If there is no enough stock, backflush still could do it?

Hi experts
  Now we do production order confirmation or backflush, even though there is no enough stock ,it just give warning , but we still could continue do it. and when we have mateirals on hand, we will go to COGI to reporcess it.
  Is that possble if there is no stock ,SAP could stop to do confirmation or backflush? Could this setup on plant level?
THanks
Alice

Hi Alice,
You can have whatever option you require --
Termination for incorrect movement - if there is no stock, then backflushing is not possible
Warning / information for incorrect goods movement - here, it is possible to continue and you correct it later with COGI
Shrenik

Similar Messages

Maybe you are looking for

  • Call RFC  by E*way

    Hello, We build some RFCs to be called from a e*way (Seebeyond). Everything seem to work fine until we change some of the RFC code, and the eway steel run the old code.  I even cleared the code of the RFC in the SAP system and the eway still run the

  • How to hidden these files?

    How to hidden these files? Thanks in advance.

  • JCO reading abap RAW data type (truncating?)

    Does anyone have experience reading an Abap RAW data type using JCO?  I am trying to read a GUID (via RFC_READ_TABLE) that is defined as RAW length 16.  When I view this field in SAP GUI, I see 32 characters.  However, when I read this field using JC

  • 1230 Series LAP and WCS 6.0.199.0 Heatmap Problem

    I recently upgraded from WLC 4.2.207.0 to 6.0.199.0 (WiSM), and WCS 5.2.130.0 to 6.0.196.0. All my heatmaps that contain 1231G LAPs are solid "maroon" (-35 dBm) in color. If I remove the 1231 APs from the heatmap selection on the right hand side, my

  • CUP assignment - Role Validity

    Hi, I have a question about role validity periods in CUP when the request gets approved. Currently valid from period is selected based on request creation date and end date is always set to 12/31/9999. Is there any way the 'from date' can be set to t