Idoc test scenario for MM invoice verification

Dear Experts,
   I am doing a scenario for testing the inbound process for Invoice ( MM ).
   If  any body has done this test idoc prcoessing for the scenario, i need your valuable help in how to go about this.
In simple, how to do the WE19 for MM invoice verification. 
Regards
RAj

hi,
Pls check this link,Hope it helps
Test IDOC inbound processing in WE19
No status record was passed to ALE (Working fine in WE19)
thanks.

Similar Messages

  • ABAP HR-test scenario for payslip-urgent

    Hi,
    please send me some test scenarios for payslip by which payslip can be affected.
    I have designed a PAyslip with retro and i want to test it.
    eg. retro. means if retro will run then it will affect payslip.
    Also send me some unit test cases in case of any payslip requirement.
    Points will be rewarded.
    Regards
    Monika

    Hi,
    Just give an entry in infotype 8, 14 or 15 for previous month and run the payroll than retro will run, than compare results using wage type reporter.
    When you run the payroll give the sandard SAP Remuneration and compare the results in the SAP payslip and payslip you have developed.
    If you have developed payslip using PE51 than the retro amounts are picked authomatically.
    Regards,
    Ramu N.

  • Test scenario for payslip testing

    Hi,
    please send me some test scenarios for payslip by which payslip can be affected.
    eg. retro. means if retro will run then it will affect payslip.
    Also send me some unit test cases in case of any payslip requirement.
    Regards

    Hi,
    Just give an entry in infotype 8, 14 or 15 for previous month and run the payroll than retro will run, than compare results using wage type reporter.
    When you run the payroll give the sandard SAP Remuneration and compare the results in the SAP payslip and payslip you have developed.
    If you have developed payslip using PE51 than the retro amounts are picked authomatically.
    Regards,
    Ramu N.

  • Test scenario for Physical Standby

    Dear Team,
    Could you please share the Test scenario for Physical Standby.
    1. Read only.
    2. Switch Over
    3. Fail Over.
    Many Thanks in Advance
    Arjun.

    You didnt mention the version.
    Oracle10g Release 2, Data Guard Switchover and Failover best practices
    http://www.oracle.com/technology/deploy/availability/pdf/MAA_WP_10gR2_SwitchoverFailoverBestPractices.pdfOracle9i, Data Guard Switchover & Failover best practices
    http://www.oracle.com/technology/deploy/availability/pdf/MAA_WP_9iSwitchoveFailoverBestPractices.pdfKhurram

  • Modulepool for import invoice verification & subcontract adjustments

    Hi,
    any one can help me to development of Module pool program for Import Invoice verification.....pls give me atleast guidelines if you are not giving copletedetails. and also another one to develop of Module pool program for Subcontract adjustments.
    thank you in advance...
    with regards
    bheem

    Hi Madan,
    Please check If you have already captured excise. You have to refer excise invoice while doing MIGO. Also ensure the correct excise invoice no. is entered (or) look at J1I7 report to find them.
    Thanks,
    Kumar

  • How to create a test scenario for Extended receiver agreement

    HI, experts,
    I tried to create a test scenario in PI7.1 / Intergration Builder, I already defined 3Operation mapping and 3Message mapping in Enterprise Builder and test good.
    1 Operation mapping is reading input, and output in "ReveiverDetermine" structure.
    other 2 mappings are real mapping program.
    My question is how to create test scenario for it? I know I should create a "Receiver Determine" with "Extended" option, however can anybody point out a good guide with details?
    thanks!

    Hi,
    >>Hence I created 2 MM/OM and one OM/MM (OM3) which uses ReceiverDetermine structure as the target.
    You need to create only one OM (add one source interface and two target interface in this)  and in that use one MM (add source MT and add the 2 receiver MT in the signature tab of the MM )
    >>One bussiness component
    One BC for Source and One for target
    >>One Receiver Determine (set extended option and select the OM 3 ?)
    Yes
    >>One sender aggrement
    Yes
    >>Two or Tree Receiver aggrement
    Two Receiver Agreement
    Also check this wiki page for step-by-step guiide
    https://wiki.sdn.sap.com/wiki/display/SI/StepbyStepguidetoExplainEnhancedReceiver+Determination
    Regards
    Suraj

  • Release st for LIV-Invoice verification

    Hi
    Can you tell me about LIV invoice verification release st version 6.00 ECC
    MVRao

    Dear Rao,
    Invoices which are blocked can be release ,for example invoces may be blocked due  to tolerance limit which you have maintained at you company code level, all these invoces are released with T.code MRBR for payment unless until you release the invoice you cannot do the payment
    Reward if helpful
    regards
    venugopal.

  • Print settings for Logistics Invoice Verification

    Hi all,
    I am Taking Con.Typ INS for printing the Logistics invoice verification but when i am setting messages in MIRO it is saying that INS is not set for this event. Plz help me is the con. typ choosen by me is correct or not what are the settings to be done.
    Regards,
    Tilak Koganti

    Hi
    INS - Invoice plan, this condition type need to be used only where you have invoice plans maintained in the Purchase order.
    MRIS - Invoicing Plan Settlement , this is the transaction to be used for Invoice Plan Settlement.
    So you cannot directly maintain the condition type in the messages in MIRO transaction
    Thanks & Regards
    Kishore

  • Pre-qualification Test Suites for Device Driver Verification

    Pre-qualification test suites for verification of network and storage device drivers on Solaris(TM) 7 (Intel Platform Edition) are now available. These test suites are prototypes of test suites we plan to make available later this year. We are making the prototypes available for download
    because IHVs (Independent Hardware Vendors) and third-party developers have told us these tests are useful in assessing the readiness of their drivers. Please note that these prototype test suites are unsupported. We welcome your comments, which can be submitted by e-mail to
    [email protected]
    The test suites (NETTests for network drivers, SUNWprtst for storage drivers) are on the Developers Tools page (http://soldc.sun.com/developer/support/driver/tools/). If you're a
    registered user of the Solaris Developers Connection, log on and go straight to this page, then choose the network or storage test suite to download. If you haven't registered yet, go to
    http://soldc.sun.com to register (it's quick and it's free). You'll find links to the test suites under "What's New" on this same page.

    Pre-qualification test suites for verification of network and storage device drivers on Solaris(TM) 7 (Intel Platform Edition) are now available. These test suites are prototypes of test suites we plan to make available later this year. We are making the prototypes available for download
    because IHVs (Independent Hardware Vendors) and third-party developers have told us these tests are useful in assessing the readiness of their drivers. Please note that these prototype test suites are unsupported. We welcome your comments, which can be submitted by e-mail to
    [email protected].
    The test suites (NETTests for network drivers, SUNWprtst for storage drivers) are on the Developers Tools page (http://soldc.sun.com/developer/support/driver/tools/). If you're a
    registered user of the Solaris Developers Connection, log on and go straight to this page, then choose the network or storage test suite to download. If you haven't registered yet, go to
    http://soldc.sun.com to register (it's quick and it's free). You'll find links to the test suites under "What's New" on this same page.

  • Problem in LSMW IDOC - Test Scenario Loading Infotype0139

    Hi Experts,
    I am Currently working on LSMW IDOC method,The scenario is  InfoType 0139 - Loading applicant details
    (loading a flat file csv format from my desktop)
    In Step 1 : While saving after entering the details of Message type and Basic Type, getting a message
    "Maintain the default values for IDoc Inbound processing"
    In Step 5: In Field Mapping , Apart from the Segemnt Type YEMPL_SEG, which i created,
    there is one more structure EDI_DC40(this is not created by me).
    Subsequently IDOC is not getting processed. Error Message shows - No partner exists with the name '', type ''
    I had gone through saptechnical document.
    Scenario:
    Reciever Logical System - IDC92.
    Sender - YDC64.
    Client 800 is assigned to IDC92.
    In WE42, For process Code , assiging a standard Function module - /ISDFPS/IDOC_INPUT_ET.  Do i need to change this FM?
    In WE20, Sender System YDC64 is assigned to Process Code.
    I tried with IDC92 to Process code aswell.
    Kindly advice.Your help is appreciated.
    Thanks,
    Felix
    Edited by: Felix on Mar 1, 2010 10:07 AM
    Edited by: Felix on Mar 1, 2010 10:11 AM

    Hello ,
       While processing the IDOC in LSMW; I am getting this error message now:
      Function module not allowed: IDOC_INPUT_HRMD
       The Status is 51.
    I donot know which FM has to be used for this purpose.
    Your help is appreciated.
    Thanks

  • IDOC:inbound scenario for posting Message type ORDRSP

    Hi All,
    I am doing a inbound scenraio to post message type ORDRSP.
    Acknowledgement gets created in Purchase order successfully but texts at header level and item level are not getting updated in the purchase order
    I am using the segment E1EDKT1 and E1EDKT2 for header texts . For item texts I am using the segments E1EDPT1 and  E1EDPT2.
    Any pointers to this is appreciable.
    Thanks in advance.

    Hi,
    Depending on whether the Order is a third party order are not, the texts are picked up from either SO or PO.
    Put a break point on line 842 in the Include LEINMF11 and debug, this should help you get to the root cause of the issue.
    Regards,
    Chen

  • How to create test scenario for KIT Item?

    Hi All,
    I want to test how KIT Functionality works in OM. I have tried looking into User Guides / Web but I am not able to get specific functionality related to KIT Item testing in OM.
    If anyone has idea of how KIT item works and what are the setups required to perform in the system related to KIT, which Transaction Type we need to use, etc. it will be great.

    Vishal,
    I'm not sure if you're familiar with the CTO processes in Oracle (if not check out the CTO user guide/manual), but kits work very similarly in that they have a bill of material structure and the components are optionally exploded to the sales order pad on saving/booking (depending on the setting of the profile option OM: Included Item Freeze Method).
    Each line has its own workflow in OM - again, in the same way as a configuration does except that in the case of a kit all of the components are required.
    I've sent you a sample test script to your email address.
    Regards,
    Jon

  • Assignment test in SAP for Logistic Invoice varification

    Hello Experts,
    We want to carry out Assignment Test in SAP for Logistic Invoice varification asp er the scenario:
    "The assignment text is a process step preceeding the invoice verification in background processing. The software checks cyclically whether an open goods receipt exists for the invoices entered in background processing. The software begins the invoice verification only when open goods receipts exist for an invoice. Effects on system administration are characterized as follows: the assignment test should be called in background processing before the report for the invoice verification, because the assignment test helps create the worklist for background processing. An assignment test is faster than a complete invoice verification in background processing, inasmuch as the software does not have to process as much data from the database and does not have to execute as many checks and reports. In addition, the software does not execute full assignment of the open goods receipts as in background processing; it executes only basic assignment"
    Please tell me if anybody has executed this and the required settings.
    Thanks,
    Radhakanta

    Hi
    The assignment filed material will be populated only for the documents after the Chnage in the G/L account.
    This change will not effect the Previous documents
    Mass change may not be posssible as accounting documents may not contain the same material.
    Thanks & Regards
    Kishore

  • Idoc-XI-file test scenario

    i m new to XI,
    i wanna make a test scenario for idoc-XI-file...
    i donno what an idoc is.......
    tell me how to create an idoc from the very basics....like message type, segment, partner profile, port creation, etc,..... and how to fire an idoc from the R3 system to my XI system,
    and ofcourse... ican do the rest of mapping and all, with the file message type

    Hi Sudeep,
    1. steps for creating customized Idocs..
      we31- creation of Segments
      we30- creation idoc types
      we81- creation of Message types
      we82- assigning message type to Idoc type...
    2. R/3 Configuration settings
      SM59 -  creation of RFC destination...
      we20  -  creation of Ports
      We21 -  Creation of Partner profiles..
    3. XI Configuration settings
      SM59  - Maintain RFC destination,
      IDX1    - Maintaining port for XI
      IDx2    - Loading the Idocstructure into metadata repository
    These are the settings to be done before starting ur scenario..
    I think this will help you... points...
    regds,
    vasanth.

  • Reg:Assignment test in Invoice Verification

    Hi,
           We are doing upgrade from 4.6C to ECC6.0.When I checked the delta functionality,SAP has explained the functionality as shown below.Is it a transaction or Program?Please give me the details.
    "You can use the assignment test in the logistics invoice verification. The assignment text is a process step preceding the invoice verification in background processing. The software checks cyclically whether an open goods receipt exists for the invoices entered in background processing. The software begins the invoice verification only when open goods receipts exist for an invoice. Effects on system administration are characterized as follows: the assignment test should be called in background processing before the report for the invoice verification, because the assignment test helps create the worklist for background processing. An assignment test is faster than a complete invoice verification in background processing, inasmuch as the software does not have to process as much data from the database and does not have to execute as many checks and reports. In addition, the software does not execute full assignment of the open goods receipts as in background processing; it executes only basic assignment"
    Thanks&Regards
    Venkadesh

    Hi,
    As per requirement we need to make settings for Assignment test for LIV.
    Has anyone can explain how it works and what settings we need to carry out.
    Thanks

Maybe you are looking for

  • How to restrict Warranty by Plant

    Hi Experts, i'm new to the Warranty module so i am need in much help.. I've created a role with t-code WTY as this role will allow users to process claims but it is also their business requirement to restrict the view to only a particular plant. For

  • Get URL Variable

    I have two relevant pages - The first presents a list of choices in HTML, and allows the user to select one. Upon selection, a variable is passed to the URL for the second page. (?installer=foo) The second page contains the Flash movie. How may I gra

  • XI20 XSLT performance

    Hello all, I use an XSLT mapping for a XML to XML mapping (without DB access and without additional JAVA code). I was wondering if there is a way to increase the performance as I'm not satisfied with the overall XI performance when processing. I run

  • Moving to advanced compression (11gR2)

    Hi all! I'm planning to migrate some schemas from a 10.2.0.4 database to an 11.2 database using datapump. At the same time i want to store the data in compressed format (compress for oltp - using advanced compression). What is the best way to achive

  • Virtual Vista SP or Server 2008 SP1 x86 problem

    New issue: When running Lookout 6.1 server process on a Vista SP1 (x86) or Win2k8 (x86) as a virtual machine under Win2k8 (x64) Hyper-V, if you set multiple virtual processors on the virtual machine, Lookout freezes after short random time (minutes t