IDOC on create or release of production order

Hi All,
I want to create IDOC on creation or release of production order (CO01), can anyone provide me steps and setting that i need to do to achieve this functionality. Business object used for his is BUS2005, and on release of Production order RELEASED event of object type AFVC_PM  is getting triggered.
Thanks

Check below badis.
AFABD_CHANGE
CAUFVD_CHANGE
SIDAT_UPDATE
Regards,
Mkhan

Similar Messages

  • Error while release of production order u201CNext period is not openu201D

    Hi Experts,
    Need your opinions on this issue where my client is facing a problem while create and release a production Order on the last day of the month (Last day of period change).
    While create and release of production order for Plant xxxx, system uses to give the error; period Next (e.g. 12) is not open. Same thing if I have created the order using T. code CO01; but when I tried to release and save the order through T. code CO02 then it gave me the same error (Next period is not Open), it checks for the next period to open.
    The above scenario happens only on last day of the month. Earlier this kind of error was not there so the question is why the period check is happening while saving the production order.
    After speaking to the user, it is determined that they are facing this problem since upgrade (Since last 8 month). Hence need to check what additional check has been implemented with upgrade from R/3 4.7 to ECC 6.
    Error Message No F5201
    Appreciate your help how to dig up this issue.
    With Regards
    Anant

    Hi Guys,
    Please throw some light why on the last day of the month (Last day of period change) at the time of release the order user is getting error: Period Next (FI Next period) is not open ( message No. F5201).
    My question is why system carried out period checks at the time of release of Production Order.
    With Regards
    Anant

  • Sap pp-releasing the production order?

    at are the activities carried out while releasing the production order?

    Hi,
    Order Release
    Use
    A production order must be released, before it can be processed. You can use the time period between creating and releasing a production order, for example, to carry out company checks and preparations. If you do not require this time period, you can automatically release the production order when it is created (see Automatic Release).
    A newly created production order initially receives the status CRTD (created). The following restrictions apply to a production order that has been created:
    Confirmations for the order cannot yet be executed.
    Shop floor papers cannot be printed.
    Goods movements for the order cannot yet be executed.
    Releasing the order lifts these restrictions.
    Features
    Order release can be executed at the following levels:
    With Release at Order Header Level all operations are released. The order and the operations receive the status REL (released).
    With Release of an Operation the operation receives the status REL and the order receives the status PREL (partially released). If all operations in an order have been released, the order has the status REL.
    Hope this helps.
    Revert if you need more information.
    Regards,
    Tejas

  • Re:No release of production order without standard cost estimate

    Hello Experts
    I do not want to release any production order without standard cost estimate
    I have come acroos the same problem raised by some other users and can you please suggest how to achieve this?
    Is there any way to achieve this without user exit?
    Thanks and Regards
    Subbu

    Hello Subbu,
    In this case, you need to put the status as "B4" Blocked in costing 1 view of material master, when you create the costing view and change it to "03" status when you released the cost estimate.
    Please note that this field can be overwritten in MRP view also. Hence please get the good control of material master and good coordination with PP team to achive this.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Please reward points if helpful.

  • Automatic release of production order for perticular work center

    hello,
    any body please help me how to set automatic release of production order when creation for a particular work center. please suggest me.
    Thanks & Regards
    Bhakta

    Dear,
    Use T Code COHVOMRELEASE here select work center as ZPACK then in header menu Program--Schedule in background here define as perodic job and set ferquency as Hr.
    Or Use Transaction SE38 to create  the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Occurs error when create purchase req. from product order with 'PP02'

    hi,friends.
    when i add a route with 'co02', and select control key 'pp02',
    then it leave to the view of 'Ext. Processing',
    i input the values of 'Cost Element' 、'Purchasing Group' 、'Material Group'....
    and the value of 'Res./Purc. req.'  is  '3',
    but when i return,it shows the error:
    Error occurred during creation of purchase requisition for operation 0050
    Message no. C2325
    Diagnosis
    During automatic creation of the purchase requisition to operation 0050, an error (ME 673) occurred.
    System Response
    The system cannot create the corresponding purchase requisition.
    Procedure
    For further proceedings, read the long text of error message (ME 673) in transaction SE91. Check the operation affected and change or complete any missing data that led to the error message.
    double click the route,goto the view of 'Ext. Processing',
    and the value of 'Res./Purc. req.'  changed  to  '2',
    why?
    and the purchase request isn't be created.

    thanks for K.Madhu Kumar
    the value of Res./Purc. req. be changed to '2'
    so the purchase requisition con't be created.
    if i Release the production order,it will be created,
    and the item cat. is null, the acct assgt cat. is 'F'
    Edited by: tizo lee on Jul 20, 2010 5:11 AM

  • Error when release the production order

    Hi all,
    while release the production order i am getting the error :-   Plant 1000 is not the only plant assigned to valuation area 1000 , how to resolve this error .
    & can we release the prod order without calculating the cost ?
    Thanks & regards
    satish

    Hello,
    I'm facing the same issue when trying to create a production order using tran. CO01 with inputs (Material:  P-100, Production plant: 1000, Order type: PP01. Next the total quatity of material is chosen freely, Dates/start is set to todays date, Scheduling is set to Forwards scheduling).
    Error message :
    "Plant 1000 is not the only plant assigned to valuation area 1000"
    Message no. CK238
    As explanation SAP says:
    "Diagnosis
    You are attempting to use material costing or order costing. However, the system has determined that plant 1000 is not the only plant assigned to valuation area 1000.
    Costing is only possible when each plant has its own valuation area to which no other plants are assigned.
    System Response
    It is not possible to cost in your system.
    Procedure for System Administration
    Go into Customizing for the Corporate Structure and check the valuation level. The valuation level must be the plant level"
    The error message implies that the user is not given the opportunity to create and save a production order.
    I have secured the followings:
    1. Valuation level is set to Plant level so that the valuation is now done at plant level. (The other option was at Company code level, which is not checked.)
    Question:
    Is there a solution to this problem?
    Thanks and Regards!
    Edited by: WilliamG on Feb 16, 2010 4:04 PM

  • Release a production  order for partial quantity

    Hi gurus,
    Can you please tell me how can i release a production  order for partial quantity without splitting the order?
    Regards
    Rajib Pathak

    Dear,
    Best way you can conver the planned order to production oreder in partial in CO40.
    Or from MD04 screen click the planned order, choose pratial release and enter the quantity you want to release and press Generate button. the order gets converted to production orders of yr specified quantity and rest planned order remains for further processing.
    Or,
    Create order
    Goto operation overview
    Select the operation and click on release button...which will release the opration alone instead of releasing the order. If you release the order, then all the eperatios are released onec for all.
    If you go for operation release...you can release operation by operation, which will be partial release of order at header level.
    at operation level - partial release
    Hope it will help you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 12, 2008 9:44 AM

  • Batch release of production orders

    Dear PP Gurus,
    Is there any program / functional module which i can execute in background to release production orders.
    I would like to release the production order automatically in background (I do not want to perform custmization setting which relase production orders when created). I would be glad to have a program / logic to perform the same - Thanks!
    Regards
    Seshu

    Thanks for your quick response.
    I would like to know if we can run CO05N in background ? I dont want user to execute CO05N.
    Do to client business it is not possible to configure SAP system to auto release.
    Regards
    Seshu

  • Bins problem while creating goods receipt for production order.

    Hi All,
              I am facing a problem with selection of bins while creating goods receipt for production order in transaction MB31 and MBBE.
    The order of filling bins is with respect to storage Unit not by document no, Please suggest something.
    The scene is like that.
    The bins are not filled in the proper sequence, the system checks for the empty bins and filled those later on.
    like this,.
    Typ StorageBin  SC SS    Stock Avail.st BUn GR Date    DocumentNo Storage Unit         Time   
    SLoc Batch      Re IA PutawayS Pick qty Cert. No.                                                                               
    VN1 106A088                 0        0  CS  01/25/2010    4739297 1005721391           10:00:59
    100  0001020069            60        0                                                        
    VN1 107B076                 0        0  CS  01/25/2010    4739298 1005721392           10:01:01
    100  0001020069            60        0                                                        
    VN1 108B076                 0        0  CS  01/25/2010    4739299 1005721393           10:01:04
    100  0001020069            60        0                                                        
    VN1 109A077                 0        0  CS  01/25/2010    4739300 1005721394           10:01:06
    100  0001020069            60        0                                                        
    VN1 110B079                 0        0  CS  01/25/2010    4739301 1005721395           10:01:08
    100  0001020069            60        0                                                        
    VN1 106B088                 0        0  CS  01/25/2010    4739302 1005721403           10:01:11
    100  0001020069            60        0                                                        
    VN1 123B158                 0        0  CS  01/25/2010    4739303 1005721389           10:01:13
    100  0001020069            60        0                                                        
    VN1 124A160                 0        0  CS  01/25/2010    4739304 1005721390           10:01:15
    100  0001020069            60        0                                                        
    VN1 118A133                 0        0  CS  01/25/2010    4739305 1005721396           10:01:17
    100  0001020069            60        0                                                        
    VN1 119A128                 0        0  CS  01/25/2010    4739306 1005721397           10:01:20
    100  0001020069            60        0                                                        
    VN1 120B162                 0        0  CS  01/25/2010    4739307 1005721398           10:01:22
    100  0001020069            60        0                                                        
    VN1 121B159                 0        0  CS  01/25/2010    4739308 1005721399           10:01:24
    100  0001020069            60        0                                                        
    VN1 122B159                 0        0  CS  01/25/2010    4739309 1005721400           10:01:26
    100  0001020069            60        0                                                        
    VN1 123B159                 0        0  CS  01/25/2010    4739310 1005721401           10:01:29
    100  0001020069            60        0                                                        
    VN1 124B160                 0        0  CS  01/25/2010    4739311 1005721402           10:01:31
    100  0001020069            60        0                                                        
    Thnks you,
    Anmol.
    Edited by: anmol112 on Jan 25, 2010 10:34 PM

    no replay, clossing threat.

  • Problem while releasing the production order.

    Hai gurus,
    When i release the production order , SAP doesn't block when i have a deficit of stock for some materails.I checked all the customizing and found every thing is fine.
    As the materials that has defict stock has back flush indicator, is that the reason why the system is assuming the stock when releasing.

    Hi,
    You need to consider the following customization settings
    (1) OPJK - For the Plant/Order type/Availability check-2 for the material availability - Release material - set the indicator '3' No release if parts are missing
    (2) OPJJ - For availability check & checking rule - check what all elements are considered as part of ATP check.
    With these settings - in the production order if the order header has status MSPT - Missing parts (i.e. components are missing) only then system will stop the release of the order.
    I hope this addresses your query
    Warm regards,
    Umesh

  • Control availability check during release of production order

    friends,
    Can you guys help me find the user exit/BADI which will allow me to control the release of production order after the availability check is complete.
    In detail, the scenario is that : based on a flag on material master, I should be able to ignore this product's availability during release. I cannot change the availability check to "KP" ( No check) as this product can be sold seperately. So what I thought was that if I get to control the availability check during production order release I would be able to ignore this product before check or may be after check and before the status change.
    I found PPCO0021 exit and function module EXIT_SAPLCOZR_003 which is actually intended for release control for automatic batch determination. I am not sure if I can use this.
    Please let me know if you guys have any idea.
    Thanks
    Prod_Planner

    Let me rephrase the scenario :
    I have a production order for a product P1 which consumes raw materials R1 and R2. R1 is supplied by a nearby vendor every 1 hour to my plant so I do not need to worry about the availability of it when releasing the order but R2 availability should be taken into consideration. So, function 1 or 2 in OPJK will not work (as release need to be stopped if R2 not available) hence I will be using 3. If I use 3, R1 availability is also considered hence the whole order is not released. I will maintain a flag on material master so if R1 has flag, I need to ignore R1's availability but still considering R2.
    As mentioned, I found PPCO---21 which could help me but need your help to understand if there is any other way.
    Thanks
    Prod_Planner

  • Exit or Badi: On release of Production Order

    Hi,
    Module PP.
    Q) Say, equipment is under maintanance so it should give warning message while releasing the Production order through CO01.
    Note: it should give message while releasing the Production Order and not when saving it.
    Regards,
    Sujit

    Check below badis.
    AFABD_CHANGE
    CAUFVD_CHANGE
    SIDAT_UPDATE
    Regards,
    Mkhan

  • Error during release of production order - AFS Specific

    Hi SAP gurus,
    Iam getting error during release of production order in AFS specific system during COHV transaction. Error is ''Error calling ATP server'' and message no is AG022. But when we read the PP master data then this error is cleared and production order is released.
    Thanks & Regards,
    N. Laxman

    hi
    1. When mass conversion of AFS planned order to production order is performed via COHV, the resulting production order does not contain the SKU details of the component.
    2. When a planned order is converted to a production order & an ATP is carried out on the production order, Message no.AG022 - 'An error occurred during Remote Function call on the ATP Server' is issued by the system.
    so you need to use the note 1087613.
    read the note and apply with the help of technical team ABAP and BASIS
    -ashok

  • Release a production order thru sales order

    Hi all,
    Hope everyone's doing well.
    Can anyone guide me as to how we can release a production order thru a sales order and henceforth confirm it?
    Thanks in advance,
    Thanks & Regards/Aryan

    yes it is [possible to convert sales order to production order directly.
    You can use strategy 82 for this.

Maybe you are looking for

  • Error during update. Error Code U44M1P2003

    Hi I'm using Adobe Photoshop Elements Version: 12.0 (12.0 (20130903.r.43239)) x32 on Windows 8 64-Bit Version: 6.2. When I choose "update" in the help menu there is an upate available. When I install the update it is downloaded but crashes at 99%. Th

  • How To Export BW Data to XML File

    Hello All- I am currently trying to find out how to <b>export </b>data in BW to an XML File. I have read previous posts but would like to know if one option is using Open Hub Services (through an Infospoke) toprovide me with the data I need while out

  • Price variance workflow for blocked invoices in MM purchasing

    Hi Gurus, We are implementing price variance workflow for blocked invoices. We built a custom workflow to take care of the routing requirement of the customer. We also did necessary customization defining the tolerance limits for price variance. Befo

  • PIR net price not follow the condition screen

    Hi all, I have a question regarding my pricing condition maintained in a PIR. In one of my PIR record, there is two validity line records in the pricing condition with the following date range and value: 1 - 2008.04.01 to 2010.12.31 ==> PB00 is USD85

  • How to split iPhoto library and NOT loose metadata?

    My iPhoto library gets too big (30GB); hence I'd like to split it and make two separate libraries, one for 2008, one for 2009. How can I do this WITHOUT loosing all the metadata and file structure: e.g. the albums, the MobileMe gallery, the Faces and