How to stop planing for Sales Order Quotation?

Dear Experts,
Please help.
Scenario:
Material = X
Material type = KMAT
Strategy Group = 20
For Material X, quotations are created before actual sales order creation.
These quotations particapte in MRP run and trigger material planning.
The need is : Quotations should not participate in MRP planning.
Thanks
Nitin

For Item category for Quotation, assign the Schedule line categiry =  "No MRP"

Similar Messages

  • How to configure rescheduling for sale order quantities

    kindly explain how to configure rescheduling for sale order quantities that are created last month. kindly explain. i am in urgent.
    regards,
    g.v.shivakkumar

    Hi,
    Short text
    Rescheduling sales and stock transfer documents: by material
    Description
    The 'Rescheduling' program (SDV03V02) processes sales document items that are contained in the item directory for the material. It takes into consideration open items and schedule lines from stock transfer items, stock transfer scheduling agreements and purchase order requests (items only), referred to hereafter as stock transfer documents, for the materials.
    All sales documents for the material that are still open are selected. This means that the material index must be activated for at least all sales document types, whose items may have requirements. All stock transfer documents or items for the material that are still open are also selected. Open in this case means for example, that there is no deletion indicator, that the item from a stock transfer purchase order request cannot be labeled as completed or that the quantity delivered and posted to goods issue for the item in a stock transfer purchase order is the same as the amount ordered. An availability check can only be carried out if a checking rule is assigned to the document type - if this is not the case, the document or document item is not checked.
    Checking rule 'A' is used as a basis for rescheduling sales orders (exceptions to this are rush orders  they use checking rule B, and orders with individual customer stock; they use checking rule AE). Stock transfer documents use the checking rule that is assigned in Customizing for Purchasing. It is important that the scope of checks is consistent for both the stock transfer documents and the sales documents and that they do not exclude each other, as this can lead to incorrect test results. An example of an incorrect setting would be: The scope of check for checking rule 'A' checks delivery schedules for stock transfer purchase orders and stock transfer purchase requests, however the scope of check for the checking rule for the stock transport scheduling agreement does not.
    The items and schedule lines found in the selection are sorted according to 'Priorities' - document category, delivery priority, creation date of the item or schedule line (for stock transfer purchase orders and delivery plans) entered on the selection screen or according to the schedule line date of the earliest schedule line with order quantity, document number and item number and then transferred to the availability check. Priority 1 is highest priority and priority 5 the lowest. Stock transfer purchase order requests are sorted after stock transfer purchase orders and scheduling agreements, as they are less binding. This means that when you have identical sort criteria such as delivery dates, the stock transfer purchase order item is checked first and then the item from the stock transfer purchase order request.
    The preset option 'Unconfirmed documents required' only carries out rescheduling for materials for which there is at least one unconfirmed transaction.
    You can use the parameters 'Sorting criteria delivery date' to define whether sorting is carried out with the order quantity after the creation date of the item or the delivery date of the earliest schedule line.
    If you mark the 'Simulation' field, the checked documents are not saved. Instead a results list is generated and saved. However, the availability check for the corresponding documents continues as if saving has taken place already, that is, that the simulated list corresponds to the actual one.
    Under 'Options' on the selection screen, specify whether sales documents and/or stock transfer documents should be processed. For stock transfer documents you can enter whether stock transfer purchase orders and scheduling agreements should be processed at item or schedule line level:
    Processing at item level:
    All open schedule lines for the item are read and collected, then transferred to the availability check. To sort and prioritize documents, you do not need each individual schedule line. It is sufficient to have the item or data from the first schedule line. All open schedule lines for the item are processed and checked.
    Example of processing at item level:
    Sorting: Date (Delivery date first schedule line) - Document number - Document item
    Doc. cat. Doc. number  Doc. item  Doc. schedule line  Delivery date PO        4500000012      10               0001              26.01. PO        4500000012      10               0002              26.02. PO        4500000025      20               0001              28.01. PO        4500000025      20               0002              02.02.
    You can see that the second schedule line for document 4500000025/20 from 02.02 was processed after the second schedule line for document 4500000012/10 from 26.02. This is because all open schedule lines for an item are read and processed. The first schedule line from 4500000012/10 has the earliest delivery date, therefore it has priority.
    Processing at schedule line level:
    Each open schedule line for an item is entered in document sorting in accordance with the values entered under 'Priorities'. The availability check is carried out for each individual schedule line.
    Example for processing at schedule line level:
    Sorting: Date (delivery date first schedule line) - document number -document item
    Doc. cat.    Doc. number  Doc. item  Doc. sched. line  Del. date PO           4500000012    10             0001           26.01. PO           4500000025    20             0001           28.01. PO           4500000025    20             0002           02.02. PO           4500000012    10             0002           26.02.
    Here you can see that each schedule line was sorted according to its delivery date. Note that this type of processing requires more runtime due to the individual checks and more frequent saving.
    The results of rescheduling are saved, as long as the program was not started in simulation mode. When calling up from the 'Sales' area menu or when directly starting via the development environment, the iniator is informed via a dialog box that he has just started a process that changes data. He can then decide whether or not he wants to continue.
    Checking procedure for stock transfer documents:
    An availability check of stock transfer documents in rescheduling is carried out in accordance with the check carried out when manually creating a document. If, however, the required quantity for a schedule line is not available on a particular date and will not be ready until later, new schedule lines are created for the stock transfer purchase orders and scheduling agreements, containing the relevant data. New items are created in this case for stock transfer purchase order requirements. The total sum of schedule line quantities for a processed schedule line corresponds to the schedule line quantity of the original schedule line.
    First example: Using a stock transfer purchase order item with a schedule line:
    a) Status of item before rescheduling run:
    Del. date  PO quantity   Confirmed quant  Confirmed del. date 23.07.      50 items       0 items              -
    ==> This now affects the stock/requirement situation:
        - Goods issue is posted for the material in the delivering plant on the 23.07.
        - A purchase order of 10 items was created for the material in the delivering plant. Delivery is expected on the 29.07.
    b) Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity   Confirmed quant   Confirmed del. date 23.07.     40 items      40 items            23.07. 29.07.     10 items      10 items            29.07.
    ==> The first schedule line was changed in accordance with the results of the rescheduling availability check. Only 40 of the 50 original items could be delivered on the 23.07. Therefore, a new schedule line is created for the rest on the 29.07. for 10 confirmed items.
    Second example: Same output situation as the above example.
    ==> There is now a change in the requirement/stock situation:
    A purchase order for 10 items is created for the material in the delivering plant. Delivery is expected on the 29.07. A further purchase shows another 40 planned items on the 30.07.
       Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity  Confirmed quant  Confirmed del. date 29.07.     10 items       10 items          29.07. 30.07.     40 items       40 items          30.07.
    ==> The first schedule line was changed in accordance with the result of the availability check for rescheduling. The original delivery date is set to the date confirmed in the ATP check. A new schedule line is created for the remaining 40 items, that are available on the 30.07.
    Note:
    Any set fixed delivery date and quantity indicators and creation indicators for schedule lines or items are 'inherited' by newly created schedule lines. Assuming that the original schedule line was fixed in the above example (since it is created manually), this indicator is also set for the newly created schedule line.
    If shipping scheduling is activated for a stock transfer document type, this is also implemented for newly created schedule lines, with the exception of route schedule determination. This means that in the current version of the program no route schedule has been determined for a schedule line containing a route schedule for which new schedule lines may need to be created.
    The results of the run are issued in the form of a list, which is also saved, so that the results can be controlled at a later date. This is done using the function 'Evaluate rescheduling', but it is only a good idea to do this after the first rescheduling has taken place. You can restrict selection requirements but these can however affect the runtime. You can use this function to analyze the saved list until the next rescheduling run, which writes over the result. If you start rescheduling in the background, a spool file with the result list referred to will be created in the corresponding setting. You can see this in spool management.
    Output
    A list of changed documents, a list of documents in which an error occurred during processing and as a result were not changed, can be called up via the menu 'Edit - Error log'. If in a subsequent evaluation a restricted selection is carried out, a note appears at the end of the list to say that not all document items are displayed.
    You can set the scope of the list under the menu option 'List' in the list display. You can view improvements, deteriorations and the whole list. Before the documents can be included in one or either of the restricted lists, the date or quantity has to have changed so that the item can be contained in both the list of improved or deteriorated documents.
    You can use the interface for changing transactions and the order list to navigate. Use 'Back' to exit the list and 'New selection' to return to the selection screen.
    Recommendation
    You should only start this program occasionally and use very restricted selectin criteria during working hours as it requires enormous system resources.
    Note
    The columns for 'New date' and 'New confirmed qty' only contain entries if the dates or quantities have changed.
    As the system only runs the change check (dates/quantities) per line in the original list, an item whose backlog has increased in the list of improvements. This occurs, for example, if the whole quantity can be delivered at once but at a later date. In this situation, the system determines an increase for the line when it compares quantities.
    Regards,
    Amrish Purohit

  • Standard Webdynpro Component for Sales Order / Quotations  ?

    Hello Experts,
    Is there any standard ABAP Webdynpro Component available for Sales orders / Quotations etc. ?
    Else we have to create everything customized for the customers ?
    Regards,
    Ravi Sharma

    LORD_MAINTAIN - for sales order maintenance. Shipped with ERP 6.0 (no enhancement packages required - although there are improvements in the later enhancement packages).

  • How to do INIT for Sales order Itema Data (DS 2LIS_11_VAITM)

    Hi all
    I have a report on sales order item data, I have to reload it. DS 2LIS_11_VAITM
    Can any of you pls explain me the steps to do the INIT? Refill set up tables etc
    Many Thanks in advance
    Ishi

    Hi Hari
    Many Thanks for the explanation and steps. I deleted set up tables and executed to fill it.
    It says in R/3 Start of Processing, I ticked to continue and its still running.
    In the mean time I checked RSA3 and it says 1007 records selected. I am refreshing it and the no. of records are still the same.
    Can you tell me how long it takes to fill the table?
    And the R/3 system is still running (Start of Processing)
    Thanks again
    Ishi

  • How to maintain version for sales order.

    Dear Guru.
                 Please tell me how do i maintain version for my sales order.

    Chaitanya,
    I think you are working in MTO scenario or Variant configuration.
    We can maintain versions in sales order by going to Header--> Sales tab
    Thanks,
    Raja

  • How to supress tab for Sales Order item (VA01)

    Hi,
    Please suggest the ways to suppress tab (example "Country") which appears at Sales Order item for some countries.
    Thanks,
    Edited by: Dipesh Kothari on Oct 6, 2009 8:34 PM

    Hi
    If you want to suppress the tab which is appearing at sales order line item then using t.code SHD0  and give the t.code VA01 and business object as BUS2032 and then select the line item data and then you can suppress the fields as per your requirement
    Kindly let us know  why you want to suppress the fields ?
    Regards
    Srinath

  • How to fetch data for sales order costing

    Hi All,
    How to fetch data for VA03 --> Extras --> Costing having cost element details.
    Thanks
    Gaurav

    Hi Gaurao ,
    There is no such function module  to extract data  in one column   , you have to  Convert all the columns data    in one column
    for period   .
    regards
    Deepak.

  • Activating Pricing for Sales Order in Retail

    Hi All/Vijay/KK,
    Please tell me how activate the pricing for sales order, actually in SD we do Pricing Determination, what has to be done for Retail pricing

    Hi,
    To do sales order pricing
    Goto IMG>Sales & Distribution>Basic Functions>Pricing>Pricing Control
    Either Follow Standard, condition type PR00
    or in case of Custom
    1. Use condition table 406 Site/article
    2. Define Access Sequences ZPR0
    Enter accesses:10 406 Site/article Exclusive x
    3. Define Condition Types (ZPR0 assign newly defined access sequence)
    4. Define And Assign Pricing Procedures (assign condition types ZPR0..etc. to it)
    Then maintain condition record , go to VK11 --> Enter your Z condition type (eg. ZPR0)., enter the amounts.
    Add the pricing procedure , to sales document type.
    For Retail Sales Pricing
    For Retail Sales Pricing based on Purchase pricing you can follow the following method:
    The retail price is always based on the purchase net/net price. This purchase net price is built up from the purchasing pricing elements or condition types defined to be included in the purchase net price. A planned mark-up is applied to the purchase net/net to calculate the proposed retail price. The planned mark-up can be set by merchandise category and for exceptions, more specifically by article.
    You can perform Two-step calculation for retail pricing, for example, for stores that are supplied by a distribution center (internal vendor). Calculating sales prices for the stores is based on the transfer price for distribution centers (preceding organizational unit).
    1. Set up Master Data (WB02) - Relevant Fields should be maintained
    2. Set up Article Master Data - Logistics DC and Store View (MM42)
    Relevant Fields should be maintained
    3. Maintain Mark up for DC(VK11) -Markup % at Distribution channel distribution chain level
    Mark ups maintained at two levels:
    For DC: At distribution chain level
    Condition type used: AUFS
    For Stores: At article level
    New condition type ZUFS created.
    4. Maintain Mark up for Stores (VK11) Markup % at Store distribution chain level
    5 Create Pricing Procedures (IMG) -Pricing Procedures created
    6. Carry out Price calculation for DC(VKP5) - Pricing Document created - DC Transfer price calculated
    7. Carry out Price calculation for Stores (VKP5) - Pricing Document created - Final Retail Price Calculated
    The final retail price that is calculated is stored in the condition type VKP0.
    Hope it helps,
    Regards,
    Anirban Roy

  • How to create a daily report for sales order

    hi
    how to create a daily report for sales order. what fields it must consists of. what are the tables it need?

    Hi
    You have to use the sales order tables VBAK,VBAP and VBEP
    So keep date field on selection screen
    and treat this date as Order creation data audat field in VBAK.
    based on this fetch the data from VBAK and VBAP  with the following fields like
    VBELN, KUNNR,NETWR,POSNR, MATNR,ARKTX,KWMENG,WAERS  etc and display in the report
    <b>Reward points for useful Answers</b>
    Regards
    Anji

  • How to look for sales order number if I know outbound delivery number?

    How to look for sales order number if I know outbound delivery number?

    Hi ,
        If you want to see the Sales order Number from Outbound delivery or invoice,go to their respective T-codes,say for example,
    for delivery,Goto Tcode: VL02N / VL03N.There you will find Document Flow Icon,click on that,or press F7.
    You will get a window,there you can see the Sales order Number before your outbound delivery Number
    With Thanks and Regards,
    Priya

  • How to find that a sales order for which there is  delivery but no goods

    Hi
    How to find that a sales order for which there is  delivery but no goods issue has been done i.e we have an open delivery for a sales order.
    How in VBUK table can we find  out with the sales order no .
    Thanks in advance

    make use of table VBFA.
    Regards
    Peram

  • How can we reject a Sales order after first Down payment invoice for Italy?

    Hello,
    As a legal requirement in Italy the Down paymenty have to be transformed into real invoices, another legal requirement is that an invoice cannot be cancelled it has to reversed by a credit memo.
    I would like to know in this context how we can reject a sales order line once a Down payment invoice has been emitted.
    When I do enter a reason for rejection in the sales order line I receive the message : V1036: Subsequent documenst exist for item XXX and then V2432 Cancellation not possible. Down payment request already created.
    I can create a down payment credit memo in order to cancel the down payment invoice but how can I get rid of my SD requirement in MD04 if I cannot reject the sales order line?

    Hello,
    have you tried using a recjection code which is not relevant for billing?
    Regards,
    Uli

  • How to update SIS Structure S503 table for Sales Order

    Hi All,
    I have a requirement where i want to restrict S503 table getting updated for an Item Category. Can somebody please help me in this.
    Complete scenario:
    I am splitting Sales Order line item into multiple Sub Line items based on batch determination. So for a line item 10 in Sales Order having ordered quantity 1000 i have 2 more sub line items 101 and 102 based on 2 available batches having 500 quantites each. When Sales Order is saved S503 have 1 entry for SO created but the ordered and confirmed quantity is doubled as it is picking it from main line item 10 as well as from 101 and 102.
    Is there any way to restrict the main line item entry quantity from getting in to SIS structures.
    Thanks,
    Sudhir.

    Hi,
    There is a change in the requirement.
    Scenario:
    I have created a sales order with some 4 condition types, in that 2 condition types are of class A & B and the other two is of class C. Here I need to update the condition price of class A & B only and the remaining condition types should not get update even though there is an updated price is available.
    For the above scenario, I need to write a standalone program. Do we have any function modules to update the price of the single condition in the sales order? Please tell me how we can update the sales order at item condition level.
    Thanks.
    Balaram

  • How settlement rule will be created for Sales order with cost object

    Dear Experts,
    We are using product cost by sales order with valuated stock. In addition we are not using COPA
    We also consume some materials at sales order level and at the end of month we want to do the result analysis and settlement for the same amount. In this case can any on explain how system will behave regarding settlement of sales order cost and what entries will get pass in the system.
    In our case we have done below activities...
    we have created sales order,
    All production order activities completed till final GRN including month end activities
    Material consumption against sales order
    Result analysis executed
    At the time of sales order settlement, system throwing error (Sender doesn't have valid receiver, please create settlement rule for sender object)
    Then i checked in sales order there sales order settlement rule not defined.
    I guess this settlement rule need be generated by system automatically. If not, please let me know the process of it.

    HI kishore
          the reason is that sale order always carry the revenue  and production order and production period carry the cost .
       cost you can settle to the Material and even management want  to be settle the cost to material only in production order OR period
    but in sales order  when u sell the product it carry the revenue not the cost and management want see and analysis based on profitability segment are profit center level .
    Prerequisites
    If CO-PA is active, the system generates a settlement rule when you create the sales order. The settlement rule determines whether data is settled to other objects or other areas in Controlling. In accordance with this settlement rule, the relevant data is settled to CO-PA.
    If CO-PA is not active, create a settlement rule. This settlement rule that you create manually normally contains a G/L account as a receiver (such as 399999). You can also settle costs and revenues or results analysis data to objects with revenue.
    You can also settle the cost of sales calculated in results analysis to a fixed asset or a cost center. To do this, you must add to the allocation structure the results analysis cost elements under which the cost of sales is updated to the order.
    The settlement rule includes a distribution rule for the sales order item. The distribution rule is made up of a settlement receiver, a settlement share, and a settlement type:
    The settlement receiver (such as profitability segment or G/L account) specifies the object to which the actual costs and revenue of the sales order item are settled. The settlement receiver can be proposed through the settlement profile.
    The settlement share defines the percentage or the equivalence numbers used to distribute the costs to the individual settlement receivers. The settlement share for sales order items is usually 100%. A settlement share of 100% is preset in the system.
    The settlement type specifies full settlement of the sales order item. This ensures that all the data on the sales order is available for results analysis.
    Settlement still takes place in each period. The revenues and the cost of sales are transferred to CO-PA by period, and the work in process and the reserves are transferred to FI.

  • How to get the pricing hierarchy based on the delivery date for sales order

    Hi,
    How to get the pricing hierarchy based on the delivery date for sales order other than system date.
    My requirement is to get the Pricing hierarchy based on the delivery date other than system date.
    Waiting for kind response.
    Best Regards,
    BDP

    HI Sai,
    please refer teh document already how to write FM based extration on generic extractors.
    and here  the logic to find the latest records values:-
    -> get the data in an internal table
    ->Sort the internal table data based from date descending
    -> Using READ statement , we can read the first record of the table which is nothign but your latest record.
    Regards.
    Sakthi

Maybe you are looking for

  • Migration assistant screw up, Mac Pro not seeing wifi/TC

    Hi I've been using a MacBookPro (MBP) for almost 5 years now, with a 1TB Time Capsule (TC1) using Time Machine (TM). I am the sole user, HDD is 270Gb used/50Gb free; using Mavericks, v10.9.2. On Friday, I used Sophos anti virus home edition, to scan

  • I'm having a problem with software keyboard.  It somehow switched to AZERTY even though I have selected QUERTY.  ???!!!

    Software keyboard has somehow switched to AZERTY and I can't switch it back to QUERTY even though this is the setting I've selected.  Any ideas?  Thanks, everyone!

  • Include weekends in date range

    Hello, I have a query that aggregates a value based on a date range and excludes business hours. I need to INCLUDE Saturday and Sunday based on the date range. I am stuck and I think I am at that time of day where your brain decides to quit. Time for

  • IOS IPS for blocking IM and P2P

    Any recommendations on the best way to use IOS IPS to stop P2P and IM? I set up a 3845 with 12.3(14)T1 to do this by importing signatures from the latest SDF using SDM. I used the attack-drop, and all IM and P2P signatures I could find. I changed the

  • How to refresh report filter?

    Hello, we are using BI XI 3.1 on a BEx 7.01 query. In the WebI reports we use report filters (Region and Country) to restrict the displayed data. When we filter the region e.g. for Europe, the table shows only data for Europe, but the filter for Coun