I am new in sap implementation project.
somebody gives me ideas about requirements gathering in gl & ap in manufacturing industry.thank you
kind regards,
puja desai
Hi,
These are the sap sites its very helpfull to you go through this help.sap.com, deleted
In deleted you will find the total configuration.
Its very helpfull to you,
Regards,
Harinath.K
Similar Messages
-
Role of a Security Consultant in an SAP implementation Project
Hi All,
What is the role of a Security Consultant in an SAP implementation Project and the stages in which he is involved?Hello Mohammed,
The role of a Security consultant in any SAP product implementation (not just GRC) is wide enough and it's hard for anyone to sum up on a single forum post. Still I can give you some pointers.
Security consultants come from different backgrounds, some from networking, database administration, infrastructure and even development like me. They contribute enormously to any product implementation from scratch (landscape design) to go-live (and continuous maintenance) so they are active on every phase of the implementation.
Following are some of the activities they may perform (or participate)
-System Landscape Design (work closely with BASIS and DBAs)
-Check Infrastructure feasibility from security perspective (For Portals exposed to internet or extranet work closely with network providers for firewall security, VPS etc.)
-Propose security guidelines, access policies, disaster recovery plan, business continuity roadmap (work closely with information security consultants and internal auditors or risk management teams)
- Implement SAP solution specific Security measures (involves almost every SAP solution) for example: SAP R/3 security, GRC, BW/BI, HR, FI, Portal security etc.
- participate in application integration for example: LDAP, IDM, SAP UME, shared directories etc (User master records security is on high priority).
- Check for any possible backdoor access vulnerabilities (ex: open RFCs, function modules like ping_rfc), and it involves almost all SAP solutions and there are special procedures to analyze such vulnerabilities.
there are many such activities that a security consultant perform on day to day basis. Please do not interprete the above mentioned activities (entirely) as a criteria for any security consultant profile. There are many many possibilities for a security consultants to work from pen testing to SoD violation remediation. That's why I said it's not easy to sum up security.
Always remember, Security and GRC are two sides of a coin they work together. however GRC is more of a combination of policy, regulation, events and involves management participation whereas security is a purely technical practice.
You may also be interested to know what it takes to become a forensic security specialist. Take a quick look at [http://amudee.com/?p=378|http://amudee.com/?p=378]
Best Regards,
Amol Bharti -
USA Based SAP Implementation Projects
Hi,
I need the details of 5 SAP implementation projects based in USA. I need the details of the following :-
1) Client name (Implemented for)
2) SAP consultancy name (Implemented by)Hi:
Normally, Nobody will give such kind of information.
Projects that are implemented by the comapny are confidentail. When an employee joins a organization, the offer letter clearly states that the employee should not disclose organization details, which will help the competitor company to gain an unfair advantage.
At the time of induction, The Hr clearly specifies not to disclose the project details to even close friends.
My suggest use google and search for infomation.contact your friend circle who can help you out.
Please let me know if you need more information.
Assign points if useful.
Regards
MSReddy
Edited by: Sridhar M on May 7, 2008 10:31 PM -
Does ALE techniques frequently used in SAP Implementation Project
As the title
ALE (Application Linking and Enabling)
ALE Technology is SAPs technology to support distributed yet integrated processes across several SAP systems.
ALE & IDoc
http://www.sapmaterial.com/idoc_sample.html
ALE/ IDOC
http://help.sap.com/saphelp_erp2004/helpdata/en/dc/6b835943d711d1893e0000e8323c4f/content.htm
http://www.sapgenie.com/sapgenie/docs/ale_scenario_development_procedure.doc
http://edocs.bea.com/elink/adapter/r3/userhtm/ale.htm#1008419
http://www.netweaverguru.com/EDI/HTML/IDocBook.htm
http://www.sapgenie.com/sapedi/index.htm
http://www.sappoint.com/abap/ale.pdf
http://www.sappoint.com/abap/ale2.pdf
http://www.sapgenie.com/sapedi/idoc_abap.htm
http://help.sap.com/saphelp_erp2005/helpdata/en/0b/2a60bb507d11d18ee90000e8366fc2/frameset.htm
http://help.sap.com/saphelp_erp2005/helpdata/en/78/217da751ce11d189570000e829fbbd/frameset.htm
http://www.allsaplinks.com/idoc_sample.html
http://www.sappoint.com/abap.html
http://help.sap.com/saphelp_erp2004/helpdata/en/dc/6b835943d711d1893e0000e8323c4f/content.htm
http://www.sapgenie.com/sapgenie/docs/ale_scenario_development_procedure.doc
http://edocs.bea.com/elink/adapter/r3/userhtm/ale.htm#1008419
http://www.netweaverguru.com/EDI/HTML/IDocBook.htm
http://www.sapgenie.com/sapedi/index.htm
http://www.allsaplinks.com/idoc_sample.html
ALE/ IDOC/ XML
http://www.sapgenie.com/sapgenie/docs/ale_scenario_development_procedure.doc
http://www.thespot4sap.com/Articles/SAP_XML_Business_Integration.asp
http://help.sap.com/saphelp_srm30/helpdata/en/72/0fe1385bed2815e10000000a114084/content.htm
IDOC Convertion
/people/kevin.wilson2/blog/2005/12/07/changing-fields-in-an-idoc-segment -
Study business process requirements in sd implementation project?
how to study business process requirements in sd implementation project?
Hi chandu,
I will suggest you first go through the document given below
SAP Implementation is the whole of processes that defines a complete method to implement SAP software in an organization. The SAP implementation method described in this entry is a generic method and not a specific implementation method as such. It is based on best practices and case studies from various literature sources and presents a collection of processes and products that make up a complete implementation method to allow any organization to plan and execute the implementation of SAP (ERP) software.
Concept Definition
CHANGE MANAGEMENT ***Activities involved in (1) defining and installing new values, attitudes, norms, and behaviors within an organization that support new ways of doing work and overcome resistance to change; (2) building consensus among customers and stakeholders on specific changes designed to better meet their needs; and (3) planning, testing, and implementing all aspects of the transition from one organizational structure or business process to another. (www.gao.gov)
CHANGE MANAGEMENT DOCUMENTATION All documentation that is required and being delivered whilst performing change management, e.g. the functional test cases and all the other documents a new end-user of SAP requires and the various tools and approaches used to manage change by the TSO. (Anderson, 2003)
COST OF OWNERSHIP ANALYSIS Determination of where and when the costs are inquired within the context of the SAP solution stack and ongoing operations. The analysis addresses all internal and external costs, both one-time as well as recurring (Anderson, 2003)
CUTOVER The process of transitioning from one system to a new one (Anderson, 2003)
CUTOVER PLAN All documentation related to planning, preparing and executing cutover, describing how to lock down the system from a technical change management perspective, preparing the TSO for its new role and rolling out the SAP graphical user interface to all future end users. (Anderson, 2003)
DATA CENTER A data center is a facility used for housing a large amount of electronic equipment, typically computers and communications equipment. (www.wikipedia.org)
DATA CENTER REQUIREMENT A requirement for the SAP data center, i.e. a physical requirement like power requirements, a rack requirement, a network infrastructure requirement or a requirement to the network server. (Anderson, 2003)
DISASTER RECOVERY (DR) REQUIREMENT Requirement that focuses on downtime that lasts many hours to days or even weeks (Anderson, 2003)
FUNCTIONAL TEST CASE A set of conditions or variables under which a tester will determine if a certain business process works (www.wikipedia.org)
HIGH AVAILABILITY (HA) REQUIREMENT Requirements that describes the amount of time that the system needs to be available to satisfy the needs of the users. (Anderson, 2003)
INSTALLATION DOCUMENTATION All documentation related to the installation of an end-to-end SAP solution (Anderson, 2003)
OPERATIONS MANUAL The collection of current state system documentation, day-to-day and other regularly scheduled operations tasks, various installation and operations checklists and how-to process documents. (Anderson, 2003)
SAP SAP AG is the name of the biggest European software company. The head office is in Walldorf, Germany. SAP was founded in 1972 as Systemanalyse und Programmentwicklung ("Systems Analysis and Product") by five former IBM employees in Mannheim, Germany. (www.wikipedia.org)
SAP IMPLEMENTATION PROJECT PLAN A comprehensive project plan that contains all products that are delivered whilst performing an SAP implementation project (Anderson, 2003)
SOLUTION STACK Set of software subsystems or components needed to deliver a fully functional solution, e.g. a product or service. (www.wikipedia.org)
SOLUTION STACK PARTNERS LIST A list of all vendors that deliver the products that make up the SAP solution stack (Anderson, 2003)
SOLUTION VISION A vision of the future-state of the SAP solution (Anderson, 2003)
STRESS TEST PLAN A test plan that is focused at determining the stability of a given system or entity. It involves testing beyond normal operational capacity, often to a breaking point, in order to observe the results. (www.wikipedia.org)
TEST PLAN A detail of how the test will proceed, who will do the testing, what will be tested, in how much time the test will take place, and to what quality level the test will be performed. (IEEE 829)
TRAINING The acquisition of knowledge, skills, and attitudes as a result of the teaching of vocational or practical skills and knowledge that relates to specific useful skills (www.wikipedia.org)
TRAINING PLAN Consisting of training units, a training plan is the result of hierarchical decompositions of a training goal, tailored according to the learning preferences and prior knowledge of the trainee. A plan is the means by which the trainee satisfies the goal. (www.ece.eps.hw.ac.uk/)
TSO Technical Support Organization. The people that are committed to implementation and management of SAP. (Anderson, 2003)
TSO CHART A chart that depicts the structure of the TSO. (Anderson, 2003)
Activity Sub-Activity Description
Project preparation Craft solution vision Refine and communicate a SOLUTION VISION of the future-state of the SAP solution, to sketch a design that meets both business and financial requirements. The focus should be on the companyu2019s core business and how the SAP solution will better enable that core business to be successful.
Design and initially staff the SAP TSO Design and staff the key positions of the SAP Technical Support Organization (TSO), the organization that is charged with addressing, designing, implementing and supporting the SAP solution.
Sizing and blueprinting Perform cost of ownership analysis Perform a COST OF OWNERSHIP ANALYSIS to determine how to get the best business solution for the least money i.e. to determine where and when the costs are incurred within the context of the SAP solution stack.
Identify high availability and disaster recovery requirements Determine all HIGH AVAILABILITY and DISASTER RECOVERY REQUIREMENTS, to plan what to do with later downtime of the SAP system
Engage SAP solution stack vendors Select the best SAP hardware and software technology partners for all layers and components of the SAP SOLUTION STACK, based on a side-by-side sizing comparison
Staff TSO Staff the bulk of the TSO, i.e. fill the positions that directly support the near-term objectives of the implementation, which are to develop and begin installation/implementation of the SAP data center.
Execute training Train the various members of the SAP TSO, like data center specialists, high availability specialist and network specialists and train the end-users to give all the required SAP knowledge and skills
Setup SAP DATA CENTER Build a new SAP DATA CENTER facility or transform the current data center into a foundation capable of supporting the SAP SOLUTION STACK
Perform installations Install the (My)SAP components and technological foundations like a web application server or enterprise portal.
Round out support for SAP Identify and staff the remaining TSO roles, e.g. roles that relate to help desk work and other such support providing work.
SAP functional development Address Change Management Develop a planned approach to the changes in the organization. The objective is to maximize the collective efforts of all people involved in the change and minimize the risk of failure of implementing the changes related to the SAP implementation.
Address SAP systems and operations management Create a foundation for the SAP systems management and SAP computer operations, by creating a SAP OPERATIONS MANUAL and by evaluating SAP management applications.
Perform functional, integration and regression tests Test the SAP business processes, by executing functional tests to ensure that business processes work, integration tests to ensure that the organizationu2019s business processes work together with other business processes and regression tests to prove that a specific set of data and processes yield consistent and repeatable results.
Final Preparation Perform systems and stress tests Plan, script, execute and monitor SAP STRESS TESTS, to see if the expectations of the end users, defined in service level agreements, will be met.
Prepare for cutover Plan, prepare and execute the CUTOVER, by creating a CUTOVER PLAN that describes all cutover tasks that have to be performed before the actual go-live
Go Live Turn on the SAP system for the end-users
Hope this will help.
Reward Point if helpful.
Thanks,
Raja -
Steps and documentation help in SAP implementation
Hi Experts,
I need some documents and documentation help.i have never worked in SAP implementation projects.
So,any body knows the steps and documentation when implementing SAP.
please,tell me details and example documents with steps.and tell me the difference between support and implementation.What we will do extrain implementation.
As a ABAP programmer what can i fill in se38 documentation.
Please tell me.
It'll be very helpful to me.
Thanks in advance.
Regards,
NandhaAny SAP R/3 implementation is a big effort which is done by a team of experts from different backgrounds, not by an individual. So if you are going to be on a project as technical person, in all probability you will join the team as a member of the technical team during the implementation phase. By this time, the blueprint and design phases would have been almost complete and some standards and procedures with regards to documentation, coding, transports and migration accross systems will have been established.
A team lead will brief you all the requirements of the project as far as documentation standards are concerned and migration of the objects, testing procedures etc. You don't have to worry about that. This will be specific to the project, so you cannot generalize it and apply it to every project.
Now the difference between a new implementation and support is that the first one is new one which goes through the phases of blueprinting, design, implementation, testing and go-live. The support phase comes after go-live. You will just be supporting the production system, in that you will be fixing any bugs in the existing programs or change some existing programs to add some more logic or remove some logic, or write new reports or programs as per the users' request.
Srinivas -
Roles & Responsibilities of a Basis consultant in an SAP implementation
Hi All,
What are the Roles & Responsibilities of a Basis consultant before/during/after an SAP implementation project?
Please list all of them separately.
Regards,
Nivas1. 1. Perform User administration and role/profile assignment.
2. 2. Perform Role Creation, Modification and Full trouble shooting support for the users authorization failures in all SAP applications and resolving the Security issues and support in integration testing of Roles/Profiles.
3. 3. Maintain the integrity of the SAP environment by managing the SAP Correction and Transport System (CTS) to ensure all configuration and development objects are promoted properly.
4. 4. Distribute the online SAP user workload and monitor and manage the SAP background job workload.
5. 5. Perform OSS / SAP Service Marketplace: Searching notes & creating OSS messages for the respective queries to improve the Performance. And software download, Maintain System Data, License Key & Maintenance Certificate, Developer & object registrations and connection maintenance etc.
6. Starting and Stopping SAP instance/(s).
7. 6. Preventive Maintenance activities - Support Pack/Plug-in implementations, Kernel upgrades, OSS note applications and to apply support pack for Java using JSPM.
8. 7. SAPGUI/SAPLGPAD troubleshooting and maintenance/upgrades/installations.
9. 8. Prepare and maintain system documentation, procedures, and standards.
10. 9. Perform SAP Database Administration – Space management, database reorganizations, design and implement backup and restore strategy, maintain database security, administer database performance, database problem determination and resolution, etc.
11. 10. Perform SAP Installation, Post installation, client administration, System Refresh and Post-Refresh activities as required.
12. 11. Perform parameter modification, Buffer, memory management, performance tuning and troubleshoot.
13. 12. Perform SAP Licensing – Indentify inactive user, user classification and prepare System Measurement result for SAP Global Audit team. -
Tasks/activities of a Basis consultant during SAP implementation
Hi,
Could someone share the list of tasks/activities of a Basis resource to handle during an SAP Implementation project.
Thanks in advance,
SrinivasHI,
i think these are the simplest Basis activities in an sap implementation.
1. Preapration of the Landscape of the systems
2. Connectivities btw. different systems like SAP R/3 - BW and so on
3. Transport Administation i.e TP creation, release, importing to QA - PRD and so
4. configuration of RFCs and TRFCs if needed
5. Config. of Data Transmissions
6. Config. of IDOCs and Message Types
7. Cutover plan preparation for the Go-Live
8. System back ups and Logs Maintanance
9. Installation of all required Patches and Notes
10. system down time estimatations and planning
Rgds
Radhakrishna D S -
Preparation beforehand SAP implementation
Hello Gurus, I'm an OCP in developer track. I look after the customized software of one of the production unit of a big company. Our company runs SAP in other production units and corporate. In a recent move, management decided to bring this unit under SAP and implementation will start by a month. It is also decided that I will get functional role in the project. Now how can I be prepared myself earlier than the implementation starts. Please looking for your expert advice...
Dear Mr. Md. Iqbal,
In my view, you may do some of the tasks mentioned under as per your role in the project:
1) Start building team consisting of IT and functional persons. Functional persons must be champion in their area. these team members should be full time dedicated to the project-take commitment from higher management on this.
2) Inform the functional team to start preparing their processes with flow charts.
3) Get demo of SAP running at other production unit so that your functional team members can start thinking of mapping their processes in SAP.
4) Start learning ABAP if you are going to be ABAPer OR start understanding business processes slowly and gradually. Material management (purchase, warehouse) would be most important part to start with. You may get into other processes as per your area of interest and background.
Most IMP : find out project owner and project manager at your location for this project.
Documentation may seem boring but it will help in longer run so if possible, try to document each and every task, meeting, requirement, commitments from implementation partner, etc. Signing on the document is equally important.
If you are going to be project manager or similar to that, ERP Demystified by Alex, SAP Project Management by Joy Ghosh and many other books may help you further.
God bless you and your company grand success in the SAP implementation project. -
Searching for SAP certified project manager for project
Please post a response if you know someone who has a BS or BA degree and has:
General SAP Functional Knowledge and Experience
8 - 10 years of previous experience as
an SAP Project Manager with SAP, an SAP Partner, or large companies doing SAP
implementation projects.
A minimum of 5 full lifecycle
implementations of SAP in a Project Manager role.
Would prefer a candidate that is an SAP
Certified Associate Project Manager, or have some other type of Project
Management certification combined with significant SAP project and implementation
experience on a number of different SAP implementation projects at different
customers and in different industries.
Candidate should be certified in the
use of SAP Solution Manager.
Candidate should be certified in the
use of ASAP Methodology.
Candidate should be willing to provide
two professional references.
Required SAP Functional Knowledge and
Experience Specifically for this Project:
SAP Solution Manager
Solution Manager Implementation
(SMI210)
Implementation Projects with SAP
Solution Manager (SMI310)
ASAP 8.0 Methodology for Implementation
(ASA380)Hi,
this might help you
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40fde890-0201-0010-fa86-ee9a507bc62e
Regards
Agasthuri Doss -
SAP CRM Implementation Project - Phases/Stages
Hi all
I am very new to this Area !
I would like to know different Phases/Stages in the SAP CRM Implementation Project !
Regards
RJRemo,
I believe every SAP CRM Implementation project would follow the ASAP methodology which is as follows:
Phase1: Project Preparation
The system landscape is set up, consultants are assigned. Project charter is created etc.
Phase2: Business Blueprint
The implementation consultants do a study of the clients business and learn how the processes/ cycles involved thru discussions, workshops etc
This is documented as an AS-IS document.
The clients business processes are then mapped on to SAP by the consultants.
This is documented as the TO-BE document
Gap Analysis is performed to identify any gaps between the AS-IS and TO-BE documents. i.e. something that the client wants but cannot be met thru SAP CRM. Then enhancements etc come into picture.
Phase3: Realization
The system is configured as per the TO-BE document. And the client is given for testing.
Phase4: Preparation for Go-LIve
Once the client confirms all the unit and integration tests, the master data needs to be uploaded. Other system checks by basis and SAP itself are performed.
Phase5: Go live and support
The project goes live and the consultants give a month's of hypercare or support.
Hope this is wat you were expecting.
Regards,
Julius
P.S: Reward if it helps. -
Can any one explain about the SAP Testing process in Implementation Project
Can any one explain about the SAP Testing process to be carried out by BW Consultant in an Implementation Project which is in Testing Phase..
hi bharat,
Two types of testing is possible in bw
unit testing
integration testing
Integration testing - It is the phase of software testing in which individual software modules are combined and tested as a group. It follows unit testing and precedes system testing.
Integration testing takes as its input modules that have been checked out by unit testing, groups them in larger aggregates, applies tests defined in an Integration test plan to those aggregates, and delivers as its output the integrated system ready for system testing.
Unit testing - One part or the whole part of transfer rules , update rules, etc..
Integration testing - The whole data flow cycle to be tested
This link will give u detailed description
http://en.wikipedia.org/wiki/Software_testing
Stress testing in BI..
/people/mike.curl/blog/2006/12/05/how-to-stress-test-bw-the-easy-way
REFER THIS REG CATT
http://help.sap.com/saphelp_erp2005/helpdata/en/d7/e21221408e11d1896b0000e8322d00/frameset.htm
Check this doc on Unit Testing
unit testing
Look at the threads below :
Testing Methods in BW
Unit Testing in BW
How to do testing in BW
Hi...BW testing
Re: Hi...BW testing
Hi...BW testing
Pls refer following links...
http://help.sap.com/saphelp_nw04/helpdata/en/d7/e210c8408e11d1896b0000e8322d00/frameset.htm
http://help.sap.com/saphelp_nw04/helpdata/en/3c/aba235413911d1893d0000e8323c4f/frameset.htm
http://help.sap.com/saphelp_nw04/helpdata/en/d7/e2123b408e11d1896b0000e8322d00/frameset.htm
http://help.sap.com/saphelp_nw04/helpdata/en/d7/e2123b408e11d1896b0000e8322d00/frameset.htm
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/721d6a73-0901-0010-47b3-9756a0a7ff51
https://service.sap.com/upgrade-bw
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/7dc0cc90-0201-0010-4fa7-d557f2bd65ef .
https://websmp204.sap-ag.de/~sapdownload/011000358700009385902004E
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/67acb63d-0401-0010-b685-b1b87dd78892
Hope it helps you!
****Assign Points If Helpful****
Regards,
yunus -
SAP CRM Projects Implemented or Done in India Required Urgent and Important
hi, friends and experts
I wish u could send me SAP CRM Projects done in india with information including, Clients Name Operations, Duration and Location as soon as possible. Its urgent and important. Pls send the details.
thanking you
with regards
PRAVEENThere are several potemtial root causes.
+ NetWeaver Mobile/DOE is not setup
+ DOE -> CRM should be Trusted RFC
+ CRM application user ID should be in DOE -
Hello All,
I have a chance to work in an implementation project based at sing pore.
The question is as a SD Consultant is there anything I've to keep in mind for Singapore country local requirements? and what type of tax they are using.
thanking you
raj
Edited by: raj rajan on Dec 3, 2008 9:15 AMHi there,
Every country will have country specific export / central sales tax. Apart from that remaining taxses & disocunts is client dependent.
To understand that further, you will come to know about all the required condition types during the scoping / BRD discussion. You can also have a dicsussion with the concerned person from the business who overlooks the taxes / discounts. Only then you will come to know about the condition types required.
Regards,
Sivanand -
How to connect Template project and Implementation project
Hi Experts,
I would like to know how to connect Template project and Implementation project
in Solution maneger. Please help.
Best regards,
GaitoHey Gaito,
great. Now that you have a template project, you need to create one or more templates within the project template.
Go to tab Templates (of your Templ Proj) and activate 'Global Rollout Functionnality' to be able to use the templates.
Create a new template thanks to button create. Visibility will be set to red 'private'. You ll have to set it to visible so it becomes visible from your implementation project.
You ll see when trying to do that next message 'No scenarios/configuration structures assigned to the template XXXX'. That means that in SOLAR01 you did not define a scenario that ll be used in template you re trying to create
In order to do that go to SOLAR01 for template project, select/create scenarios in tab structure and set in column template value of your template (the one you re creating in SOLAR_PROJECT_ADMIN) and in Global Attribute set value t Global
You l definitely find more info on this in sap document SMI310 (course). I don t know if you can find it on internet
Hope this helps
Regards
Khalil
Maybe you are looking for
-
9i report services need info. on CGI and RWSERVLET
We are trying to use the reports 9i against forms 6i. I need to info. on how we can differentiate the two types of service(whether it is CGI or rwservlet). Setup1: 1. Run rwserver -install server=TESTCGI 2. This creates the service and the testcgi.co
-
IPod won't sync any of my purchased mucic
After restoring my iPod to factory settings it is not syncing any purchased music I have lost everything. Ant ideas? Thanks
-
Messages on Yosemite quit syncing
Hello, I have been using Messages on OSX for a while now, but all of a sudden yesterday it quit working. I will skip through a bunch of troubleshooting. I found that I can create a new user account and Messages works fine in the new account. Therefor
-
When I sync my photos from Itunes to my Iphone 4 there isn't any photos under the Photos app. Pictures are in camera roll under the Camera app. How do I get them to show up in the albums section of the Photos app?
-
When I click on the FF setup icon on my desktop, I only get as far as being able to select "Standard" or "Cutsom" Setup then a box pops up saying "Your computer must be restarted" and everything. I've Have tried restarting my computer SERVERAL times,