Impacts of important component change in BoM on CO-PC
Hello dears,
will anybody please help me?
I have to change the principal component for a lot of materials.
I premise that we wouldnt change the name of the material produced.
What kind of impact this will have in Product Cost Controlling?
Thanks in advance,
Best regards.
Juan
Dear Juan,
In your case if the change is only for one HALB item(change) for only one BOM
means,easily you can do a cost rollup & released cost estimate using T code
CK40N.But this has to be done by the CO consultant and they can observe the
changes properly.But on the other side if you have carried out mass changes
using CS20,then it takes much time to clear the Finance issues.
The impact will be seen in variances,so kindly take the help from your FI-CO
consultant & proceed.
Regards
Mangal
Similar Messages
-
Impacts of important component change in BoM on VARIANCES?
Hello dears,
will anybody please help me?
I have to change the principal component for a lot of materials.
I premise that we wouldnt change the name of the material produced.
What kind of impact this will have in Product Cost Controlling and overall on variances?
Thanks in advance,
Best regards.
JuanDear Juan,
In your case if the change is only for one HALB item(change) for only one BOM
means,easily you can do a cost rollup & released cost estimate using T code
CK40N.But this has to be done by the CO consultant and they can observe the
changes properly.But on the other side if you have carried out mass changes
using CS20,then it takes much time to clear the Finance issues.
The impact will be seen in variances,so kindly take the help from your FI-CO
consultant & proceed.
Regards
Mangal -
Impacts of important component change in BoM on BW
Hello dears,
will anybody please help me?
I have to change the principal component for a lot of materials.
I premise that we wouldnt change the name of the material produced.
I premise that we wouldnt change the name of the material father.
What kind of impacts this will have on BW considering that we reunite the report by this component?
Thanks in advance,
Best regards.
JuanDear Juan,
In your case if the change is only for one HALB item(change) for only one BOM
means,easily you can do a cost rollup & released cost estimate using T code
CK40N.But this has to be done by the CO consultant and they can observe the
changes properly.But on the other side if you have carried out mass changes
using CS20,then it takes much time to clear the Finance issues.
The impact will be seen in variances,so kindly take the help from your FI-CO
consultant & proceed.
Regards
Mangal -
hi
i want to mass change some components in BOM. For example in the BOM i have 10 components. Now i want to change 5 components in the BOM
I have around 500 FG How to do that? Is it possible in LSMW?. or CS20?It is better to go for getting a BDC developed for all the mass changes in the BOM.
Using CS20 you can only change a single component and replace with a new material. I think BDC is the best alternative.
Hope this helps you. -
Mass change in component Scrap % in BOM
Hi Guru,
Can someone explain me the process of mass change in component scrap % in BOM ? I have to make zero coponent scrap % in BOM for all materials.Dear Vikash,
Check with t-code CEWB
for this you need to define work area in OP77
Regards
Madhu -
BOM Component changes when changes done in VC
Hi All,
When ever we are changing the characteristic values in Variant configuration, it result the component changes in the BOM.
Please any body let us know how to find the what are the component changes in the BOM when we change any characteristic value in VC. Is there any FM or it will store in any table?
Regards,
Vasu.Sure Vasu,
Find explanation on this as below :
BOM components are selected by making use of a special type of dependency called SELCETION CONDITIONS.
If you want to find which BOM components will be selected on selecting which characteristic value, then follow the below given procedure :
1. goto T.Code CS03.
2.enter BOM header name , plant etc. and press enter.
3. now you are in inside BOM.
4. Select any BOM component for which you want to check when will it be selected during configuration.
5. then, in top menu , choose Extra --> Object Dependencies --> Assignments
6. It will display all Object Dependencies assigned to that BOM component.
7. Select the Dependency with type Selection Condition.
8. Click on Dependency editor.
9. It will show you the Dependency code
10. when the condition as per this code is satisfied, the component is selected during configuration.
Please revert back if you have any doubt.
Reward Points.
Regards,
Gaurav Raghav. -
Component change in respective BOM
Hi All,
I have situation, one raw material used in 10 diff BOMs, but now i want to replace this component by other,
Is there is any mass transaction to amke this replacement effective.
Thanks
RegardsHi,
Yuo can try here CS20 mass changes in BOM .Where you can change material ..
Just try it.
Regards
SANIL -
BAPI to change a BOM copmonent
Hi gurus,
I am using a BAPI named by BAPI_BOM_UPLOAD_SAVE.
With this BAPI i could create a new BOM. But i am not able to change a specific component in the BOM. Is there any indicators to imply the change or is there any BAPI to change the existing BOM component without having the whole structure to be used.
Regards,
Nehru.FU CSAP_MAT_BOM_MAINTAIN
Functionality
You can use function module CSAP_MAT_BOM_MAINTAIN to process simple material BOMs.
This function module is intended mainly as a tool for changing BOMs. However, it can also be used to create BOMs.
If you only want to create BOMs, use function module CSAP_MAT_BOM_CREATE.
To change BOMs, you can also use the following function modules:
CSAP_MAT_BOM_OPEN
CSAP_BOM_ITEM_MAINTAIN
CSAP_MAT_BOM_CLOSE
For more information and examples, see the documentation of the individual function modules.
Restrictions:
To date, you can only process one alternative or variant with this function module. This means that, if you do not enter an alternative for function module CSAP_MAT_BOM_MAINTAIN, the system assumes that you want to process alternative 01.
To date, changes to the BOM header are not yet supported.
Please note:
The item to be changed can be identified in two ways:
via the fields item category, item number, sort string, and object (depending on the item category, this can be material, document data, or class data).
The names of these identifying fields begin with 'ID_' and are contained in structure CSIDENT_02. Structure CSIDENT_02 is part of structure STPO_API03.
You can use any combination of these fields to identify the item, provided the fields identify the item uniquely. Otherwise you see the error message 'Item cannot be identified uniquely'.
via the BOM node and BOM item counter
These fields are only known to the system if you have read the BOM before. If you identify the item in this way, you should therefore use function modules CSAP_MAT_BOM_OPEN, CSAP_BOM_ITEM_MAINTAIN, or CSAP_MAT_BOM_CLOSE to change the BOM.
If the error message 'Item cannot be changed' appears in the log, this can be for the following reasons:
- The item is not valid on the valid-from date - it becomes valid at a
later date.
- The item has already been changed on the same valid-from date
with a different change number.
You cannot change the item category of an item that exists already in the system.
To delete an item, you must identify it as described above for the change function and set the deletion indicator.
FL_BOM_CREATE (default ' ')
If you set this indicator to 'X', the system creates a new BOM if it cannot find the BOM you want to change and there is no other error.
Items can only be created if sufficient data exists to do this.
The system ignores items with a deletion indicator when creating a BOM.
FL_NEW_ITEM (default ' ')
If you set this indicator to 'X', the system creates a new item if it cannot find the item with the identification entered.
The system ignores items with a deletion indicator.
Example
*---- BOM header data structure
data: begin of tstk2.
include structure stko_api02.
data: end of tstk2.
*---- BOM items table
data: begin of tstp3 occurs 0.
include structure stpo_api03.
data: end of tstp3.
*---- Object dependencies table
* Basis data
data: begin of tdep2_data occurs 0.
include structure dep_data.
data: end of tdep2_data.
* Description
data: begin of tdep2_descr occurs 0.
include structure dep_descr.
data: end of tdep2_descr.
* Source
data: begin of tdep2_source occurs 0.
include structure dep_source.
data: end of tdep2_source.
* Sequence
data: begin of tdep2_order occurs 0.
include structure dep_order.
data: end of tdep2_order.
* Documentation
data: begin of tdep2_doc occurs 0.
include structure dep_doc.
data: end of tdep2_doc.
data: flg_warning like capiflag-warning.
*- Initialize database log
call function 'CALO_INIT_API'
exceptions
log_object_not_found = 1
log_sub_object_not_found = 2
other_error = 3
others = 4.
*- Fill item data
* Exception: items that can be identified uniquely via their item
* number
* 1. Item 0010: change quantity
clear tstp3.
tstp3-id_item_no = '0010'. "Item identification
tstp3-comp_qty = '5.000'.
append tstp3.
* 2. Item 0020: delete
clear tstp3.
tstp3-id_item_no = '0020'. "Item identification.
tstp3-fldelete = 'X'.
append tstp3.
*- 3. New item 0030 (stock material)
* For new items, the ID_ fields, BOM nodes, and BOM item counters are
* initial unless they use
* FLG_NEW_ITEM
clear tstp3.
tstp3-item_no = '0030'.
tstp3-component = 'MAT200'.
tstp3-item_categ = 'L'.
tstp3-comp_qty = '1'.
tstp3-rel_prod = 'X'.
tstp3-sortstring = 'A1'.
append tstp3.
* 3. Item 0040: change component
clear tstp3.
tstp3-id_item_no = '0040'. "Item identification
tstp3-component = 'MAT500'.
append tstp3.
*- Change BOM
call function 'CSAP_MAT_BOM_MAINTAIN'
exporting
material = 'MAT100'
plant = '0001'
bom_usage = '1'
valid_from = '14.10.1996'
fl_bom_create = ' '
fl_new_item = ' '
i_stko = tstko
importing
fl_warning = flg_warning
o_stko = tstk2
tables
t_stpo = tstp3
exceptions
others = 1.
if sy-subrc eq 1.
*---- Error
* Please see log
endif.
if flg_warning eq 'X'.
*---- Please see log for information, warning messages, and success
* messages.
Endif.
Parameters
MATERIAL
PLANT
BOM_USAGE
ALTERNATIVE
VALID_FROM
CHANGE_NO
REVISION_LEVEL
I_STKO
FL_NO_CHANGE_DOC
FL_COMMIT_AND_WAIT
FL_CAD
FL_BOM_CREATE
FL_NEW_ITEM
FL_COMPLETE
FL_DEFAULT_VALUES
FL_IDENTIFY_BY_GUID
FL_WARNING
O_STKO
T_STPO
T_DEP_DATA
T_DEP_DESCR
T_DEP_ORDER
T_DEP_SOURCE
T_DEP_DOC
T_DOC_LINK
T_DMU_TMX
T_LTX_LINE
T_STPU
Exceptions
ERROR
Function Group
CSAP -
Mass change in BOM - field "Relevant to sales"
Hi All,
How to do Mass change in BOM for the field "Relevant to sales" ?
Thanks.
MariannaHi,
Need to use CS02 recording in such a way that you can change every item in a particular BOM.
e.g. First get into HEader Material BOM (CS02), once you've General Item Overview screen, do NOT directly go to item details of any item.... first click on tab-'Position', enter either Item Number or Component or both and then go to item details to change the relevancy indicator. Once changed for a particular item, save the BOM & come out of it. Then try for next item & so on....
Again this is my initial thought, you need to try out few recording options like this and then chose the most suitable one. Take help from ABAP expert if any available.
Off-course, initiallly it would take time to set-up LSMW but later on just need to create a data-file & do the mass changes.
Hope it will help.
Regards,
Anup -
Add component to 200+ BOMs
Hi,
I want to add a single component to over 200 BOMs. Is there any mass change transaction ? I tried the CEWB but cant seem to figure out how to use it to add a single component to many BOMs.
Thanks
GS>
GS wrote:
> ok dudes, I am not getting a firm answer still.
>
> Can CEWB be used or not ? Whether LSMW or BDC is better is a later discussion.
>
> Also to use CS20 I need to specify a common component which would need to be replaced by this new component. I DO NOT have a common component in the 200+ BOMs. So where do I put the list of 200+BOMs to be updated ?
>
> Thanks
> GS
GS,
1. CEWB cannot be used to mass add a Components to Multiple Material BOMS.
CS20 if none of the BOM components are common for all 200, may be you can try to group them based on common materials and then try to run CS20 multiple times to complete your task.
Final option is as described earlier LSMW and BDC.
Regards,
Prasobh -
Hi,
I have created a BOM for SD (one material with some component)
Do I have a choice to delete one component for one day in the BOM (if this component is insufficient or too late GR) without change my BOM for the future days?
where can I do it in th eBOM or in the sale order.
ThanksDear,
I hope the situation is you have sales order and for that sales order you have a production order
Decide in which in production order you donot want to withdrew the component and delete that component in production order. When you confirm that component will not be issued.
If you donot want to delte in Production order, then during confirmation itself...goto goods movement screen and delete atht conmponent and save the confirmation.
pl conme back if required -
Hi friends,
Can anybody let me to know how to change a bom component in a existing BOM with the use of BAPI. Say for example i am having a bom structure for A. I want to change a line item named A1 which is a component without having the whole BOM structure.
Regards,
Sankar.Hi Sankar,
Check:
CS_BOM_EXPL_MAT_V2
Check these :
BAPI_MATERIAL_BOM_GROUP_CREATE -- Creation of a material BOM group
BAPI_MAT_BOM_EXISTENCE_CHECK --Check whether BOM for material exists
Hope this helps you.
Regards,
Chandra Sekhar -
Hi All,
I have created a sub-con PO and after that some changes are required in the BOM and the same are done. How to re-explode the BOM in the same PO and what will be the impact of the same on MRP?
Thanks in advance
Radha Krishna MadineediHi,
I created a PO > BOM was exploded > after I changed the BOM (validity 'from' in the past) > the BOM in PO remaines the same and I cannot change it.
So, you have to do it manually I' afraid...(on 'material' tab of your PO item)...because we are speaking about an already issued PO...
Just my opinion I'm not sure...
BR
Csaba -
Hi,
I need to check what change has been done in BOM and when the change has been done.
Suppose, I have added or deleted a component in BOM today then i want to check that yesterday what were components & today what is there?
Is it possible without ECM?
Regards,
Samir WadajkarHi,
You can track changes in BOM without ECM.
For one individual BOM you see the Display change document.
Display change documents. You have following options.
Document overview
Document Number
Date & Time
User who made the changes
Object ID
From this list you can display individule change document. To do this, place a cursor on a line containing the document you require. Or else you see Display Document Full.
You see all the changes document, listed one after the other.
For more, please revert.
Best Regards,
Vijay Mankar -
Component changes when changes done in VC
Hi All,
When ever we are changing the characteristic values in Variant configuration, it result the component changes in the BOM.
Please any body let us know how to find the what are the component changes in the BOM when we change any characteristic value in VC. Is there any FM or it will store in any table?
Regards,
Vasu.Hi Anji,
Thanks for your reply.
The above FMs are returning only the characteristic changes. But i need to to find the Changed Components in BOM if the characteristic value changes. Plese give any other FM if you are having.
Regards,
Vasu.
Maybe you are looking for
-
How do I add a tax form field to a tax form magnetic tape structure?
I'm in version ECC 6.0: I copied SAP's tax form HR_F_1099R_TAPE and created ZHR_F_1099R_TAPE, bringing in all the entries. The only change to ZHR_F_1099R_TAPE is to add tax form fields T102 (STATE withholding) to position 139 and T103 (STATE tax) to
-
hi all, this my query against budget error in project system in tcode sap_alr_87013558 i am finding that my budget is for 11100000, actual is 8116942,commitment is 511355,remord plan is 9597403,and available is 1502597 . please note that even i am ha
-
Add download link to lightroom gallery
I want to add a 'download' link to my lightroom gallery so that visiters can download images easily. Is it possible to add some custom html to a lightroom template?
-
I have a 2620 being used as a console server. I have an async 32A card in it with two octal cables connected to my deivces. When trying to reverse telnet to any of the lines, all I get is: % Connection refused by remote host Here is the configuration
-
MacBook Pro Screen Suddenly "Zoomed In"
I've got a two year old MacBook Pro running 10.6.8. About five minutes ago, while I was using a four-finger trackpad shortcut, the screen suddenly zoomed in about a half inch or so. Now, everything is just slightly lower resolution and my screen is