Identifying Critical Maintenance Storeroom Material

Hello, We are currently using ABC indicators for identifying critical Material in our Maintenance storeroom. Is this the best way to do this or is there a better way of identifying slow moving, critical, Maintenance Storeroom Material? We would like to exclude critical Material from our slow moving material reports.
Thanks.

Hi Yocomo,
You can built custom classification objects fields in Material Class type "01".
Here you can create custom entries like Vital,Essential,Desirable,Obsolete,Insurance etc.
These can be defined at company level/plant level.Decide characteristics accordingly,and configure the system.
This will help majorly for reporting purpose.
Please go through this link for examples on how to do this:
http://help.sap.com/saphelp_46c/helpdata/en/24/47633a416711d189ec0000e81ddfac/frameset.htm
Hope this helps!
Thanks,
Ravi

Similar Messages

  • MASS MAINTENANCE FOR MATERIAL-RELATED EXCISE DUTIES FIELDS

    Dear Experts,
    Is there any separate t code available to MASS MAINTENANCE FOR MATERIAL-RELATED EXCISE DUTIES FIELDS ?
    I got this POINT from ECC 6.0 features in Solution browser.
    Please help me on this.
    MASS MAINTENANCE FOR MATERIAL-RELATED EXCISE DUTIES FIELDS:
    Functionality Enhancements
    Provides a specific transaction for mass maintenance of material related excise duties fields
    Business Benefits
    Mass maintenance can now be performed in one step for material-relevant excise duties fields, instead of maintaining the excise duties fields in each material master record separately.
    Regards
    Soundar.G

    Dear Ravi,
    I have already created LSMW for this in Material master and J1ID.
    But i have checked in ECC 6.0 feature, there they are mentioning New t code is available for MASS maintenance of excise duty fields.
    Regards
    Soundar.G

  • MASS MAINTENANCE FOR MATERIAL-RELATED EXCISE DUTIES FIELDS - T CODE

    Dear Experts,
    Is there any separate t code available to  MASS MAINTENANCE FOR MATERIAL-RELATED EXCISE DUTIES FIELDS ?
    I got this POINT from ECC 6.0 features in Solution browser.
    Please help me on this.
    MASS MAINTENANCE FOR MATERIAL-RELATED EXCISE DUTIES FIELDS:
    Functionality Enhancements
    Provides a specific transaction for mass maintenance of material related excise duties fields
    Business Benefits
    Mass maintenance can now be performed in one step for material-relevant excise duties fields, instead of maintaining the excise duties fields in each material master record separately.
    Regards
    Soundar.G

    Dear Ravi,
    I have already created LSMW for this in Material master and J1ID.
    But i have checked in ECC 6.0 feature, there they are mentioning New t code is available for MASS maintenance of excise duty fields.
    Regards
    Soundar.G

  • Error during Mass Maintenance of Material Master

    Dear All SAP guru,
    During mass maintenance of order unit ( PCS) and variable order unit "1" (Active) from T-code MM17, system is giving one error message.
    Error Mess:  30000052280140 : Messages have been issued: number MASS000120000000 and notification No.:
    MK101.
    While system allowing automatically to log through MM90, but after puting the log no.: MASS000120000000, system is not execting.
    Pl suggest ....as conversation factor is also maintained in material master for this.
    Regards,
    Pinku.

    HI ,
    check note 487111.
    According to this note
    Symptom
    In the planning data mass maintenance (MPGD_MASS), you select the "Conversion" field (UMREF) and enter the new value e.g. '2,01' and save the change. In the log of the mass maintenance, the system issues error
    MK101:
               ....... : Messages have been issued: number MASS............
    Detailed display of error message:
    Message number BF 020
               Value cannot be interpreted as a floating-point number. Other terms
    Reason and Prerequisites
    The problem is caused by a program error.
    The symptom occurs if during the maintenance of your own user profiles, you defined "Comma" for the decimal notation (Transaction SU3).
    Due to a program error, the system saves the value of the field to be changed program-internally in the exponential display with "Point" as the decimal place (2.01E+00).
    Solution :
    You have implement the solution mentioned in the note .
    Regards,
    Anupam

  • Mass maintenance of material master

    Folks
    I am trying to make mass maintenance to certain fields in the material master. I want to change the MRP type from PD to X0 for several materials.
    How do I accomplish this on single shot ?
    Thanks

    Hi
    Please follow the below steps to mass change your MRP type.
    1.Go to transation MM17
    2.Select MARC in the tab Tables
    3.Select MARC-DISMM in the tab Fields & Execute
    4.Input the materials & plants ehich under goes changes.Execute.
    5.You will get two section of screens.In the top you can see New values with emty field.you can give the new value.In the bottom you get the details of existing field for material/plant combination
    6.Click the button called Carry out mass changes
    7.Save and check the log for any errors.
    You have to consider the mandatory fields that affected during the change of MRP type.
    Hope you can do the changes now.
    Thanks / karthik

  • Identifying updated column in materialized view logs

    Hi all,
    I created a materialized view log for a table with three columns(say colA,colB,colC). Is there any way to identify which column got updated among these three columns? through the entries in mat view logs?
    any inputs on this ll be of great help.
    Thanks in advance.
    gopi

    Can someone tell me about M_ROWS$$ column in Materialized view.
    I am in confucion.

  • PR from Maintenance Order - Material Purchase

    Dear Experts,
    Likewise we can generate Servide PR against Maintenance Order,  also it picks service data frrom Maintenance Order....Similarly can we generate PR for Material Purchase against Order also it should pick Material from component that we have enetered in Maintenance Order ..is it possible??
    Thanks
    DM

    Hi
    Deletion of PR from Maintenance Order is not possible because the PR is created automatically
    This PR will get deleted automatically when you cancel//teco/complete the order
    Otherway around is you can always block the PRs
    Regards
    Kartik

  • Preventive Maintenance Plan Material requirement forecast

    Is there any way I get to know what whether the materials included in Tasklist of maintenance plan are  available or not , Just like forecasting or material requirement planning.
    Regards,

    I dont think this is possible. You may have to extend the standard simulation program for scheduling to include the Components. You will also have to call the material availability check FM to analyse the demand for the required date.
    Even then there is no guarantee for material availability when the Order is actually called.
    Regards
    Narasimhan

  • Reg. price maintenance in material master and Costing

    Dear Experts
    I have maintained price for material in material master and costing,but when I create PO price didn't come from anywhere. Pls help me.
    Thanks
    Rajakumar.k

    Dear Rajakumar,
    The values that are maintained in the material master in costing view is considered only for costing
    purpose.
    Say while doing the cost estimate for a material using CK40N,a costing variant will be used and say For
    Eg,PPC1,for this a valuation variant will be linked ,as per this valuation variant for costing purpose the
    first priority would have been given to the planned price in the material master in costing 2 view.
    So this value will be considered only for costing purpose.
    For procurement related things you have to maintain a purchase info record for a material + vendor
    combination in ME11 and a source list in ME01.
    In the purchase info record you can maintain a price for buying the material from that vendor.
    I hope this will clear your doubts.
    Check and revert back.
    Regards
    Mangalraj.S

  • Need solution for how to identify excat View in Material master tran (MM02)

    Hi,
       Can any body help out of this,
      I am doing MM02 updation for perticularly a field like Abnormal Quantity field in MRP2 View .
    I have done Recording using One material say XXX material so it is working for that material, But here issue is if  iam using another material it is going another View like MRP3 because every material having different Material Types.
    How to over come this situation is ther any Function modules for this or any other way ?.
    please help me out advance thanks.
    MK.

    Hi Murali ,
    For this , just check in the code for material type .
    Ask your functional the no. of views each material type would be having .
    Now in the code depending upon the material type , execute different BDC code according to number of views .
    Its a bit lengthy solution as will increase the coding but will work.

  • Reg Mass maintenance in Material master

    Dear Gurus,
                           I have uploaded HALB material wth movng avg price by mistake....I want to change it to std price in accounting view. Kindly guide me how to change it as standard price.

    Hi,
    Use Tcode MASS to change data.
    Go to MASS - select object type as  BUS1001001 (material) - Execute - here select the tab FIELD and select the line with field: price control again execute then enter. input the number from and to of the materials for which you are require to change the price control and execute.
    I hope this helps
    Regards,

  • MRP view maintenance for Material Master

    What is the basic entry for R3 material master, if, I want EBP below condition works:
    Stock in R/3 sufficient: Shopping Carts creates MatReservation.
    Stock in R/3 not sufficient: Shopping Cart still creates MatReservation, and when run MRP (in R/3), it gives Purchase Requisition, with the exact shortage qty.
    Info: We have set customizing in EBP so that every follow-on document for Shopping Cart will be Reservation.
    -Mimi-

    In R/3  , the material should have MRP view and all planning related settings ...
    wr u want to go for consumption based planning or deterministic planning .
    Based on the planning procedure setting in MRP views of the R/3 sytem , PRs will get generated.
    This is what u are looking for .. otherwise post your feedback...
    Regards
    Mani

  • Material Master for Maintenance material

    In regards to a Material Master for a Maintenance storeroom Material, On the MRP 2 tab there is a field called Safety time/act.cov.
    What is the difference between that and the planned delivery time of a material. I have tested both and they appear to do the same thing in materials planning. Can you tell me the differences between these 2 fields
    Thanks

    HI Yocoma,
    The first difference I can site is that is in Workdays whereas Planned Delivery time is in Calender Days and is based on past experience
    For further details please go through these links
    http://help.sap.com/saphelp_45b/helpdata/en/f3/dbbb16b36111d1a6770000e83235d4/content.htm
    http://help.sap.com/saphelp_470/helpdata/en/f3/41b53c4d36265ce10000000a114084/content.htm
    Hope this helps!
    Thanks,
    Ravi

  • Material codification

    Hi All,
    I would like to know the best practises in SAP handling the following issues:
    1. We have spare parts which are procured locally and are imported. We codify if as Ixxxxxx for import and IxxxxxL for local item. Although the material is same the price that we procured was different. For stock we look at two codes.
    2. For certain similar raw materials we have uniquely identified by adding the supplier code along with material code. This is done because the materials look similar but are different in grade/quality and used as subsitute when either material is not available for use in production.
    Can any one suggest the best practice for maintenance of material master data  in terms of valuation and stock keeping?
    Regards
    Rasheed

    Hi
    I would suggest you to activate Split valuation for the first case
    Without split valuation, materials are valued at plant level.
    With split valuation, the same material number at a plant can have different stock quantity and value for different groupings (called valuation types).
    The valuation types are set up in configuration could be for example:
    u2022     new, old or
    u2022     GB, US, AU, ... (indicating countries for example)
    u2022     red, blue, black, etc.... (indicating colors for example)
    The valuation typs are grouped together in a valuation category
    So for example, the above valuation types could be grouped by age, country, color.
    A material is activated by entering the valuation type in the accounting view of the material master.
    IMPORTANT: It is possible to change a valuation category if no stock and PO were created. However, once a Valuation category is assigned -- it can not be un-assigned (make blank again). So it is not something that get changed at will. It needs to be decided on creation of material.
    Steps to set it up
    CONFIGURATION
    1.     Activate Valuation
    2.     Create Valuation Category
    3.     Create Valuation Types
    4.     Link Categories > Types
    5.     Link valid Valuation Categories to Plant
    MASTER DATA
    1.     Activate Split valuation for a material
    (Add Valuation Category in material master)
    2.     Create Accounting views for every valuation type
    Using Split Valuation in transactions
    1.     Create Purchase Order
    2.     Goods Receipt / Goods Issue
    3.     Physical Inventory
    4.     Stock Overview
    DETAIL----
    In this example we want to group material in the same plant based on AGE (valuation category). We will have two "groups" (valuation types): OLD and NEW.

  • What is the concept of  view in material master?

    Hello sap gurus
    Some quetions regarding Material Master
    what is  the concept of views in material master ?
    what is determined by specifying industry sector in material master ?
    To sell material which views are material are maintened in Material master?
    Regards
    Amit

    Hi,
    <b>Material master  for finished ggods is related with SD, MM & PP departments</b>. If you carefully go through the various screens in MM record you will realize the importance of the respective fields and the department to which they belong.
    <b>1.Suppose Base unit of measure</b> in Basic data 1 screen. The production people will keep the stock of the item using this UOM.
    <b>2. In Sales:Sales Org.1</b> screen we have sales unit in which we will sell the material.
    <b>3. Then we have the plant</b> data in which we enter the delivering plant. Also the taxes are determined from the plant so we have the settings for taxes also - whether this material is fully taxable/50% tax/Tax exempted.
    <b>4. Then we have purchasing</b> screen in which the data like the purchasing group, variable units,etc are entered. This will effect the purchasing cycle when we are procuring a material from outside. This is related to MM.
    <b>5. The we have MRP</b>, this is related to PP as to how to manufacture the product, the MRP type, the strategy group - whether it is MTO/MTS like that.
    <b>5. Sales:Sales Org.2 screen</b> - Here we mainatin the account assignment group which is very important as far as the generation of the accounting document is concerned. This triggers the system where to post the value in which G/L account. Accounting document is generated when we create the invoice in VF01 & save it.
    <b>6. Work scheduling</b> - Related with the sceduling of the production as to whether underdelivery or overdelivery is allowed, the storage location
    <b>7. Quality</b> - Here you can select for a particular finished item where where it has to be checked for quality during its journey from the raw material stage to the finished goods store as a finished item.
    <b>8. Accounting</b> - Related to accounting, product costing, total value of the stock in hand, etc. Also related with FI & PP
    So all the screens have data which effects one or more modules for the proper functioning of the system to give the optimum results.
    <b>Industry Sector:</b>
    Key that specifies the branch of industry to which the material is assigned.
    <b>Use</b>
    When you create a material master record, the industry sector you specify determines
    1. which screens appear and in what order
    2. which industry-specific fields appear on the individual screens
    <b>Screens for Sales:</b>
    Sales:Sales Org.1, Sales:Sales Org.2. But other screens also have data which is related to sales. You cannot just maintain the sales views and save the master. It has to be properly linked with the other modules also for the proper functioning of the system. That is why the system is called as "Enterprise Resource Planning" You have to paln the resources of your company and these resources are related with all the modules.
    Reward points if solution helps.
    Regards,
    Allabaqsh G. Patil

Maybe you are looking for

  • Transfer music to BB Bold 9780 fastest way possible (max. capacity?)

    I currently have an 8GB card in the phone and like to exchange music often.  I think it's only a class 4 (4MB/s), and I've seen cards that go as fast as 20MB/s.  My question is, what's the fastest the blackberry will support in terms of data transfer

  • Viewsonic vx1935wm lcd display with macbook

    i'm trying to connect my monitor using the dvi cable and the mini-dvi to dvi connector. it just says "no signal analog." when i go to system preferences on my macbook, the highest resolution it shows is 1280 x 800. the viewsonic tech lady said someth

  • Check Values....F4 functionality

    Hi all PARAMETERS:code LIKE bkpf-bukrs  OBLIGATORY . PARAMETERS:year LIKE bkpf-gjahr OBLIGATORY. PARAMETERS:pernr1 LIKE zissue_master-pernr OBLIGATORY. PARAMETERS:bookn LIKE zissue_master-bookno OBLIGATORY. PARAMETERS:new LIKE zissue_master-pernr OBL

  • How can I have my servlet accept 100 concurrent client requests?

              My servlet extends HttpServlet so it is multithreaded. Then I have written a java           client which starts 100 concurrent threads that try to contact the servlet.           There are always lots of threads which are refused by the Webl

  • How To Set Synchronous Call in FM CRM_SEND_DATA

    Hi all, Please help me, how to set i_synchronous_call in FM CRM_SEND_DATA? Thank you