How to start and finish a 16:9 project?

Hi,
I got this movie, what was shot on a 16:9 camera. I did import it to FCE2 and edit like normally i do ( i did not change any settings )
After that i did import it to IDvd. I'm using a 16:3 theme. And the problem is:
When I preview the theme is ok on a 16:3 preview window, but if i play the movie it's play on a square ( 4:3 ) I still have a black strip on the top and botton of my movie. And a have a 4:3 aspect on a 16:9 screen ( like two strips on both sides)
What i did wrong? Is there any way to not lost what i did edit?
Thanks you all.

The material needs to be correctly defined as anamorphic. That has to be done first. But that doesn't affect the material that's in the timeline. From your description it sounds as if the first sequence you edited was wrong, not in the widescreen format, and the material edited into was not properly defined. Basically you now have a mess.
The material in the incorrect edited sequence needs to be copied into a correct widescreen sequence. Unfortunately that's not enough. The material that's now been edited into the correct sequence itself needs to be fixed by fixing the aspect ratio. Look at at one of the clips in the timeline and check it in the viewer. It's aspect ratio is probably distorted and needs to be fixed.

Similar Messages

  • How to start and finish a transaction using EJB 3.0 in JDeveloper

    Hello everybody!
    Does anybody can explain how to start and finish a transaction using EJB 3.0. I need to start a transaction insert some information in some tables and if everything was fine commit the information.
    I put the annotation @TransactionManagement(TransactionManagementType.BEAN) in my session bean and @Resource SessionContext ejbContext; but I don't what anything else I have to do.
    Any help will be appreciate.

    I tryied to use in the client the statement EntityTransaction transaction = myBean.getTransact(); but I receive the EJBException: Cannot use resource level transactions with a container managed EntityManager
    I just need to start a transaction something like this: transaction.begin(); and finish the transaction, something like this: transaction.commit();
    Does anybody can help?

  • How to be more specific with start and finish times in microsoft project

    I am trying to schedule down to the hour with the start and finish information. Is that possible? 

    schedhelp,
    a) yopu can set the "time" for either Start Date or "finish" date, but not both. Project caluclates one or the other when you supply one value.
    b)  Yes, you can definitely schedule down to an hour, however manually typing in the start or finish times will create constraints for the schedule and you are really not using Project for what it is supposed to do (Dynamic Scheudling).
    c) If you are just using project Online, in the Schedule PDP, navigate to Options tab, and select Time with Date, to see the times attached to each of the dates, and modify them
    d) if you are using project Pro, go to File >> Options >> General >> date format and select a format that shows time along with date, to see the times attached to each of the dates, and modify them
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:
      

  • I entered a new calendar event at I cloud on my laptop.  The enent showed up on my I Phone  4S but, the start and finish times on the entry in I cloud was different than the times shown on the I phone calendar.  How do I sync the time in my I Phone with

    I entered a new calender event using I cloud on my laptop. The enent transfered to my i Phone 5 S but, the start and finish times shown st i cloud on the laptop are different than the times shown on the i phone.  How do I sync the times on the i Phone with the times shown on the laptop i cloud calender?

    Turn off time zone support on the phone.

  • Timeline Start and Finish Dates - how to not display finish dates for tasks not added to timeline

    I have a project, Project 1, with start date 1 Jan 2014 and finish date 31 Dec 2014.  When I switch to timeline view, the timeline spans this period. I now want to create a second view for a sub project within Project 1, called Project 1A.  It
    starts 1 June 2014 and finishes 31 August. I only want to see Project 1A's tasks and time span on this second custom timeline view. I create the new view, add the tasks from Project 1A to the timeline, and save the view as CustomView1A. My problem: CustomView1A
    shows the tasks for Project 1A, but also shows the dead space between 1 Jan 2014 and 1 June 2014, as well as the dead space between 31 August and 31 December.
    I dont want to see the dead space. I want CustomView 1A's timeline to start and finish on Project 1A's start and finish dates.
    How do I adjust CustomView 1A's timeline borders on the left and right to exclude the dead space?
    Hanneliese Fourie

    Dear Sir,
    I checked in CO41 and it allows me to convert planned order to production order and not have any provision to re-scheduling the planned order . Any function to reschedule planned order to future dates ( whose start dates and finish dates are in past ) ?
    Thanks,
    SL

  • 2LIS_04_P_MATNR Delta - Actual Start and Finish Dates

    My company is experiencing a problem with retrieving the actual start and finish dates and times from the 2LIS_04_P_MATNR data source with delta extraction. The R/3 source system is version 4.6C. The BI system is version 7.0. Specifically, the data source fields GETRI, GEUZI (finish), GSTRI, GSUZI (start) are sometimes never populated with data. These fields are often blank in the production data extracted. It was observed that the actual delivery date for the order (posting date of goods receipt from process order) was often an earlier date than the GETRI date. This scenario was tried in test systems, and it was found that if the final goods receipt for the process order was posted before the end of the last phase was confirmed, the actual finish date and time fields were not transferred to BI from R/3. In fact, it was noted that a new record was not created in the 2LIS_04_P_MATNR delta queue when the end of the last phase was confirmed. Regarding the actual start data, this is missing if a goods receipt from the process order is posted before the start of the first phase is confirmed.
    Has anyone else experienced this problem? How was it resolved?
    SAP Notes have been searched regarding this problem, and in fact, a customer message has been opened with SAP for this problem. However, we thought we would try asking the community as well, to see if any other users have experienced this, and how the problem was resolved. We also understand that it may be an unusual practice to post a goods receipt from the process order before the end of the last phase is confirmed. In a more general sense, has anyone else experienced that some of the data source fields are never populated if the R/3 information is entered after the posting of the final goods receipt against the process order? Our testing indicated that no more delta records are created for the 2LIS_04_P_MATNR data source after the final goods receipt was posted.
    Thank you,
    Chris Sopek

    Hello,
    we are experiencing your same problem! The only difference to your scenario is that wer are currently operating on SAP ECC 6.0.
    Did you receive any answer from SAP?
    We opened a request for the same topic.
    Thanks

  • Planning Profile Start and Finish Dates (Project systems)

    Hi Friends,
    I need a help from you in regard to Start and Finish dates of Planning Profile dates.
    For transactions cmp3 and cmp9, the start date should be the current date, and Finish date should be End of the current year for the selected profiles. I had done the necessary configuration for profiles in spro and tried. I could make the starting date appear as current date, but the year is increasing the next day, which i do not want.
    Can anyone suggest how to tackle this problem. Can we get the soln, by any non standard method.
    I appreaciate your valuable views.
    Regards,
    VENKAT

    The fourth parameter of your start condition is probably incorrect. When your event is not in the queue, the virtual attribute doesn't bind the webservice to the agent determination subworkflow, which probably causes the third instance of the org management object to fail, resulting in a knock on effect of the workflow inserting an incorrect planning date.
    Alternatively, might I gently suggest posting your question in a PS forum, we mostly deal with workflow and BPM-related issues here.
    Cheers,
    Mike

  • How to start and stop the BI Services in Solaris 10

    Hello All,
    Can anyone guide me on how to start and stop the BI Services in Solaris 10. In windows there are options set in Start->Programs->Middleware_Home->Start/Stop BI Services.
    Primarily after doing changes to the scheduler configuration, I need to restart the services to get it implemented? If yes how can I do it?
    Any help will be appreciated
    Thank you
    Ash
    Edited by: 902739 on Jan 11, 2012 12:17 PM

    Please help me by showing action plan for stop sap , offline backup and then start sap.
    i am little bit confuse How to start and stop SAP on cluster for offline backup
    Below are the systems name with host name , please explain me in sequence
    Systems name                                   Hostname
    # Hope SAP ERP Prod DB Primary       gsgbbux860
    # Hope SAP ERP Prod DB Standby      gsgbbux861
    # Hope SAP ERP Prod Cluster              gsgbbux862
    # Hope SAP ERP App 1                       gsgbbux864
    # Hope SAP ERP App 2                       gsgbbux865
    Thanks in advance
    Zaheer

  • Basic Start and Finish Date coming as default while Order Creation (IW31)

    Hi Members,
    I am in situation where in i am trying to cretae an order from IW31 but after the order creation basic start and basic finish date is being updated as default date which is the current date of creation.
    I have written my code in Include LCOINFNJ where basic start and basic finish date should get populated as per my written code .After debugging i found that the code is populating the dates in structure CAUFVD-GSTRP(basic start date)  and
    CAUFVD-GLTRP(basic end date) but whill posting at user command  SAVE the fields are getting updated back to default dates.
    Even after adding an enhancement point at the end of below given FM where in i am hardcoding the values still the issue remains the same .
    Function Module : CO_ZV_ORDER_POST is the FM responsible for posting.
    Please help regarding this issue .  
    Thanks and Regards.
    Gaurav Chopra

    Hi ,
          If you do not want start and finish date as current date then u can do it via config
    spro ->pm -->maintenance order processing -->Maintenance and service orders -->general data -->Activate default date for current date as basic date  here for a particular plant remove the tick mark in default current date , thus when u create MO on that plant then u will not get any default dates in basic start date and finish date ...
    regrds
    pushpa

  • Production order basic dates (start and finish) in past

    Hi,
    My clinet has got one requirement where in they want to create an production order with past date (Basic start and finish). I found one way to achieve this by selecting the scheduling type as "Only Capacity requirement", but the disadvantage is that the order will not get scheduled.
    Do you know any other method to achieve this functionality?
    Thanks and Regards
    Purushothaman Nagarajan

    Dear Friend,
    As i said, in Production order, under Production order - Setting - Scheduling maintain the number of days in past (says 100 days).
    Now in below select the scheduling type as backward scheduling and in Finish date give the date which is in past and now enter (or schedule the order). Because of this system will propose the start date which will also be in past.
    Regards,
    JItendra

  • How to Start and Stop Processes?

    How to Start and Stop Processes?
    Im trying to create a program which allows me to Start and Stop (and Restart) GameServers. I will then expand on this so i can start and stop them through a web applet with build in useraccounts.
    Currently the way we do this is to log into the server using a RemoteAssistance. Which is not very safe as the users have the abbility to do anything on the server and potentially corrupt it.
    Below is my code for how i start the servers. But i dont know how i would stop the process.
                    private void startServers()
                   for(GameServer gs : servers)
                        int ID = Integer.parseInt(gs.getID());
                        if(isChecked(ID))
                             try
                                  String cmd[] = gs.getStartString();
                                  Runtime.getRuntime().exec(cmd);
                                  int sleepPeriod = Integer.parseInt(sleepField.getText());
                                  Thread.sleep(sleepPeriod*100);     
                             catch(Exception e)
                             System.out.println(e);
                   }//end of iterator
                   JOptionPane.showMessageDialog(null,"All Selected Servers Have been started.","Servers Started",2);     
         }//end of startserversAnyhelp would be great thanks.

    Using the process class would give you a nicer API, but using destroy isn't a nice way to shutdown a process. Its like killing the process with your task manager. You should make a connection in some way with the game server and tell it to shutdown in stead (gracefull termination).

  • How to Start and Stop the SAP System

    Hi,
    I have installed "Sneak Preview"; Searched for start and stop scripts but there are more than one script which has named start.bat and stop.bat. Moreover, I searched the documents which comes with Sneak Preview but could find useful instruction there either.
    Question: Could you please point me to the documentation where it explains the starting and stopping SAP, for Sneak Preview?
    Thanks in advance
    Jawad Kakar

    Please help me by showing action plan for stop sap , offline backup and then start sap.
    i am little bit confuse How to start and stop SAP on cluster for offline backup
    Below are the systems name with host name , please explain me in sequence
    Systems name                                   Hostname
    # Hope SAP ERP Prod DB Primary       gsgbbux860
    # Hope SAP ERP Prod DB Standby      gsgbbux861
    # Hope SAP ERP Prod Cluster              gsgbbux862
    # Hope SAP ERP App 1                       gsgbbux864
    # Hope SAP ERP App 2                       gsgbbux865
    Thanks in advance
    Zaheer

  • How to Starting and Stopping OC4J Server using Ant

    How to Starting and Stopping OC4J Server using Ant
    In the ant task definitions for ant-oracle-classes.jar (see antlib.xml) there are two tasks called
         name="restartServer" classname="oracle.ant.taskdefs.deploy.JSR88StartServer"
         name="shutdownServer" classname="oracle.ant.taskdefs.deploy.JSR88ShutdownServer"
    I thought that these would shutdown and start the OC4J server. I guessed the parameters as – (Does anyone know where 50 ant targets are documented?)
    <oracle:restartServer
    userid="${oc4j.admin.user}"
         password="${oc4j.admin.password}"
         deployeruri="${deployer.uri}"
    />
    <oracle:shutdownServer
         userid="${oc4j.admin.user}"
         password="${oc4j.admin.password}"
         deployeruri="${deployer.uri}"
    />
    This, however does not start and stop the SOA suite. To do that I've hacked this solution together -
    <path id="oc4j.console">
         <pathelement location="${oracle.home}/config"/>
         <pathelement location="${oracle.home}/jlib/startupconsole.jar"/>
         <pathelement location="${oracle.home}/opmn/lib/optic.jar"/>
         <pathelement location="${oracle.home}/lib/xmlparserv2.jar"/>
    </path>
    <target name="stop" description="stop oc4j server" depends="init">
         <java classname="oracle.appserver.startupconsole.view.Runner">
              <classpath refid="oc4j.console"/>
              <sysproperty key="ORACLE_HOME" path="${oracle.home}"/>
              <arg value="stop"/>
         </java>
    </target>
    <target name="start" description="restart oc4j server" depends="init">
         <java classname="oracle.appserver.startupconsole.view.Runner">
              <classpath refid="oc4j.console"/>
              <sysproperty key="ORACLE_HOME" path="${oracle.home}"/>
              <arg value="start"/>
         </java>
    </target>
    This sort of works – except when the SOA suite doesn't stop cleanly – and needs user interaction to press a Close button. This isn't very useful when doing a continous integration build and deploy.
    So, does anyone have any suggestions or alternative methods to do this?
    - frank

    Actually if the server throws exceptions when it stops (which it always has since we applied patch 10.1.3.3) this technique will pause until a user responds to pop-up ... So a better way (I think) is -
    <target name="start" description="start oc4j server" depends="init">
    <java classname="oracle.appserver.startupconsole.view.Runner">
    <classpath refid="oc4j.console"/>
    <sysproperty key="ORACLE_HOME" path="${oracle.home}"/>
    <arg value="start"/>
    </java>
    </target>
    <target name="stop" description="stop oc4j server" depends="init">
    <echo message="We expect OC4J *NOT* to stop cleanly, so we will timeout after 3 minutes ..."/>
    <java classname="oracle.appserver.startupconsole.view.Runner" fork="true" timeout="180000">
    <classpath refid="oc4j.console"/>
    <sysproperty key="ORACLE_HOME" path="${oracle.home}"/>
    <arg value="stop"/>
    </java>
    </target>
    <target name="restart" description="restart oc4j server">
    <antcall target="stop"/>
    <!-- wait for server to quieten down -->
    <waitfor maxwait="2" maxwaitunit="minute">
    <not><http url="http://${oc4j.http.hostname}:${oc4j.http.port}"/></not>
    </waitfor>
    <antcall target="start"/>
    </target>

  • Scheduled start and finish dates in the Work order.

    Hi Friends,
    I am facing peculiar issue that once the Work order has been released schedule start and finish dates should be derived from the control key and
    operation hours and work center capacity,infact in my case while releasing the Work order,these dates (scheduled start & finish) are not been
    populating in the Work order,(but SAP standard behavior is while releasing WO,the dates should be populated).
    though i have maintained proper configuration
    could you please light up some thing on it.
    Regards,
    Srinika

    Check Scheduling Parameters assignment to order type, Scheduling option in Control key.

  • Basic start and finish dates vs scheduled start and finish dates in work order

    Hi Friends,
    I have observed  that whenever releasing the work order,irresepective of number of operations in the work order, system generating scheduling start and finish dates are same, however after releasing the Work order and by adding another operation in the work order, immediately scheduling end date equaling to Basic finish date (i.e.: Basic start and finish dates are equal to Schedule start and finish dates).
    Can any body please explain why this is heppening
    Please find the screen shots.
    After adding one more operation in the operation list and save the Work order,then Basic start and finish dates are equal to schedule start and finish dates.
    Regards,
    Srinika

    Srinika
    There are many things that affect the order scheduling:
    IMG setting - scheduling parameters
    Work centre settings
    Operation values e.g. work, duration, operation control key settings
    Calendars
    Etc
    So one possible interpretation of the above data is that the initial order operations have no work assigned, or the operation control keys don't require scheduling, or the work centres arn't set up correctly.
    Then you add a new operation which does appear to work.
    Please supply a screen-shot of the operation tab.
    PeteA

Maybe you are looking for

  • Problems with partitions after hard reset

    Hi hope some can help here, I installed Maverick on my imac and everything seemed fine, I went to work and came home to find a black screen with nothing but the mouse cursor, however the computer wouldnt respond in any way so had to do a hard reset w

  • IMAC Mail App will not open

    Hi. I have an iMac (21.5-inch, Mid 2010) using OSX Yosemite. Version is 10.10.2. My MAC mail app hangs instantly it is opened. The app doesn't appear on the screen at all. I need to right click the icon and force quit. The problem started around 3 we

  • OO ALV buffer problem

    Hello all, When a workflow work item is executed, a function module is called that displays a screen.  The workitem calls a function module that displays an ALV on a screen.  The same ALV is displayed for 3 different workitems. I am changing the fiel

  • X201 no HDMI ?

    hi, there is not HDMI port on X201 so how to connect to HD TV and watch HD movies with HD audios from the harddisk?  + ThinkPad X201 3626-FBG / Intel Core i5 M520 2.4Ghz / DDR3 8Gb / Intel SSD 730 Series 240Gb / 12.1" WXGA 1280x800px / Dual boot Win7

  • Bug in JDev 9.0.3.3 when removing joined entities from a view

    Hi, I observed in JDev 9.0.3.3 the following behavior for views containing several joined entities:      -I'm creating the view V1 based on the entity E1 and generate the row implementation java file with accessors (close wizard)      -I'm joining a