Ici in mrp4 view

My understanding is that by setting 2 in ICI of mrp4 view, it will combine the all pru2019s or planned orders of that particular material and generates single procurement proposal. My doubt is that if the date of procurement is different, then what system will do? I mean if procurement date of one sales order requirement is 20.01.10 and other is 25.01.10, then how system behaves? Will it generate two pru2019s or single pru2019s? what is the reference for system to decide so? Please advice.

Hi,
This will be controlled through your lot sizing procedure. If there are two sales orders which have a common component as A and you have two different delivery dates for them then when you run the MRP system will be have as follows,
1) create 2 PR's/PO of the delivery date for both of them are different and you use EX in Lot sizing
2) If you use daily/weekly/monthly lot sizing then system will generate the cumulative requirement based on the delivery dates.
Regards,
Zoheb Hasan

Similar Messages

  • Follow-Up material items in MRP4 View

    Hi All,
    In MRP4 view, in discontinued part, if we set follow-up material, MRP will trigger requests for the follow –up material if the stock of existing material is zero.
    Now there is a requirement, so that even though follow-up material is updated, system should be trigger any requirement for the existing one, though the stock is zero, ie, the follow up material is only for an information .
    Is it possible ? can we do it with  changing the effectively of date in eff.out (set it as future unlimited)
    Thanks for the help.
    Regards,
      Vijesh

    Pls help.

  • BAPI/Function module for production version tab data of  MRP4 view(MM01).

    Hi,
    I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    Thanks.
    Edited by: sanu debu on May 6, 2009 3:24 PM

    >
    sanu debu wrote:
    > Hi,
    > I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    >
    > Thanks.
    >
    > Edited by: sanu debu on May 6, 2009 3:24 PM
    BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA

  • MRP4 view exclude storage location & material provided by vendor/customer..

    Hi
    Could anyone please tell me in MRP4 view for a material,where is the option so that i can exclude or include the storage location stock from MRP?
    and also in which T code i should indicate the material is provided by vendor/material provided by customer?In CS01wher's this option?
    Please help me
    Thanks & regards
    Raj

    Hi Karthik,
    MRP area is nothing to do with storage locations settings in MRP4 view. If you want to activate MRP area and use the MRP run at MRP area level then you have to customized MRP area either at storage location level or sub-contractor level (in MRP master data settings )... then you need to assign this MRP1 view of the material and with valid MRP type.  Now when you run the MRP then planning will be carried out at this MRP area for this part.
    With storage location indicators in MRP4 view (must enter with putting the stoarge location values from MM02/MM03) you can exclude the stock of this storage location (indicator 1) in the palnning run or you can plan seperately with indicator2 with using re-order level. Here no need of MRP area.
    If helps rewards points.
    Regards
    TAJUDDIN

  • Average plant stock in MRP4 view

    Hi all
    We are using long term planning and want to change Average plant stock in MRP4 view.
    Also we are implementation MDG. Now we cannot use MM02 and we have to follow change process to change anything in material master.
    Is there is âny way to change  calculated average plant stock  shown  in MRP4 view. ? 

    Hi.
    I can use MS29 to calculate the average stock. The average stock could be used ad initial  stock on LTP scenario.
    Than you can update it by material, if requested, directly from MM02.
    Regards.

  • Enable Storeage Location MRP settings in MRP4 View

    Hi Experts,
    I need your help very urgent!
    How can I enable the Storage Location MRP settings in MRP4 View?
    I think it should be somewhere in the spro.
    Thank you for your help!
    Artashes

    Hi Everyone.
    Acutally <b>MMSC </b>transaction helped me!
    I was unable to see the mentioned settings in <b>MM02</b>, even if I was specifying a SLOC.
    I already did <b>SPRO ->MRP->Planning->Define Storage Location MRP per Plant</b>  , but it will affect only materials created after the changinh.
    Thanks everyone for answer!

  • MRP4 View: Significance of Individual/Collective indicator

    Hi,
    Ref : MRP 4 view , Field : "Individual/Coll."
    Request to give the significance of the above field.
    I am not able to understand the help data available for the filed in SAP.
    If possible request to give example to elaborate the significance
    Regards
    Nitin

    Hi,
    This indicator is useful in case of sales order planning.
    If u enter 2, in collective/individual for component, then in component stock requirement list u can see there is no reference to sales order.
    That is commom stock will be consider by system.
    If u enter indicator 1 or no entry, in MTO after creation of sales order, for component sales order stock will be created. U can see the sales order in component stock requirement list. The common stock of component will not consider the common stock. Pr will be generated for the component/ For this situation u have to transfer common stock material to sales order stock.It depends of the requirement of company. Where to check common stock or sales order stock.
    Check the above & reward if found suitable.
    Regards,
    Suhas

  • MRP4 view in Material Master

    Hi,
    Anyone know how to make the error message '20002953 is already a follow-up material in plant 1000' from error message to just warning? I try to search in SPRO and seem cant to find it a way.
    Hope that any expert out there can give me a solution.
    Thanks.

    hi,
    You can't make the message as warning, untill the material if done wid its full procurement cycle in the plant XXXX(given in your msg.)...
    So, firstly compeated the cycle and then only try to change....
    Regards
    Priyanka.P

  • Individual/Collective Requirements MRP4 View

    I have a situation where my top level material (FERT) is a MTS item (reorder point planning).  In the BOM is an intermediate (HALB).  Due to the nature of my process I must have a 1:1 relation ship of the HALB to the FERT.  However: as many have pointed out, where I have multiple production orders for the FERT, the MRP behavior is to combine multiple order reservations for the HALB into one planned order, regardless of the individual/collective requirement setting.  There must be a way to get a planned order for each order reservation in this MTS situation.  I know that I am not the only one who has this requirement.  Any advice/expertise would be greatly appreciated.  Thanks.

    Mgf,
    I believe expert Sundaresan has answered your question - for Baseline SAP.
    In addition to Baseline, though, SAP offers several addons that are industry specific, and some of them appear to me to be tailored to industries in which Milliken is a participant.
    Check out the standard industry addons in
    http://help.sap.com/content/documentation/industry/index.htm
    You also might want to consider hiring a consulting company to explore possible SAP solutions for you.
    Best Regards,
    DB49

  • Collective and ind indicator in mrp4 view

    Hi, we are using strategy 20 (mto). For header material collective and individual indicator is not maintained. For item it is maintained as 1 (ind). We created one sales order and run md02 for header material. In this case mrp is considering the unrestricted stock and accordingly no pru2019s were generated. We changed to 2 for item material, again it considers stock qty in mrp run so no pru2019s generated. as I understand if ind is 1 for item, it should not consider the existing stock as it is not sales order specific. Please advise why system is considering the existing stock if 1 is set for item material.

    Hi,
      The ind/Coll indicator is used to dispaly the requirements for a particular component in the following manner.
    Individual requirements
    Requirement quantities of the dependent material are stated individually for each header materials reqmnt.
    Collective requirements
    Requirement quantities of the dependent material are grouped together for all the materials.
    Ind/Coll
    All the MTO req are shown separately and MTO are grouped together
    Hope this clarifdies your doubt. This indicator will not control whether the unrestricted stock is to be considered or not.
    Regards
    Ramana

  • Control parameters

    Hi, selected planning mode as adapt planning data (1) in mrp control parametrs. maintained 2 in ICI of mrp4 view and lot size as EX. Created one sales order for one fert material and delivery date maintained as 30.07.10 and run mrp, pr generatted for bom items. now created one more sales order for the same product with same delivery date. Now advise whether system should amend the existing pr qty by summing up the old and new sales order requirements or should create new pr along with the existing old pr? incase it is summing, what is the criteria for the system to combine the qty in single pr? pls advise.

    Dear Yadav,
    if strategy 20 for header material & Indi/Coll indicator maintained as 2 for raw material
    say two header materials having strategy 20 & having two sales orders on same date
    then Run MRP with option delete & re-create planning data, you will get one PR for raw material
    Regards
    Madhu

  • How to trace the pr's with ref to sales order incase ici is 2 in mrp view

    Hi, maintained 2 in ici field of mrp4 view of the roh material master. system generated pr's without any ref to sales orders. pls advise how to trace which pr's are for which sales order? pls advise.

    HI,
    It is not possible to do in SAP if you give Individial/collective requirement as 2, It is possible if you give 1 but your point is that there will be more PRs in the system. Iit is not possible through customizing.
    I would like to suggest you some options, which of course requires manual intervention.
    1. Suppose system genrates purchase requistion of quantity 100,(if you maintain ici 2)  then you need to split the pr quantity in to more line items and then specify the Account assignment as Sales order and specify the sales order number.
    OR
    1. You have to maintain the vaious sales order details in a Item text in PR.
    Note: Make sure MRP is behaving correctly.
    Regards,
    Sreenivasa
    Edited by: Sreenivasa Rao on May 5, 2010 9:47 AM

  • ISSUE:regarding production version tab of MRP4 of  data transfer using BD10

    Hi all,
    This is regarding production version tab of MRP4 of  data transfer using ALE idoc (BD10).
    When i transfer the data using BD10 the production version is received at receiving end through segment
    but not created in MRP4 view tab.An error is coming as-
    "You wanted to maintain the master record of the material AB_06.04.09(2). However, it is already being processed by the user EBGABAP and is therefore locked."
    I logged in as-EBGABAP
    Please help me resolve the issue.
    Thanks
    Edited by: sanu debu on May 6, 2009 11:08 AM
    Edited by: sanu debu on May 6, 2009 11:09 AM
    Edited by: sanu debu on May 6, 2009 11:11 AM

    >
    sanu debu wrote:
    > Hi,
    > I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    >
    > Thanks.
    >
    > Edited by: sanu debu on May 6, 2009 3:24 PM
    BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA

  • Open a Particular view in MM03

    Hi all
    I want to open the MRP4 view of MM03 (directly) by passing the value of Material plant & Storage loc to the tcode.
    I have tried using the BAPI -> MATERIAL_MAINTAIN_DIALOUGE, but it opens the MRP1 view
    any pointers will be helpful.
    Regards
    Ravish

    Hi.
    You can try a simple batch-input in mode N. Do a recording in SM35 and create the batch-input.
      PERFORM bdc_dynpro TABLES my_bdc USING 'SAPLMGMM'   '0060'.
      PERFORM bdc_field TABLES my_bdc USING 'RMMG1-MATNR' '91'.
      PERFORM bdc_field TABLES my_bdc USING 'BDC_OKCODE'  '/00'.
      PERFORM bdc_dynpro TABLES my_bdc USING 'SAPLMGMM'   '0070'.
      PERFORM bdc_field TABLES my_bdc USING 'MSICHTAUSW-KZSEL(15)' 'X'.
      PERFORM bdc_field TABLES my_bdc USING 'BDC_OKCODE'  '=ENTR'.
      PERFORM bdc_dynpro TABLES my_bdc USING 'SAPLMGMM'   '0080'.
      PERFORM bdc_field TABLES my_bdc USING 'RMMG1-WERKS' '1001'.
      PERFORM bdc_field TABLES my_bdc USING 'BDC_OKCODE'  '=ENTR'.
        CALL TRANSACTION 'MM03'
            USING my_bdc
            MODE 'E' UPDATE 'S'.
    FORMS ---
    FORM BDC_DYNPRO ------------------------------------------------------
    Creates a dynpro line: program - screen no
    <->  PT_BDCDATA
    -->  PW_PROGRAM   Program name
    -->  PW_DYNPRO    Screen number
    CHANGES: SY-TABIX
    form bdc_dynpro tables pt_bdcdata structure bdcdata
                     using pw_program pw_dynpro.
      clear pt_bdcdata.
      pt_bdcdata-program = pw_program.
      pt_bdcdata-dynpro  = pw_dynpro.
      pt_bdcdata-dynbegin = 'X'.
      append pt_bdcdata.
    endform.                                                   " BDC_DYNPRO
    FORM BDC_FIELD -------------------------------------------------------
    Creates a field line: field name + value
    <->  PT_BDCDATA
    -->  PW_FNAM      Field name
    -->  PW_FVAL      Field value
    CHANGES: SY-TABIX
    form bdc_field tables pt_bdcdata structure bdcdata
                    using pw_fnam pw_fval.
      clear pt_bdcdata.
      pt_bdcdata-fnam = pw_fnam.
      pt_bdcdata-fval = pw_fval.
      append pt_bdcdata.
    endform.                                                    " BDC_FIELD
    Reward if it helps,
    Regards,
    George

  • Automatic reorder point planning -forecast view

    Hi
    Our client want to implement automatic reorder point Planning.
    Reorder point quantity was maitained from last 3 years  but MRP type is 'ND' as they are not using MRP.
    Now i am changing MRP type to:VM  and in forecastting view: i maintained model as:D constant model period indicator:M
    His periods:60 , forecast periods:12 initialization:X tracking limit:4000 selection procedure:2 reset automatically
    Is it ok ? than can i run MP30.  and  the client wants to run for many materils(2000).
    How can be run for many materials.?
    Regards,
    srihari.M

    Dear,
    In automatic re-order oint planning , system uses past consumption data (historical data) to forecast future requirements. The system then uses these forecast values to calculate the reorder level and the safety stock level, taking the service level, which is specified in MRP2 view, and the material's replenishment lead time into account, and transfers them to the material master.
    Since the forecast is carried out at regular intervals, the reorder level and the safety stock level are continually adapted to the current consumption and delivery situation. This means that a contribution is made towards keeping stock levels low.
    From MP30 you have to executed forecast and system has generated forecast values and updated safety stock and reorder point also. Only thing to remember is you have to maintain service level in MRP 2 view of material master when you use VM- MRP type to calculate safety stock and reorder point
    Find bleow the set up following set up for automatic re-order point planning :
    1.Material Master Set up : Maintain all the relevent parameters from MRP1 to MRP4 view , Forecasting View
    1.MRP Type -VM , Lot Size -EX
    2.Procurement Type -E for FG and F for ROH
    3.Planning Startegy -10 or 40 in FG/SFG and 20 for componenet
    4.Planned Delivery Time in MRP2 VIEW
    5.Indiviaul/Collective Indicator - 1/2 based on your requirement in MRP4 View
    6.BOM Explosion -Keep it blank
    7.Service level percentage -MRP2 view
    8.Maintain Forecastin view data like model selection , Histry period , period indicator , Forecast control pramaters ,
    10.Make sure that you have min 12-8 monhts total consumption update in Forecasting view .
    Configuration : InSPRO -MRP -Check MRP Type -VM-check the details like Re-Orde point .Safety Stock both the automatic calcvualtion box are marked .
    Finally as a sample test , select any material -mm02-execute forecast in mm02-forecasting view -exectute forecast -then save .Run MRP in MD03-1,1,3,3,1.NETCH indicator and check the result in MD04
    HOPE IT WILL HELP. PLEASE REVERT BACK.
    Regards,
    Alok Tiwari

Maybe you are looking for

  • How to change a field of type CHAR of a database table to DATS

    Dear ABAP experts, I have a database table: ZLT_aztnew with fields M1, M2, K1, K2, A1, A2, P1, P2, S2, D1, D2,  STD, BES. All these fields are of type 'Character'.  except D2 which is of type DATS. The field D1 is date and is in format DD.MM.YYYY. I

  • Missing EXIF information on Export

    Hi Everyone,  have just purchased the Canon CP800 Photo Printer for my Mac,   seems as if I can't print any photo from my Aperture 3 library (All the pictures I own are in A3)   The problem,  and its been around for a while .. according to the variou

  • Oracle ODBC driver not visible in MS SQL server 2005

    Hi all I am trying to export a Ms SQL Server table to Oracle and I do not see the Oracle Driver or any of my local drivers. Why?

  • Issues importing after Lion Os upgrade

    I recently upgraded to Lion Os.  After the upgrade, I am not able to import my files from my CF card, it gives me an error message "The following files could not be imported because they could not be read".  I am currently using LR 3.5.  Is there a f

  • History.back() in Folio

    Hi, I want to realize a history-back button in the folio. The button should jump to the last viewed article. So there is the option to make a button which will have a hyperlink to the last article (with a navto-link), but the problem is, that if you