dear all:
my step is below:
1, CT04, create "Characteristic"
2, CL02, create "Class". and class type is "14".
3, now how to customize to use the class in project definiton and WBS.
Please explain me all the steps to be required.
Thanks in advance!
Hi
Classification is only assigned for the network profile or in the activity.
CJ20N -
> Extra ---> Classification --- > Classification
Hope this will help you.
Regds,
Uddhab
Similar Messages
-
How to block reusage of archived Project definition and WBS element numbers
Dear All,
We have archived our projects using the TC SARA and the Project definition and WBS elements numbers no more exist in tables PROJ and PRPS etc.. When I now try to create a new project, the system proposes the next open number or allows to enter a number which is the same as one of the archived projects. But in our organization we cannot reuse the Project definition and WBS element numbers (even if it is archived) as a rule.
Can anybody guide me what are the possibilities to block or avoid the reusage of the numbers of archived project definition and WBS elements in a fool-proof way?
Thanks and regardsOne Workaround:
Use T code OPSJ and lock the project coding mask. Doing this you can not use this mask any more.
But you want to continue using the mask but with different numbers. Not sure how this can be acheived. lets wait for others view
Regards
Sreenivas -
Enhancement for project definition and WBS element.
Hi Experts,
I have a client requirement for creation of the custom specific fields for the project definition and the WBS element level called IT relevant and they need to use this fields for the purpose of structured reporting in PS.Can you please guide me as to how do in need to do this.
When i go in to the transaction CMOD and SAP Program SAPMSMOD it says you are not authorised.Please let me know the process as to how it has to be done.
Thanks for your cooperation.
ShivkumarRefer the IMG documentation against the SPRO node 'Create Customer-Specific Fields in a Project Definition' and 'Create Customer-Specific Fields in a WBS'.
Regards
Sreenivas -
Grey field for project definition and WBS element
Dear all,
I have created a project and WBS element in CJ01. Now I go via CJ02 to the change mode and the project ID and WBS element ID is not greyed out. But I would like that the system shows these key fields as not changeable anymore, only fields like description should be changable. Can you please tell me, which customizing step I missed to get the grey field for project ID/WBS element ID?
FYI I do not use a project mask to create the project.
Thanks for your answer.
HeidiHi Heidi ,
I don't think you can grey out the Project Definition and the WBS Element fields after the creation .
If you want to restrict the users to change the Proj definition and WBS , a better way is through
Authorization objects and restricting only specified users to change the WBS
Kish -
Creation of project definition and wbs element
I want creation of project definition and wbs element upto 4 level using bapis.
i am using transaction cj27,cj01,cj02
which function module to use for this??Hi,
to create project definition with customer fields the BAPI you should use is : BAPI_BUS2001_CREATE
to create WBS elements with different levels and specific fields the BAPI you should use is BAPI_BUS2054_CREATE_MULTI
these bapi must be used in the sequence of call :
BAPI_PS_INITIALIZATION
BAPI_BUS2001_CREATE / BAPI_BUS2054_CREATE_MULTI
BAPI_PS_PRECOMMIT
BAPI_TRANSACTION_COMMIT
before using the bapi, you must apply OSS note :
637345 - Syntax error with enhanced PS tables
i sent you the oss note to your mail
please reward points if helpfull. -
BAPI/FM for setting the user status for the Project definition and WBS elem
Hi,
I have to set the User Status for the Project Definition and the WBS elements in that project.
The User status to be set is the same for the project and wbs elements.
Please let me know if there is any BAPI/FM to set the user status..
Thanks in advance.
Regards
ShivaHi Shkithija,
There is a dump encoutered in the form "PS_FLAG_GET_GLOBAL_FLAGS" for 'chk_precommit_ok' in the "BAPI_PS_PRECOMMIT".
But it is showing SY-SUBRC = 0 when used along with BAPI_TRANSACTION_COMMIT.
May i know what are input parameters we need to pass it to "BAPI_PS_PRECOMMIT".
Do you have any idea.
Please let me know
Regards
vishnu -
How to use the API for DATE, MONTH AND YEAR
I would like to use the java api in .util.calender in the java api to get the date.
How to implement the API for the "DATE","MONTH","YEAR" which are available provide by java?
can someone give me in one complete code?From the Java Developers Almanac 1.4:
Calendar cal = new GregorianCalendar();
// Get the components of the date
int era = cal.get(Calendar.ERA); // 0=BC, 1=AD
int year = cal.get(Calendar.YEAR); // 2002
int month = cal.get(Calendar.MONTH); // 0=Jan, 1=Feb, ...
int day = cal.get(Calendar.DAY_OF_MONTH); // 1...
int dayOfWeek = cal.get(Calendar.DAY_OF_WEEK); // 1=Sunday, 2=Monday, ... -
How to use same form for Editing info and creating info.
Hi all,
Here my aim is to select the user from list and edit the user info. There is one more option to create the new user.
Currently I am using two separate input forms one for Editing and one more creating new user.
Can anyone tel me, how to use the same form for both editing and creating.
Thanks,
Ramesh BiradarHi Ramesh,
I'll make some assumptions about how you're going about this, and then give you a possible solution:
I assume that you have a table with selection on one page. To edit an item, you wish to select it's radio button and click an edit button to take you to another page with the item filled in to edit it. To create a new item, you'd like to click a "new" button and go to the same page.
If this is correct, here's the basic steps:
1). Assuming you have both the list and edit pages already created, make sure you have a JSF navigation case defined going from the list page to the edit page. I'll call this navigation case "goToEditPage" for this discussion.
2). To make the edit button, drag a command button from the component palette and drop it on the af:TableSelectOne (the column in your table containing the radio buttons for selection).
3). Set the action property on this command button to "goToEditPage".
4). Now, to make the create button, drag a command button from the component palette somewhere on the page. I like to put mine in a panelButtonBar inside the actions facet of an af:Page component.
5). Now, for the Action property of this command button, bind it to a method in your page's backing bean. The code will look something like this:
public String performNew()
BindingContainer bindings = getBindings();
OperationBinding operationBinding = bindings.getOperationBinding("Create");
Object result = operationBinding.execute();
if (!operationBinding.getErrors().isEmpty())
return null;
return "goToEditPage";
}Hope this is helpful, Ramesh.
Regards,
John -
Extension structure for a bapi to create project definition and wbs element
Hi,
is there a bapi that have an extension structure for custom fields, that can be used to create a project with wbs elements.
thanks for your help.i yhink BAPI_PROJECT_MAINTAIN dont have extension structure, so i cant use it because i have custom fields.
BAPI_BUS2054_CREATE_MULTI seems meet my requirement because it has extension structure, -
How to use form design for both online and Offline Scenrio!
Hi All,
I have created the forms using WebDynpro context with ZCI layout for Online scenario.
There are some fields which need to be prefilled and are read only.. Header fields.
There is no interface structures created seperately but the interface is constructed through webdynpro context.
Now that I have to use the same for offline scenario, I don't see layout in SFP of form. I can create a structure for Importing fields but there is no Layout for mapping?
Do I need create seperate forms for this as I have some prefilled hedaer fields which I can't pass using download beacause there is no context design available for this?
Regards,
Srinivasyou could either create a separate form for your offline form using Data Dictionary interface or use the Data Dictionary interface for both of your forms.
You do have the option of creating your own XML file for your offline form - you may be able to copy the XML code out of your online interface, save it to a file and use that for your offline interface - i'm not 100% sure on this as I've never done that. -
CADO Report - Missing Project Definition and WBS elements
While running CADO (time sheet data) report for employee, data is not being pulled up for the WBS Element and Project Definition. What could be the reason? Here time is entered against a network activity but for some entries WBS element and project definition is dispalyed and for remaining it is not.
Yes....these activities are assigned to the WBS element in the project. As I mentioned earlier for the same activity in some cases WBS element is populated.
-
How to use XML Gateway for Order Import and Item Import?
Hello XML gurus,
I'm working in Oracle Apps area and do not have much knowledge on XML or web programming. Currently in my project there is a need to use Order Import and Item Import using interface tables and XML Gateway. The items/orders information will be in the XML format from Siebel system, there will be no custom processing...just process the data as-is.
I've read the XML Gateway user guide but did not understand much.
Anyone with similar implementation experience?
I'm looking for a step-by-step guide on what needs to be done in Oracle Apps side to populate the interface tables from XML file and call the import APIs?
Your inputs, suggestions, tips are highly appreciated. :)
Thx,
JagsI have a similar requirement to automate the order import and was looking at XML Gateway. Please update if you were able to find more information.
- Ayyappa -
Validation for Project defination and project profile
Hello,
I have to create validation for Project Definition and Project Profile.User requirement is when the project (Exp: Z/0120) is creating with project profile Exp: Z0001_Z system should allow , If user is trying to select other than this profile system has to give the error.
I tried below validation but it is not working:
Prerequisite - PROJ-PSPID = 'Z'
Check - PROJ-PROFL = Z0001_Z
Kindly any suggest how can i give the validation for the same.
Regards,
Lakshmi.
Message was edited by: Mohamed Rafi - Many threads available on this topic search for those.Hi,
Have you tried to save the project? Because validation rule will call at time of saving the Project.
I have created the same but for start with 'U'
When I create project and at time of saving, validation rule will call and system throw error if I don't create project start with 'U'.
Now If I am creating here, start with 'J'. System is throwing error as per validation rule.
Also Pl check if you have assigned same correct rule on project profile.
Regards
Shishir -
Different profit center in Project definiton and WBS
Hi,
Our client facing a problem for closing the project due to different profit center. In Project definition the assigned on profit center and WBS they assigned another different profit center . There is not data posted or planed .
SAP won't allow me to change the Profit Center because it says the project is released.
Now they try to close the project but it showing error like different profit center in project definition and wbs.
Could you please anybody help to solve this issue?
Thanks.
V.KFrom the error message It seems there is a validation using Field exit. Ask your abaper to debug. Then would be able to know the logic behind it.
Venkat -
How to find next number range for project definition in tcode CJ20N
Hai Experts,
Please help me 'How to find next number range for project definition in tcode "CJ20N". I was trying in function module NUMBER_GET_NEXT. Is it right function module? If its right what input i need to give for this tcode and for the field project definition?
Note: I searched in forum before posting, but couldn't find the solution.
Thanks
Regards,
Prabu S.Hi,
For project defination internal number is assigned by system.
When you saves's project then system allocate one number to project defination, you can view it,
SE11 >>> table PROJ >> Click on contents >>> execute,
here you will get your project defination & number is assigned to project defination.
kapil
Maybe you are looking for
-
"Ipod software update server could not be contacted": Ipod Restore
When I was trying to update software on my 4th generation Ipod Touch, the screen froze with the 'connect to Itunes' image (i.e. the Itunes logo and the USB). The screen has been frozen that way since and consequently, I have tried to restore my Ipod.
-
Getting an Error-Document is distributed while changing the status
Hi Experts, The Scenario is to create a contract in CRM whose follow up document is call of order. When the Status under the general tab in the Contract changes to Approved, immediately the status of the follow up document (i.e. the Call of Order doc
-
There was an error opening the database for the library "/Users/stacia134/Pictures/Aperture Library.aplibrary". Why am I getting this message and how do I correct it so that I can open Aperture???? any suggestions would be most appreciated
-
Dynamic link server won't connect
After a complete reinstall of my computer (Mac Pro 5.1, nvidia GTX 120 & GTX780) i cant use dynamic link to import sequences out of other projects. Dynamic link server can't connect. What can I do to resolve this?
-
The reports builder on my machine was working fine till lastweek & all of a sudden it starts giving me this error. The only change that happened was I moved from one building to a new building all of which are in the same network. Not sure if its a n