you have directed me too and they are very useful, thank you. however there are still a few things that i am not clear about. I am using net beans 5.0 I have placed a text file named Results.txt into the project at the root so the program can view it.
    When I use the code that you provided me with, does it matter where the file is, or will it look through everywhere on the hard drive to find a match?
    This code compiles but at run time it comes up with this error
    run-single:
    java.lang.NoClassDefFoundError: NamedFile
    Exception in thread "main"
    Java Result: 1
    BUILD SUCCESSFUL (total time: 3 seconds)
    import java.util.Scanner;
    import java.io.*;
    class NamedFileInput
      public static void main (String[] args) throws IOException
        int num, square;   
        // this Scanner is used to read what the user enters
        Scanner user = new Scanner( System.in );
        String  fileName;
        System.out.print("File Name: ");
        fileName = user.nextLine().trim();
        File file = new File( fileName );     // create a File object
        // this Scanner is used to read from the file
        Scanner scan = new Scanner( file );     
        while( scan.hasNextInt() )   // is there more data to process?
          num = scan.nextInt();
          square = num * num ;     
          System.out.println("The square of " + num + " is " + square);
    }his is the code that i used. It is the same as the code you posted for me (on chapter 23 I/O using Scanner and PrintStream) Sorry im just really stuck on this!!

  • How to allocate the workflow to the action defnitions in solution manager

    Hi,
    we are having solution manager with the CHARM configured, and currently we are looking for the trigger of mail and workitem for change of action. the work flow is designed for that, but how to assign the workflow to the condition and processing type .
    please suggest, points are definetly awarded.
    Thanks and regards
    keerthi

    Hi,
    Well, why dont you check the event that gets triggered during the Status change of the user?
    This can be done by switching on the EVENT TRACE using SWELS txn and simulate the BUSINESS PROCESS and then check the event trace using SWEL.
    After getting the required Business Object and event, Please attach your WF to that EVENT in the BASIC DATA-START EVENTS.
    Regards,
    <i><b>Raja Sekhar</b></i>

  • How to restrict the GR for Production Order when Goods Issue is not done

    Hi Gurus
    How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
    Pls suggest best solution.
    Abhijit.

    Hi,
    You can club together the GI nad GR at the time of confirmation..
    I.e Backflush for the components and auto GR for the Product.
    So that you can stream line the Process.
    The best Option would be to use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Refer below link for further details..
    How to stop the goods receipt before issueing the goods for production orde
    Regards,
    Siva

Maybe you are looking for