HR Implementation Assistance

Please add me to the list too.
[email protected]

check these to start with...
find some sample config docs with screen shots in the below link
http://www.atomhr.com/Menu_pages/library_preview.htm
http://www.sapbrain.com/TUTORIALS/FUNCTIONAL/HR_tutorial.html
http://planetsap.com/Time_evaluation_process.htm
hr learning guide:
http://searchsap.techtarget.com/originalContent/0,289142,sid21_gci1030179,00.html
http://help.sap.com/saphelp_470/helpdata/EN/e1/8e51341a06084de10000009b38f83b/frameset.htm
http://www.planetsap.com/hr_hrtrans.htm
http://sap.ittoolbox.com/topics/t.asp?t=302&p=302&h1=302
http://www.saptutorials.com/index.php?a=list&d=2&p=3&strict=1&w1=P
good luck

Similar Messages

  • AC 53 IdM Integration Implementation Assistance Guide released in BPX

    Hi Everyone,
    The first version of AC 53 IdM Integration Implementation Assistance Guide has been released in BPX.  You can find this document directly via this link:
    https://www.sdn.sap.com/irj/bpx/index?rid=/library/uuid/20bfb824-ea45-2c10-b093-bd097a579793&overridelayout=true
    Thanks!
    Ankur Baishya
    SAP GRC RIG

  • Implementation assistant

    Hello Experts,
    what is implementation assistant and solution architect or solman and is it delivered along with SAP standard system? is it possible to work on it  on IDES system
    kavita

    http://help.sap.com/saphelp_47x200/helpdata/en/cb/89f657c27211d28afa0000e828549c/content.htm
    http://help.sap.com/saphelp_sm32/helpdata/EN/ae/64c33af662c514e10000000a114084/content.htm
    http://help.sap.com/saphelp_sm40/helpdata/en/45/51fbdbd4941803e10000000a1553f7/frameset.htm

  • Implementation Assistant and ASAP Roadmap

    Hi all,
    We are in the project preperation phase, can any body let me know how can i use the Implementation Assistant and ASAP Road Map in defining the scope of the BW project and to prepare the Bluprint.
    Or can anobody tell me is there any other tool which can be used to prepare the scope the project and blueprint based on the requirements.
    Thanks and regards
    Chandrashekara Vijaykumar

    Vijay,
    the implementation assistant or the ValueSAP tool is a utility that helps you manage the project documentation. ASAP will give you templates , but I am not sure if there is any tool that would convert your requirements into the blueprint or scope.
    ASAP templates will be a good thing to start with and you can have a good overview of the steps involved in the projects via the implementation assistant.
    My 0.02
    Arun

  • H323 inspect in a single class with match criteria

    Hi, I trying to apply this to make sure only inspect h323 traffic in a single host (that's a Video Conference host), but don't works. Only works when I applied the inspect in the inspection_default class.
    Here is the config:
    access-list 100 extended permit ip host x.x.x.x any
    access-list 100 extended permit ip any host x.x.x.x
    class-map h223_VC
    match access-list 100
    policy-map global_policy
    class inspection_default
      inspect dns preset_dns_map
      inspect ftp
      inspect ip-options
      inspect rsh
      inspect rtsp
      inspect skinny 
      inspect esmtp
      inspect sqlnet
      inspect sunrpc
      inspect tftp
      inspect sip 
      inspect xdmcp
      inspect pptp
      inspect icmp
      inspect netbios
      inspect icmp error
    class h223_VC
      inspect h323 h225
    It´s possible? or is something wrong?
    Thanks a lot for your help

    Hi,
    When you have it in the global policy you only H323 H225 or you also have H323 ras?
    What do you see if you run this commands?
    packet-tracer input tcp 1025 1720
    sho service-policy flow tcp host host  eq 1720
    How do you test it?
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • Web Filtering on a Cisco 891 Router

    I am looking for a new method of filtering our internet. We currently have 1200+ sites utilizing cisco 891 and 891w routers for their external connection to the internet. Our current method of filtering them is utilizing whitelisting for http(80) traffic and a acl with an ip list for https(443) traffic. We also have specific https websites proxied that utilize akamia servers. This method is very difficult to maintain on our large scale. Is there a better method of doing this on the router to filter both http and https traffic via URL that does not invlove allowing all 443 or 80 traffic out?

    Anthony,
    Yes it does https inspection and the portal also block based on categories (Social Networking, Gamblin; to tell a few samples), IP address and domain name.
    Get in touch with your Cisco Account Team or Cisco Partner/Reseller and get an evalution.
    HTH
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach us"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • Web Filtering Cisco ASA 5510

    Hello !
    I m a netword administrator, and i have been looking how to setup web filtering in a network, we are using cisco asa 5510 as a firewall and i have been looking for a way to block url such as facebook and streaming web sites since users are allowed to access to any website and they have been downloding stuff lately and i cant controll the bandwith!!
    What u guys recommand !
    Thanks

    Hi Neji,
    Here you have all the content security options available on the ASA. I think only the CX doesn't apply to your HW but the other options are available.
    Block URLs using Regular Experessions (Regex)
    http://www.cisco.com/en/US/products/ps6120/products_configuration_example09186a0080940e04.shtml
    CSC module:
    http://www.cisco.com/en/US/products/ps6823/index.html
    How to enable the CSC module:
    http://www.cisco.com/en/US/docs/security/asa/asa72/configuration/guide/ssm.html
    ASA CX module (ASA 5512,5525,5545,5545,5555)
    http://www.cisco.com/en/US/docs/security/asa/quick_start/cx/cx_qsg.html
    Scansafe:
    http://www.cisco.com/web/about/ac49/ac0/ac1/ac259/scansafe.html
    Configuration Cisco Cloud Web Security
    http://www.cisco.com/en/US/docs/security/asa/asa90/configuration/guide/protect_cloud_web_security.html#wp1559223
    Ironport:
    http://www.cisco.com/web/about/ac49/ac0/ac1/ac259/ironport.html
    How to integrate the ASA with Ironport (WCCP):
    https://supportforums.cisco.com/docs/DOC-12623
    HTH
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • Web filtering on Cisco 867 VAE K9 router

    Hi,
    how do I enable web filtering on Cisco 867 VAE K9 router with 15.1(4)M4 release? i have a message on the router : Content Filter unvailable ....
    thanks.

    Anthony,
    Yes it does https inspection and the portal also block based on categories (Social Networking, Gamblin; to tell a few samples), IP address and domain name.
    Get in touch with your Cisco Account Team or Cisco Partner/Reseller and get an evalution.
    HTH
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach us"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • IronPort C670 AsyncOS Upgrade over http proxy

    Good day.
    I try to upgrade my IronPort C670 AsyncOS over http proxy.
    Proxy is working fine when i try to get featured keys for example. But whe when i try to ugprade AsyncOS i get "Error — Error fetching manifest: Failed to connect to manifest server" message.
    Proxy server is work and ironport have network acess to it. Even for telnet to 80 port.
    Squid proxy log:
    1373973019.051     57 {{IP_ADDRESS}} TCP_IMS_HIT/304 368 GET http://downloads.ironport.com/vtl/vof_history_year.tgz - NONE/- application/x-gzip
    1373973079.194    117 {{IP_ADDRESS}} TCP_IMS_HIT/304 368 GET http://downloads.ironport.com/vtl/vof_history_year.tgz - NONE/- application/x-gzip
    1373973119.168    497 {{IP_ADDRESS}} TCP_MISS/200 715 GET http://downloads.ironport.com/asyncos/fkey? - DIRECT/217.212.252.179 text/plain
    What can be the problem?

    Hi,
    Please take a look to this:
    http://tools.cisco.com/squish/c93bE
    HTH
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • Cisco Ironport Certificate ISsue

    Hai All,
    We have cisco ironport WSA 370 version 7.5 .
    We need to decrypt some https traffic . But the issue is our corporate AD support only 2048 bit cert. But our WSA box only support 1024.
    Heared that asycos 7.7 (new release) support 2048 bit cert.  When i check the 7.7 guide, its not mentioned. Can you please suggest???

    Hi Mohamed,
    There is a feature request so the WSA can generate 2048 bit certificate; but you can upload a an Intermediate root signing certificate to the appliance.
    Look for "Uploading a Root Certificate and Key"
    https://www.cisco.com/en/US/docs/security/wsa/wsa7.7/User_Guide/WSA_7.7.0_UserGuide.pdf
    HTH,
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • How to create an rule with action to subtract from the event log of Ips manager express console?

    how to create an rule with action to subtract from the event log of Ips manager express console?, some knows of has an guide?.
    Thank you.
    Sent from Cisco Technical Support iPad App

    Hi,
    http://www.cisco.com/en/US/products/sw/secursw/ps2113/products_tech_note09186a0080bc7910.shtml
    HTH
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach us"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • BestPractices Error - Set Decimal Notation and Date Format

    Hello everyone,
    first of all, I don't know, if this is the right forum for my question, but I hope so
    We're trying to implement the Best Practices Scenarios to a new SAP ERP System.
    We did the steps of the following url, where everything worked fine: http://help.sap.com/bp_dm603/DM_DE/html/index_DE.htm
    Then we integrated Best Practices 603V8 via Solution Builder (TA: /n/SMB/BBI). But now, when we switch to Implementation Assistant and try to activate Scenario DE_109 --> 100(DE) --> Folder USERSETTINGS, we receive the following error in report /SMB99/SU3_O009_B32: Set Decimal Notation and Date Format.
    So we called transaction SU3 and changed Decimal Notation and Date Format, but the error still exists.
    Anybody knows what to do?
    Thanks for your help!
    Best regards
    Patrick
    PS: We executed Testscript /SMB99/SU3_C009_B32 via TA SECATT and there is the error:
    TCD SU3 0,292 sec N Maintain Users Own Data

    Hi,
    Follow below link to verify whatever you have done is correct:
    http://help.sap.com/bp_bblibrary/600/Documentation/B32_BB_ConfigGuide_EN_MX.doc.
    Thanks
    Sunny

  • Analysis Engine is Not Running

    Hi Guys!
    I´m looking for your help about an issue with an Cisco IPS (B-BEAU) that is showing the Analysis Engine=NotRunning
    These are the SO and Version of my IPS:
    Version: 7.0(6)E4
    OS Version: 2.4.30-IDS-smp-bigphys
    If I execute the show events command I get the following lines:
    ct-sensorApp.650 not responding
    evStatus: eventId=1326914865100530240 vendor=Cisco
      originator:
        hostId: XXXXXXXX
        appName: modprobe
        appInstanceId:
      time: 2013/07/13 02:11:05 2013/07/12 20:11:05 CST
      syslogMessage:
        description: Note: /etc/modules.conf is more recent than /lib/modules/2.4.30-IDS-smp-bigphys/modules.dep
    The following lines show the result for the show status command:
    XXXXXX# show health
    Overall Health Status                                   Red
    Health Status for Failed Applications                   Red
    Health Status for Signature Updates                     Not Enabled
    Health Status for License Key Expiration                Red
    Health Status for Running in Bypass Mode                Red
    Health Status for Interfaces Being Down                 Red
    Health Status for the Inspection Load                   Green
    Health Status for the Time Since Last Event Retrieval   Not Enabled
    Health Status for the Number of Missed Packets          Green
    Health Status for the Memory Usage                      Not Enabled
    Health Status for Global Correlation                    Not Enabled
    Health Status for Network Participation                 Not Enabled
    Security Status for Virtual Sensor vs0   Green
    Security Status for Virtual Sensor vs1   Green
    Do you have any idea what's wrong here?
    I'll appreciate any help about it,
    Thanks folks!!!

    Hi Manuel,
    Pre-7.0.8 versions have issues with the latest signature updates, so most likely you will face this issue after every signature upgrade. So I suggest you to upgrade at least to 7.0.8 or 7.1.7.
    HTH
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • Business process-BUSES

    Sirs, My project is the related to the Manufacturing, industrie BUSES , Under this one what we can say as the BUSINESS PROCESS,(how to the intial stage comes to work in, and how to the finished completed structure) please what have ur valuble suggestion..... help

    Dear Ameer,
    <b>ASAP Methodology</b>
    Forward Media has adopted ASAP (Accelerated SAP) as its methodology of choice for SAP implementations, upgrades and module additions.
    Our in-depth knowledge of ASAP allows us to customise and streamline ASAP to suit widely varying project requirements. For example - while ASAP was originally conceived as an implementation methodology, Forward Media has found ways to apply its strengths to the smaller tasks of SAP upgrades and new module additions. Innovations such as these have become part of standard and offically endorsed ASAP methodology.
    Our involvement with the ASAP methodology began in 1996, when Forward Media Director Nadia Ward worked extensively with SAP America on the creation of the original ASAP methodology. Nadia led the technical component of the first commercial trial of ASAP in an implementation for CFS in New York - in the process contributing several operational templates to the ASAP toolkit.
    ASAP Phases
    The ASAP methodology structures the project lifecycle into five phases which run sequentially from project start to project completion. These standard ASAP phases are:
    1.     Project Preparation
    2.     Business Blueprint
    3.     Realisation
    4.     Final Preparation
    5.     Go-Live and Support
    Concurrently with these ASAP phases, we also run a series of continuous processes which cover the types of activities which, by their nature, transcend individual phase boundaries (eg: Quality Assurance) or which require activity throughout the project lifecycle (eg: Knowledge Transfer).
    These continuous processes identified as necessary for most SAP projects:
    1.     Quality Assurance
    2.     Data Migration
    3.     Basis
    4.     Knowledge Transfer
    5.     Cutover Planning
    6.     Project Accelerators
    Together, the ASAP phases and our continuous processes define the broad outline of our approach for SAP projects.
    Project Management Toolkit
    Forward Media has a series of Project Management tools in addition to those sourced from ASAP that we make available to our clients. These include templates such as our:
    •     Project Plan Template (for SAP Implementations and Upgrades)
    •     Data Conversion Strategy
    •     Cutover Plan
    •     ABAP specifications
    •     Test Scripts
    •     Client Landscape
    •     Change Management Strategy
    •     Month End Schedule
    •     Issues Log
    •     Phase 1: Project Preparation
    •     Phase 2: Business Blueprint
    •     Phase 3: Realization
    •     Phase 4: Final Preparation
    •     Phase 5: Go Live & Support
    <b>Phase 1: Project Preparation</b>
    In this phase of the ASAP Roadmap, decision-makers define clear project objectives and an efficient decision-making process. Here Project Organization and roles are defined and implementation scope is finalized.
    System landscape and Technical Requirement
    •      Infrastructure need (Hardware/interfaces): Available- QuickSizing Service: to be accessed via SAPNet
    •      System Landscape
    •      High level strategies for client
    •      Archiving strategy
    Issues Database:
    Issues must be resolved before phase completion ot before beginning of the next phase. The issues can be
    •     Unanticipated tasks
    •     Normal tasks that can not be completed
    •     External factors that need to be dealt with.
    Issues database allows the project team to enter, track and report on project issues.
    <b>Phase 2: Business Blueprint</b>
    In this phase scope of the R/3 implementation is defined & Business Blueprint is created. Business Blueprint is a detailed documentation of company’s requirements.
    Various tools are used in this phase.
    •     AcceleratedSAP Implementation Assistant
    •     Question & Answer Database (Q&Adb)
    •     Business Process Master List (BPML)
    •     R/3 Structure Modeler
    •     Business Navigator and external modeling tools
    <b>Project Management:</b>
    Activities nagement:in this work package are:
    •     Conducting Status meeting for project team
    •     Conducting steering committee meetings
    •     General project management
    •     Addressing organizational issues relating to organizational change management.
    Other activities include:
    •     Project Team Training
    •     Developing the System Environment
    •     Defining Organizational Structure
    •     Defining the Business processes
    R/3 reference model can be used for
    •     Comparing the standard functionality with your companies own organizational requirements
    •     Creating documentation for the conceptual design
    •     Optimizing business processes
    •     Training the project team and users
    •     Writing user documentation
    Question and Answer Database can be used to determine
    •     The Baseline Scope
    •     Cycle Plan
    •     Integration test Plan
    <b>Phase 3: Realization</b>
    The purpose of Phase 3 is to configure the R/3 system. The configuration is carries out in two steps; baseline configuration & Final configuration. 
    Business Process Master List (BPML) is created in phase 2 as a report from Q&A database. It is used to identify, plan, schedule and monitor the configuration and testing of all R/3 scenarios and processes within the scope of an implementation. BPML is a representation of the R/3 business and transactions that are contained within the scope of the project. BPML is feeds all business information to all subsequent worksheets.
    <b>Implementation Guide (IMG):</b>
    It is the main tool for setting the parameters to configure or ‘Customize’ R/3 during the realization phase.   IMG reflect the chronological order in which the customizing activities are carried out.
    The following aspects of configuration are also to be considered:
    •     Defining authorizations in the R/3 system
    •     Defining workflows
    •     Creating user documentation
    System Manager Procedures
    •     Developing system test plans
    •     Defining service level commitment
    •     Establishing system administration functions
    •     Setting up Quality Assurance environment
    •     Defining the design of the productive system
    •     Defining system management procedures for the productive system
    •     Setting up the productive environment
    At the end of this phase, Project Manager must check the status of deliverables for completeness and accuracy. This internal quality check should be carried out in addition to an external, independent third party Quality Audit.
    Preparation for end-user training needs to be gone through and approved at and of this phase.
    <b>Phase 4: Final Preparation</b>
    The purpose of this phase is to complete the final preparation of the R/3 system for going live. This includes testing, user training, system management and cutover activities, to finalize your readiness to go live.
    In this phase the R/3 system is handed over to individual departments for productive operation. This includes preparation of end-user documentation and training the end-users. The technical environment is installed on production system & is tested. Project managers prepare plans for going live, transfer of legacy data and support at early stages.
    End-user training is a critical activity for success of the project. InfoDB may be used to plan for the User Training activities. Computer Center Management System (CCMS) must be set at this time. Simulation of productive operation system & testing the same is of great important.
    The test plan contains the following activities
    •     Testing conversion procedures and programs.
    •     Testing interface programs
    •     Conducting volume & stress testing
    •     Conducting final user acceptance testing
    •     Developing a final go-live strategy.
    The Computer Aided Test Tool (CATT) can be used to automate test sequences for key business processes.
    Phase 4 also provides for the testing of the disaster recovery plan for the productive environment. Disaster downtimes are verified and details on de-escalation.
    <b>Phase 5: Go Live & Support</b>
    This phase is concerned with supporting and optimizing the operative R/3 system.
    Following activities are carried out
    •     Production support facilities are defined.
    •     Validation of business processes and their configuration.
    •     Follow-up training for users
    •     Signoffs etc.
    During phase 5, the first EarlyWatch session should be held, where experts from SAP analyze the system’s technical infrastructure. The aim is to ensure the system functions as smooth as possible.
    Version upgrades should be planned whenever found necessary. AcceleratedSAP contains a continuous roadmap, with standard activities necessary after implementation. The tasks in that structure provide solutions for all known types of continuous change: Business changes, technology changes or changes in user community.
    with regards,
    B.Ravindranath

  • Equivalent to show disk0: on ASA-SSM-10

    Hi, are you able to see the contents of the disk on an ASA-SSM-10 module? Like the show disk0: command on my 5510? I know it has an internal flash disk..Is that where the image and configuration files and software are located? Can one see these files and copy them to TFTP server?
    Cheers
    Phil

    Hi Philip,
    You can view this content through the service account of IPS. The downside will be that you can only access it with the supervision of TAC. If you want to see the configuration you can do a show config; if you want to see what version are you running you can do it through the show version command.
    HTH
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach us"
    http://www.cisco.com/web/partners/tools/pdihd.html

Maybe you are looking for