How to use Vendor Material Number in Purchase Order Creation - ECS Scenario

Hi SRM Gurus,
We are in Extended Classic Scenrio - SRM 5.0.
We want Vendor Material Number to be printed in the Purchase Order Layout. I remember in R/3 we have inforecord, wherein we have vendor Material number. Where do we maintain vendor material number in SRM. Suggest a suitable solution.
Thanks & Regards,
Ramkumar

Hi
Please refer to BBP_PD transaction to get the SRM Shopping cart (use Object type - BUS2121) / Local PO details (Use Object Type - BUS2201).
<u>Please use the following useful links to refer in this case.</u>
<b>Re: PO Display
Vendor material no is not replicated in R/3
Re: PO Display
Re: SRM PO SMARTFORM
Re: SRM PO Print
Re: SRM PO SMARTFORMS
You need to copy the standard SAP smartform BBP_PO to a custom smartform say - ZBBP_PO.
SRM SPRO Configuartion Settings ->
In SPRO -> SRM-SRM server-Cross Application basic Settings ->Set output Actions and output format->Define Action for output document.
Select Action profile as BBP_PD_PO, click on processing type, choose smart form print or fax or e-mail as per your requirement and
change PO name as ZBBP_PO, in this case.
Incase you need any assitance, let me know.
Hope this will help.
Regards
- Atul

Similar Messages

  • Vendor material number in purchase order

    Hello,
    I have the following problem :
    When i create a purchase order (transaction ME21N), the vendor material number (field IDNLF) will be suggested from the purchasing info record.
    It isn't the case, the vendor material number is empty.
    I don't understand why.
    Do you have an idea ?
    Thank you

    Hello,
    Vendor Material Number;  Material number used by the vendor, Usually we saw this field in Info records.
    We can see the same field in ME21N in Material data tab ( Item level of the PO), If Vendor and Material combination have correct info record and if suppose user has maintained  Vendor Material number field,  then while creation of PO for the combination of particular material and vendor system will get Inforecord price in PO and  system will populated Vendor Material number in Material data tab of the PO in item level.
    Thanks and Regards
    Mahesh Naik

  • How to include vendor catalog number on purchase order?

    Is there a way to have the vendor catalog number print on the purchase order? Or does it have to be manually typed in each time in "Vendor mat. no." under the "Material Data" tab? Thank you!

    Hello Vanessa,
    If you are using ME21N to create a PO, the vendor material number (EKPO-IDNLF) will be determined in include LMEPOF5W:
        IF rekpo-ebelp NE space AND rekpo-idnlf NE space AND
           rekko-lifnr EQ ekko-lifnr.                           "530554
          lf_idnlf = rekpo-idnlf.
        ELSEIF aekpo-ebeln NE space AND aekpo-idnlf NE space AND
          aekko-lifnr EQ ekko-lifnr.                            "530554
          lf_idnlf = aekpo-idnlf.
        ELSEIF reban-banfn NE space AND reban-idnlf NE space AND
             ( reban-flief EQ ekko-lifnr OR                     "548217
               ( reban-flief EQ space AND
                 reban-lifnr EQ ekko-lifnr ) ).
          lf_idnlf = reban-idnlf.
        ELSEIF kekpo-ebeln NE space AND kekpo-idnlf NE space AND
          kekko-lifnr EQ ekko-lifnr.                            "530554
          LF_IDNLF = KEKPO-IDNLF.
        ELSEIF FEKPO-INFNR EQ *EINA-INFNR.
          LF_IDNLF = *EINA-IDNLF.
        ENDIF.
        CH_IDNLF = LF_IDNLF.
      ENDIF.
    As above, the vendor material number will be firstly taken from the reference doc. If there is no vendor material number found in the referece doc. system will take the data from the vendor master. Otherwise, you have to enter it manually in the PO item.
    For the question that if it can be printed,  can check whether it is defined in print form MEDRUCK ( by using transaction code SE71).
    Regards,
    Diana

  • Can SAP get material number in Purchase order in external processing?

    I have a question that:
    As I know, Exeternal processing is a service, so that Material number can not be shown in purchase order converted from PR for external processing. Here, PR can be automately generated from transaction CO01 to create an external processing production order. Meanwhile, for external processing, purchase info record is created without material number only with material group.
    So, I want to know that if there any solutions to show material number in purchase order generated for external processing?
    thanks,
    best regards,

    If therer are no production order, How can I get finished products from internal activity and external processing?
    Now, external processing in our company like this:
    1.create an purchase info record. (type:subcontracting, with material group, but not material ID)
    2.Maintan external processing data in external operation where external processing happens.(control key: pp02, external processing data: info record, purchase org. net price, cost element etc.)
    3.create a production order for the material.(one of the operations is an external processing operation described like step 2)
    4.Purchase requstion is changed into Purchase order. (Purchase requestion is automately created with the production order)
    5.MIGO to receive goods from the purchase order.
    6.finished the production order and delivery goods.then the production order is DLV.
    In step 4, purchase order can only get the production order ID, but there are no material ID shown in it. Only method to show material is that maintaining a description text in the external operation, then, purchase order item could show material in material text(but, here, there is no material ID derectly from info record or production order).
    this is the big problem now for our company. No material ID can be automately carried into the purchase order.
    Hope you help..
    thanks...

  • Tax code not Check on Plant / Vendor / Material Combination in Purchase order

    Hi,
    I have created L1 Tax code for VAT and L2 for CST, also maintain the Tax code with combination Plant / Vendor / Material in FV11 for L1 (VAT) Tax Code.  While creating the Purchase order, tax code is not Assigning the Plant /Vendor/ Material combination as maintain in FV11. All tax code allowed to above combination.

    Hii,
    Solve problem.
    Thanks
    Sachin

  • How to export the material list during sales order creation

    Hello,
    In VA01 while creating Sales Order is there are an option to export a list of material numbers at one shot?
    I have about 400 materials to create in 1 sales order. It's time consuming to enter one by one manually.
    Please help. Will reward points.
    Pri

    Hi Pri,
    Go to VOV8 transaction check the document type PV -Itemproposal if not there then define the document type for Itemproposal.
    You copy the Standard OR type do these settings only
    Sales document type PV Item proposal
    SD document categ. D
    Screen sequence grp. MA
    Transaction group 5
    Doc. pric. procedure C
    Display Range UALL
    FCode for overv.scr.UER1
    Propose deliv.date give chek mark    
    Define the number range and assign number range.
    Noe you try
    I hope it will help you,
    Regards,
    Murali.

  • How to integrate price list on a Purchase Order?

    Hi,
    Version : R12.1.3
    I wanted to know how to use price list on a purchase order. I have created one price list but I am not able to use that, how could I use this.
    How to link Price list to the particular supplier.
    Thanks in advance.
    AmolA

    Oracle purchasing now integrates with Advanced Pricing the same way Order Management does.
    You can set qualifiers / modifiers. You can set up volume discounts etc too.
    See http://www.ncoaug.org/NCOAUG%20Training%20Day%20Feb%202009/Sundeep%20Sharma%20-%20Integrating%20Advanced%20Pricing%20with%20Purchasing%20in%20Release12.pdf
    Sandeep Gandhi

  • Profitability segment for purchase order creation - how to read it

    Hello,
    how to read it profitability segment for purchase order creation at item level ??
    There's a method on ME_PROCESS_PO_CUST ?
    Tks

    Hi,
    Use the below FM from the function group KEAK
    To read: COPA_CALL_PROF_SEGMENT or COPA_INPUT_PSEGMENT_RETURN
    To create: COPA_PROFITABILITY_SEGMENT
    Hope this helps
    Regards
    Shiva

  • BOM change after Purchase order creation

    Dear all
    My client requirement is an error message should appear when the end users are trying to change the BOM after the purchase order creation for the BOM items and the system should allow the BOM change only after the PO cancellation.
    Please throw some light
    regards
    Kumar

    Dear Kumar,
    Do you mean to say user's should not be allowed to change hte BOM items in a purchase order?or should not be allowed to change a
    BOM,if there are some purchase orders for the same material?
    If your requirement is to restrict the BOM change of a material using T code CS02,after purchase order creation,I dont think its
    possible.
    Please explain your problem little more in detail.
    Regards
    Mangalraj.S

  • Stock analysis based on vendor material number

    Hi
    Is there any report which can show the total stock of a material with split on vendor material number (I am entering different vendor material numbers upon goods receipt) or any query I can write to get the above result?
    The requirement is as follows: I will order an item with name say X and vendor supplies the item with different name say Y. So I am maintaining vendor specific name in vendor material number. Now I want to see the stock X with what quantity of it is Y.
    Thanks

    Dear Praveen
    You could use the following;
    Input and Output Conversion of Material Numbers  
    Use
    Like every other part in the SAP system, an inventory-managed manufacturer part has an SAP-specific material number that uniquely identifies it. If this material number is uncommon or unknown to the vendor, you should consider the following (especially in the purchasing process):
    ·        You can enter a part with its Manufacturer Part Number (MPN) and its External Manufacturer, and not just with its material number. This is possible because of the input conversion of material numbers.
    ·        The system displays this part with its Manufacturer Part Number and the External Manufacturer in lists and screens. This is possible because of the output conversion of material numbers.
    You have to increase the maximum field length for input and output values in the Output Length for Material Numbers field to enter and display the MPN and the manufacturer code in one field
    Prerequisites
    You have made the following settings in Customizing:
    ·        You have activated the conversion exit for material numbers.
    ·        You have maintained a delimiter. The delimiter separates the MPN and the external manufacturer when they are entered or displayed in one field.
    ·        You have specified a maximum output length for material numbers. This means that the fields for the long material number are scrollable, and the output columns for lists are wider.
    You configure and activate the conversion exit for material numbers in Customizing by choosing Logistics - General ® Interchangeability of Parts ® Set Up Conversion Exit for Material Numbers.
    Features
    Input Conversion
    If you have activated the conversion exit, you can enter the relevant MPN instead of the material number in the relevant input fields.
    If the MPN is not unique, you enter the external manufacturer in the same field, separating the MPN and the external manufacturer by the delimiter defined in Customizing.
    You have defined: as the delimiter.
    Enter 45L700W:36121 (Manufacturer Part Number, Delimiter,and External Manufacturer) for the part, instead of material number 1011. If the MPN is unique, you only have to enter 45L700W (the Manufacturer Part Number).
    You can now scroll the input field for the material number. This allows you to enter the maximum output length for material numbers, which has also been defined in Customizing.
    Input conversion gives you an alternate and additional input option. You can still enter the ERP material number to identify a part.
    The system determines the correct material number from your input, and passes it to the program logic. The system handles your input as follows:
    ·        If your entry contains the delimiter, the system splits the entry at the delimiter, interprets both parts of the entry as the Manufacturer Part Number and the External Manufacturer respectively, and searches for a part corresponding to these entries
    ·        If your entry does not contain a delimiter, the system interprets your entry as an (ERP) material number, and searches for the corresponding part in the material master. If this is unsuccessful, the system interprets your entry as an MPN, and searches for the corresponding part.
    If the system cannot determine a part clearly, or the search is unsuccessful, it issues an error message.
    Value Range for MPN on the Selection Screen
    The system converts the MPN into a material number internally.
    To ensure that the system correctly interprets the value range for an MPN that is entered as selection criteria, when the conversion exit is activated, the system provides both the material number and the MPN as selection criteria in the selection screen.
    Output Conversion
    If the conversion exit is activated, the output conversion ensures that the system displays the MPN and the external manufacturer on screens and in lists, separated by the delimiter in the field or column that usually displays the ERP material number.
    If the Output Length for Material Numbers field in Customizing is not long enough to display both the MPN and the external manufacturer, the system displays the MPN, if it is unique.
    If the MPN is not unique or the output length too short, the system displays the ERP material number.
    The system displays parts with the output length defined in Customizing. In addition:
    ·        You can scroll the output field for the material number on screens.
    ·        The system adjusts the layout of lists to the output length.
    List Formatting
    If you use the inventory-managed MPN, you have to change the list formatting as follows:
    ·        Variable length of the material number in reports
    In cases of the automatic conversion of the material number into an MPN and external manufacturer, the system takes account of the Output Length for Material Numbers field (defined in Customizing) when it structures the lists for selected reports. This ensures that columns are aligned, line breaks are correct, and the lists can be read.
    ·        Adding a field for the external manufacturer
    The external manufacturer should also be displayed in lists because the MPN, into which the material number is automatically converted, is not always unique.
    In Customizing, you have defined whether the external manufacturer should be displayed with the MPN. The system adds the field for the external manufacturer immediately after the field for the MPN in lists and on the screen.
    You can display the external manufacturer with or without an active conversion exit.
    ·        Sorting by MPN, not by material number
    You can sort some lists by material number.
    You can sort by MPN in cases where the MPN is displayed instead of the material number.
    with kind regards
    Sundar

  • Validation of vendor material number in IDOC_INPUT_INVOIC_MRM

    Hi folks,
    Scenario: Inbound EDI vendor invoices received as IDOCs.
    I'm using Logistics Invoice Verification process code INVL to receive and post vendor invoices on to the ERP2004 release of R/3.
    I have purchasing info records setup with the vendor material number.
    When I process an inbound vendor invoice, I can put in a customer material number i.e. a material number existing in material master in E1EDP19-IDTNR with qualifier E1EDP19-QUALF = 001.  When I do this, R/3 checks that the material number is valid and refuses to post an invoice if the material number is invalid - this is good.
    This means that the EDI program parameters with the 'Check Material Number' enabled is working as expected.
    Now when I only have a vendor material number i.e. E1EDP19-QUALF = 002 an E1EDP19-IDTNR = vendor part number, R/3 posts the invoice even if the vendor part number is invalid - IDOC_INPUT_INVOIC_MRM does not seem to be validating the vendor part number.  The document posts whether I use a valid vendor part number or an invalid one - what am I missing?
    Satish

    I can answer by words of Axel Angeli - top level SAP R/3 consultant and R/3 cross-application development coach, the author of classic book "SAP R/3 Guide to EDI, ALE and Interfaces":
    "SAP R/3 delivers a serious of predefined EDI programs. Many project administrators see them as standards which should not be manipulated or modified. The truth is, that these IDoc processing functions are recommendations and example routines, which can be replaced by own routines in customizing."
    and
    "SAP R/3 is delivered with a series of predefined IDoc types and corresponding handler function modules.
    Some of the handler programs have been designed with user-exits where a developer can implement some data post-processing or add additional information to an IDoc.
    You must always see those programs as examples for IDoc handling. If the programs already do what you want, it is just fine. But you should never stick to those programs too long, if you need different data to be sent."
    So now you can feel free to customize
    Regards,
    Maxim.

  • Vendor material number

    Hi Gurus,
    For ROH materials, we have our own material numbers and if we take printout of po's our material code is being printed.  But our vendor requires their material number reference to be printed.
    is it possible? if yes where to do that.
    Regards,
    naras

    you can configure Manufacturer Part Number (MPN) functionality.
    Step 1 -
    In customisng under Lo General - Material Master - You have to create a MPN profile.
    Step 2 -
    Create normal material under material type ROH or Traded as required. Under purchasing tab , maintain MPN Profile,Manufacturer's part number(Vendor material number) and Manufacturer's code.(Vendor Code)
    This is a material in which you will maintain stock, use in BOM etc. This is your internal material number. This number  will not be used in the PO.
    Step 3
    Create a new material each for your alternative materials under Material type HERS. Under this you will create material which is supplied by your vendor.In this material you will link the internal material number as created in step 2 above.
    Step 4
    Create a PO by using material number created under material type HERS. 
    Step 5 - Do a GRN
    MPN process works like this :
    Order is created for HERS material but whenever you will do GR against this PO, stock and other reports will get updated under material code created in step 2 i.e normal material created under material type ROH or traded. Thus HERS material is used only for ordering purpose.

  • PO report which includes Vendor Material number

    I am looking for a report similar to ME2K but including the Vendor Material Number.  Customer wants to run by Cost Centre and Material group.  However, I cannot find a way to include the Vendor Material number on this report, is there a way to do that thorugh config?
    Thanks for any info.

    Hi,
    You can find the vendor material number in the material data tab of purchase order.
    Goto EKPO table enter the PO numebr and look for the field name with vendor material number. Select that with all other fields . for cost center and account assignment chekc table EKAN.
    Write the program to fetch data from all these tables with feild names.
    Hope thsi helps.
    Regards,
    Smitha

  • How to Create inspection that assign to Purchase Order / Material Document

    Dear QM Master,
    I am using QA01 to create inspection lot but can any master tell me , How to Create inspection that assign to Purchase Order / Material Document ?
    Appreciate.
    Thank you.

    Hello,
    When you create an inspection lot manually, you cannot reference an original document (for example, a goods receipt document, an order, or a delivery note).
    In QA01 you can create inspection lot manually for all inspection lot origins except the following:
    10 - Delivery to customer with sales order
    11 - Delivery to customer without sales order
    12 - General delivery
    13 - Repetitive manufacturing
    14 - Plant maintenance
    You can also refer this link
    http://help.sap.com/saphelp_47x200/helpdata/en/2d/3519d8448c11d189420000e829fbbd/frameset.htm
    Please check and revert.
    Regards,
    Priyanka

  • BADI / USER-EXIT to change Vendor Material Number in ME21n

    Dear Sir,
    We are looking for a BADI/USER-EXIT  in Tcode ME21n , which can change the Value of  "Vendor Material Number" (Vendor Material Number is available under Item Detail in "Material" Tab . The value which need to be populated in the Field "Vendor Matreial Number" is  equal to first 4 character of the Item Code .
    I request the SAP Experts to kindly guide me with a sample Code please .
    I will be highly grateful for the kind help pl .
    Regards
    B Mittal

    Hello B.V.,
    User-Exit:
    First open the relevant Module Pools for ME21n via SE38. Then search for all CUSTOMER_FUNCTION 'xxx' where xxx is a 3 digit number. This number is linked to a User-Exit EXIT_<Module Pool>_xxx. Then investigate this function for it IMPORT parameters. In your case there has to be an interface for "Vendor Material Number".
    For to implement the required changes use the by SAP delivered include ZX<something> inside this function.
    BAdI:
    1. Search in IMG
    2. Find Enhancement Point in the relevant Module Pool.
    Hope this helps,
    Heinz

Maybe you are looking for

  • Firmware Upgrade for Actiontec GT704WG Rev. B Router

    How do I find the firmware upgrade for the Actiontec GT704WG Rev. B Router?  Almost everytime I try to get onto the internet, I have to run the troubleshooter because there is no connection and the final diagnosis is that "The default gateway is unav

  • Need Information about IPS 4240

    Hello, Could you please give me information about IPS 4240: Number of sessions Number of signature Number of protocol Thank you very much

  • Why doesnt my mobile me gallery work

    My mobile me account wont reconize my apple id and password to use mobile me gallery

  • Lightroom and Audio Files

    Does anyone know if Lightroom will play audio files, like PhotoMechanic? Thanks!

  • Oracle RAC Failover (CTF) support

    hi! every developers. I am running Portal 6.0 In the WAS6.40 JDBC configuration, Is this JDBC driver THIN? and Is this connection String effective on failover (CTF) with Oracle RAC? below is our current configration for reference. Connection conn = D