HR system separation - moving data at DB level.

Hi All,
We have two SAP systems - one ORP - in which we have all modules - mm fi pp hr etc. we are making a new sap system - HRP. Now we are planning to move our entire HR module from ORP to HRP. If suppose we ask our basis guy to create the HRP system by copyieng all customizations from ORP and then identify all HR module related tables - for master and transactional data, and MOVE THEM FROM ORP TO HRP AT THE DB LEVEL - FROM ONE SYSTEM TO ANOTHER, would this be recommended and by this approach - all the HR module would be moved from ORP to HRP - or it would create some ambiguity?
our both systems - orp and hrp are same configurations and versions. we do not have payroll and time management in our system.
Please suggest

hi fellex,
pls chk this site it may help you.....
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/c236be6b-0701-0010-8db7-90de6ec4a707
help.sap.com/bp_biv335/BI_JA/documentation/DataWarehousing_WP_EN.pdf
www.sap.com/germany/about/company/revis/pdf/DS_Leitfaden_BW_en.pdf
all the best
thanks
sagar
reward me if usefull

Similar Messages

  • Moving Calendar to a New Computer & Moving Data: Downloads and Add-ons

    Moving Calendar to a New Computer & Moving Data: Downloads and Add-ons
    The handle says is all. Totally lost here & in a virtual house of cards. Please first see screen-shot.
    I have the Mozilla calendar (Lightening?) program on my computer. Is this screen-shot Thunderbird or is it an add-on called Lightening that was added on to Thunderbird? I don't even recall how I acquired in a few years ago. Whatever it is I find in invaluable. Indispensable. Brilliantly conceived. A superb creation.
    Notice that I have several calendars in different colors for different purposes and a long task agenda on the right. Wonderful program!! I absolutely love it! I can not afford to loose these calenders and this data. However, big caveat, entrusting my life (our lives) to it has become extremely dangerous for it's a virtual house of cards upon the purchase of a new computer. The move-over is more like a career most of us already have one. Need anyone really wonder why PC sales are down? Res ipsa loquitur.
    FIRST ISSUE:
    I must move this/these Mozilla program/s and calendars over to the new computer but I don't have a clue where to begin. What must I download? Thunderbird? What must I add-on? Lightening? Is this a suite of programs? All I care about are my calendars and task agendas that you see in the screen-shot -- not any email programs etc. Just this personal management system that you see.
    SECOND ISSUE:
    After I downloading, installing, and adding-on what I need, how do I then move (migrate) my profile (data) over to new computer?
    Please know that I do know where that 'profile' and its .ics calendar profiles are stored. I am also well backed up. I just need to know how get (downloaded/install) what I need and move this over to the new computer. (See screen-shot)
    First, what must I download and install and add on. Second how do I move this data/profile (a virtual Life) over to the new computer without it all coming down like a house of cards?
    Please, unless it's all been documented in one location, a link to this and a link to that probably won't be very helpful. Anyone who can lay-out a simple, easy to follow plan (1, 2, 3, 4, done) will be a hero and make a significant contribution to people who dread buying a new computer for precisely these reasons. It will certainly encourage more people to use this absolutely wonderful personal management system. It's the best I've ever seen and I must keep it. But it's soooo risky.

    Obviously the screen-shot is posted so show what I see now and want to see when I am done. Was the ''really ''not clear? Nothing could be more germane ("Germaine" is a person's name) than a visual that shows the multiple calendar dynamic and what I actually want to see nor better communicants the fact that all I want is that and not other programs in a suite – a question btw asked but not answered.
    "I have no idea what the threshold issue is. Perhaps Zeno can assist you."
    I now see Zeno's reply but I never got an email re: my questions and just noticed it. I will respond to him separately. But ''obviously ''the ''''threshold'''' issue is ISSUE ONE (1) exactly what, and only what, must I download and install.
    Was that really not clear? That was not answered in your first reply. And since you here, later, state that Lightening does not need to be downloaded and installed how on earth could you presume the first threshold issue (question 1) was a joke?
    Once again I wrote and you even quoted me “Please, unless it's ALL been documented in ONE LOCATION, a link to this and a link to that probably won't be very helpful. Anyone who can lay-out a simple, easy to follow plan (1, 2, 3, 4, done) ...”
    As this exchange demonstrates, that statement has certainly proven to be correct.
    You then wrote, “Read the question... the question is. How do I move my profile to a new computer? You are the one making much more of it than that. ... All covered in the link.”
    What “the” (singular) of several links (plural) you provided are you talking abut? But no matter. No it was not "all" covered in the multiple links you sent which do not address the more important threshold question (1). The only issue you addressed was (2) data transfer which is secondary to the threshold issue which is ISSUE question one (1). Threshold issue/question presented: before we can go to question (2) we must address question (1).
    As I stated “Please know that I do know where that 'profile' and its .ics calendar profiles are stored.”
    You replied “No you do not. Local calendars are not stored in ICS files.”
    First please notice you make no attempt to clarify where they are; but, once again, please read carefully. I did not say that the calendars are “stored in the ICS files” but that the .ics files ARE the calendars and I do know there they are stored.
    Please see the screen-shot you claim is not germane? Each of those different colored calendars are (“not stored” in but are) .ics files that are stored in the Profile directory. In the directory c:\Users\myName\AppData\Roaming\Thunderbird is a directory or folder called \Profiles and in that directory is a file named 9w2ydrc4.default. That file IS the profile. In that profile is a folder called “calendar-data” and in that folder are the calender .ics files that are the different colored calenders you see in the very germane screen-shot. So I do know where the calendars are. So I gather that all I copy into the Profiles directory is the file (profile) called 9w2ydrc4.default.
    Again, as I wrote before, I do not want a full suite with email. So what do I downloaded and install to get only what you see in the screen-shot. I don't think we ever installed a full suite before. I never saw and email program. So, again,'' asked but not answered. ''
    Then you stated, I do not need to download and install Lightening (please notice, is a partial answer to my first, threshold, question you presumed was a joke) but only Thunderbird since “Lightning is already in your profile so will move with it When you actually move the profile.”
    Well, since you like to use links, exactly what is your documented Mozilla authority for that hearsay? Since I posted the question I have spent much time at Mozilla. Literally everything I have seen indicates I must first download and Thunderbird. But again, I do not want to and never did, install a full suite of programs and, as far as I know, there is no Mozilla mail or other suite programs on this (my current old computer) and there never were. So, once again'', asked and not answered).''
    Everything at Mozilla states I must first download & install Thunderbird'' and then ''add-on Lightening. Nothing I have seen at Mozilla suggests otherwise or states that when we want to get Mozilla calendars over to a new computer we must first and *only* download and install Thunderbird and then just copy the profile (9w2ydrc4.default) into the 'Profiles' directory. Nothing I have seen at Mozilla suggests I do not have to download and install Lightening. So please show me where Mozilla documents that. ''' Please notice that even Zeno states, “You download AND INSTALL LIGHTNING as an add-on.'''”
    Since this contradicts you do tell me: what is your Mozilla authority for claim that I do not need to download and install Lightening because it's already in my profile? I see nothing in my profile that suggests Lightening is there.
    Finally, I wrote to you “ ...it is axiomatic that Windows transfer wizard does NOT transfer programs but only data. You did not know this?” I only wrote that because it appeared your reference to Transfer Wizard was a response to the threshold question of (1) how to I get the program onto the new machine. But your response is''' very '''strange for you wrote “You are the first person I have encountered that thought it did more than transfer data.” Show me where I said that. I said the opposite. How on earth did you come to that interpretation as a response to my simple and very clear statement that " ...it is axiomatic that Windows transfer wizard does''' NOT transfer programs but only data.'''.”

  • PO Delivery date at Item level is getting modified by Delivery date in PR

    Hi Experts,
    I am using BAPI_PO_CREATE1 for creating Purchase Order. I am passing delivery date (item level) in parameter
    POSCHEDULE of the  Bapi but the on creation of the PO it does not take the value that I passed in delivery date field
    ,however it takes the delivery date from Purchase requisition (the preceding document).
    Please let me know how can I fix this issue, It should take the date that I passed in the Bapi.
    Thanks & Regards,
    Sushant Singh

    Hi,
    In the X-Structure 'POSCHEDULEX' set 'X' in 'PO_ITEMX'.                  
    Please check in your system the following data:                          
    Check that the X-fields in structure POSCHEDULEx are set Correctly and  that the key fields item number and schedule number are equal in  PoSchedule and PoScheduleX.                                                                               
    Example:                                                                 
    POSCHEDULE                                                               
    PO_ITEM  00010                                                           
    SCHED_LINE  001                                                          
    DEL_DATCAT_EXT                                                           
    DELIVERY_DATE 10/13/2010                                                
    QUANTITY  2                                                              
    DELIV_TIME                                                               
    STAT_DATE  10/13/2010                                                                               
    Structure POSCHEDULEX                                                    
    PO_ITEM  00010                                                           
    SCHED_LINE  001                                                          
    PO_ITEMX  X                                                              
    SCHED_LINEX  X                                                           
    DEL_DATCAT_EXT                                                           
    DELIVERY_DATE X                                                          
    QUANTITY  X                                                              
    DELIV_TIME                                                               
    STAT_DATE  X                                                                               
    Please also make sure that all line items of PO should have at least one delivery schedule.                           
    Regards,
    Mauro

  • Entering budget data on different levels

    Dear experts,
    I have a question concerning posting budget data on different levels in BCS. In Former Budgeting there was an automatic check for budget entry which was not allowing greater amounts on lower level commitment items than on higher levels.
    Now with BCS there is not a hierarchical structure when entering budget data so you can enter a greater amount on subordinate commitment items than on superior ones.
    Do you have an idea if the budget entered on the lowest level can be totaled up automatically to the higher levels of the hierarchy or consistency checks should be defined in order to control budget amounts on the different levels???
    Thanks in advance.
    Best regards,
    sappsm

    Dear SAPPSM,
    In the Budget Control System (BCS) there exists no hierarchical budget structure which would take into account some funds center hierarchy, for example.
    This was standard function in Former (or Classical) Budgeting, but is not available in BCS only from EhP 603 on, you will be able to have multi-level budget structure but still in development phase.
    As a consequence, when you enter budget, budget values are only created at the level of budget entry (for example, at the 3rd level). Furthermore, BCS does not provide functions like "Distribute budget"
    or "Total up budget".
    However, you can "simulate" a totalling up of budget values via reporting. For example, for Report Writer reports like FMRP_RW_BUDGET you can use funds center groups (FM menu, Master Data, Funds Center), created by transaction FM_SETS_FICTR1. You can use such funds center groups with the Report Writer reports, which then automatically sum up the budget values according to the funds center group.
    BCS is a complete system with more possibilities than FB and you will be able to define strategy derivation for controling budget or posting address according to business process. Please check the documentation available in help.sap.com and in BCS node from SPRO configuration.
    I hope I could help you
    Kind Regards,
    Vanessa.

  • What are required Oracle products for moving data from IBM IMS/DB(mainframe) to Oracle environment?

    I am z/OS system programmer, our company is using IMS as its main OLTP database. We are investigating moving data off the mainframe for data warehousing and online fraud detection. One option is using IBM InfoSphere CDC and DB2, another option is using IMS connect and writing our own program, I am wondering what is the oracle solution for this kind of issue?
    I am not oracle technician but I googled and find out Oracle has some product like Oracle Legacy Adapters, OracleAS CDC Adapter and Oracle Connect on z/OS, however I didn't find them in Oracle site(https://edelivery.oracle.com/), I don't know whether these products are deprecated or not?!
    I would very much appreciate any help or guidance you are able to give me

    Thank you for responding.
    I've considered dumping the data into a flat file and using SQL*Loader to import as you suggest but this would require some scripting on a per-table basis. Again: all I want to do is to copy the contents of a table from one database to another. I do not think I should have to resort to creating my own dump and load scripts in order to do that. However I agree with you that this type of solution may be my final solution.
    I've tried the db link solution. It was just a slow as the 'imp' solution for some reason. Don't know why. The tables are rather large (3 tables of a few Gb each) and therefore require intermediate commits when loaded. Otherwise the rollback segment will run out of space. So the 'db link solution' is really a PL/SQL script with a commit for each x records.
    I think Oracle is making it a bit difficult for me to copy the contents of a table from one database to another and to do it efficiently. Perhaps I'm missing something here?

  • Moving Data from Normal table to History tables

    Hi All,
    I'm in the process of moving data from normal tables to
    History tables.
    It can be some sort of a procedure which should be a cron job running at night.
    My aim is to move data say 1.5 yrs or 2yrs old data to History tables.
    What aspects i need to check when moving data. And how can i write a procedure for this requirement.
    The schema is same in both the normal table and history table.
    It has to be a procedure based on particular field RCRE_DT.
    If the rcre_dt is above 2 yrs the data needs to be moved to HIS_<table>.
    I have to insert record in to HIS_table and simultaneously delete record from the normal table.
    This is in Production system and the tables are quite big.
    Pls do find enclosed the attached sample schema for Normal table and HIS_<table>.
    If i want to automate this script as a Cron job for similarly other History tables
    how am i to do it in a single procedure assuming the procedure for moving the data is the same procedure.
    Thanks for ur help in advance.
    SQL> DESC PXM_FLT;
    Name Null? Type
    RCRE_USER_ID NOT NULL VARCHAR2(15)
    RCRE_DT NOT NULL DATE
    LCHG_USER_ID VARCHAR2(15)
    LCHG_DT DATE
    AIRLINE_CD NOT NULL VARCHAR2(5)
    REF_ID NOT NULL VARCHAR2(12)
    BATCH_DT NOT NULL DATE
    CPY_NO NOT NULL NUMBER(2)
    ACCRUAL_STATUS NOT NULL VARCHAR2(1)
    FLT_DT NOT NULL DATE
    OPERATING_CARRIER_CD NOT NULL VARCHAR2(3)
    OPERATING_FLT_NO NOT NULL NUMBER(4)
    MKTING_CARRIER_CD VARCHAR2(3)
    MKTING_FLT_NO NUMBER(4)
    BOARD_PT NOT NULL VARCHAR2(5)
    OFF_PT NOT NULL VARCHAR2(5)
    AIR_CD_SHARE_IND VARCHAR2(1)
    UPLOAD_ERR_CD VARCHAR2(5)
    MID_PT1 VARCHAR2(5)
    MID_PT2 VARCHAR2(5)
    MID_PT3 VARCHAR2(5)
    MID_PT4 VARCHAR2(5)
    MID_PT5 VARCHAR2(5)
    PAX_TYPE VARCHAR2(3)
    PAY_PRINCIPLE VARCHAR2(1)
    SQL> DESC HIS_PXM_FLT;
    Name Null? Type
    RCRE_USER_ID NOT NULL VARCHAR2(15)
    RCRE_DT NOT NULL DATE
    LCHG_USER_ID VARCHAR2(15)
    LCHG_DT DATE
    AIRLINE_CD NOT NULL VARCHAR2(5)
    REF_ID NOT NULL VARCHAR2(12)
    BATCH_DT NOT NULL DATE
    CPY_NO NOT NULL NUMBER(2)
    ACCRUAL_STATUS NOT NULL VARCHAR2(1)
    FLT_DT NOT NULL DATE
    OPERATING_CARRIER_CD NOT NULL VARCHAR2(3)
    OPERATING_FLT_NO NOT NULL NUMBER(4)
    MKTING_CARRIER_CD VARCHAR2(3)
    MKTING_FLT_NO NUMBER(4)
    BOARD_PT NOT NULL VARCHAR2(5)
    OFF_PT NOT NULL VARCHAR2(5)
    AIR_CD_SHARE_IND VARCHAR2(1)
    UPLOAD_ERR_CD VARCHAR2(5)
    MID_PT1 VARCHAR2(5)
    MID_PT2 VARCHAR2(5)
    MID_PT3 VARCHAR2(5)
    MID_PT4 VARCHAR2(5)
    MID_PT5 VARCHAR2(5)
    PAX_TYPE VARCHAR2(3)
    PAY_PRINCIPLE VARCHAR2(1)

    Hi All,
    Thanks for ur valuable suggestion.But can u explain me bit more on this as i'm still confused about switching between partitoned tables and temporary table.Suppose if i have a table called PXM_FLT and an correspoding similar table named HIS_PXM_FLT.How can i do the partitioning shd i do the partitioning on the normal table or HIS_PXM_FLT.i do have a date field for me to partition based on range.Can u pls explain why shd i again create a temp.table.What's the purpose.Now the application is designed in such a way that old records have to be moved to HIS_PXM_FLT.can u pls highlight more on this.Your suggestions are greatly appreciated.As i'm relatively new to this partitioning technique i'm bit confused on how it works.But i came to understand Partitioning is a better operation than the normal insert or delte as it is more data intensive as millions of record need to be moved.Thanks for feedback and ur precious time.

  • Copy data of posting level greater 10 in EHP2

    Dear all,
       We install EHP2 ( enhancement package 2 ) to our BCS.
       According to the document , we should be able to copy data with posting level >10.
       We are trying to copy data(all data types) from one group currency to another one.
       First ,we create a copy method with data type = All data types and with one currency translation method.
       We also create a copy task with that method.
       When we run the task, the system keep showing that :
    =====================================================
    Data stream for activity numbers is incomplete
    Message no. UCF6884
    Diagnosis
    The data stream for activity numbers does not contain the Source System and Referenced Activity fields. Therefore, the system cannot store the link between the new activity number to be assigned and the activity number of the source.
    System Response
    The data cannot be copied or loaded.
    Procedure
    Add the missing fields to the data stream for activity numbers.
    ======================================================
    There are two fields missing Source System and Referenced Activity.
    But, I don't know where or which data model we should assign those two fields.
    We try to add 0BCS_COINRR & 0LOGSYS to activity number DSO.
    The system still shows that message.
    Anyone knows how to make the copy work with posting level > 10?
    Please advise .
    Thx,
    Jeff
    Edited by: Jeff Huang on Sep 16, 2008 3:25 AM

    Jeff, are you still havnig this problem?
    - after we have implemented EHP2, I hope to copy PL20 and 30 too.
    Please let me know if you have succeeded or have found a workaround

  • Requirement date for 3 level  Component in BOM

    Iam having Multilevel  Sales order bom
    Header material requirement date and receipt date given by system is 23.04.2009
    first level assembly requirement date and receipt date given by system is  is 07.04.2009
    second level assembly is phantom
    Third level componant requirement date is 31.03.2009 and receipt date given by system is 19 June 2009 .
    Gr proceesing time of 2 days is maintained and no planned delivery time is maintained.
    Why Third level componant receipt date given by system is 19 June 2009 ?
    Edited by: mayuresh  bhurke on Jan 19, 2009 6:31 PM

    Mayuresh,
    It seems the 3rd level component has a long planned delivery time in material master. Hence the system  has pushed the receipt date forward to 19 June 2009  from 31.03.2009. Please check material master time for the 3rd level component.
    Hope this helps.
    Thanks,
    Ram

  • Loaidng data to Parent level using ERPi

    Hi All,
    We have a scenario that we have to load data from GL_Balance to Planning and HFM using ERPi at Parent level, is this possible to load data at parent level using ERPi..
    SVK

    FDM does not impose any rstrictions on what you can load into HFM it just respects the load constraints of the target system i.e. if you can't do something directly in HFM you won't be able to do it via FDM. In HFM data can only be loaded to base level members not parents, parents are calculated and are not stored i the HFM database. Therefore you will not be able to load to parent level members in HFM. You can sometimes have excptoions to this but only if the HFM developer has written specific rules to allow this.

  • The datediff function resulted in an overflow. The number of dateparts separating two date/time instances is too large. Try to use datediff with a less precise datepart.

    The below function is giving me the hours difference what I wanted, but today it is giving us the below error: 
    Msg 535, Level 16, State 0, Line 1
    The datediff function resulted in an overflow. The number of dateparts separating two date/time instances is too large. Try to use datediff with a less precise datepart.
    Please Help..
    ALTER FUNCTION [dbo].[GetHoursExcludingWeekdays](@StartDate datetime2,@EndDate datetime2)
    returns decimal(12,3)
    as
    begin
        if datepart(weekday,@StartDate) = 1
            set @StartDate = dateadd(day,datediff(day,0,@StartDate),1)
        if datepart(weekday,@StartDate) = 7
            set @StartDate = dateadd(day,datediff(day,0,@StartDate),2)
        -- if @EndDate happens on the weekend, set to previous Saturday 12AM
        -- to count all of Friday's hours
        if datepart(weekday,@EndDate) = 1
            set @EndDate = dateadd(day,datediff(day,0,@EndDate),-2)
        if datepart(weekday,@EndDate) = 7
            set @EndDate = dateadd(day,datediff(day,0,@EndDate),-1)
        declare @return decimal(12,3)
        set @return = ((datediff(second,@StartDate,@EndDate)/60.0/60.0) - (datediff(week,@StartDate,@EndDate)*48))
        return @return
    end
    ReportingServices

    You'll get this error if the difference between the start and end date is greater that about 68 years due to the "second" DATEDIFF specification.  Perhaps the dates are greater than the expected range due to a data quality issue. 
    Taking the advice from the error message, you could use minutes instead of seconds like the example below the version below.  This could still result in the error of the difference is greater than a couple of hundred years, though.  You might consider
    validating the dates and returning NULL if outside expected limits.
    ALTER FUNCTION [dbo].[GetHoursExcludingWeekdays](@StartDate datetime2,@EndDate datetime2)
    returns decimal(12,3)
    as
    begin
    if datepart(weekday,@StartDate) = 1
    set @StartDate = dateadd(day,datediff(day,0,@StartDate),1)
    if datepart(weekday,@StartDate) = 7
    set @StartDate = dateadd(day,datediff(day,0,@StartDate),2)
    -- if @EndDate happens on the weekend, set to previous Saturday 12AM
    -- to count all of Friday's hours
    if datepart(weekday,@EndDate) = 1
    set @EndDate = dateadd(day,datediff(day,0,@EndDate),-2)
    if datepart(weekday,@EndDate) = 7
    set @EndDate = dateadd(day,datediff(day,0,@EndDate),-1)
    declare @return decimal(12,3)
    set @return = ((datediff(minute,@StartDate,@EndDate)/60.0) - (datediff(week,@StartDate,@EndDate)*48))
    return @return
    end
    GO
    Dan Guzman, SQL Server MVP, http://www.dbdelta.com

  • Remote system monitoring entry- data not relayed to Central system

    Hello Folks,
                        I am trying to establish a central monitoring system for our client. I am trying to test it in the DEV environment first.
    The central system is a Solution manager system (Dual stack- ABAPJAVA). I am trying to bring in monitoring data from the ECC development environment (ABAPJAVA).
    First of, i created to RFC connections in Solution manager system, one for data collection and the other for analysis. I have maintained the host address of the ECC system as target.
    Then i have created a remote system entry in Transaction RZ21--> technical infrastructure entered the 2 RFC names and have executed the function.
    At this point i am only trying to bring in ABAP stack monitoring data form the ECC system so i have not generated the CSNCONF file.
    Now when i look in Solution manager RZ20-->CCMS monitoring templates, i can't see any data for the the ECC system.
    I guess i am doing something wrong. Am i looking in the wrong monitor set?
    As additional information: Solution manager (SMD) and ECC (ECD) use different transport domains / transport groups. I dont know if this makes a difference.
    Can some one please help.
    Regards,
    Prashant

    Hi Prashant,
    if I understand correctly your system shows only MTEs from R/3 Stack, not from the OS side, pls check your SAPOSCOL. Are the data in OS06 in your remote system correct and do you see the current data, refredhed all 10 seconds?
    To check your environment, pls do the following:
    in th efirst step check in RZ21 > in the Topology part the System Overview for your system connection to your back end system. Are the Read Destination Data RFC and the Destination Analysis RFC correct and works the authority chek fine?
    In the second step pls check in RZ21 > in the Agents for Remotey SAP Systems part; are there registered your remote ccms agents correctly and works the connection test.
    Stop the agents and in your RZ20 monitor pls enter STAT in your command field. Are there displayed for your MTE nodes the read RFC destinations?
    Start the agents and and in your RZ20 monitor pls enter STAT in your command field. Are there displayed for your MTE nodes the CCMS Agent RFC destinations?
    To rebuild the Monitor in the CEN system you could try to reset the node of your remote system in the warm up status > go in the remote system to RZ1 > go to local segments  > change to edit > select your segments > reset segment in "WARMUP" status.
    In the CEN system you coul try to go to the edit mode for the Agents for Remot SAP Systems > select your remote system and push the button Reinitialize Agents
    In the back end system you can try to delete all MTEs in RZ21 > menu Technical Infrastructure > Reorgenize Segment Table > select the options with "ALL" in the CEN and the remote system to reorgenize all data.
    Could you pls post for the missing MTEs a screenshot on the one side from the CEN system and on the other side from the remote system...
    and last but not least you could try the following for missing OS MTEs
    delete  ALALERTS, ALMTTREE and ALPERFHI in /usr/sap/ccms/<SID>_<SNR> and check in the agents folder all trace and log files for errors.

  • Getting error while opening a saved for later notification: The selected action is not available. The cause may be related to security. Contact your system administrator to verify your permission level for this action.

    Hi All,
    While opening a saved for later notification, we are getting "The selected action is not available. The cause may be related to security. Contact your system administrator to verify your permission level for this action". error.
    This is a custom notification.
    Please help.
    Thanks
    Raghava

    HI All,
    Please help on this issue.
    Thanks
    Raghava

  • Can we load data for all levels in ASO?

    Hi All,
    Im creating cube in ASO
    can i load data for all levels in ASO
    we can load data for all Levels In BSO but in ASO i need confirmation????
    and one more
    wat is the consider all levels option in ASO is used for ? wat is the purpose?
    Can any one help ,it would be appriciate.
    Thanks

    In an ASO cube you can only load to level zero
    The consider all levels if used for aggregation hints. It allows you to tell the aggregation optimizer to look at all levels when deciding if aggregation needs to be done on the dimension

  • Can we load data for all levels in ASO cube

    Hi All,
    Can we load data for all levels of members in ASO cube in 9.3.1.
    Regards

    Yes you can load data for all levels in an ASO cube in any version HOWEVER, none of the upper level data in any cube will be there when you look for it. You will get a warning message in the load because ASO cubes don't store data at upper levels. It is the same as loading data into dynamic calc members in BSO cube. It will do the load without compalints, but there will be no data there (At least you get the warning in ASO)

  • Report on delivery data in item level for list of po

    Dear all
             How to take Report on delivery data in item level for list of po
    regards
    M.Chandra mohan

    You can check any of the standard reports like ME2M with the selection variant as "PO where GR exists"

Maybe you are looking for

  • Connecting optical out to soud system

    Hello, I am from Germany. I am trying to connect my MacBook Pro via a standard optical cable (I guess its called tosslink) to my Sony Sound system. All other devices I have had before (DVB-S receiver, DVD player) fit perfectly with this cable, but no

  • Thunderbolt Display Extension

    I am re-arranging my office, and moving my computer and monitor setup around. I have an Apple Thunderbolt Display, and the cable is about 3ft too short to get to where I want to put my computer (Mac Pro). I was looking online, and it appears that no

  • Mac OS 9.1 How to connect to the internet

    How do I connect to the Internet with PPP (dial-up access and a modem? What are the procedures. I am using a OS 9.1. Please help.

  • Process Order fields

    Hello I'm basically new to PP-PI and could anyone explain me the process flow. 1.when we create process order what the fields  Total quantity, Delivered and Expected Yield Variance means. 2. should we do confirmation of process order to get in to pro

  • Dynamic Link Premiere and After Effects CS4

    I am new to owning the whole suite, so I did not realize that you could use dynamic link. I figured out that I could import premire projects into AE (without linking) I just imported them and assumed I would create my effects and render out the proje