How to Trigger the process in XI

Hi,
How to start trigger the process in XI? In my scenario first step need to Starts in XI .
So can you please guide me how i can proceed.
Thank you very much.
Sateesh

Thanks sandeep,
Your valuble inputs, CC triggers every day that's good concept
actually my scenaio having three systems two sender systems and one target system
                                             SAP(Source System1)
                                             KDatabase(Source system2)-Database system
                                             DB(target system)-- Database system
First step starts trigger in XI------
---then XI fecthes the date of the last successful SAP data update in the DB(target System)- (That means XI Fecthes data from DB(target system)
---and XI call RFC to SAP(Source System1) and last sucessful date updated in SAP and get result(response) from SAP
---Now this response pass to same DB (target sytem).
This RFC response pass to two tables one "H_Data" and "P_Data" If data is successuful stored in the two tables automatically update the "Sap_log" table with the date and status fields. If not successful stored in the two tabels it throws  the error message.
after update the SAP data second process witll start again
XI fecthes the date of the last successful Kdatabase data update in the DB(target System)- (That means again XI fecthes data from DB(target system).
---after that XI sends data to Kdatabase based upon on the condition, Condition:XI selects all datasets of the Kdatabase view, that contain at least one modification date younger than the last successful Kdatabase data update.
--after "Kdatabase" sends the response to XI and XI put this data into the DB(target system)
--The "Kdatabase" response pass to one tables one "K_Data"  If data is successuful stored in that table automatically update the "K_log" table with the date and status fields. If data not successful stored in that tabel it throws  the error message.
This is process .
Can you provide your valuble suggestion, It will be very helpful me.
Thank you very much.
Sateesh

Similar Messages

  • How to trigger the Process Chains in BI from ECC

    HI Friends,
    Can let me know  How to trigger the Process Chains in BI from ECC. Please let me know.........

    Hi,
    1) Define a Custom ABAP Program (eg : Z_EVENT_RAISE)..........call the FM : BP_EVENT_RAISE or RSSM_EVENT_RAISE..........and trigger an event towards BW .........specify BW as RFC destination...........
    2) Create a R/3 Job in SM36>> use the Program Z_EVENT_RAISE ......
    3) In BW schedule the PC..........and in the Start variant use this Event..........
    http://sapbiwtutorials.blogspot.com/2009/03/how-to-trigger-process-chains-in-bw.html
    It can be help full
    Regards,
    Edited by: subba2010 on Aug 19, 2010 6:51 AM

  • How to Trigger the process chain using Excel Files?

    Hi All,
    We have 9 excel files(4 master data attributes and text files and 1 transaction file).
    Everyday new records will be added into the excel sheets and we need to trigger all these files into the bw server through process chain automatically . As we have all these Excel files in the desktop.
    Please suggest how to achieve this task?
    Thanks
    Gowtham

    Hi,
    You cannot load flat files to BW automatically using process chains.
    You have to upload them to Apllication server and point your Infopackage to the directory path of the flat file in application server. then process chains can load it.
    How to guide for loading flat file to application server.
    Program to load CSV file from local desktop to Application server(For flat file Data extraction)
    -Sriram

  • How to trigger the automated row fetch process and open modal window by javascript api?

    Hi,
    I would like to click the one row of column of IR report, to open the modal window of current page.  <----------------it is ok. I can use "javascript:openModal('windowID')"  to do it.
    There is one form in this modal window, Meanwhile, I would like to pass column data to this form.    <--------------------- it is ok also. I can use " $s('P7_ID','column_value');" to do it.
    But I don't know how to trigger the "automated row fetch" process of this form to retrieve other field's value in this form.   
    I tried to use following 2 ways. But failed.
    First method:
    add one ajax process of "automated row fetch" in "page processing" block, named "get_fetch_data"
    when click IR column , call "openModal", and call  "apex.server.process ( "get_fetch_data", {}, { success: function( pData ) { }  } );"  , I tried to call above ajax process to refresh form. It is failed.
    Second method:
    add one process of  "automated row fetch" in "page rendering" block, named "get_fetch_data"
    when click IR column, call javascript api "apex.submit" to submit current page , then call "openModal".
    such as :  javascript:apex.submit({request:'MODIFY',set:{'P7_ID': #ID#}}); openModal('trade');
    But it is failed also. the modal page is showed firstly. then page refresh. but modal window will not open again.
    I am not sure if my thinking is right. Could you please provide any suggestion?
    Thanks in advance,
    Ping

    Hi Ping,
    You can try to set the session state of your modal page's primary key before opening the modal page. Use one dynamic action (on click of IR row) with two true actions. First one to set session state of modal page pk, second on to open modal page.
    Or you can add the modal page url as link in your report by extending your query:
    select ...
    ,         apex_util.prepare_url( 'f?p='||:APP_ID||':7:'||:APP_SESSION||'::'||:DEBUG||':7:P7_ID'||COLUMN_VALUE ) as link
    from ...
    This will give you the url of the modal page, with set primary key.
    Regards,
    Vincent Deelen
    http://vincentdeelen.blogspot.com

  • APD process is active, How to trigger the data from BI to CRM table

    Hi All,
    I want to send data from BI system(using APD method) to CRM table (ADS method).
    I am able to see the table for e.g ABCD in CRM system , i can open using SE11 , but data is 0.
    In BI , i have data in DSO and i have mapped it in APD process to data Target to CRM system and APD is active.
    Now i want to know how to trigger the data from BI to CRM table? (e.g ABCD).
    Please let me know the steps.
    Regards.
    Nithi.

    Hi
    Just create a Process Chain to execute this APD method, if the process Chain is already available, then just insert this Process in to the process Chain and execute the Process Chain by normal process, by hoe we do in general.
    Hope it solves...

  • How to trigger a process task on IT Resource process form

    Hi,
    I want to know how to trigger a process task on IT resource process form using OIM API.For Example:- If a task ilike an e-mail is to be sent on the departure date of a user.So,how can it be done using API?
    Thanks.

    This would typically be done through a scheduled task. Write your code to query for the departure date. If someone meets your criteria for an action to occur, you can either use the addProcessTaskInstance which has an adapter attached to it to send the email, or in your code, send the email.
    The details that need to be considered though is where the departure date is stored. Is it on a process form, or is it on the user's OIM profile. Do you want to disable the user or revoke the object instance at this departure date? You could use the notification tab of these existing tasks if so.
    -Kevin

  • HOW TO STOP THE PROCESS CHAIN WHICH IS RUNNING IN THE PRODUCTION?

    HI ALL,
    CAN ANYONE TELL ME HOW TO STOP THE PROCESS CHAIN WHICH IS RUNNING DAILY AT 5.00 PM. I NEED TO STOP THE PROCESS CHAIN FOR COUPLE OF DAYS AND THEN RESTART IT AGAIN.
    cAN ANYONE TELL ME THE PROCEDURE TO STOP THE ENTIRE PROCESS CHAIN RUNNING IN THE PRODUCTION.
    THANKS
    HARITHA

    Hi,
    First and foremost let me advice you to be very careful while doing this.
    For Rescheduling
    RSPC> chain > Goto > Planning view and
    click on Execution tab > select > Remove from Schedule and then in Maintain variant of start process reschedule for the day you require it to run.
    For terminating active chain
    You can start from SM37, find the process WID/PID then go to SM50 or SM51 and kill it. Once its done come back to RSMO and check the request, it should be red but again manually force to red and save by clicking on the total status button in the status tab. This shuld ensure that the process is killed properly.
    The next step will be to go to targets that you were loading and remove the red requests from those targets.
    Note: For source system loads you may have to check if the request is running in the source system and kill if needed and pull it again.
    But for BW datamart delta loads u may have reset the datamarts in case u are going to pull the delta again.
    Re: Kill a Job
    Re: Killing a process chain.
    Regards,
    JituK

  • How to stop the process chain showing status as yellow but no process step

    Dear Friends,
    How to stop the process chain showing status as yellow but no process step is running in that process chain.
    We have manually triggered the process chain for sales it finished successfully till load data but the next step is create index and DB statistics. Both of this steps are in unscheduled position only and no background job for this.
    Please guide me.
    Thanking you in advance.
    Regards,
    Shubhangi

    Hi,
      At times even I have faced this situation.  During those times, running the Function module RSPC_PROCESS_FINISH by passing the right parameters came to my rescue.
    Regards,
    Raj

  • How to get the process id of a sql statement or a session  ....

    How to get the process id of a sql statement or a session . ..?
    Thanks

    What about this?
    SELECT pid
      FROM v$session s, v$process p
    WHERE p.addr = s.paddr
       AND s.sid = :sid;   -- replace :sid with your session idRegards.
    Al

  • How to move the process chain from Unassigned node to a new node in 3.5?

    Hi all,
    I have created a new process chain in the development and it is falling under the Unassigned nodes. I want to move that process chain to an another node. but i am unable to do that
    Can anyone let me know how to move the process chain from unassigned node. I have drag and dropped but still the same in BW 3.5 ?
    Thanks
    Poooja

    Hello,
    Try this....
    Double click on your process chain. Via the menu select:
    Process chain > Attributes > Display components
    Select F4 (possible entries)
    At the bottom of the window you will find a create icon
    to make your own component.
    After you created it, assign it to your process chain.
    Don't forget to save the process chain.
    Regards,
    Sivaram

  • How-to trigger a process chain using ABAP?

    Does anybody know how to trigger a process chain using ABAP code?
    Any help would be appreciated!
    Thanks
    Ioan

    Hi Ioan,
    try this in your ABAP:
        CALL FUNCTION 'BP_EVENT_RAISE'
          EXPORTING
            eventid         = 'Your Event'
            eventparm       = 'START'
            target_instance = ' '
          EXCEPTIONS
            OTHERS          = 01.
    and schedule your process chain, waiting for 'Your Event'.
    regards
    Siggi

  • How to trigger a process chain using external scheduler ?

    Hi all,
             we have a requirement wherein we need to trigger the process chains from an external scheduler used by client rather than directly scheduling it through BW scheduler.So any pointers on this will be heplful.

    Hi we have had a same scenario like this. You can schedule it using schedulers like autosys. Speak to your basis team and see if you have the autosys software installed or some thing similar to that. You have to write a program which calls the function RSPC_CHAIN_START. When you excute this program, it willl ask for a variant to execute. this variant will be the start variant of the process chain you want to trigger.
    the flow will be like the basis team will schedule the autosys or the scheduler to run the program and this program will in turn trigger the process chain.
    regards,
    Satish.

  • How to test the process chains

    hi sap gurus,
    Can anybody tell me how to test the Process chains before i load real time data,i run process chains every morning 6.15 am,before that i want to test every process is linked to another.
    thanks in advance.

    Hi,
    Scheduling the process is the only way to check whether it is running fine or not. The process chains should be checked first in the Dev server and then in the QA server before transported to Prod.
    You can also check the process chain using the "check" button to see if the processes are in the proper sequence or not.
    There is a "log" button to keep track of the progress of the chain
    suresh

  • How to cancel the process in initiator of human task in 11g?

    human task as the initiator of the process, by default there is only a SUBMIT button, how to cancel the process then?
    if I just close the form, a task will still created in the task list, still in initiator step. what if I don't want this?
    I tried to add an "CANCEL" output for this , if the output is CANCEL then go to then end activity, but seems it doesn't work. anyone got a better solution? thank you.

    You should be able to use the "Withdraw" action for this - available from the task Actions button/drop down on the human task form.

  • How to Disable the Process Header, collapsible Area, and Process Warning Bar from Contacts Form of CRM 2013

    Folks,
    How to Disable the Process Header, collapsible Area, and Process Warning Bar from Contacts Form of CRM 2013
    Thank you.

    Hi,
    You can deactivate the business process itself if you do not want at all. So that the header will not available for the entity.
    Regards,
    Priya

Maybe you are looking for

  • Imminent Hard Drive Failure Pavillion DV6

    HP Pavillion DV6 - 6051ea Windows 7 64-bit Imminent Hard Drive error I've run the hard drive scan, and got the following failure ID: M4JC3U-5K9655-MFH14J-60E303

  • BPM query

    hi frnds, while doing bpm scenarios splitting(1:2) and merging(2:1) messages, a) in splitting scenario integration process container, we use 3 abstract interfaces and 2 multiline receivers  (using fork here) b) in merging scenario integration process

  • Any mac pc differences with PSE 11 and premier 11

    There were a lot of differences between mac and pc versions of 9 and 10. Are there still the same limitations for mac users. Also has the time stamp problem that existed for mac users been corrected? Thanks

  • Is it possible to find owner of lost Apple & Nike?

    Found Apple and Nike "chip". Can I use serial number to find owner?

  • Can a device be too old for firewire 800?

    Hi all, I have an old Sony DCR-TRV30 mini-DV camcorder with a Firewire 400 4-pin out. I have long used Firewire 400 to connect to my MacBook Pro 2.16GHz core duo, circa 2006. Right now I'm running 10.6.8. In order to connect the camera to my students