Hi,
Demand planning require Sales BOM from ECC. Sales BOM in ECC will not have Routing & Work center, then how a PPM with Sales BOM can be transferred.  If i have to create a dummy routing & WC for those sales BOM it will be tidious job to create all the master data. Is there any way to transfer the BOM alone from ECC to APO.
Please throw some light on it.
Thanks & Regards
Shan

Hi Somnath / Ritesh,
Are you sure about ciffing Sales BOM(usage 5)to APO as PDS ? Did you test it or your comments are based on SAP documentation?
I tried to CIF Sales BOM as SNP PDS, it is creating PDS with only parent item.Child items are missing.I have not used any production version here.
If i use production BOM(usage 1), it is creating PDS with both parent and child items.I have not used any production version here also.
SAP says BOMs can be ciffed to APO as PDS. No productions versions are required. but it has not mentioned about BOM's usage. May be , Is it by default production BOM?
One more question, Is it possible to create production version with BOM usage 5? It has no meaning right..
I think system does not allow you to create production version with BOM usage 5.
I also tried with BOM usage 2. In this case also it behaves like sales BOM.
looks like only production BOM can be ciffed with proper BOM structure in APO.
if required i can send you the link to share screen shots.
Pls comment..
regards,
Umamahesh

Similar Messages

  • How to transfer sales bom from SAP R/3 to APO?

    Hi Experts,
    I just want to ask how to transfer sales bom from R/3 to APO? if i change my bom usage to 5 and use this BOM in my Production version be enough to send it to APO?
    Also, this is my first time using sales bom, could you please help me understand how sales bom work in APO planning?
    Thanks so much.
    Mylene

    Hi Senthil,
    Thanks again for your reply. I was trying to CIF sales BOM in APO but only the header material are being created in APO. The component are not added in PDS. This is how I create it in SAP R/3:
    1. transaction cs01 -->  enter header material, plant and BOM USAGE =5
    2. inside cs01, i entered components, quantity for each components and ITEM category = L (stock item)
                            i also eneterd base quantity for header material
    3. create production version for header material with routing and this BOM
    4. create and activate material CIF model for header and components
    5. create and activate PDS CIF model for header and components.
    After doing all these steps, PDS is created in APO but I only have the header material (no components)
    I tried changing BOM to other bom usage and components were populated in PDS.
    Am i missing nay steps?  Thanks.
    Regards,
    Mylene

  • Issue in transfer of data from ECC to APO

    Hi All,
    I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
    How should I proceed...Please help....this is an urgent requirement
    Thanks & Regards,
    SriLalitha

    Hi,
    you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
    Determine Forecast of Replenishment Lead Time
    Use
    In this field, you specify how the extended safety stock planning determines
    the forecast of the replenishment
    lead time (RLT). The following values are available:
    Supply Chain
    The system determines the RLT forecast using the supply chain structure by
    adding the corresponding production, transportation, goods receipt, and goods
    issue times. If there are alternative procurement options, the system always
    takes the
    longest
    option into account.
    Master Data
    The system determines the RLT forecast from the location product master
    data.
    Master Data/ Supply Chain
    First, the system determines the RLT forecast from the location product
    master data. If no RLT forecast can be determined, the system determines the
    forecast using the supply chain structure (as described under
    Supply
    Chain
    Dependencies
    You can retrieve the replenishment lead time forecast yourself by using the
    GET_LEADTIME
    method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
    Replenishment Lead Time in Calendar Days
    Number of calendar days needed to obtain the product, including its
    components, through in-house
    production or external
    procurement.
    Use
    The replenishment lead time (RLT) is used in the enhanced methods of safety
    stock planning in Supply Network Planning (SNP). The goal of safety
    stock planning is to comply with the specified service level, in order
    to be prepared for unforeseen demand that may arise during the replenishment
    lead time. The longer the RLT, the higher the planned safety stock level.
    Dependencies
    The field is taken into account by the system only if you have specified
    master data or master data/supply chain in the RLT: Determine
    Forecast field of the safety stock planning profile used.
    Hope this helps.
    The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
    May be if you maintain the setting in the profile, you may get the value in RELDT.
    Thanks.

  • Transfer of PIR from ECC to APO - Time stamp

    Hi Friends,
    We are transferring Planned Independent requirements from ECC to APO through CIF.
    In APO Product view Forecast requirements Date is sync fine with ECC date however the time is setting default to 03:00:00 am.
    we want the time to be set to 06:00:00 am by default.
    How we can we archive this?
    Regards,
    Krish

    Dear Tiago,
    I changed Product view Time zone settings, and issue resolved.
    Thanks for your valuable reply. Awarded you the points.
    Regards,
    Krish

  • Transfer product division from ECC to APO

    Hi Experts,
    To transfer product division field from ECC to APO, I have made changes in FM EXIT_SAPLCMAT_001 to add entry in table OT_CIF_MATKEYCUS. And it is populating record correctly.I have added a field for product division in table /SAPAPO/MATKEY.but product division field value is not transfered to APO side. Is there any change I need to do at APO side ??

    Hi,
    have you checked documentation for FM EXIT_SAPLCMAT_001? It's written there that you need to implement user exit APOCF005 in SAP APO.
    Cheers

  • Transfer purchase requsition from ecc to apo

    Hello,
    When creating purchase requirements in ECC, they are not transferred to APO although there is model integration. If I activate again the model, the pur req are trasnferred.
    In CCR
    It gives the error 181 in Schedule line does not exist in APO
    Schedule line does not exist in APO
    Message no. /SAPAPO/CIF181
    And the Queue is not bloqued, and the model is active.
    Thanks

    Hi Fernando,
    Based on the information given, it seems there is problem in
    activation.
    1) Check is there more than one model activated for purchase
    requisitons
    2) Check the master data (purchasing view) has been
    maintained for those items in R/3 level
    3) Check distribution definition is maintained in APO
    customisation
    4) I have a query in which, in general PR transfer will be
    from APO to R/3, in your case it is reverse, is there any
    business requirement?
    5) Check transfer to SNP orders to OLTP system in APO
    customisation
    Regards
    R. Senthil Mareeswaran.

  • Transfer field Value from ECC to APO

    Hi,
    I want to transfer a field from material master to APO. For this i am, using a CIF user exit... The field is not available in the ECC side (EXIT_SAPLCMAT_001), but i found a user exit on APO which has this field (EXIT_SAPMMDUSER_005) which i m not sure if it is called.. please help...

    Hi,
    Could you please send the details..What field you are checking..Field name ?
    You can explore the below 2 table in ECC EXIT EXIT_SAPLCMAT_001. It has the option for expansion.
    OT_CIF_MATKEYCUS
    OT_CIF_MATLOCCUS
    Thanks
    RKS

  • Transfer of fields from ECC to APO

    Hi All,
    I have a requirement where in I need to implement logic for Repl. Lead time as follows -
         1. check if the purchase info record exists
              if exists, then check if the current date is between lifba and lifbi of EINA table
                   if exists then pass EINE-APLFZ to AT101 field of cif_matloc
         2. if purchase info record does not exist, then pass the lead time from Material Master data.
    I have done the coding in Exti_SAPLCMAT_001 (ZXCIFU01).
    the issue is, its not checking for the existence of info record, directly the lead time is being taken from material master data.
    Pls help...this is an urgent issue.
    Thanks & Regards,
    SriLalitha. 

    Hi SriLalitha,
    I have loaded a document explaining how you can set defaults values in APO MAT1 when the material is CIFfed. See this document, here you have the ABAP code:
    http://scn.sap.com/docs/DOC-56755
    This need to be done in APO, thru BAdI: BADI SMOD_APOCF005. In the ABAP code in APO you will need to use function: 'RFC_READ_TABLE' in order to get the details from table EINE. In my example, I am doing something similar checking values from tables MARA and MARC.
    Thanks and Regards,
    Mariano

  • Problems when trying to transfer location from ECC to APO

    Hello,
    I am trying to transfer some locations from ECC to APO via CIF, but a system error appears: "Message no. SR053, data error for the location address 1000". For this reason I have not been able to transfer any location to APO. Could anybody tell what could the problem?
    Thanks in advance,
    David

    Hello Tiemin,
    Thanks for your answer. Based on your answer we changed some settings and now we are able to transfer locations from ECC to APO, but the error message is still showing, so even tough the error is not stopping the transfer now, we are not able to find what could be the problem.  Any more ideas about what we need to check?
    Thanks againg for you help.
    David.

  • CIF of transaction data from ECC to APO

    Hi,
    I wanted to know where we maintain the configuration for real time transfer of transaction from ECC to APO.
    I know for master data we have an option in CFC9 for real time/periodic transfer. Is there any similar config for transaction data too like sales orders etc.

    Hi Alok,
    To allow online transfer of changes to transaction data from SAP R/3 to SAP APO, you have to activate generally the BTEs in SAP R/3.
    This is done in R/3. This is the path:
    SPRO --> Integration with Other SAP Components --> Basic Settings for the Data Transfer --> Change Transfer --> Change Transfer for Transaction Data --> Activate Online Transfer Using BTE
    You can read about it here:
    Change Transfer for Transaction Data - Integration via APO Core Interface (CIF) - SAP Library
    Then of course you will need to generate and actiave your IModels.
    Kind Regards,
    Mariano

  • Error during transferring PDS from ECC to APO

    Hi,
    When I transfer the PDS from ECC to APO, the follwing message is displayed. Can any one advise to overcome this issue.
    Mode N50026289010001 001000000001 S is not assigne
    Message no. CURTO1010
    Diagnosis
    The error described in the message 103 of message class /SAPAPO/CURTO occurred in SAP APO while generating the production data structure.
    Procedure
    You can find the associated message text in SAP APO in message 103 of message class /SAPAPO/CURTO.
    thanks and regards
    Murugesan

    Hi,
    I think you are transferring PDS through I-Model and I-Model is active for the required selection with SNP subcontracting parameter.
    Ensure that the production version "check" status is green and with correct BOM (production) assignment.
    If the I-Model is active, then you can also try sending the PDS using txn: CURTO_CREATE with SNP application.
    Hope this helps
    Thanks
    Venkat DR

  • Urgent : transfer of custom fields of a sales order from ECC to CRM

    Hi,
    We have a sales order which will be created in CRM and replicated to ECC.
    We have added some custom fields in table VBAK, which we are displaying in the sales order additional data tab B. When the user saves the sales order,we need to transfer the fields back to CRM.
    We are aware of the the BADI CRM_DATAEXCHG_BADI.
    Also i think we need to conisder the structure BAPIMTCS but not sure how exactly we can use it.
    On the CRM side these Z fields exist in the structure BAD_BUS_TRANSN_MESSAGE-CUSTOMER_H of the method CRM_DATAEXCH_R3D_MBDOC_FILL.
    Can someone guidde us on how exactly do we transfer the value from ECC VBAK-Z* to CRM  value BAD_BUS_TRANSN_MESSAGE-CUSTOMER_H.

    Hi Sameer,
    Thanks for the document.
    I tried doing the same steps recommended(in the document it was for a customer). However i dont think my values from the ECC side are being passed to the CRM side.
    I created a new Z structure and passed it via BAPIMTCS, but on the CRM side when i tired retrieving my Z structure,i dont think the system found it.
    There are 2 BAPITCMS structures, t_table_info and the other t_bapistruc.
    Do you know which one we need to fill up?
    Thanks,
    Neil.

  • Transfer of global settings from ECC to APO

    I know there is the 'transfer of global settings' option from within transaction RSA1 in APO to transfer units of measure, fiscal year variants etc from ECC to APO, to ensure synchronisation.
    How does this actually work? For example, suppose we have 14 units of measure in ECC, but already have 16 units in APO. If we run the synchronisation transaction, what will end up in APO? Is the complete table of units replaced in APO, so we would have just 14 units?
    Thanks, Bob Austin

    there is some explanation to what you have mentioned in Re: Factory Calendar
    this talks about calendars and is relevant till SCM 4.x
    I would imagine the situation would be the same for UOM
    In SCM 5 you have the option to update the tables, Rebuild the tables and also a simulation option

  • How to transfer the data from R/3  to APO

    Hi Gurus,
    How  to transfer the data from R/3  to APO.
    I do have 4    Ztables  in R/3  can I pass this Ztables data to APO when sales order is created in APO  .
    Thanks & Regard,
    Mohammed Ali.

    Welcome to SDN.
    refer this link
    creating integration model
    Give ur mail id i will send the document which i have.
    With regards.
    Maya.

  • How to delete Master Data transferred from ECC to APO via CIF

    Hi, all
    I'm connecting SCM 5.1 with ECC 6.0 via CIF.
    When activating Integration Model in ECC, the following error occurred;
       "Location 0001 of type 1001 (BSG 592BUSGP) already exists in APO"
    This is because Location 0001 was already transferred from different ECC client via CIF, and not cleared.
    I'm now trying to initialise master data transferred from ECC to APO via CIF, but in vain.
    I suppose I have to first delete all master data CIFed from ECC in APO, or have to execute initialisation of APO master data with ECC data in ECC.
    Please tell me how to do this.
    For details, please read the followings;
    I connected APO client with ECC client 590.
    I transferred Plant and Material Master from ECC to APO via CIF.
    After that, I wanted to change ECC client from 590 to the other.
    I created the other client (592) by client-copying from 590 with SAP_ALL copy profile.
    I deactivated Integration Model in ECC 590, and activated the same in ECC 592.
    Here, I faced the problem.
    The initial data transfer failed due to the duplicate of data.
    Now I'm wondering how I can initialise master data in APO and transfer initial data from ECC.
    Due to testing purposes, I have to change ECC clients from one to the other this time, but I cannot initialise master data in APO and cannot tansfer initial data from different ECC client.
    thanks in advance,
    Hozy

    Hi all,
    Thank you very much indeed for lots of your replies.
    Thanks to all of your advices, I'm getting to understand what to do.
    Well, I'll say I have to create one more client for testing with other ECC clients or I have to rebuild the client by client-copying from 001 and implementing all transportation requests, for marking del flags to each master data and running del programme sound like tough work, and sound like odd ..
    Then, I've got next issue here.
    In SCM-APO, I use BI objects, and , if I have to create several clients for testing, I have to set up clients where you can use both BI objects and CIFed master data.
    I suppose I have to change 'BWMANDT' in RSADMINA and make RSA1 accessable in other SCM clients and implement tests.
    Also, I have to register BI System for newly created SCM clients in RSA1-SourceSystem.
    Well, if you have any experiences on this kind of use, and if you have any advice on it, please give me any tips.
    Particulary, I'd appreciate very much if you give me advice on which way you have chosen; creating several clients or rebuilding the one client in SCM-APO when you use both BI objects, CIFed master data and Demand Planning.
    Thanks in advance.
    Hozy

Maybe you are looking for

  • CRM Survey on Web - Submit button not working.

    Hi Gurus, We have created a Survey in CRM_Survey_suite. The Problem is, when we send the survey with one Question (mail goes out with a link, user click on the link and link take them to our QA Server BSP Page), the submit button is working but when

  • Server Admin- Mail queue is this before or after its been checked as spam?

    Hi we have been bombarded with shed loads of junk causing the mail queue to swell and slow down considerably almost to a halt. I have now created the junkmail account and the notjunkmail accounts and now trying to teach the server to sort itself out.

  • Crystal Reports BAPI Error

    Hi, i am working the fist time with Crystal Reports 2008 and i dont get data from SAP BW Queries. I can connect to the SAP-System and build a report on the Design screen. But on the Preview screen i get the message "BAPI Error #:0 Fehler beim Start d

  • Running out of memory - is there a hole in my code?

    public class Cover extends JPanel {     private static int WIDTH = 180;     private static int HEIGHT = 180;     private static Thread resizer;     private static BlockingQueue <Cover> covers = new ArrayBlockingQueue <Cover> (100);     static {      

  • What is causing this to happen to the screen?

    My son has a new 15" MBP (July 2012). When he tries to play a game on it, like WoW. He is getting this happen on his screen. Is this a video card problem?