How to Switching Alternate BOM to Primary BOM

Dear All
Need help...
I have already try to switch from alternate BOM to primary BOM. but why it can not effect anything? any step that i mis?
my step is :
1. Navigate to the Substitute Components window. choosing the Substitutes button from the Bills of Material window.
2. Enter a substitute item for the component.
3. Enter the quantity of the substitute item needed to replace the full component quantity.
its correct ??
Best Regards,
The pooh

MRP plans according to primary bom. If you run ASCP constrained plan, you can set the plan options such that it will look at alternates as well.
If you run MRP or unconstrained bom, you will have to change the primary bom itself (via ECO or BOM changes).
You can also consider using the alt. bom when creating the work order manually.
Sandeep Gandhi

Similar Messages

  • How to define alternate BOM in SBO

    Hi all,
             Can you help me to define alternate BOM for an item?
    Thanks in Advance
    Suresh R

    Hi Suresh,
    One work around can be to define all permitition & combination in one BOM only and after selecting the BOM in Production order, user can decide which child items are to be kept and which child items are to be removed.
    Hope it helps
    BR
    Samir Gandhi

  • Alternate BOMs and Routings

    Hello Gurus,
    I had a question. I have created Alternate BOMs and Routings for a Material. How through Configuration/or Material Master settings Can I control, as to when MRP derives result from Primary BOM/Routing or Alternative BOM/Routing.
    Thanks,
    Sachin

    Hi,
    For BOM selection, system will check BOM selection method in material master of MRP4 view.
    BOM selection by Lot size, Date, Production version & Only by prod version.
    Addition to that BOM selection by Selection ID defined in plant parameter. This selection ID consists of BOM priority & Usage.
    Manually you can not control BOM selection.
    For routing selection, system will check Lot size. If lot size not matched with required qty, system avoid the lot size & consider the date.
    In addition to that system will consider Task list type, priority, Usage & Status.
    In Order type dependent parameter(OPL8), you can configure whether system should select routing automatically or manually.
    Regards,
    Dharma

  • Alternate BOM explosion in planned order creation

    Dear Experts,
    We have maintained a alternate BOM 1 and 2 of a assembly which is defined as a Phantom (E-50). User wants a option of selecting the alternate BOM of this phantom assembly while creating the planned order of Header assembly. Is it possible?How?
    Thanking you,
    SR

    Dear Sachin,
    In my understanding it's not possible to select the different alternative BOM of a phantom assembly when creating the planned
    order for a header material.
    But give a try in this way,create 2 production version with different lot size or validity date for each laternative BOM and assign
    the value as 2 in BOM selection method in MRP4 view for the phantom assembly.
    Correct me if I'm wrong.
    Regards
    Mangalraj.S

  • How to create Alternative Bom by given inputs

    Hi to all,
    I need to create BOM with alternative number.
    my inputs are
    BOM Header
    Material, plant, BOM usage, Alternate BOM, BOM status, Base Qty, Valid From, valid to
    BOM Item
    Item number, item category, component, component description, UOM, valid from, valid to, item ID, QTY
    if i use CSAP_MAT_BOM_CREATE to create BOM , it will not create alternative number
    if i use BAPI_MATERIAL_BOM_GROUP_CREATE , does my input value are enough to create alternative bom.
    please can any one, put some light on it, i search SDN ,but i dont know how to create alternative bom with input provided.
    i shall be thankful to you for this.
    Regards
    Pavneet Rana

    Try the program-RCSBI010

  • Alternate BOM Text from sales order

    Hi ,In My report I need alternate BOM Text.
    The scenatrio is : when we create Sales order it will ask for Alternate BOM ( 1 or 2 or 3 ).
    Based on selection it will assign the BOM and Sales order will be saved.
    I want how to link the sales order doc no with Alternate BOM.
    I have tried so many tables : MAST,VBAP,VBAP.STPO,STKO,STAS etc but not getting the Link.
    Can anybody suggest me ?
    Thanks
    Kumar

    Hello Kumar ,
    you need to Link VBAP-STLNR -->STPO-STLNR.
    regards
    Prabhu

  • Alternate Bom for a finished product has huge varience in cost estimate

    Hi all
    I have created alternate BOMs for a finished material. One is local raw materials and another has imported raw materials. Goods are produced using both these boms but in one period i can release cost estimate of one BOM. Thats why there is a huge variance in cost estimate when alternate BOM is used for the material. kindly give me a solution as to how i can fix this issue.
    regards,
    shahzad

    Dear,
    Please refer this link for,
    [Costing with alternative BOM |Re: Costing with alternative BOM]
    One thing you can do it with split valuation with batch managment please take help from CO person.
    Regards,
    R.Brahmankar

  • Alternate BOM & Alternate Routing

    Hi All,
           What is Alternate BOM ?
           What is Alternate Routing ?
           How do I create Alternate BOM ? [Please give me a step by step procedure]
           How do I create Alternate Routing ? [Please give me a step by step procedure]
           What are all the configuration set-up is required to automatically and manually select the Alternative BOM while creating a Planned and Production Order ?
       What are all the configuration set-up is required to automatically and manually select the Alternative Routing while creating a Planned and Production Order ?
    Please provide me an understanding on above questions will be grateful.
    Thanks in Advance

    Dear Madhan Shah,
    If  you are new to the FORUM kinly read the rules first, so that in future you wil avoid posting mulitple questions in same thread.
    What is Alternate BOM ?
    If you have more than one BOM for same material then each BOM is created as alternate BOM
    EX - The BOM for producing sample will not be same as BULK so based on lot size you will have this.
    What is Alternate Routing ?
    If you have more than one ROUTING for same material then each ROUTING is created as alternate ROUTING
    EX - The ROUTING for producing samplING will not be same as BULK so based on lot size you will have this.
    How do I create Alternate BOM ? Please give me a step by step procedure
    First create a BOM in the CS01 and save it.
    Again create a BOM for the same material, the system will give you a message telling Alternate bom created.
    You can see the alternate bom number.
    How do I create Alternate Routing ? Please give me a step by step procedure
    First Create a Group and Group counter 1
    Add the second routing as Group counter 2
    You can define the Alternate routing / group counters based on the lot size or validity
    What are all the configuration set-up is required to automatically and manually select the Alternative BOM while creating a Planned and Production Order ?
    What are all the configuration set-up is required to automatically and manually select the Alternative Routing while creating a Planned and Production Order ?
    For above 2 questions
    NO configuration is requried
    Creat PRoduction version in C223
    Here you define in each production version which is the BOM and routing it has to use.
    Each production version you can define it with a lot size or valdiity period.
    IN the MRP4 against the selection method you can define how the production version has to be selected.
    Kindly let me know your feedback , if answered kindly close the thread.
    reg
    Dsk

  • Alternate BOM in Sales BOm Costing

    Hi,
       When we create sales order with alternate sales BOM we face a problem.I am using Alternate BOM 5 in sales order .But Costing is happening for Alternate BOM 1.By default Costing  is taking Alternate BOM1 irrespective of alternate  BOM  i am using in sales order.
      At the time of sales BOM costing system should take alternate BOM5 .how to do this?
    Regards,
    Guru
    Edited by: kumaraguru v on Jan 22, 2010 7:24 AM

    You can use Mixed Costing for this. Maintain Procurement alternative by CK91 & Mixing Ratio CK94 for the version you want to cost
    Regards
    Hardy

  • Use ot alternate BOM

    Hi
    We have alternate BOM of a GF material, How can i use boththe BOMS in MRP run, and If we run MRP 2 time for the same material Ist time i use BOM no 1 and in IInd run change the BOM and run the MRP what will be the impact on my PR`s
    Thanks

    Dear Sir,
                 Other way of doing is that make one production version active and then run MRP and then the other.Go to C223 and make inactive or make it inactive through MRP-4.Avinash Sir, please be free to call
    Regards
    Bhupendra Singh
    Edited by: laxmi23101975 on Jun 15, 2011 12:28 PM

  • Alternate bom items

    Hi, created a bom with 2 roh materials as bom items. For the first line item, alt item group 01 maintained as 1 (priority),2 (strategy-100% check), 100 (usage probability) and for the second line item maintained the same settings. Now wants system to pick the roh material, which is having more stock (more qty). when I create production order, system is selecting only the first line item. Pls advise how to rectify the same.

    Hi,
    The setting of the priority of an item within an alternative item group determines the sequence in which material components are reserved in the production order.
    Strategy is to determine how the items within an alternative item group are selected for the withdrawal posting. Use the same strategy for all alternative items in an alternative item group.
    Your requirement of withdrawal posting for ROH which has highest stock is not possible in standard system.
    But
    Strategies for withdrawal postings are supported with:
    1) Withdrawal according to usage probability (manual changes possible) or
    2) Withdrawal if availability is 100%
    So in your case if 1st item is available 100% then the system considers only 1st
    If it is not available then only it searches for 2nd item 100% availability
    Hope you have understood the system logic
    Pavan
    For further clarification ref:
    Alternate BOM
    Edited by: ch pavan on Mar 22, 2010 3:22 PM

  • Production order for alternate BOM and Routing

    Hi All,
             In my business(Discrete) scenario I have alternate bom and routing has group counters. some times i should use first BOM and First group counter. Then next Bom and next group counter. But lotsize is same( prodcution version how to assign).
    When creating production order i should select which ever i need.
    Regards,
    S.Suresh.

    >          In my business(Discrete) scenario I have alternate bom and routing has group counters. some times i should use first BOM and First group counter. Then next Bom and next group counter. But lotsize is same( prodcution version how to assign).
    >
    >  When creating production order i should select which ever i need.
    >
    Hi,
    For your requirement you can define your Order Type Dependent parameters OPL8 as:
    Production Version : 1 Manual Selection of production Version.
    In this case every time when you creat your Production order System will ask for the Production version to be selected. You need to select the PV manually then only you can proceed further.
    This setting is applicable only when the Production Order is Created.
    It will not effect the Planned Oredr creation via. MRP Run..
    Hope this helps..
    Regards,
    Siva

  • How to select another BOM in Planned Order Based Production Order

    Dear PP GURUS / EXPERTS,
    I am using following Scenario: I have alternate BOM for FG and Maintaining Finished Material with Production Version in MRP4.
    Now, When I run the Forecast based Planning (MP30) and go for Single Item  Multi-Level MRP Run  (MD02 & MD04)  it takes 1st Alternate BOM.
    Now, I create the Planned Order Based Production Order (CO40), but due to some reason - WE WANT TO CHANGE THE BOM. instead of 1st BOM We want to use another BOM For Production.
    How can we achieve this.
    Please Help. THANKS IN ADVANCE.
    DSC

    WE WANT TO CHANGE THE BOM. instead of 1st BOM We want to use another BOM For Production
    create  two production version ( PV)and assign the 1PV 1st  BOm and 2 PV 2nd BOM
    System will create a Plan order for PV 1
    IF you want you can change the Production version 1 to Production version 2  in Planned order itself ( in MD11)
    Or reread the master data for production order by selecting PV 2

  • While Create PO alternate BOM Issue

    HI All,
    While Create PO Iam not able to find alternate BOM which have mainained 1 2 3 BOMs.
    System is showing only 1 Deafule BOM Could please let me know how fix this issue.
    Alt BOM is Universal -usage and alternate 1 2 and 3.
    BR,
    Nagaraj K

    Hi Nagraj,
    If several alternative BOMs exist, there is no possibility
    of selecting the desired BOM interactively. Instead,
    selection can be controlled via the following mechanisms:
    - SELECTION BY QUANTITY:
      A lot size interval for which the BOM is valid can be
      entered in the BOM header.
      A prerequisite is that the Selection method indicator is
      not set in the material master record (MRP 4 view).
    - SELECTION BY DATE:
      Can be set in the IMG under Production -> Basic Data ->
      Bill of Material -> Alternative Determination -> Define
      Alternative Determination for Multiple BOMs (transaction
      OS32). A prerequisite is that the Selection method
      indicator the is set to 1 in the material master record
      (MRP 4 view).
    - SELECTION BY PRODUCTION VERSION:
      Can be used if the same material has different BOMs with
      different suppliers.
      You create different production versions in the material
      master record of the assembly (pushbutton in MRP 4 view)
        and assign an alternative BOM to the versions on the
      detail screen. You then enter the valid production
      version in the info record in each case.
    If NO selection mechanism has been defined and several
    alternatives exist, the FIRST one found is pulled.

  • Alternate BOM

    Dear Friends,
    I am creating alternate Bill of material for FERT, but system is throwing following error.
    BOM CAN ONLY BE EXTENDED VIA MASTER RECIPE
    Please guide me how to crate the alternate BOM for the same.
    Regards,
    AMit Shirsath.

    Hi
    If this message is only warning then just go ahead and change the BOM. If this is a warning then change the BOM from receipe but it is not possible to create an alternate bom.
    The creation of alternate BOM is not possible because the existing BOM is already used in the calculation. Let me know why you want to create alternate BOM? If possible i may suggest other way round solution
    krishna

Maybe you are looking for

  • Linux 6.1/Oracle 8.1.5 Pro C compilation core dumps

    Linux installation did not place stdarg.h or stddef.h in the /usr/include directory for some reaon. I located different copies in other directories and have created symobolic links to them all in the end. BUT all result in the following error when I

  • Check table and its effect in AET - Application Enhancement Tool

    Hi fellows, I created a Z-field using AET, and assigned a check table to it. I did not populate the dropbox values, as I have a check table for the field. As far as I know, a check table for a field means "you cannot enter a value which is not stored

  • Sound Icon Greyed Out - Midi AutoAggDevice auto-created

    Whenever I restart my computer or log out/back in, the sound icon in the menu bar is greyed out. When I check the sound preferences in system preferences, it says that the output is: "AutoAggDevice". I gain back control after selecting "Internal Spea

  • Need help on network design

    Hi guys. Looking for some advice on a network design. Please tell me what you think may or may not be wrong or missing. Here are the details: The user count is approximately 600 (desktops, laptops and Cisco IP phones) with two locations (office and d

  • Servlet failed with Exception java.rmi.UnexpectedException: Unexpected exception in personal.web.news.NewsBean.getID():

              When I run a jsp file, the server has the exception:           javax.ejb.EJBException           at personal.web.news.NewsBean.ejbLoad(NewsBean.java:169)           at weblogic.ejb.internal.EntityEJBContext.load(EntityEJBContext.java:158)