How to use new iPad3 in conjunction with Lightroom on desktop iMac?

Workflow:  Will this work?  Camera RAW to iPad3 to Lightroom???
I would like to use my new iPad3 in conjunction with my already-established Lightroom workflow on my desktop Mac.  What I have in mind is to shoot in RAW (Sony SLT A-65 - 24.3 megapixels) and then, in the field, transfer my photos from the camera to the iPad3 (64GB version).  On the iPad I might do some rudimentary editing - deleting duds, etc. - but I will still do all my significant editing in Lightroom on the Mac.  Thus, I need to import the photos, from the iPad, in either RAW or DNG into LightRoom once I get back to my office.  My questions are:
Is it possible to import RAW photos into the iPad3 and either keep them in RAW or convert them to DNG?
Is it possible to export RAW or DNG photos from the iPad3 into Lightroom?
What app(s) do I need on the iPad3 to make this happen?
FYI - I am using Lightroom3, but will upgrade to Lightroom4 if that makes any difference in whether this will work or not.
Thanks so much, in advance, for your suggestions and your advice!

You can load your RAW images to any iPad either using the Camera Connection kit that comes with two dongles. One for inserting an SD card from your camera to load the images. Or the USB dongle which you can connect the USB cord for your camera to the iPad to load the images. There are a few CF card readers that will work with the iPad if your camera uses those a Google search will feret them out for you. Additionally, you can also load images to iPad, iPhone or iPod touch (as well as laptops and desktop cumputers) using WiFi as you capture them using an EyeFi SD card.
http://www.eye.fi/
A good app for working with EyeFi on the iPad is Shuttersnitch (though, it does not coordinate with Lightroom)
http://www.shuttersnitch.com/
Unfortunately their isn't any RAW processing image editing software for the iPad that Lightroom can make use of the edits. Though there is an app called Photosmith that will allow you to rate, label, add keywords etc. then you can upload that info to Lightroom on your laptop or desktop cimputer and have that info synced to the images. You do have to transfer the image files themselves from the iPad to your workstation seperately.
http://www.photosmithapp.com/

Similar Messages

  • How to use new aluminum apple remote with an imac

    How does it work?  Menu button doesn't seem to do anything.  I paired it io and got the linking chain icon.  The volume up down works, and sometimes the left right buttons move itunes to the next selection, but that's it.  I was not able to find an online articel

    You can load your RAW images to any iPad either using the Camera Connection kit that comes with two dongles. One for inserting an SD card from your camera to load the images. Or the USB dongle which you can connect the USB cord for your camera to the iPad to load the images. There are a few CF card readers that will work with the iPad if your camera uses those a Google search will feret them out for you. Additionally, you can also load images to iPad, iPhone or iPod touch (as well as laptops and desktop cumputers) using WiFi as you capture them using an EyeFi SD card.
    http://www.eye.fi/
    A good app for working with EyeFi on the iPad is Shuttersnitch (though, it does not coordinate with Lightroom)
    http://www.shuttersnitch.com/
    Unfortunately their isn't any RAW processing image editing software for the iPad that Lightroom can make use of the edits. Though there is an app called Photosmith that will allow you to rate, label, add keywords etc. then you can upload that info to Lightroom on your laptop or desktop cimputer and have that info synced to the images. You do have to transfer the image files themselves from the iPad to your workstation seperately.
    http://www.photosmithapp.com/

  • How to use SOA Suite in conjunction with SOA Analysis and Design Tools

    Hi everybody,
    I am a novice in this field and I need some help regarding integrating analysis and design tools with SOA Suite.
    We used to analyze and design with Oracle Designer and use its powerful form generator to develop a system. It almost covered all the software lifecycle and kept the traceability between anlaysis,design and implementation.
    I have studied about the SOA concepts and read some papaer about SOA Suite. I have also installed the SOA demo based on SOA Suite and I found it absolutely amazing, but my problem is that It seems oracle does not have any tools for SOA Analysis and Design. am I right? if so, How can we analyze and design a system based on SOA concepts and implement it using soa suite in such a way that keeps traceability? What tools is used for this purpose?
    It seems that IBM have some tools like Rational Software Architect and Rational Suite which enable people to design and analyze based on SOA concepts and then generates some pieces of code (like oracle designer in old days) but is it possible to design in these tools and then generating codes for SOA Suite ? (for example generating a bpel file from a design model)
    As I told before I am a novice in this field and I would be so grateful if other users can share their expriences regarding this matter.
    Any help would be highly appreciated.
    Thanks in advance,
    Navid

    Learn About All Things SOA:: SOA India 2007:: IISc, Bangalore (Nov 21-23)
    Aligning IT systems to business needs and improving service levels within the constraints of tight budgets has for long been the topmost challenge for CIOs and IT decision makers. Service-oriented Architecture (SOA) provides a proven strategy to clearly address both of these objectives. Creating more agile information systems and making better use of existing infrastructure are two leading factors that are boosting SOA adoption across large, medium, and small Indian industries from the BFSI, Retail, Telecom, Manufacturing, Pharma, Energy, Government and Services verticals in India. If you are an IT decision maker belonging to any of these verticals, SOA India 2007 (IISc, Bangalore, Nov 21-23 2007) presents a unique opportunity to gather cutting-edge business and technical insights on SOA and other related areas such as BPM, BPEL, Enterprise 2.0, SaaS, MDM, Open Source, and more.
    At SOA India 2007, acclaimed SOA analysts, visionaries, and industry speakers from across the world will show you how to keep pace with change and elevate your IT infrastructure to meet competition and scale effectively. The organisers are giving away 100 FREE tickets worth INR 5000 each to the first 100 qualified delegates belonging to the CxO/IT Decision Maker/Senior IT Management profile, so hurry to grab this opportunity to learn about all things SOA. You can send your complete details, including your designation, e-mail ID, and postal address directly to Anirban Karmakar at [email protected] to enrol in this promotion that is open until 12 October 2007.
    SOA India 2007 will also feature two half-day workshops on SOA Governance (by Keith Harrison-Broninski) and SOA Architecture Deep Dive (by Jason Bloomberg). If you are an IT manager, software architect, project leader, network & infrastructure specialist, or a software developer, looking for the latest information, trends, best practices, products and solutions available for building and deploying successful SOA implementations, SOA India 2007’s technical track offers you immense opportunities.
    Speakers at SOA India include:
    •     Jason Bloomberg, Senior Analyst & Managing Partner, ZapThink LLC
    •     Keith Harrison-Broninski, Independent consultant, writer, researcher, HumanEdJ
    •     John Crupi, CTO, JackBe Corporation
    •     Sandy Kemsley, Independent BPM Analyst, column2.com
    •     Prasanna Krishna, SOA Lab Director, THBS
    •     Miko Matsumara, VP & Deputy CTO, SoftwareAG
    •     Atul Patel, Head MDM Business, SAP Asia Pacifc & Japan
    •     Anil Sharma, Staff Engineer, BEA Systems
    •     Coach Wei, Chairman & CTO, Nexaweb
    •     Chaitanya Sharma, Director EDM, Fair Isaac Corporation
    A partial list of the sessions at SOA India 2007 include:
    •     EAI to SOA: Radical Change or Logical Evolution?
    •     BPEL: Strengths, Limitations & Future!
    •     MDM: Jumpstart Your SOA Journey
    •     Governance, Quality, and Management: The Three Pillars of SOA Implementations
    •     Building the Business Case for SOA
    •     Avoiding SOA Pitfalls
    •     SOA Governance and Human Interaction Management
    •     Business Intelligence, BPM, and SOA Handshake
    •     Enterprise 2.0: Social Impact of Web 2.0 Inside Organizations
    •     Web 2.0 and SOA – Friends or Foe?
    •     Achieving Decision Yield across the SOA-based Enterprise
    •     Governance from day one
    •     Demystifying Enterprise Mashups
    •     Perfecting the Approach to Enterprise SOA
    •     How to Build Cost Effective SOA. “Made in India” Really Works!
    For more information, log on to http://www.soaindia2007.com/.

  • How to use MS Project in conjunction with a time-tracker tool

    In my new job, the company is using a time-tracking tool in a very strict way.
    Allow me to explain...
    Let's say the project has two phases: Ph1 and Ph2.
    Ph1 starts on day 1 and effort is 5 days.
    Ph2 starts after Ph1 and effort is 10 days.
    There are 3 resources available, R1, R2 and R3, and after a careful estimate of skills and avilability it has been decided the following:
    - Ph1 is assigned to R1 from day 1 to day 5, resulting in a duration for Ph1 of 5 days.
    - Ph2 is assigned to...
    ...R2 from day 6 to day 10
    ...R3 from day 8 to day 12
    resulting in a duration of 7 days.
    The above is mapped into the time-tracking tool to allow each resource to track time against Ph1 or Ph2 only in the aplanned timeframe. That is: R3 will be able to track
    hous aganst Ph2 only from day 8 and only till day 12. That is to avoid that resources track more time that what was originally allocated: if this is necessary, it must be explained why, a new plan must be calculated and more budget must be allocated. When
    the ok is given, the tasks in the time-racking tool will be changed accordingly.
    If the above situation is clear, my question is: how would you model this in MS Project?
    If the WBS in MSP is simply
    1. Project X
    1.1 Ph1
    1.2. Ph2
    when allocating R2 and R3 to Ph2, how can I specify that R2 will work only from day 6 to 10 and R3 from day 8 to 12?
    At the moment the only clean solution I found is to go into the task usage view and adjust, for each day, the working hours of each resource assigned to the activity.
    A second less clean solution is to have a WBS like follows
    1. Project X
    1.1 Ph1
    1.2. Ph2
    1.2.1 Ph2.R2
    1.2.2 Ph2.R3
    that is split Ph2 into two sub-activities, one for each resource.
    Thanks fo any help.

    Thanks a lot to both of you for your suggestions.
    Unfortunately the time-tracking tool cannot be changed: it is a new SAP based tool deployed worldwide.
    The problem is that each project involves different teams from differnt countries for a fixed "budget" (or a fixed number of man-days). Therefore there is a global PM in London that will define in the time tracking tool
    a WBS like this
    1. Project X
    1.1 Analysis
    1.1.1 Analyse impact for team in Rome
    1.1.2 Analyse impact for team in Amsterdam
    1.1.3 Analyse impact fr tam in Bangkok
    1.2 Development
    1.2.1 Develop A
    1.2.2 Develop B
    1.2.3 Develop C
    1.3 Customer Acceptance Test
    1.3.1 Prepare test environment by team in Amsterdam
    1.3.1 Test by final user
    1.3.2 Support user testing by team in Rome
    then he would assign the development tasks to the rsources that are supposed to work on it and for only the estimatd time. The reason is easy: he want to make sure that a resource tracks time only against the task she is supposed t work on and for only the
    estimated number of days, to avoid exceeding the budget. If extra effort is required for a resource on a task, before allocating more time on that task, a long battle will start.
    This we cannot change.
    The problem now is on our side, the teams in Rome/Amsterdam/Bangkok: we must keep our own plan in MSP. Our tam in rome is divided in 4 sub-teams, one for each module of the core product, each team with a team
    leader assiging tasks to resources with Asana. Untill las week, for months, there was not PM in Rome leading the four teams and hand and of course there was no global plan for the tasks in Rome.
    My first attempt was to try with a Gantt that would stop at phases level, without going down to task level, that are under responsibility of the 4 team leaders. the reason being that we have something like
    25 projects, some with dependecies with each other. I simply wanted to avoid having one huge MSP file with all projects down to task level: by experience, in my previous project (an ERP upgrade for Oracle EBS in FAO) this approach did not work very well.
    But this is bringing up he problem I described: if I stop at "1.2 development" in the WBS, than when I assign R1 and R3, to mak sure their effort is planned accordingly to what has been setup in the time-raking
    tool, I need to edit work in the task usage resource by resource, activity by activity.
    The other option is to insert under 1.2 development another level with all tasks from Asana, each task being assigned to one resource:
    1.2 Development
    1.2.1 Develop A
    1.2.1.1 Develop class x (by R1)
    1.2.1.2 develop class y (by R3)
    1.2.2 Develop C
    1.2.2.1 Develop new pricing interface (by R4)
    1.2.2.2 Modify all logos (by R7)
    A third option would be to have one dtailed plan for each project down to the Asana task and then one higher level plan summarising all projects, down to phases only.

  • How can I resolve the major problems with Lightroom 5 on iMac 5k?

    There are many many bugs that have come up in Lightroom 5 on my new iMac 5k (OSX10.10.1 Yosemite) that are seriously challenging my productivity!
    A short list of the problems include: Huge slow-downs when navigating in the develop module, very slow and sometimes unresponsive crop tool, improper slider scaling when develop panel in resized (because it is far too narrow on retina screen), poor auto selection of spot removal tool, slow local adjustment brush tool, and overall slow load times of 1:1 previews. My 2011 iMac beats the maxed out 2014 5k iMac in almost every part of the develop module except for initial loading and export times. What the heck is going on?!
    These are just some of the problems with LR, there are many more issues with premiere pro and after effects...

    Well, many of my issues evaporated when i re-installed the most recent update 5.7.1 (by download rather than cc desktop updater). Cropping is finally fast, sliders are ok for scale as long as you don't change panel size while the application in running (if you do you must close and reopen LR for slider scaling to match panel scaling). There are still some issue that I will be reporting on, but will make do for now.
    This was a major retina 5k iMac compatibility update, even though its not really mentioned in the list of fixes

  • How to use "Notes" on my iPad with my existing iCloud address?

    How to use "Notes" on my iPad with my existing iCloud address? It asks me to create a new one...

    Did I overlook some critical info here? I'm having the same problem described by Henry5, but I'm signed in to iCloud with my AppleID which is not the same as my Mobile Me/iCloud email. I keep being asked to create an account (which it won't allow me to do since the account already exists) but no where do I see an option to use the existing account. I also tried logging out with my AppleID account, and using the iCloud email, but that doesn't work.
    I just want to sync my notes and mail... this is really irritating!

  • How the IVI New Session.vi works with the ivi.ini?

    Hi,all
    Does anyone know how the IVI New Session.vi works with the configuration file ivi.ini?
    And when the ivi application running, how the ivi calss driver refers to the right specific instrument drivers without changeing the program?
    Thanks,
    njzhw
    人的生命是有限的,但知识是无限的!
    南京众知维测试技术有限公司

    Which VI or function are you referring to? There is neither an "IVI New Session.vi", nor a corresponding "Ivi_NewSession" function in C.
    The Ivi Class Drivers determine which specific driver to use at run-time, by looking up the resource descriptor (a Logical Name, or Virtual Instrument) and determining the associated Instrument Driver. That configuration information is settable by the user through MAX (Measurement and Automation Explorer).
    --Bankim
    Bankim Tejani
    National Instruments

  • How to use the same OC4j server with different port number

    How to use the same OC4j server with different port numbers..?
    I have to OC4J installed on my machine on different hard disk drives....
    I want to be able to run both the server simultaneously..?
    is it possible ..it yes then how..?
    for that i have changed the port number of one server...
    but when i am trying to start the other server with different port number..it says that JVM -Bind already...
    Is there any clues...?
    Nilesh G

    In the config directory:
    default-web-site.xml: Change the port the HTTP listener listens on
    jms.xml: Change the port the JMS service listens on
    rmi.xml: Change the port the ORMI listener listens on.
    Or, you can add another web-site.xml file, and deploy your applications to 1 server, and bind the web applications to the different web sites. This way you only have to deploy your applications to 1 place.
    Rob
    Oracle

  • How to use FM SO_DOCUMENT_REPOSITORY_MANAGER send mail with CC.

    Dear Experts:
    Please help me. How to use FM SO_DOCUMENT_REPOSITORY_MANAGER send mail with CC.
    My Program code is as follow:
    *Send the mail.
    tb_receipients-recnam = 'BAITZ'.
    tb_receipients-recesc = 'B'.
    tb_receipients-sndex = 'X'.
    tb_receipients-att_fix ='X' .
    APPEND  tb_receipients.
    CALL FUNCTION 'SO_DOCUMENT_REPOSITORY_MANAGER'
      EXPORTING
        method       = wa_method1
        office_user  = wa_owner
        ref_document = wa_ref_document
        new_parent   = wa_new_parent
      IMPORTING
        authority    = wa_authority
      TABLES
        objcont      = tb_objcnt
        objhead      = tb_objhead
        objpara      = tb_objpara
        objparb      = tb_objparb
        recipients   = tb_receipients
        attachments  = tb_attachments
        references   = tb_references
        files        = tb_files
      CHANGING
        document     = wa_document
        header_data  = wa_header.
    endform.                    " send_mail
    By the why, tb_receipients-recnam = 'BAITZ'. What's the meaning of 'BAITZ'? Thanks!

    you can use FM SO_NEW_DOCUMENT_SEND_API1
    WA_RECV TYPE SOMLRECI1,
    IT_RECV TYPE STANDARD TABLE OF SOMLRECI1.
    wa_recv-receiver = 'TO email address'.
    wa_recv-rec_type = 'U'.
    wa_recv-com_type = 'INT'.
    APPEND wa_recv TO it_recv.
    CLEAR wa_recv."To Recipient
    wa_recv-receiver = 'CC email address'.
    wa_recv-rec_type = 'U'.
    wa_recv-com_type = 'INT'.
    wa_recv-copy = 'X'.
    APPEND wa_recv TO it_recv.
    CLEAR wa_recv. "CC Recipient
    wa_recv-receiver = 'BCC email address'.
    wa_recv-rec_type = 'U'.
    wa_recv-com_type = 'INT'.
    wa_recv-blind_copy = 'X'.
    APPEND wa_recv TO it_recv.
    CLEAR wa_recv. "BCC Recipient

  • How to use the eventing and databag with a WAS 6.20 ?

    How to use the eventing and databag with a WAS 6.20 ?
    Is what there is a good guide for these services?
    Thank's

    In the raise event you can pass the value
    like below.
    <SCRIPT>
    function raiseEvt(value1){
    if(window.document.domain == window.location.hostname){
    if ( document.domain.indexOf(".") > 0 ) document.domain = document.domain.substr(document.domain.indexOf(".")+1);
       EPCMPROXY.raiseEvent( "urn:com.sap:BWEvents","BWiViewevent", value1, null );
      // alert('tree domain'+document.domain);
    </SCRIPT>
    and in the
    subscribe event you can get the values like below.
    <script language="javascript">
    if(window.document.domain == window.location.hostname){
    document.domain = document.domain.substring(document.domain.indexOf('.')+1);
        EPCMPROXY.subscribeEvent("urn:com.sap:BWEvents","BWiViewevent", window, "myreceiveEvent");
    function myreceiveEvent( eventObj ) {
          document.forms[0].gp_hidden.value = eventObj.dataObject;
    </script>
    Also look at the following link for a complete documentation.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/documents/a1-8-4/Enterprise%20Portal%20Client.pdf
    Regards
    Raja

  • How to use warn about changes property with page menus

    how to use warn about changes property with page menus

    Hi,
    If u will enable this property, then u will get warning message as a popup in case of change of state of VO.
    Regards,,
    Gyan

  • How to create new view without interlinking with gantt chart or resource views

    ok clear
    one another question
       In msp how to create new view without interlinking with gantt chart or resource views

    Hi Shiv PMC--
    I splitted your question above in another thread in order not to have  a huge thread with many topics in it.
    That being said, I'm not sure to understand. A view is just a manner to display MS Project data with columns. A view can have a table with column (left part) associated with a Gantt chart. It can also just contain a table with no Gantt chart (like the task
    table) or a table with a timephased grid (resource and task usage).
    Please give us more information, maybe with a concrete example so we can help you.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Using ProShow Gold in conjunction with PSE4

    I would be interested if anybody has any comments on using ProShow Gold in conjunction with PSE4 (under Windows XP).
    I am currently trying out the evaluation version of ProShow Gold 2.6.
    My reasons for trying out ProShow as an alternative to the built in PSE4 slideshow maker are:
    (1) More and better transitions available.
    (2) More control over audio - timing, fading and voice-overs for individual slides.
    (3) DVD burning available without going to Nero or other product.
    (4) Getting away from the problem of backing up slideshows under PSE4.
    ProShow Gold does have a folder pane for picking photos but if the photos required for a particular show are spread over a large number of folders (which is almost certainly the case for most PSE4 users) it is not very convenient.
    I therefore use Organizer, with all its tagging and searching and collection facilities as a "front end" for ProShow from which to drag selected photos. The only problem is that it is rather hard to find room on a single monitor for both programs simultaneously.
    ProShow also allows for an "external image editor" to be specified. But after nominating PSE4, I find that clicking on ProShow's "Edit" button only invokes Organizer, and does not open the image in Editor as I would have expected.
    EDIT - please disregard last paragraph - I did not have things set up properly.

    I use Proshow in preference to Elements. I find the quality of the end product is far better.
    I also use Elements Orgainser to make a collection of the images for the show and then drag them onto Proshow. I've found it works best by dragging the images into Proshows Light Box, which can be detached from the main window. You can shrink the Proshow main window down very small and the Organiser down too. As long as you have all the images selected in the Organiser and can just see one, you can drag this over to Proshow.
    You need to be careful of the order in which they appear in your Collection.
    I've found a 'feature' in Proshow that may just be unique to my setup. The preview, Full Screen or otherwise is not sharp. I have to go into the make Executable dialog and set up my screen dimensions. Once this is done the output is nice and clear.
    Colin

  • ANyone know how to use an Apple keyboard A1359 with a MacBook Air?

    Does anyone know how to use an Apple Keyboard A1359 with a MacBook Air?

    I'm going to ask the hosts to move this to the macbook forum since you're more likely to get answers there than in the iPad one.

  • HT4623 How to use epson iprint after connected with iPad help

    How to use epson iprint after connected with iPad help.

    When you open Epson iPrint, you will see the various options of ways to proceed, e.g., Photos (to print photos), Maintenance (for printer maintenance). Scan (to perform scanning).

Maybe you are looking for

  • How can I edit the number of columns in a header in Pages?

    I'm trying to set up headers in an APA style document and the middle field in the header is cutting off my copy. How can I make the header only two columns? Or is there a way to hide the middle one so it doesn't cut anything off? Help please!!!

  • .TOD Files/Quicktime/iMovie 08

    Ok, I've searched the forums for the answer, and haven't been able to find/understand how people are doing this. I have a Everio GZ-HD3U and haven't changed any of the settings on it. The files, once the Everio_HDD shows up on the desktop, I believe

  • Different transitions page build in and build out

    is there a way to create different transitions for page build in and build out in indesign?

  • AddressBook.data is missing

    hello i have lost all my address book contacts when synchronizing imac-iphone-ipad. i've been searching for help for several hours and found that solution could be: replacing AddressBook.data with AddressBook.data.previous! the problem is they are bo

  • Calendar crashes on st

    After upgrading to Ios8, my calendar program crashes at startup every time.  It was synced through MS Exchange with my Mac and phone.  What to do?