I m doing operation subcontracting  . i that i m converting planned order

dear sir
i m doing operation subcontracting  . i that i m converting planned order into prod order . i m facing error like Error or warning occurred during master data  transfer (see ). plz explain whole opration sub contracting step by step

Dear,
Procedure
1. Create Purchase Info Record using T code ME11.(Vendor & material combination) for subcontracting.
2. While creating routing for that header material and defining operation, For the
10 to 40th operation for which outsourcing is given set the control key as
PP02.After entering the control key as PP02 ,press enter -the system asks you
for the purchasing info record no & check the tick mark for Sub-contracting. Here
give the number which u obtained while using T code ME11.
4) The moment you release the order system will create the PR for all external processing operations.
5) That material you can transfer to your subcontracting vendor by ME2O or you can post transfer posting.
6) In transfer posting you need to mention as a reference of Subcontracting PO, which you have already converted from SubPR.
7) In that transfer posting, system will automaticaly generate 541Mtyp.
8) You need to create SubCon Challan (J1IF01), for the material which you are sending outside of your plant.
9) You need to mention that material doc number in creating challan.
10) The same challan will be reconcilled after receipt of the material thru simple MIGO process.
11) Your challan should get reconcilled by J1IFQ. It will remove the stock from supplier end from your system.
Regards,
R.Brahmankar

Similar Messages

  • Dump "Message X" when converting plan.order in APO (Operation classified)

    Hello,
    We are using master recipes. One operation is classified with work center class type 019 assigned. Operation is classified with two values so I get two alternative modes in APO PDS.
    I can drag and drop between alternative modes in the Planning Board, and then save so I can see the mode change also in the order processing view for example.
    However when I am triggering the conversion of planned to process in APO then order is never converted. An error queue appears in the qRFC inbound monitor in ERP stating that a short dump has occurred
    Short dump "MESSAGE TYPE X" Information on where terminated
    Termination occurred in the ABAP program "SAPMSSY0" - in "%_ORDER_FORM_LEVEL". The main program was "SAPMSSY1 ".
    Thanks in advance
    Carlos

    Hello Carlos,
    Have you updated alternative resources  with the values in the user fields of the operation. ?
    Also assign the work center class for the operation (same class which you have assigned for the work centers)
    Best Regards,
    Roopesh
    Edited by: Roopesh Menon on Feb 17, 2011 9:55 AM

  • Externally processed operation and planned order

    Hello experts,
    When an operation is defined as externally processed, once the production order (from a planned order generated via MRP) is created, the purchase requisition for that operation is automatically generated. My question is if it is possible to generate the purchase requisition before generating the production order, I mean, with the planned order.
    Although this external operation is defined in the routing, the planned order does not show it and it means that the purchase requisition is not generated.
    In our scenario we want to convert the production orders as late as possible to have automatic changes in BOM, but if we do not convert the planned orders to production orders, we won’t have this purchase requisitions.
    Is there any way to solve this?
    Regards

    Hi Laura
    No, it's not possible to generate the purchase requisition for an externally processed operation before the creation of the production order. The planned order routing is only exploded for scheduling and capacity requirements calculation and an operation is not actually created.
    As an alternative, you can create a separated material number and assign the special procurement 30 for subcontracting to this material. If you add this component to the BOM of the parent material, MRP will directly generate a purchase requisition for subcontracting.
    BR
    Caetano

  • Conversion of planned order into subcontracting order

    Hello Gurus,
    my problem concerns a subcontracted material.
    This material may be produced internally (managed with production order) OR produced externally (managed with subcontracting order) depending on the available capacity of the production line.
    For this material MRP must generate planned orders, so the planner can choose either to produce either to subcontract.
    The planned order is then converted manually into production order or into purchase request.
    With procurement type = X, it is possible to do so. However when I convert my planned order into purchase request, my item category is NOT automatically set up to L.
    So I have to enter the item category manually even if I have only one purchasing info record (with record category = 3).
    Do you think it is possible to create automatically a "subcontracting request" from the planned order ?
    Many thanks for your help
    regards
    Amaury

    Hello,
    I am afraid that when I enter procurement type=X & special procurement=30 in material master data, planned orders created by MRP have then a order type = NB (standard purchase order) and special produrement type = 3 (subcontracting).
    So this kind of planned orders can only be converted into purchase request and NOT into production order.
    It looks like it is not standard to do so in SAP and that I will have to manage subcontracting in prodution order; 1 routing for internal operation and 1 routing for subcontracting.
    Thanks
    Amaury

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • How to have a default generated operation in a Planned Order

    Dear Sir,
    We execute MRP run to generate dependent Planned Orders for a FERT having multi-level BOM . In the BOM there may be few components against which the Routing has not been defined .
    So we desire that generated Planned Order should have a default operation against those components which have no routing available .
    Kindly guide us as how can we achive the same .
    With Thanks & Rgds
    B Mittal

    Dear Mittal ,
    I will be interted to know about your material structure based on the BOM Level :
    For an exmaple : FERT-HALB-RAW .There may be as many HALAB , RAW as per your business process.
    For any FERT/HALB if this has to be produced in-house , generally , it should have valid BOM as well valid routing with sequence of operation and BOM compoenet assinged to those operation because , when you will run MRP-MD02 , it will generate Planned Order for both and subsequncelt it will allow you to convert the planned Order to Production Order .In case , routing is missing or BOM is mssing , while converting planned order to PO ( FERT/HALB) , it will flag you exception masg and ask you to create the same before proceed farther  or you can generate Operation based on the Option refelected while productioin order conversion .
    we desire that generated Planned Order should have a default operation against those components which have no routing available -As you stated , if there is no routing avaliable for those component ( must be HALB /FERT) , there will not be any Routing copied to Planned Order in Master Data Tab  when running MRP in MD02.Basically  , in your case , Planned Order of FERT will be having routing with operation where as Planned Order for BOM compoenet which are HALB  , will not be having any routing master data .U have generate operation or create routing beofre conversion of production order .
    Hope it is clear
    Regards
    JH

  • HT201412 My ipad has a software problem and does not work, request that it is loaded the software and there is no way that the operating system loads, is not restored. WHAT SHOULD I DO?

    My ipad has a software problem and does not work, request that it is loaded the software and there is no way that the operating system loads, is not restored. WHAT SHOULD I DO?

    This is an iPad user to user forum, so you are not addressing Apple. Depending on how many user helpers are on-line, it may take several hours, or longer, to get a response.
    Try this  - Reset the iPad by holding down on the Sleep and Home buttons at the same time for about 10-15 seconds until the Apple Logo appears - ignore the red slider - let go of the buttons. (This is equivalent to rebooting your computer.) No data/files will be erased.
    Frozen or unresponsive iPad
    Resolve these most common issues:
        •    Display remains black or blank
        •    Touch screen not responding
        •    Application unexpectedly closes or freezes
    http://www.apple.com/support/ipad/assistant/ipad/
    iPad Frozen, not responding, how to fix
    http://appletoolbox.com/2012/07/ipad-frozen-not-responding-how-to-fix/
    iPad Frozen? How to Force Quit an App, Reset or Restart Your iPad
    http://ipadacademy.com/2010/11/ipad-frozen-how-to-force-quit-an-app-reset-or-res tart-your-ipad
    Black or Blank Screen on iPad or iPhone
    http://appletoolbox.com/2012/10/black-or-blank-screen-on-ipad-or-iphone/
    What to Do When Your iPad Won't Turn On
    http://ipad.about.com/od/iPad_Troubleshooting/ss/What-To-Do-When-Your-Ipad-Wo-No t-Turn-On.htm
    iOS: Not responding or does not turn on
    http://support.apple.com/kb/TS3281
    Home button not working or unresponsive, fix
    http://appletoolbox.com/2013/04/home-button-not-working-or-unresponsive-fix/
    Fixing an iPad Home Button
    http://tinyurl.com/om6rd6u
    iPad: Basic troubleshooting
    http://support.apple.com/kb/TS3274
     Cheers, Tom

  • PR to PO conversion in operation subcontracting

    Dear friends,
    We are trying this scenario of operation subcontracting.
    I have a semi - finish material SM01 on which i m carrying 5 operations. The 20th operation is sub contracting. I do not want to maintain a separate material for this operation.  I have done all the necessary settings which are required. I m also getting a PR when a Production order is generated for operation 20.
    Now the problem is when i go to convert this PR to PO in ME58 the system gives me an error, "Not possible to determine any components".
    I do not understand where i have gone wrong.
    The PR document type that is created is NB.
    The PO does not take any material even if I try to maintain one.
    What can be the possible solution.
    Thanking all you for your kind assistance.

    Hi pankaj
    The concept is like that. You need to send a material out with gate pass to the vendor for that particular P.O.
    You might have issued the material from stock for the previous operation so that you will not have a component for that operation. There may be two options.
    Options 1) Create a dummy material with MRP type ND so that the planning will not happen and no plan order. keep stock through a movement type update. Allocate this component to the operation in your routing. If the external operations is pre defined.
    Option 2 )  Create a dummy material with MRP type ND so that the planning will not happen and no plan order. keep stock through a movement type update. Include this component in P.O while converting from PR. If the external operations is not pre  defined.
    The component will now appear in ME 2O
    Hope this is clear
    Regards
    J . Saravan

  • IST OPERATION SUBCONTRACTED WITH REFERENCE TO ORDER

    Hello SAP Experts,
    i am doing operation subcontractiing. My first operation is subcontracted. So, I have assigned PP02 control key to first operation  and maintained external processing data for opration in routing. When i saved the order, for that operation PR gets generated.
    Now, I converted PR into PO and assigned raw material that has to be send to vendor. By 541 mvt. type material is issued to vendor. When i do goods receipt in MIGO, system is not showing storage location field. I dont find material in stock anywhere.
    But i can see quantity received in external processing tab of first operation in routing overveiw in order.HERE P.O is generated with reference to order.& it is in cost center.while confirming the second operation system will ask for storage location of material received from vendor.it ie not seen in mmbe.iam creating new code and it is assigned to second operation .
    Then how can i issue the material from storage for second operation if it is not in stock?
    How can i get stock of subcontracted material by MIGO?
    Please help me.
    regards,
    RAHUL

    Hi!,
    When you say operation subcontracting, in SAP it is considered as a service you are recieving and hence there is no material movement involved in that because you are sending a WIP material and recieving a WIP material back. But as per indian requirements whenever a material is sent out side the factory premises, you need to send a challan alongwith that. To print a challan you need to have a material movement. This movement (541) happens in normal material subcontracting but not in operation subcontracting. To generate a material doc, you can send the raw material with 541 movement but on GR of the processed material just reverse that movement so that raw material will again come in the stock. Then issue that raw material on order with 261 movement.
    I hope this will help in resolving your problem.
    Regards,
    Uday

  • Operational subcontracting scenario

    We have a requirement in operation subcontracting.
    In our production process some of the routing operations we are doing outside (external procurement). But the customer doesnu2019t want to create a Purchase Order for this process (each subcontracting requires a order and release). Since the number of operation level of subcontracting is more per day and they have contract with the subcontractor for the price for a year. Further they will send the order quantity by different schedule
    Please suggest for the above situation which process we need to follow and what are all the master data requirement and the transaction data requirement in a frequent manner.
    Regards
    Sridharan

    Create a  Contract and then create a Subcontracting PO  with reference to contract ( for a year )and assign the Component to be sent( Mostly  Dummy Material)
    And give the material description Similar to subcontractiong process.
    & IN OPL8, Production order dependent parameter : Set The dependent reqmt/.reservation - Never,  in General valid setting tab, this will restrict to create a PR while releasing Production order.
    and follow the same process as per the existing process.
    Note: IF you go to scheduling agreement for subcontracting You can't able to assign the component.
    Edited by: Sundaresan . E. V on Oct 5, 2010 11:29 AM

  • Operation SubContracting

    Hi Folks,
       We use Operation Subcontracting ( sending A & getting A back with some marking / coating ect ) PO (doc typ POIN ) without item cat L but with A/c assignement cat F against prod ord  followed by MIGO -->103 , 104 if scrapping , 105 to receive the high-quality serviced items back. 
    Item in the PO doesnt contain any material only Mat group "Sublet Mach & Fab"..
    Now today MIGO threw  error "Part1 will not be done: TH BLANKS FOR BLACKENING -M/S MIKRON TOO does not exist Material Chapter ID table .....with E (Error) Message class 4F (Message class for India localization) Message number 167 "  , while doing 105 unusually.
    But if we receive the same with MB01 , it goes through without any error  !!!! 
    What could go wrong in the process ?  Any pointers would be highly appreciated....
    Out of curiosity ,,,cant we achieve the same with Normal SubContracting ??  ...we are on a Support & Maint environment & above was set up by else...
    Regards
    Jamna

    Hello,
    If Material and chapter Id is not maintained in J1ID , then system will issue given error in MIGO.
    You your creating Std PO for Sub vendor and receiving the goods , this means the perticular vendor can send material you,
    Check "Exception Material excise rate " in J1ID,
    maintain Plant , Blank material and Vendor in J1ID  and check the process.
    Regards
    Mahesh Naik.

  • How to map operation subcontracting in a process order.

    Dear Gurus,
    How to map operation subcontracting in a process order.
    there are five operations in a process after three operations the material is send to a subcontract for further processing(i.e the fourth) then it comes to the plant and the fifth operations completed
    How can i map this process .
    Thanking you in advance
    Regards
    Ram

    Hi,
    have you tried external operations in  receipe.  There you need to maintain all the procurement realted data for that particular operations that is done outside,  and system creates PR for every process order that you release.  However the material goes and comes in without any material number  (as WIP).
    If you want to have more control,  create a part number before SC operations  and afer SCoperations   and then use subcontracting process in procurement. 
    The need determines which option you can go with.
    cheers
    Rav

  • Operation subcontracting in REM

    Hi Experts,
    Can we map operation subcontracting in REM.  please help me out in mapping this as i know that we cant do in REM, But client is asking to do that.
    I m working with MTS REM. Please help.
    Regards
    Kumar

    Hi,
    Check the following :
    1. REM profile in Material master MRP4 view.
    2. Control key in the routing/rate routing.
    Both must match i.e if U have specified reporting point in the REM profile & not done so in the control key or vice versa, this error will appear.
    The milestone is defined in the control key in the routing. Go to the operations tab in routing. Click on the control key field. U will find a host of std control keys.
    Click on any std. control key say PP01.
    Click on "detailed information".
    In that U will see a field "confirmation". There U will find '1' - Milestone confirmation. This is another name for reporting point confirmation.
    U must specify this 1 in Ur control key.
    U can choose any of the std. keys or otherwise, create Ur own control key.
    Please check and confirm.
    Thanks and Regards
    Binoj M D

  • Operation subcontracting (one operation outside scenario)

    Hi
    I am desperately looking for an answer to this scenario regarding operation subcontracting one operation outside, how will be the BOM, Work center, Routing pl provide docs pdf.
    Thanks in advance

    Please follow below.
    1. In Routing assign PP02 control key for second operation.
    2. It will create PR while order release.
    3.Create PO for wrt PR with item cat " L"and do Component Posting to vendor wrt PO(MB1B-541)
    4.DO GR for that PO movement 101
    5.AT the time of GR 543 movement will be done and stock will be consumed from Vendor end( IN SAP it will reduce from stock provided to vendor in MMBE).
    6. If Components which you are sending outside are excisable then you required CIN consultant also, check below steps(It can be without payment of duty and full payment of Duty).
    check below transactions
    7. Creation of Subcontracting Challan w.r.t. Transfer Posting Doc ()
    8. - Reconciliation of Subcontracting Challan (J1IFQ)
    9. - Completion of Subcontracting Challan (J1IF13).
    10.- Generation of Annexure IV (J1IFR)
    Thanks
    Neeraj Dixit

  • When attempting to add an event to my calendar and I press "done," I receive a message that reads "Cannot Save Event." "That event does not belong to that event store." What can I do remedy this issue?

    When attempting to add an event to my calendar and I press "Done," I receive a message that reads "Cannot Save Event," "That event does not belong to that event store." How do I remedy this problem so I can add events and appointments to my calendar?

    i am having the exact same problem, same messages (no end date set; cannot save; no calendar set; event does not belong to that event store."
    it is unbelievable to me that this issue existed so long ago and hasn't been fixed. I just bought my first apple product (iphone4s) and am ready to toss it. Despite hours of searching on these forums I have been unable to find out how to fix my calendar. I have rebooted, adjusted settings to no avail. without a calendar, i can't use this product. Also, i am not technologically brilliant and can't handle the advanced fixes that some people recommend.
    question, is apple a product for the ignorant like me? or should i go back to nuts and bolts pc?
    all i really want is to be able to use the calendar without "uploading, reprogramming, contacting support offices for 3 hours, contacting network administrators, upgrading, switching fonts, changing operating systems.... etc. " I am just a regular person who needs a portable calendar.
    sorry to vent, but can anybody tell me (in simple terms) how to get my calendar to accept a simple apointment?
    thank you.