IDOC Mass Change

Hi All,
We have a number of unposted inbound Idocs in our system. These inbound Idocs are not posted due to mention of incorrect cost center in the Idocs.
I just want to know how can we change the cost center number in incoming idocs. Is there any option available to mass change idocs..?? I mean, can we change the cost center number in all the idocs in one go..??
Regards,
Ravi

Hi Ravi,
I know this answer is way too late and the issue that you encountered already taken care of. However this is an ongoing issue for many folks who deal with IDOCs, so here is my attempt to provide an answer:
There are few choices to take care of this issue:
1. Ask the source to resend the inbound file.
2. Make change at Middle-ware level and resend the file.
3. Make changes to the IDOC within SAP system.
Option 1 and 2 may not be possible due to various reasons. So option 3 is most viable option. With standard SAP tool-sets, mass update of IDOCs not possible. You can edit one IDOC at a time which would be very time consuming.
To help in this area as well as in many other areas within IDOC MANAGEMENT, there is a custom SAP product, Error Message Manager - EMM, out there.  This product provides Single Editing, IDOC Analysis, Monitoring, Mass Editing, Mass Status change, Mass delete, and a number of other user friendly features.

Similar Messages

  • Mass Change ERS in PO + BAPI

    Hi All,
    I need to make mass change in lot of PO at itme detail level. I need to uncheck ERS and GR based IV check box in invoice tab.
    I dont want to make use of Mass change tcode for this as it cause lot of work and chances of manual error are lot.
    I have never used BAPI in LSMW  but I have come accross BAPI for PO Change......I am pretty good at recording method in LSMW but I think that wont help me in this case due to the table control in PO. I have also found a tutorial on BAPI + LSMW for PO creation so I got some rough idea for it.
    Can someone tell me the sturucture I should use for the BAPI in LSMW for my requirement and the points which I need to take care of. also tell me do I have to actiavte the inbound idoc processing for it.
    Please guide....
    Also suggest if i need to create 2 flat files for this ....like 1 for header and antoher 1 for item level.
    Edited by: Sap: IN on Apr 30, 2011 2:36 PM

    I am able to map my flat file with the structure sucessfully
    But I am facing problem
    1. IDOC segment E1BPNEPOITEM  does not have the field GR based IV and ERS.
    requirement : as I want to remove these 2 check boxes from couple of PO for different line item I have mapped the fields with the segement mentioned above but I am passing blank value from my flat file...so in the display imported data I am getting PO number and line item number and for those 2 field blank value.
    due to this in the step display converted data those 2 fields along with all the fields of the segement itme data are blank and so the IDOC gets created with out any field in the item segment.
    question: how to over come this problem ...I need thoes 2 field in the segment but with balnk value. as the check box need to be unchecked in the po.
    Edited by: Sap: IN on May 1, 2011 11:56 AM

  • Mass Change Vendor

    Dear all,
    we need to do mass changes for the vendor.
    We need to change the fields LOEVM and SORT2.
    The LOEVM is possible via MASS but how Do I change the SORT2 field ?
    Any ideas ?
    Thanks
    Marc

    Hi,
    Please check this link: Re: How to load customers (and vendors) needing extra street address?
    Customer/vendor's street 3, 4, 5 is not part of the customer master data.
    The extra street fields do belong to address management tables. In other words table ADRC.
    For this reason, you have NO chance to succeed if you try to work with DEBMAS idocs & LSMW or XD99 !!
    You may only succeed with processing ADR1MAS idoc type. With LSMW this should be possible.
    As an other remark, there is NO BAPI or function module to maintain customer master data.
    Starting with ERP 2005, you may investigate with class CMD_EI_API
    Hope it helps

  • User roles were deleted for the mass change in CUA system.

    Dear Team,
    I have assigned a role to a set of users in CUA via SU10 to a specific child system, as like I have executed the task 3 to 4 times for the assignment of the different roles to a set of users and some users may repeated in each execution .
    And when I check in child system after few hours the old roles were deleted and contains the role which I have assigned in the mass change.
    It was happened only to few users not more than 20 users, then I expected that may be the users who get repeated in SU10 more than one time for the different role assignment it get impacted.
    But that is not a problem, because I verified some of the users who repeated more than one time in child system and they didnu2019t get deleted  the old roles and it was appended with the new role to the existing rights of the user.
    Still some of the IDOC were showing in SCUL transaction with Yellow signal triangle shape
    So please help me out what would be the issue.
    Kindly let me know if need more information....
    SV

    Hi,
    It is a problem related to IDOC issue. Please contact Basis Team regarding pushing of the Idocs. I am giving an over view of the steps that needs to be executed for idoc push. Please contact Basis with the same.
    Run RBDAGAIN report (se38)
    Give Idocs and save as variant.
    Now go to sm36 specify a job name and start.
    This will change the Idoc status from 02 to 30. For 03 to 30 it needs a different report. Please check and let me know if any issue. As long as idocs are not pushed properly it will give an error. At times also check the CUA user is ok or not. It gets locked at times. To know which one is the CUA user->Login to child system->su01->See the change executed by the user->Get the user name.
    Let me know if any issue.
    Regards
    Aveek.

  • Service Desk - need IB52 iBase "partner assignment" mass change

    Dear Ladies and Gentlemen,
    We are using SAP Service Desk in Solution Manager 7.0 EhP-1.
    There are many satellite systems connected to SolMan using Service Desk.
    Of course all of them are setup in SMSY, have a valid iBase entry in IB52, and have the "sold-to-party" assigned in IB52 -> Goto -> Partner.
    Now we need to assign a new business partner as "sold-to-party" for all these systems.
    We do not want to rename the current business partner, but have to assign a new business partner to not influence existing tickets.
    Thus, manually we would need to go to IB52 and change the partner assignment in IB52 -> Goto -> Partner and enter a new value for all the systems.
    Q: is there a way to perform a mass change for the "sold-to-party" partner assignment of the iBase entries? Is it possible to update or replace all or multiple existing partner assignments in iBase?
    Many thanks,
    Peter

    Hi Christian,
    Can you please tell me how did you create iBase for NON-SAP Systems? I know it is IB51/IB52? I am not sure what do you do after that? For an example I went to IB51 and create iBase number 403? now I go to IB52 and put the 403 in the installed Base field and click on Green arrrow to go inside correct? what do I do after that? where is the options to create the iBase name call "Network Group" ?
    How did you solve your issue for not showing when you went to F4 in NOTIF_CREATE? was that authorization error? if yes, do you know the object name?
    any help is much much appreciated
    Thanks in Advance
    Kumar

  • Separate TCode for Mass Change of documents (For authorization purpose)

    Hi
    We have internal audit function where internal audit chief will remove the payment block of multiple vendor invoices through FBL1N --> Environment --> Mass Change.
    Now problem is that authorization for FBL1N is given to 6 more employees (related to AP Accounting). Hence all these employees can do the mass change. I want to restrict this mass change authorization only to one person i.e. internal audit chief.
    Please tell me how to bring this restriction.

    Hi:
          You should contact your basis guy to do so...In tab authorization first you will have to find this object he system will display it , there you can assign 03 in place of *. 
    Personally i will recommend you should go for creating transaction variant using SHD0 which is an easy way to do so. Please check it will solve your issue. I just did both in test sever both of them are working perfect for me. Mass button is disabled when you set 03 for F_BKPF_KOA. SHD0 meets the subject topic of your post.
    Regards

  • Contract Mass change enhancement in SRM 7.0

    Hi Experts,
    We are using SRM 7.0 & implementing new Contract mass change functionality for header P.Org. & P. Group data. I have created a Web Dynpro Component (with View similar to /SAPSRM/WDC_UI_AO_CT_MC_D), & implemeted a BADI /SAPSRM/CTR_MC_BADI & added an entry in Table BBPV_CTR_MASSOP.
    After selecting the change method i am getting the error "View O_V_PURCH does not exist in the component YWDC_UI_AO_CTR". Actually, O_V_PURCH is an outbound plug of the WEb Dynpro Component. I am not sure why this eror is coming.
    Could you please help me out in this. That will be a great help.
    FYI - I am using Operational Contract Configuration document as reference.
    Thanks & Best Regards,
    Vishnu

    Hi Azad,
    Thanks for the reply.
    I checked that the outbound plug is linked to the Window correctly. I do not understand why the plug is considered as a view.(as per the error message"
    Thanks & Best Regards,
    Vishnu Reddy

  • Mass change of Pgrp for open PO's

    Hi all,
    SRM 5.0 SP12,ECS
    We need to mass change the purchasing group for all open PO's in our system...Is that possible in SRM?
    Is there any std report which can do that??
    Thanks.

    Thanks Alex.
    Let me frame my question in another way...if there is no std report to change the purchasing group in all open PO's to a particular Purchasing group...then do I need to change the Purchasing group for each and every PO manually thoruigh CHANGE Mode in PROCESS PO transction?
    Experts,
    Any idea if SRM 7.0 has other ways of doing this??
    Thanks.

  • Sales Order Material and its MOQ mass change

    *The issue is related to our Spare parts Ordering process in our company.*
    We have a concept of having 65 days of back orders. Hence there will be
    lot many open orders in the system.
    The Material code will be changed from (for eg) M01 to M02. Hence forth the Material (M01) ordered will
    automatically changed to M02 through Material determination logic. But
    for the 65 days back orders, it is very difficult to change the
    material one by one in sales order. There may be more than 100 orders
    for a material. Even if the MASS change option in Transaction VA05
    doesn't address because of the following reasons;
    1. The changed new material (M02) may have new price with new validity
    periods, whereas the back orders will have old pricing dates. Its
    difficult to change individually in the open orders.
    2. Some materials may have partially delivered.
    Similar to ECM changes, there will be MOQ changes which also needs to
    be changed individually the order quantity in the old Open orders.
    For example,
    Initially the MOQ for a material in 10. Order inflow has happened based
    on this MOQ.
    Now if the MOQ is changed to 20, future orders are addressed. But for
    the 65 day back orders, we need to manually open the individual sales
    order and change the order quantity.
    Hence we require a mass change option for the open orders as below:
    1. For Material Changes (M01 to M02), I will give the list of orders and
    the line items and Qty for M01. The program should reject the existing
    line item for M01. An additional line item should be created with M02.
    Also the pricing date should be changed.
    2. For MOQ changes, I will give the list of orders and the line items
    and Qty. The program should reject the existing line item for those
    materials. An additional line item should be created with new Qty.
    If the material is partially delivered, the the existing qty should be
    updated to the extent it is delivered and the remaining qty should be
    updated with new material or New MOQ.

    You can use BAPI_SALESORDER_CHANGE.
    1. Get the SO detail using BAPISDORDER_GETDETAILEDLIST.
    2. MODIFY the ORDER_CFGS_* internal tables and  update.
            CALL FUNCTION 'BAPISDORDER_GETDETAILEDLIST'
              TABLES
                order_cfgs_value   = gt_char
                order_cfgs_ref       = gt_char_ref
                order_cfgs_inst      = gt_char_ins.
            MODIFY gt_cfgs_*.
            CALL FUNCTION 'BAPI_SALESORDER_CHANGE'
             TABLES
                order_cfgs_value   = gt_char
                order_cfgs_ref       = gt_char_ref
                order_cfgs_inst      = gt_char_ins.
    Refer SAP note 549563.

  • Mass change of payment in customer line item for all open line item.

    Hello,
    We have updated the new payment as per the new agreement with customer in customer master. We want this new payment term should also be updated in all the open invoices which are not cleared. Is there are way we can do the mass change in Payment term as the open line item in the customer where line item are more than 50. Please let me know the transaction code for the mass change of payment term in Customer account balances.
    Thanks and Regards,
    Rajesh Kumar Mantri

    Hi
    you can find the way to change the payment terms
    first check weather the payment term field is having change option in your document change rules in the line item for you customers.
    Financial Accounting (New)Financial Accounting Global Settings (New)DocumentRules for Changing DocumentsDocument Change Rules, Line Item
    if the payment term BSEG-ZTERM(payment term) is there for your customer and having deselcted check box for changing document you cannot change payment term for your company code.
    This can done client level or company code level.
    if the payterm  can be changed you do changes to payment terms mass level.
    Thanks
    ANJI

  • Validation not working during Mass Change of Vendor Line Items

    Hi All,
    I created validation for Reference Key 1 field of Vendor line items, in this validation i used customized user exit.
    Whenever i select multiple line items in FBL1N for mass change & try to put a unauthenticated value system gives error as per Validation only for 1 st item but it not work for subsequent items & put the unauthenticated value in subsequent line items.
    I am not able to understand why Validation is working only for 1st line item during mass change & not for subsequent line items.
    Please provide your suggestions in resolving this issue.
    Thanks
    sandeep

    Hello Sandeep,
    I understand your issue. First check if the changes as per the SAP Note 640908 (https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=640908) is available in your system.
    Actually, Mass changes call FB02 in background and at this stage Validation gets activated and hence, the control doesn't go back for the next item changes. You can test this by deactivating the Validation and then the mass changes will me fine.
    I hope this explains the behaviour.
    Thanks and regards,
    Suresh Jayanthi.

  • Mass change of Vendor Line Items Payment Terms

    Hi all
    We are trying to make a mass change of payment terms for vendor line items.  We have implemented the change required as per SAP note 640908. However when we try to do this not all payment terms are changed.
    The log gives us the following error - 'Field BSEG-ZTERM. does not exist in the screen SAPMF05L 1302'.
    Please how can we solve this error.
    Many thanks
    PRG

    Hi,
    According to note 640908:
    " Notes on error handling:
        If the mass change does not occur as required even though you
        changed and activated all program parts, note that the error log
        for the mass change (Environment -> Mass change -> Error log of
        line item list) may contain useful information for error
        handling."
    " Note: SAP cannot guarantee that the modified mass change will work
      correctly even if you carry out all of the steps as described in the
      manual tasks."
    It is not planned to enter the payment terms by using of
    the field payment term ZTERM but by using of the fields ZBD1T/ZBD1P and
    ZBD2T/ZBD2P and ZBD3T.
    With Best Regards,
    Gladys Xing

  • Mass change problem in sales order form

    Hi,
    I am changing the promise date at mass change by selecting all the lines.
    Now, the same date I want to be populated for the Schedule_ship_date if the source_type is 'EXTERNAL'.
    thanks
    Rohit gupta

    Hi,
    I am updating the promise date in mass change form and same is updating at line level.
    Now I want to built a functionality so that the same date changes(as promiose date) would be applied for the SChedule ship date at line level only for the source_type 'External'.
    I am unable to accomplish through form personalization.
    Please suggest for the above request how it could be achieve?
    Thanks,
    Rohit

  • Mass-change in scheduling agreement

    Hi Gurus,
    today I wanted to do a mass change in scheduling agreements using transaction MASS.
    Unfortunately, it seems not to be possible to change these agreements with MASS. I found SAP Note # 483303 which tells us that MASS is only able to change documents with VBAK-VBTYP = 'C'.
    The scheduling agreements use VBAK-VBTYP = 'E' or VBAK-VBTYP = 'F'.
    Does anyone have a workaround for this? In the meantime I'll set up a LSMW, this should work fine.
    Thanks
    Ralf

    Yes you are correct, you can't use MASS to update scheduling agreements. As you mentioned, use LSMW or you can try using SCAT/BDC to update the documents.
    Regards,

  • Mass change of account assignment group in sales order

    Dear All.
    We have created a new Account assigement group and assigned revenue accounts to it.When the orders are registered this data will flow from the master data automatically.Where as in the open orders i need to make the changes manually.Is there a provision in std SAP to Mass change a filed in  sales order .Like we do in MM17 or XD99 .Kindly let me know.
    Thanks in advance .
    regards,
    K.Vivek

    Hi,
    Go to XD99,
    1. Select the table ie KNVV in the tables tab, select the fields tab and select the fields u would like to change for eg Acct assignment group
    2. Execute the report
    3. U will come to the screen where u can restrict the entries.
    Enter the criterion say
    Cust: Test 1
    Sales Org 8000
    Dist 08
    Div 08
    4. Again press execute
    5. Enter the new values you would like to have
    6. Now select columns of the new values and press carry out mass maintainence button in the new values area
    7. Press Save
    8. u will then receive a success message
    Best regards
    Mahesh

Maybe you are looking for

  • Is there a way of parenting objects in Muse?

    Hi, I'm creating a page where there are some parallaxing elements. I want a tooltip widget to stick to one of these parallaxing objects, but they keep sliding apart. It seems it's a too clumsy method to make the widget have the exact same parallaxing

  • Issue in BMP

    Hi all, I am starting a new thread on the issue i previously had: Just transported a scenario into Q for testing, suddenly the BPM fails. I am guessing this is a performance related issue, let me briefly explain what is happening, there is a transfor

  • Max number of TCP connections to one IP?

    Is there any limit, imposed by the TCP protocol, to the number of active connections to one IP address on one interface? I'm asking this because it's easy to add more servers behind a load balancer, but I wonder if the TCP protocol limits in some fun

  • Spa922 in "SOS phone in recovery mode"

    Hello, how can I recover the phone? What I have tried is the software in this discussion: https://supportforums.cisco.com/discussion/10616406/spa962-sos-recovery-mode but it didn't work. The software didn't find the phone. What I need in the computer

  • Update Premiere Pro CC or Premiere Pro CC (2014)

    This morning I go to install updates, but there are now two versions of Premiere Pro CC. I selected the Premiere Pro CC (2014) and it installed a whole new version of Premiere Pro CC on my computer. Can I still work on my projects using the new (2014