Hello,
i'm in a desperate situation. I want to measure resistance with LabView 7.1 over GPIB. The equipment i use is the HP 34401A multimeter. For many times it was no problem. The single read example worked without failures and returned the measured values.
Then a short time later, nothing worked as before. I always receive this error: "VISA Wait on Event in Wait for RQS.VI->HP34401A Read Meas.vi->HP34401A Single Read Example.vi"
I know this question is not asked for the first time. But the answers given in the other threads don't help.
The timeout time i changed from 10000 to 60000 ms. The failure is in the wait for RQS.vi .
Please help me, that would be very kind!
Thanks a lot
Greg

I have one of those multimeters as well, and use it from time to time in a program to verify the voltage from a power supply...
I always use the method in the vi attached, since I've always found it easier (again, easier for me anyways), since you can control everything. You may want to vary the wait in between the read and the write, since my meter is an Agilent (newer than if it says HP...they had to branch it off for some reason), and it might be different, but I doubt it.
All the commands are in the manual... Hope this helps,
Geoff
Attachments:
GPIB Write-Read.vi ‏22 KB

Similar Messages

  • Need help on Wait for Event.

    Hello all.
    I faced an issue with wait for event step,Which goes like this.
    For a workflow one of the fork branches there is a wait for event step(wait for manual release) . On development server when ever that event is fired (manual release) , the wait for event is capturing and completing the workflow ( This is the correct process).(PO release procedure)
    On production system, this event is not been caught(after manual release is done) and and the workflow is not  complete and still in progress. (even po is released manually) Which should not happen.
    So what all the things i need to verify in the production to fix this. I cannot simulate any kind of event on production ryt. so please suggest.
    please suggest.
    Cheers
    PRASAD.

    Hi Prasad
    i doubt that in Production the event trace would be on. Check SWELS to see if you see the "OFF" button (this means the trace is on). If it is On, check SWEL to see if any event is there for rejection. You will have to ask example of the PO and search using the Key (PO number).
    Also, check the workflow instance which is supposed to complete when the rejection happens (which did not complete). Check the technical WF log. Look for the Business Object container element which should hold the runtime instance. Check if it has a value and the same is bound from the event to the workflow in the wait for event step's binding. (_EVT_OBJECT to Workflow Container element of same type). This WF container element should have an instance and should not be empty for the wait step to work.
    Regards,
    Modak

  • Wait step event

    Hi,
    i am new to the workflows.i worked in support project and i am looking for development.
    could any one can explain:
    what is wait step event,
    when it should be used and
    while creating the wait step event do we use any tcodes to assign the events(swetypv,sweinst etc)
    generally when we use starting events we will write start conditions based up on that event will be triggered so in the same way how waitstep event will be triggered?
    Regards,
    Mudhiraj

    Use
    A wait step can wait for:
    u2022  An event
    u2022A condition
    u2022A local event
    u2022An event that is initially received by the workflow.
    At runtime, a wait step is represented by a wait step work item. Wait step work items are not displayed in the Business Workplace. You can, however, locate these using work item selection.
    Correlations
    You can use a correlation when waiting for an event and when waiting for an event by using workflow.
    A correlation enables you to identify objects that belong together, for example, a quotation and the relevant sales order.
    Features
    Wait for Event
    When waiting for an event, the wait step is terminated when the event specifies occurs. This event
    terminates all wait steps waiting for this event.
    You can use this type of wait step for the following purposes:
    u2022To suspend the workflow until a defined event has occurred.
               A workflow is to wait until documents requested have been provided for an applicant activity. Once the
    requested documents are received, the transaction used for inbound processing and archiving creates an
    event which the wait step waits as a receiver.
    u2022To wait for an event in a parallel processing branch, which renders processing in the other
    branches unnecessary.
    The event for which the wait step waits should not be created in the other branches of the fork.
    u2022Wait for the result or a message from another workflow that was started in another system by the
    WebFlow function.
    u2022Wait for a message of the process that the workflow started using a Wf-XML message.
    Wait for Condition
    When waiting for an event, the wait step is terminated when the corresponding condition returns the
    value true.
    Wait for Local Event
    When waiting for a local event, the wait step is terminated when this event occurs.
    Wait for Event Via Workflow
    When waiting for an event via the workflow, the event is initially received and temporarily saved by
    the workflow. Once the wait step has been activated, the event is forwarded to the wait step. During
    waiting via the workflow, the event can terminate a maximum of one wait step. If several wait steps are
    active, the event terminates the oldest wait step.

  • VISA wait on event Error -107380731​3

    Hello, I am trying to zero and calibrate a pair of HP power meters.
    After sending the command to zero one of the meters, I use the VISA Wait for RQS.vi which throws this error:
    Error -1073807313 occurred at VISA Wait on Event in Wait for RQS.VI->HP 437B_visa.vi->PowerMeterSetup.vi
    Possible reason(s):
    VISA: (Hex 0xBFFF002F) You must be enabled for events of the specified type in order to receive them.
    I opened up the "Wait for RQS.vi" to examine the "Wait on Event.vi". The "Wait on Event.vi" has the hexidecimal constant 3FFF200B (Service Request) attached to the event type input, and there is a VISA event class controller set to "Generic Event" attached to the event resource class input.
    So, why the error?
    Thanks,
    Victor

    On NI's web site there is a tutorial, app note, and examples on using VISA for handling service requests. Below are links to each.
    Tutorial: http://www.ni.com/swf/presentation/us/visa/
    Application Note: http://zone.ni.com/devzone/conceptd.nsf/webmain/1A​760883EEF23D7E86256DBA006C9C00?opendocument
    Examples: http://sine.ni.com/apps/we/niepd_web_display.DISPL​AY_EPD4?p_guid=C99424CC48EC1273E034080020E74861&p_​...

  • Process chain Error: This AND process is not waiting for event RSPROCESS

    Hi All,
    I am facing an error in the process chain in PRD.
    Error message: This AND process is not waiting for event RSPROCESS.
    We had a process chain which had two sub chains which run parallel and below of this we had AND process type and below of the AND process we had 4 more jobs.
    Once the two subchains got successfully loaded, the and process should turn to green and further 4 jobs should start.
    It is a daily load , it worked fine from past years,but suddenly the AND processtype is getting failed.The thing is in the two subchains if one got completed, the AND process process is not waiting for 2nd subchain to get completed.The AND process is turning to RED (status: cancelled) . I tried to repeat the AND process once after above 2 subchains loaded, but it didnt worked.
    And i removed the existing AND process and created a new one and placed it in same place and activated and schedules again.but still it is getting failed with same error.
    Thanks in advance,
    Sai Chand.S

    Hi,
    If you did any transports related to that metachain we face similar kind of issues.
    not only the AND process , we need to remove all the process before executing the AND process and create it again.
    It helps you, you said your in production So you should take the proper approvals and do it.
    Regards,
    Yerrabelli.

  • Query on Using fork with wait for event

    Hi All,
    I have a scenario in which a fork has two branches and one branch has the multiple steps along the line and also calls a subworkflow in one of the steps.
    The second branch has a single wait for event to complete the workflow in case of a cancel event.
    My understanding is that when the branch one executes and is on a single step decision or have gone inside a subworkflow and wating for user decision on the workitem created
    Whenever the wait event is triggered on the main workflow the second branch gets executed completing the workflow and all the branch one steps and the subworkflow gets logically deleted removing all the workitem from the inbox.
    Do I have to do any specific process control in main workflow to make sure that the subworkflow is deleted .
    Please clarify on this.
    Thanks,
    Charan.

    It should be taken care by itself. No additional steps required.
    Regards, IA

  • Error in Workflow wait for event node

    Hello Experts,
    I am working on one QM notification. I shall explain the scenario first:
    1) User will take the usage decision on inspection lot in QA11. When user will take decision and save inspection lot BUS2045 event USAGEDECISIONMADE will be triggered and initiate my workflow here.
    2) After workflow initiation system will create notification and send to approver, but here i have wait step in my workflow for BUS2078 - Created (Notification).
    wait for Event step
    BO: BUS2078
    EV: CREATED
    I am posting error below:
    Error when starting work item 000000294361
    Error when processing node '0000000060' (ParForEach index 000000)
    Error when creating a component of type 'Wait Step'
    Error when creating an event item
    Error within method CL_SWF_RUN_WIM_EVENT->_CREATE_WORKITEM_CONTAINER
    Error within method CL_SWF_RUN_WIM_EVENT->_GET_INIT_WORKITEM_CONTAINER
    Workflow 000000294361 wait step 0000000060: No valid object ID in container element 'Notification
    Node 60 - wait for event step.
    Re.,
    Guri

    Hi,
    Based on your description what I felt is you are making use  of a wait step in which you have choose to wait till BUS2078 event CREATED is occured ... right.. Now can you please clear me that where and how this event will triggered.
    or is it some thign like you are making use of event creator step and in this case, When ever you are making use of the eventcreator  step and a BOR object inside it make sure that specific BOR object is already instatitaed in the workflow container , if it is instantiated then only it will try to identify the instance  or the BOR and it will try to rasie the event.
    Regards
    Pavan

  • Bpm:message being sent and wait for event

    Hi,gurus:
    My scenario is about BPM.In the integration process I used a loop and correlation.The scenario worked successfully yesterday,but after I changed some thing,it did not work.The outbound status of the message in sxi_monitor said "message being sent".And when I clicked PE to see the workflow log, it said " wait for event".
    Thanks in advance.

    Could you tell me how to reimport the integration progress in ID?
    reimport means...delete the already imported BPM from ID.....this would affect the corresponding ID objects....save and activate....and then again run the import Integration Process wizard....create the objects once again.....seems time consuming.....hence mentioned it as the last option in the list:(
    Also from SWWL delete only the instance with status as ERROR.
    Edited by: abhishek salvi on May 20, 2009 9:30 AM

  • Message being sent and wait for event - BPM help.

    Hi Experts,
    I am doing BPM interface, in that i am receiving two files. Between these two files, i have set the coorelation in the BPM and included in the BPM's receive step1 and receive step2. After execution, when i look into the sxmb_moni, message status shows processed successfully, but when i look the Process engine status, it shows Message Being Sent and when i look into the BPM monitoring it shows message wait for event in the coorelation object.
    I have gone through the following forum :
    Link:[https://forums.sdn.sap.com/click.jspa?searchID=27600139&messageID=7561954]
    but everything is green and messages are set to Message being sent status.
    Experts kindly advise me.
    Regards
    Mani.

    Hi Abhishek,
    Here i have given my BPM design,
    Start
    Fork - two branches
    Branch1 - Receive File1
    Branch2 - Receive File2
    Transformation
    Send
    End.
    In coorelatin editor, i have specified container,involved messages and properties clearly.
    I have gone through the SAP basis contents as per your previous reply.
    One thing is, i have used the same design for my other interface, it is going through, but specifically for this interface i am getting error. If you could send me your mail, i will send you the exact screen shots, so that you can advise me.
    Pls i need to complete this in a short period, kindly help me to come out.
    Regards
    Mani..
    Edited by: mani_sg on Jun 18, 2009 10:21 AM

  • Problem with wait for event

    Hi everyone,
    I'm using wait for event step in my workflow of a custom event called zevent2.
    I'm not using the event as a start event of the workflow.The event is getting triggered at a certain point of the workflow programmatically.
    So for that what should be the entry in SWE2? I've maintained the following entry for zevent2 at swe2 tcode.
    Object type: BUS2000126
    Event: ZEVENT2
    Receiver type:
    Receiver function module: SWW_WI_CREATE_VIA_EVENT_IBF
    In swel I'm finding out that event got triggerd but it is giving error "No Receiver Entered".
    And the workflow is getting stuck at 'wait for step event'.
    So can anybody please tell me what is the step am I missing? is the swe2 correct?
    Thanks & Regards,
    Anirban

    HI....
    you have to specify RECIEVER TYPE without which you will be getting this error
    goto SWE2 and give the value and your problem will be done
    regards
    Edited by: Mohit Kumar on Feb 20, 2009 10:50 AM

  • Error in "Wait for event" step

    Hi,
    I try to use a wait for an event (CREATED) on a delegated subtype to business object KNB1.
    Container element in the wait step is empty at the time of creation of the runtime wait item but I know what the key of the container element has to be so my idea was to set in a check funktion module in trx. SWEINST and filter out irrelevant events.
    But when the waitstep is to be created, the workflow goes into error: WL 442 No valid object for the container element.
    Should this not be possible?
    Any suggestions for another solution?
    I have also tried to instantiate the object before the wait for event step - but since the object does not exist in the database yet - method GENERIC.INSTANTIATE goes in error, too.
    WAS 700 sp 11 with ERP 6.0 but also tried on a 620 with 4.7
    Thanks,
    Regards,
    Claus Lücking

    Hi Mark,
    Yes, you are right - I am waiting for an event on a object not yet created:
    I am waiting for a customer to be created in FI via change documents (table KNB1). Since the customer is going to be created in a company code that has a one-to-one reference to the sales organization where it is created first, I know the key of FI customer to be created.
    Example: A Customer 23 is created in sales area 1000-01-01 and the workflow is triggered via an event KNVV.CREATED. Then I would like to wait for event KNB1.CREATED for customer 23 in company code 1000.
    Thanks,
    Claus.

  • Error in wait for event activity

    hi all,
    i am gettin gfollowing error when i am using wait for event activity in my WF.
    wait step 0000000088: No valid object ID in container element 'EVENT_BOR'
    'EVENT_BOR' is my container element of type BOR object which contain event.
    please tell me correct way to use wait for event step.
    i am using this on one parallel branch of Fork.
    thanks.

    Hi,
    check the event in SWO1 if there is an import parameter defined. If there is one you have to define the binding in the task waiting for event. You have to bind the relevant object type from workflow to containerelement &_WI_OBJECT_ID& of the event container.
    reagrds,
    Steffen

  • NiDCPower Wait For Event

    Hello,
    I am using the PXIe-4139 SMU to source a current sequence that starts when a trigger is received and takes about 40 seconds to complete.
    After the niDCPower Initiate VI I have inserted the niDCPower Wait For Event VI with a timeout set to 300 seconds to allow for enough time to receive the trigger and complete the sequence. This VI waits for the Sequence Engine Done Event.
    Now this works fine, however, when the user wishes to stop the programm for whatever reasons, they have to wait the full 300 seconds until the Wait For Event VI produces a timeout error and stops the programm. This is rather inconvenient. How can I change the programm so that the user can stop it even when the Wait For Event VI hasn't reached its timeout?
    I tried this:
    But this doesn't work. For some reason, I get a timeout error with code -200474 but the boolean operator returns FALSE.
    Any other ideas?

    If there an output on the wait for event VI that flags a timeout? If so, set the timeout short (like 100 msec) and wait for 3000 timeouts before continuing on.
    Oh, and use an event structure. Timeout event (timeout=0) checks the wait for event, value change event for button breaks out of loop.
    Mike...
    Certified Professional Instructor
    Certified LabVIEW Architect
    LabVIEW Champion
    "... after all, He's not a tame lion..."
    Be thinking ahead and mark your dance card for NI Week 2015 now: TS 6139 - Object Oriented First Steps

  • Workflow WAIT FOR EVENT STEP deadline not working

    Hi,
    Need some inputs for the experienced people;
    I have a wait for event step in a workflow with deadline monitoring (Latest End) but it doesn't seem to work.
    Ofcourse, all the required setting are in place and deadline works fine for other Activity steps.
    The problem is specific to Wait for event step.
    The alternative is having a fork but I just want to know why the wait step with deadline doesn't work.
    Thanks,
    Roopesh

    Hello Ajay,
    Can you share with us what did you do to solve your problem?
    I'm facing the same thing in my project now, I'm wandering if you could help me with this one.
    I have this wait for an event step wich is configured to wait 4 minutes since the work item creation. I've also selected 'Modeled' on the Action field, and a display text for the outcome.
    But in one of my tests, the event hasn't occurred and the workflow stuck in this task forever.
    Thanks in advance.
    Regards.
    Actually, I think I got this handled. This thread was really helpful to me: http://scn.sap.com/thread/47482
    Message was edited by: Leandro Farias dos Santos Abreu

  • Wait for event step..

    hi all,
    I have a wait for event step in my owrkflow and it is working fine. My problem us i am not able to trigger this event using program can anyone please let me know what i am doing wrong. following is the code i am using to trigger the event
    DATA: key TYPE SWEINSTCOU-OBJKEY,
            object  TYPE  SWETYPECOU-OBJTYPE,
            event TYPE SWETYPECOU-EVENT.
      DATA: event_id LIKE swr_struct-event_id,
            return_code LIKE sy-subrc,
            input_container TYPE swr_cont OCCURS 0 WITH HEADER LINE,
            message_lines TYPE swr_messag OCCURS 0 WITH HEADER LINE,
            message_struct TYPE swr_mstruc OCCURS 0 WITH HEADER LINE.
    *  CONCATENATE pernr reinr INTO key.
    key = reinr.
      object = 'BUS2089'.
      IF action = 'APPROVED'.
        event = 'APPROVED'.
      ELSEIF action = 'REJECTED'.
        event = 'CANCELLED'.
      ENDIF.
    *  swc_create_object object 'BUS2089' key.
      CALL FUNCTION 'SAP_WAPI_CREATE_EVENT'
        EXPORTING
          object_type             = 'BUS2089'
          object_key              =  key
          event                   = event
         commit_work             = 'X'
         event_language          = sy-langu
         language                = sy-langu
         user                    = sy-uname
    *    IFS_XML_CONTAINER       =
       IMPORTING
         return_code             = return_code
         event_id                = event_id
       TABLES
         input_container         = input_container
         message_lines           = message_lines
         message_struct          = message_struct
    commit WORK.
    however if i execute the FM SAP_WAPI_CREATE_EVENT by passing the values it works fine.
    Thanks
    Saurabh

    Hi
    however if i execute the
    FM SAP_WAPI_CREATE_EVENT by passing
    the values it works fine.
    It will trigger only when you execute the above function module or
    SWE_EVENT_CREATE because 
    You have a BO and an event associated with it now when you want to trigger this this event through program then you have to make a kind of mapping between BO and your program so thta's what this Fm does, when ever you execute the program as you are passing all the values to the Function the Evnt associated with the BO is triggered.
    In order to trigger use SWE_EVENT_CREATE aand after calling this fucntion use COMMIT WORK statement
    Could you let  me know what condidtion did you write for the WAIT step to continue.
    Regards
    Pavan

Maybe you are looking for

  • Data recovery iphone 5 please can someone help?

    Hi My phone was dropped down the toilet and it won't start up. I keep getting the following message: nand findflashmediaandkeepout 601 Is my phone completely dead or can it be fixed? Also is it possible to recover any data from it like pictures, vide

  • In Bex analyzerr what is the use of  "Use Formula" checkbox

    Hi Experts,   In the properties of "Analysis Grid" there is an option "use formula" what is use of it ? In which senarion it is useful, as user i didn't find any significance with this option & even developers point of view i didn't find any help. Co

  • How to load images from client to oracle server

    Hi I want to load the image in oracle. when i tried to laod the iamge from my client(windows) to oracle server(linux) it is giving error. i wrotea pl/sql program to store the images in oracle database. but the server not reconzing the path of image w

  • Safari skipping to previous page

    Within the last couple of months, I have had problems with Safari suddenly skipping back to the previous page. It is as though I clicked the "back" button. It is happening more and more frequently. It is very frustrating when I am in the middle of co

  • Leopard and Adobe CS1 on my iMac G4

    Hi everyone, I currently own a iMac G4 flat panel, 1.25GHz, 1GB ram. I'd like to upgrade my current OS (Panther) to Leopard. My problem is I own retail copies of Adobe CS1 (I'm an illustrator) and currently can't afford to upgrade to CS3. Will Adobe