How to transport LSMW  project

Can LSMW project be transported? If the answer is yes, how ?

<a href="http://help.sap.com/erp2005_ehp_02/helpdata/en/da/a22506a3291b418b759524b278dcde/frameset.htm">Steps are here!</a>
Step 1 Create a request SE10
Step 2 Export from client where LSMW is recorded
Step 3 Import in the client where LSMW is to be transported to.

Similar Messages

  • How to Transport LSMW to development server to Prodution server

    Hi all,
    I would like to know how we transport LSMW(project, sub-project, Object) from development server to Production server.
    Thanks
    Vipin Nagpal

    Hi Vipin,
        Actually, it depends based upon the requirement. There are some advantages and disadvantages with both of the methods.
    See the following documentation. I think this would be helpful for you and based upon your requirement you proceed further.
                 <b>Transport LSMW Projects</b>
    The LSM Workbench provides data transport for a project via both the SAP transport system and down-/upload. (Excluded are the presettings for IDoc inbound processing. These presettings should be manually created in every SAP system and every client.)
    <b>1. Generate Change Request</b>
    Choosing this function creates an SAP change request containing all information about an LSMW project. This SAP change request can be exported / imported with the usual means of SAP correction and transporting. You can find this function in the initial screen under Extras -> Create change request.
    When transporting LSMW data this way, you can trace the transports any time in SAP correction and transporting.
      <b>Note 1</b>: When importing such a request, the complete project is deleted from the target system first. It is then created again.
      <b>Note 2</b>: When exporting the transport request, all changes to the selected project made until the time of export are entered (not only until the time of creation of the transport request.)
    <b>2. Export Project</b>
    In the initial screen, select Extras &#61664; Export project. This first displays the structure tree of the selected project. Via Select / Deselect you can select whether the entire project or parts of the project are exported. Then select Export. The program then creates an ASCII file.
    Note: The selected elements are exported together with their documentation
    <b>3.Import Project</b>The exported mapping and rules can be imported into another SAP system.
    On the selection screen, select Extras -> Import. The program then prompts you to enter the name of the PC file. The file is imported and the contents are analyzed. After the analysis, a list of the subprojects and objects found is displayed.
    You can now mark the objects to be imported. Project data existing already are check-marked. They are overwritten by the import.
    You can prevent a project already existing in the target system from being overwritten by using function "Import under different name".
      Note: The selected elements are imported together with their documentation.
    If you feel this is helpful, don't forget to reward points.

  • Problem in Transporting LSMW project

    Hi,
    We created LSMW project in development environment. Then we created Transport request through menue <b>Extras -> <u>C</u>reate Change Request</b>
    We successfully transported this request to test environment. When status is checked through STMS_IMPORT everything was fine. However when we tried to open project through LSMW, it didn't exist.
    Can anyone suggest, what could have gone wrong ?
    Nishad

    Hi,
    if your problem is not allready solved.
    You can not transport LSMW-Project - I do not know what this icon is for.
    You have to export the project and than import on the new system.
    use these icons.
    best regards

  • How to create LSMW project for MPN deletion

    Hi
    in MP01 there is a deletion indicator how to tick mark that for All MPN materials
    how to create LSMW project
    bcz LSMW project wil reads the data line wise bt MPN numbers varies for different materials
    how to do this?
    i cant do it manually bcz there sre around 15000 materials are there...
    can anybody help me on this?
    Regards
    Smitha

    there is no standard program for deletion,  through LSMW recording method possible to delete the materiasl.
    goto LSMW tcode and create programt subproject and object  goto step 1 select the second method that is RECORDING  , here you need to record the MM06 tcode and process the recoding...
    the tcode MM06  is set the deletion flag.
    if you want delete alla metarial based on client level  use MMDE tcode.

  • How to transport wdj project code from one server to other server?

    Hi, experts,
    I development 100 wdj component and deployed them to development server(A_development_server).
    I have download sca file of my WDJ project from A_development_server.
    I have config the SLD and Track in the other development server(B_development_server).
    I don't know how to transport the project code from A_development_server to B_development_server for download the project code ?
    Do you give me some hint?
    Best regards,
    tao
    Edited by: wang tao on Mar 12, 2010 4:41 AM

    Hi Wang,
    You can directly deploy project from A_development_server to B_development_server. For that you need to Define Runtime details under RUNTIME tab in landscape configurator for B_development_server in CMS. To access CMS, go through http://host:port/devinf
    Automated Deployment into Multiple Production Systems
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/44/355093ba830a67e10000000a422035/frameset.htm
    Getting Started with the Development Infrastructure 
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/44/0d18d725301a78e10000000a1553f6/content.htm
    Hopt it helps
    Regards,
    Arun

  • Error when transport LSMW project

    Error description:
    When set up LSMW project in develop system, it is all right. But when transport to production system, its file path shows wrong. It looks the same as in Develop system. Now We delete the file path in P-System and re-create new file path the same as before, it can work. How could we solve this problem?
    Thank you.

    Hi,
    LSMW is a transaction, which will let you mass upload almost any other transaction (FB01, FD01, AS91, etc.). You do it in the following way: 
    1. Enter into transaction LSMW (no menu path), possibly in a development / test system 
    2. First, define a project, subproject and object (relatively formal task). 
    3. On the horizontal menu, go to Goto -> Recordings. Click on "Create recording". 
    4. Enter the name and description of recording (freely definable). 
    5. I cannot simulate this now in my system, but SAP will ask you about transaction code (AS02) and will take you into the AS02 transaction. In this step, do the change manually. Make sure you "touch" (change / write something) in all fields which you want to update. 
    6. Once you are done, save the recording and return on the start page of LSMW. Click "Execute". 
    7. You will see a list of tasks. Do them one by one. They should be relatively simple (and I cannot help you with them). Important is step 3 (maintain source fields) - here you define the columns of your excel (csv) file in the particular order. In step 5 (field mapping and conversion rule), you assign file columns to SAP fields (note that you will see only those fields which you "touched" during recording). You need to go through all the steps. In the end, you get (and run) a batch session. 
    8. <b>If you did this in a development system, transport the LSMW object (menu Extras - Export project, Extras - Import project). You have to do it via file, not via standard transports of configuration (it is perhaps more simple). </b>
    Make sure you test it first in development or quality system! 
    Pls reward points if useful.
    Regards,
    Ameet

  • How to transport Implementation project template changes?

    Hello All,
    I have made changes to the project template (added doc types, assigned status schemas) for Implementation projects in my dev system by going to SOLAR_PROJECT_ADMIN > Goto > Project Template > Implementation projects.  I want these values to be the standard values whenever I start a new Implementation project.
    When I save my changes, I am not prompted for a transport request, nor can I find any transport option in the menu.  Do these project templates need to be manually configured in my test and production systems, or is there another way of assigning the changes to a transport that I cannot figure out?
    Thanks in advance,
    Michele

    Hi,
    Just enable the GLOBAL field for the values which you want to be available for all the implementation projects.
    e.g
    You created a documentation type which is having global field tick so it will be available for all
    Hope it helps
    Regards
    Prakhar

  • Transport LSMW

    Hi,
    When we do LSMW system does'nt prompt for the request then,
    how to transport LSMW.
    Rgds,
    fattesingh

    Hi,
    There are two methods for this. Can choose any one.
    1)<b>Extras>Export Projects>(</b>Give the Project name)
    In next screen(Choose what subproject, routines, etc.. you wan to copy then, <b>Export Rules-->Export</b>((Will prompt for file name)
    A text file will be downloaded.
    In the Target System
    Goto LSMW <b>Extras-->Import Projects</b> and give the text file done.
    2)<b>Extras-->Generate Change Request</b>
    Assign a change request can then transport.
    Regards,
    AS

  • How to transport ONLY 1 subproject(which has 1 object) of LSMW project?

    ^Hi Experts,
    I hv a LSMW project, with 9 subprojetcs, and each sub project has 1 object.
    Now, I made a change in 1 object of 1 sub project........so, I need to TRANSPORT only this 1 object to TEST system!! suggect how to do it?
    replies appreciated,
    thanq

    >
    SAP ABAPer wrote:
    > actually, Initially, all this big LSMW project with 9 subs(inturn w/ 9 objects) moved to TEST, well.
    Generate change request carries all the PROJECT!!
    Yes,I was waiting for this confimartion.
    Than you can move LSMW by generating "Generate change request" as your changes would be only in subproject_1 rest all subproject would remain unchanged,so while transporting whole request changes will be overwrite only for subproject_1.
    Is there any issue in this way?
    i'm open for Thomas's suggestion also if there any other way to do same.
    Cheers

  • How to transport an LSMW object from dev to Quality and to Production?

    hi All,
             Could any one please specify how to transport the lSMW object from developmen to Quality and finally to Production?
    Thanks in Advance.
    Regards.
    Abhilash.

    Hi,
    The "cleaner" way is using normal transport procedure via "Extras->Generate Change Request".
    This will transport the entire project though, not possible to transport a single object this way.
    step by step
    1. Run Tcode LSMW in source system.
    2. in the menu bar choose Extras-->Export. Now give the filename and save in your desktop.
    3. Now login to destination system. again execute LSMW.
    4. Now goto Extras-->Import.Give your file which was downloaded earlier.
    5. Now tool bar click on import with diffrent name option and give your new project and subprojectname.
    6. Now execute all steps.
    Also refer the below link
    http://help.sap.com/saphelp_crm50/helpdata/en/da/a22506a3291b418b759524b278dcde/content.htm
    Please reward points if it helps
    Thanks
    Vikranth

  • How to achieve the project is obligatory entry when creating transport requ

    Hello
    How to achieve the project is obligatory entry when creating transport request

    In T-code SE03, under Administration -> Display/Change Request Attributes
    Select "SAP_CTS_PROJECT" and hit the change button and then change the value of "Default for All Clients" to Mandatory
    Hope this helps.
    Thanks,
    Naveed

  • How to delete and rename LSMW projects...

    Hello Experts,
    I can't seem to find a way on how to delete and rename my LSMW projects.I dont see any options on how
    to rename it.
    Thank you guys and take care!

    On the LSMW transaction start screen. Goto->Administration. Here you can select your project etc. and rename/delete/copy.

  • How to offline transport ESS project?

    Hello experts,
    I had configurated NWDI , created  track, download develop configuration into NWDS , created ESS project, then modify  some ESS project .Of course , I had created some activities for my modify of ESS project.
    I had deployed my changes by "Development Componnent -> Build/Deploy "   to development system  .
    But our product system was in another LAN ,  and the message server port was forbidden by firewall.So I can't deploy the modified ESS project by NWDI transport or NWDS directly deploy.
    Is there any offline solution to transport my modified ESS project to production system ?
    I  had builded the ESS project by "Development Componnet -> Build ", then got the .ear file . Then deploy the ear file with SDM, deploy was succeded , but the ESS project was not updated in production system.
    I also deployed ear file with visual admin deploy service ,  it occured error "Can't conver file ..... " , can't deploy.
    Then I used "create archive" to create ear file of ESS project, and deployed with SDM and visuam admin deploy service.
    Deploy with SDM was also succssed ,but project was not updated; deploy with visual admin deploy service ,also got error "Can't convert file ....".
    Could you please give a suggestion about offline transport ESS project ? Thanks.
    Best Regards,
    Louis Chen

    Hi Louis,
    Do you have CTS configured in your landscape?
    You can also achieve your Java transports using CTS.
    If it is configured, then you can choose the option.
    "Connect to CTS" option inside General Track Data of your Track, in Landscape Configurator from CMS Web UI.
    I hope that helps.
    Regards,
    Shreyas Pandya

  • How to lock LSMW Obj.

    Hi ,
        How to Lock LSMW Object. Restrict other users for changing.
    Thanks
    vinod.

    Hi!
    I don't know how to lock, but if you don't want other changes, just download the project (or object) to local PC. Before using next time, upload again.
    That's also good to get 'immediate' transport to other systems, you don't have to bother with transport requests when in a hurry.
    Regards,
    Christian

  • How to call LSMW from a Report program

    Hi,
    I have a requirment of extending vendor master data (Companycode data and Purchasing Organization data ) through Tcode XK02 using LSMW.Also I need to generate an error log file for validating the data from flat file and  must have an export option of the error log file.
    Can you help me how to proceed on this in steps.
    Also pls let me know how to call LSMW transaction through a Report.
    Based on the selection criteria I need to maintain two source structues,one for companycode data and the other for Purchasing Orgnization data for uploading  data thru LSMW.How to do this?
    pls respond ASAP,
    Thanks,
    Nagendra

    Hi,
    create 2 LSMW object (under same project and subproject)..
    one for extended vendor master data for company code data and other for  extended purchase organization data for company code data.
    Now check the radio buttons and based on that populate ur LSMW object.
    Store project
      project = < >.
    Store subproject
      subproj = < >.
    Store object
      object  = '6GSC022_TS3'.
    if r_ccode = 'X'.
    Store object
      object  = < >.
    else.
    Store object
      object  = < >.
    endif.
    Call the function module to display object (LSMW) maintenance screen
      CALL FUNCTION '/SAPDMC/LSM_OBJ_STARTER'
        EXPORTING
          project        = project
          subproj        = subproj
          object         = object
        EXCEPTIONS
          no_such_object = 1
          OTHERS         = 2.
    Generating error log:
    After the checking the field if u think for this u need to generate error message then In the Maintain Field Mapping and Conversion Rules option under the required field write the following code:
    data: v_msgtxt(100) type c.
    message  <msg ID>    <message type>   <message no>
                     with   <var1>  <var2>
                     into v_msgtxt.
    write v_msgtxt.
    Follow the next step in LSMW object till you reach the option  Convert Data.
    After you execute this option you will get the desired message here.
    Regards,
    Joy.

Maybe you are looking for