Impact on DBM due to EHP Upgrade
Dear Experts, We are in process to upgrade EHP 6 to EHP 7.0. Will there be any impact on Dealer Business Management due to this? Currently we are using DBM 7.0 (Highest Support Package - SAPK-70005INDBM). Kindly suggest, Regards, T.R.S.Praveen
Hi Praveen,
Refer to SAP Note 1307624 - Installing SAP DBM 7.0 on SAP ERP 6.0.
It clearly states that following:
Compatibilty with EHP5 for SAP ERP 6.0, EHP6 for SAP ERP 6.0, EHP7 for SAP ERP 6.0
DBM 700 SP01 is compatible with SAP ERP 6.0 EHP5.An ACP is also created for the same:
1. DBM=======700. This ACP is part of DBM 700 SP03.
2. DBM 700 SP05 is compatible with SAP ERP 6.0 EHP6.
3. DBM 700 SP07 is compatible with EHP7 for SAP ERP 6.0
Thus if you are upgrading you ERP to EHP7.0 then it is recommended that your DBM 7.0 version is upgraded to SP07.
Please check your existing support pack level of SAP DBM 7.0 & proceed accordingly.
Regards,
Sachin Balmiki
Similar Messages
-
Impact to existing Software Component during EHP upgrade
Hello Friends,
I have the below query with regard to Enhancement Pack Upgrade from EHP5 to EHP6.
Our Current set up
ERP Version - SAP ECC 6.0, EHP5
SPS Stack 11 (Released Oct 2013)
SAP_HR Level 69 (Released in Dec 2013)
Proposed upgrade to
ERP Version - SAP ECC 6.0, EHP6
SPS Stack 09 (Released in Oct 2013)
SAP_HR Level 69 (Released in Dec 2013)
When we upgrade the system to EHP6, SPS Stack 09, what would be the impact to the SAP_HR software component which is already on SP level 69 which is released on December?
After upgrade will the SAP_HR SP level be downgraded to level 66 (released in Oct), since we are moving to SPS Stack 09 ? And are we expected to apply SAP_HR SP 67, 68 and 69 once again?
OR
2. Will the SAP_HR component remain at SP level 69 while rest of the system gets upgraded to EHP6 SPS Stack 09 (Oct 2013)?
Any help would be appreciated.
Thanks,
AnanthHello Ananth,
The EHP upgrade will not downgrade the SAP_HR packages,
if stack level that has lower SAP_HR level included it will remain at current level
and apply stack level to any components lower than that so as you
describe in second part is accurate.
Regards,
Aidan -
EHP Upgrade - Trying to understand the concept
Dear experts, this is an effort to understand the concept. I have been doing Basis work for the past 10 years approximately. All along, I have been doing the typical LCP and SP upgrades way back from legacy systems until now (ECC 5.0 / BW 3.5). We have recently upgraded our BW 3.5 to BI 7.01 and also created a dual stack (we never had Java stack before for BW). This is my situation. Below are my questions. Any guidance would be highly appreciated.
1. Do we still have the SP Stack upgrades within Ehp 1? Or, has it been revamped completely and there is no more SP upgrades and we only need to do EhP upgrades? In this case, if I have to upgrade from Netweaver 7.01, is my only option upgrading to 7.02?
2. Is there a place where I can start to catchup with the whole EhP concept? I would like to know the maintenance life cycle and the impact on our environment.
3. Are there any specific upgrade guides that will guide me in transitioning from the typical SP upgrade methodology to EhP upgrade methodology. Also, I would like to know how did you transition (learning curve) from someone who had been with typical SP upgrade for a long time and how did you adopt yourself to the new path (like what guides did you use, what links did you follow, etc)
NOTE: I have heard the EhP upgrades are similar to release upgrades and I have done handful of release upgrades.
Thank you so much in advance.>1. Do we still have the SP Stack upgrades within Ehp 1? Or, has it been revamped completely and there is no more SP upgrades and we only need to do EhP upgrades? In this case, if I have to upgrade from Netweaver 7.01, is my only option upgrading to 7.02?
Yes we do have both option available. Either we can go for SP upgrade or we can go with EHP upgrade.
>2. Is there a place where I can start to catchup with the whole EhP concept? I would like to know the maintenance life cycle and the impact on our environment.
Yes. http://Service.sap.com/erp-ehp is the place where you can get all the infromation and document.
>3. Are there any specific upgrade guides that will guide me in transitioning from the typical SP upgrade methodology to EhP upgrade methodology. Also, I would like to know how did you transition (learning curve) from someone who had been with typical SP upgrade for a long time and how did you adopt yourself to the new path (like what guides did you use, what links did you follow, etc)
Everything is available on Service marketplace.
Regards,
Subhash -
I am due for an upgrade on 5/23 and I am trying to find out if I can get my phone through the Apple store? I have an iphone 4 and am hoping to upgrade to a iphone5. Just want to make sure if the price is the same as if I went to a Verizon store to upgrad.
I don't believe they were looking for a trade in, they are due for a subsidized Verizon upgrade. I think the bringing the iPhone 4 was for setting it up and transferring as Verizon does not require you to swap your previous phone for an upgrade.
-
Reg : Importing Mapping from PI 7.0 to PI 7.0 EHP upgraded
Dear Experts,
I have done few huge changes in the mapping existing in our test system which was opened for editing because of EHP upgrading of our Development system.
Now development system is EHP upgraded and Test system is plain.
Is there any way we can import the chagnes done at Test environment back into the development environment without having to redo the changes in Development environment.
I have also exported the changes as tpz file in the export path of our Test system.
Regards,
SrivatsanHi Supriya,
Thanks for your reply. The changes has huge mappings, but there are also other objects as well to be moved from the upgraded test environment to the development envieonment,
Is there any way to move all these changes through transports or Other means.
Regards,
Srivatsan -
Pages and icons (in the tabs and navigation bars) are too big due to 22 upgrade
Due to FF22 upgrade (from 21), all my icons (from webpages, addons and regular buttons) and tabs have got bigger and that's really ugly because of the low resolution of the images. Also considering I have a rather big number of tabs I can just see a smaller number of them and it's annoying.
The zoom of the page is now bigger (given that I has already zoom in in version 21, now the pages are too big and I have to zoom out a page that was correctly zoomed in 21)
Surprisingly the menu bar is intact !
Is that a new graphic convention ? Is there an update of something like GTK+ in this new version that could be responsible of this bug ? And mainly is there anyway to fix it ?
My screen resolution is 1920*1080. And for example with chromium or FF21 the menu have the perfect size.
PS: Sorry for my poor English.All these confusing explanations on how to fix something that never should have been changed. It just pisses me off that I now have to get used to inferior graphics because someone thought it would be cool to screw with settings people have obviously been using for who knows how long. I have tried simply zooming down and that doesn't work. I am not going to enter a bunch of techie gobbledeegook and screw up my whole internet experience. I am just PISSED!!!!
How about another version to correct this? Hey, if someone wants to stay with this one, fine. At least give us people who aren't tech wizards an option to stick with what we have and what we have been happy with for years. Now, excuse me.. I need to get away from this.. I am so f***king pissed!!!
30 minutes later: Okay, I went to about:config and a window came up .. pretty much telling me my computer would blow sky high and take me with it. I'm just an old lady who WAS passing my time browsing and playing a few games. Oops, I'm getting mad again. PS I NEVER talk like this, but this has ruined my whole fricken day.
15 minutes later: I decided to give up. I went to play some monopoly at my favorite game site and the pop up window with the game board was unplayable. The board was way down the window and not complete. So, I went back and despite all the warnings went back to Version 21. I have used Firefox for years and have sworn by it and defended it and given it my best reviews. up until now. I absolutely don't want to quit FF, but I don't know all the tech stuff, I guess is required to change formats back to what you are used to. I still can't believe FF would make a drastic change across the board without warning or giving a choice. If I didn't know how to downgrade, I wouldn't be able to use my PC to help me get through each day. Why why why? -
IW31/32/33 screen size reduced/shrinked after EHP upgrade
Hi!
After an ECC6 EHP upgrade our maintenance order screen's size has been reduced, for some unknown reason.
Is there a way (customizing, setting,etc) to increase it's size back to the old size? At the moment the users have to scroll down to see the technical location or the equipment.
Changing the screen's resolution or resizing the window help a bit, but not much...
At the moment it seem like this (I highlighted with yellow the empty places, which was not empty before the upgrade):
Thank you
TamasCheck this SAP note.
Note 1775663 - Maintenance order screen sizes
Note 1017953 - Technical status: incorrect subscreen in operation tab -
MSSQL 2008 - Database size getting smaller after EHP upgrade??
Hi All,
Did anyone observe the DB size of MSSQL 2008 after EHP upgrade?
In my two system, after upgraded to EHP5 and EHP2 respectively, the database is getting smaller compare to before upgrade, estimated 5-10gb.
EHP upgrade is unlike DBEXPORT, it shouldn't have any reorganization features and so do MSSQL.
Any idea?
Cheers,
Nicholas Chang> Right after upgrade is smaller and after sgen, db size is bigger than source.
So it's ok.
> As system was upgrade from ECC6 to EHP5 with Central Application, HCM and Finance .... the after upgrade size should bigger than the source even before SGEN. Your kind input is mostly welcome.
If the source system was compiled completely (using SGEN) then you need to compare the sizes of the target system also, otherwise you compare apple with pies.
Another reason may be that index compression was activated:
Note 1459005 - Enabling index compression for SQL Server
You could now upgrade to SQL Server 2008 R2 and apply
Note 1488135 - Database compression for SQL Server
this will save additional space (30 - 50 %).
Markus -
Database history growth not updating after EHP upgrade
Hi All,
We are using SAP ECC 6.0 (731 - SP09 ) & DB2 Fix pack 5 version.Database history growth not updating after EHP upgrade. I have check collector job running fin and DB tab > Configuration > Data Collection Framework > Configuration Collector are in green status.
Please help me to resolve this issue.
Regards,
MKHi MK,
You can try few things:
1. Check to collector standard job like SAP_COLLECTOR_FOR_PERFMONITOR should be running succesfully.
2.If you can check to data collector collection interval column , you will find it to be Not Schedule.
Try with Repair all collector.
To make it work properly you have to perform
Data Collection Full
Data Collection Incremental
Hope it helps
BR Vaibhav -
Risks for ongoing Dev-Transports during SP & EhP Upgrade
Hello together,
We are planning at the moment a Support and EhP upgrade for our whole SAP system landscape. We have one centrally ERP 6.0 System where at the moment all affiliates will be migrated into one client. So we have ongoing Roll-Out projects until 2012. During this Roll-Outs we want to Upgrade our SAP ERP system landscape with the relevant Support Packages and EhP 5 in the mid of the next year.
My question is, how should or must we handle the transports, if we want to implement the Support Packages and EhP in parallel to the ongoing Project Transport. If there are some objects affected of new objects coming up from the EhP Packages and affected also from development-transports from the projects. I think that could be a risk that the queue in the Q-System is not valid an we get an surprise in the productive system after transporting all transports form the Support packages and EhP Packages within the Project relevant transport in the P-environment.
So, how should or must we handle the Transports during this time incl. emergency Transports to keep always a valid transport queue in the Q-System for the P-System and to avoid an overtaking of Transports.
Thanks in advance for best practice, documentation and answers.
Best regards
Stefan KrogmannAs long as you don't activate additional functionality in the source/DEV system transports should be smooth. However, it's always advised as with support packages installations to keep the gap between DEV/QA/PRD as short as possible.
Markus -
Losing all my recordings due to an upgrade
I've just been informed that I will lose all my recordings due to an upgrade in 30 days time. Unfortunately the 2 weeks prior to this I am on holiday and wanted to record things whilst I'm away. Frankly, I am appalled that any upgrade should make us lose recordings and will therefore cancel my contract, seek compensation and change to someone that understands customer needs!
Will this upgrade affect ALL BT Vision users I would love to know why I have not been notified?
I am going on Holiday and want to record the Tour de France whilst away so this is terrible news
Can someone tell me:
A: WHEN is this upgrade due to take place?
B: how do I get the information you have been sent?
c: If I upgrade myself now will I be exempt?
On top of all the other BT Vision service problems I am experiencing: The rubbish BT Vision box locking up daily! - All my recordings ending 5 mins early! - BT Vision box reporting no iternet connection when my PC and tablet both have wireless conectivity through the same home hub! this is the worst news possible.
I am totaly fed up with BT Vision already and I have only had it for two weeks!
Time to go buy a seperate HDD so I can just record off my TV directly!
What a total joke and waste of my money BT Vison is turning out to be. -
My phone is due for an upgrade in 7 days
Hi my mobile is due for an upgrade in 7 days but I was wondering if it was possible to upgrade now or will there be a charge for this?
There will be a charge you will have to pay off all of your old contract. Wait the 7 days and there will be no charge.
-
I am currently on a plan with my parents, but my two years is up and I am due for an upgrade. My plan was to drop from my parents plan and join my fiancee's. Will I be able to get a discounted phone, and keep my existing number?
You'll need to do an Assumption of Liability. The parent that is the account owner and your boyfriend will both have to be at the store to do this. Your line is actually your parents and it will be your fiancee's once the change is made. But you should be able to get your upgrade and you definitely get to keep your number. Also depending on your fiancee's credit history there may be a security deposit required.
-
How do I change app store settings from Japanese to Philippine store. I cannot upgrade my apps because it says that my store settings is not valid in japan. Am not sure if this due to IOS7 upgrade. Thanks.
You have to have a Canadian credit card, billed to a Canadian account, AND you have ot be physically inside the borders of Canada.
From the itunes store terms of service:
"The iTunes Service is available to you only in Canada, its territories, and possessions. You agree not to use or attempt to use the iTunes Service from outside these locations. Apple may use technologies to verify your compliance."
http://www.apple.com/legal/itunes/ca/terms.html#GIFTS -
When am I due for an upgrade? Can I find this on the website?
Can I look up what date I am due for an upgrade and what phones will be available to me at what price?
Or do I have to speak to someone on the phone or at a store to find out this information?
THANKS!
-LeanneIf you're the account owner, you can log on to My Verizon and see when you become eligible to upgrade.
When you do become eligible, you will get the 2 year contract price of the phones - which is displayed on Verizon's website.
Maybe you are looking for
-
The window just ends right below the slide bar. I tried closing the window and reopening it, even restarting the computer, but it didn't fix it. At first I thought the window was too big, so I tried resizing it, but it didn't work.
-
Submit a transaction O4B1 via job and the result as an attachment Excel
Hi, I'm executing a program in background via job to get back the result of a report as an attachment XLS on mail. the result of my program give me just title of Excel columns , but when i execute it manually , the result is perfect. my code is : ***
-
I would like to use my ATA 186/188 to operate with a dial-up modem. I understand that this configuration is not supported, but some users have gotten it to work using fax configuration's on their 186. I have the following configuration on my 186 and
-
I go to the Pages application and click on it, and instead of getting the normal Pages menu I get an old Pages document and the spinning wheel. I can't open the menu bar, can't create a new document, can't open another document, can't access the men
-
Hi. i have a troble with my computer, a virus called "bagle". then i hope to resolve it, but now my pc suite doesn't work.... when i connect my mobile it said to me that no connection are available..(not Irda, not bluetooth, not USB)...i try to didin