Importance of EK01 in Sales order costing

Hi all,
What is the importance of EK01 in sales order costing and what is the diff between Ek01 and EK02.
Thanks

Check this link http://help.sap.com/saphelp_pserv472/helpdata/EN/90/ba6e67446711d189420000e829fbbd/frameset.htm
Regards / KOTA

Similar Messages

  • Sales order cost estimate with GIT account

    Hi,
    Business introduced Goods - in - Transit (Balance sheet account), so PGI will always post to GIT and Invoice it will get reversed.
    For one of the Configuratble material (MTO) scenario we need the Sales order cost estimate to get the Planned cost.
    When i try to execute the sales order cost estimate it says cost element doesnot exist for GIT GL (WHich is right).
    But with maintaining the GIT how to achieve the sales order cost estimate.
    I tried to create CE category 90 for GIT, in Cost estimate am getting error CE 90 not supported for Cost estimate.
    Kindly help this is kind of urgent req for us
    Thanks,
    Sudha

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Difference between sale order Costing & Standard Product Costing

    Hi experts
    I wanted to know Importance of Sales Order Costing & standard Product Costing.what are the benefits of these.
    Regards
    Sandeep patil

    Dear Sir,
    we are implementing SAP in packing industry. In packing industry in PP Bill of material is frequently change, for this we are implementing sales order costing.
    We are doing the following things,
    1. we are doing the inquiry at that time we are doing unit costing.
    2. On the basis of inquiry we are preparing the quotation. the unit costing done in inquiry flow to the Quotation because we r preparing the quotation with reference to inquiry.
    3. Similarly we are preparing the sales order based on quoation and unit costing data flows.
    4. Now when we run the MRP it doesnot explode the unit costing material requirement.
    Please tell us how the unit costing material data will flow to MRP run.
    Please reply.
    Regards,
    Bhadresh

  • Sales order costing for Configured Material (Material Variant Not KMAT Mat)

    Hi All
    For a Configured Material (Variant) (Not KMAT Material), which is having Std price costed.
    But if we create a Sales Order for the Configured Material, what options are availale to Execute Sales order costing and take the sales order value to COGS during Delivery.
    The reason being Client wants to Cost BOM items are price which is different from the Price used in Std cost estimate due to Price Volatility.
    I can understand we can do this in KMAT, but not sure how to do in Conifgured material. We can execute sales order costing and get Statistical cost value in EK02/EK01, but how to get this value posted during PGI..?
    Thanks
    Aravind

    Hi Ajay
    Even if i maintain M in Valuation filed, my Material Variant HALB material is already having standard cost in its material master and it is picking the std cost during PGI Delivery and hitting COGS A/c.
    Now how to get my sales order costing to real and post my sales order costing value to GI..this is the client requirement.
    Due some complication KMAT is not used and logistics go with Material Variant

  • Sales Order Costing (Project Scenerio)

    Dear All,
    I am doing (MTO) sales order costing (Account Assignment is WBS element).
    Material  Code XYZ contains raw material X,Y,Z.
    XYZ=XYZ and price in Material master price control (V) - 50,100,150 price for X,Y,Z.
    So when I does Sales order Costing XYZ=50100150
                                                         XYZ=300
    Requirement comes from Sales order and when GR will done system will have new price for mareial
    X=100,Y=200,Z=300. So when production order confirm the actual cost of the material =100200300
                                                                                    =  600
    But,system is giving      XYZ=50100150
                                       XYZ=300.
    Please guide me how to  get actual cost 600 instead of 300.
    Regards
    Sainath

    Hi
    GR for the order will be done at the old std price of XYZ.
    But when you do sale order costing, actual latest price of X, Y , & Z will be costed. That will be used to arrige the COGS entry.
    But for GR against the process order old ZYZ value will be used.  Difference 600-350 will go as Price difference.
    New sale order costing value 650, if you maing Ek01 or EK02 this will be considered for COGS entry.

  • Sales order costing  - Z-report without going to sales order/quotation

    Dear All,
    Currently we are arriving the pricing thru sales order costing. After doing the sales order costing in sales order / Quotation, the costing value flow to condition type EK01. Now management has decided that, to go for manual price and put it in z-table. From z-table system will pick and show in sales order / quotation.
    Now management want to compare the sales order costing price as well as z-table price. They need z-report.
    They will put the material, plant, pricing date and costing variants in the initial screen. then after execution of this report, they should able to see sales order costing price and z-table price.
    They do not want to do the sales order costing thru sales order/quotation.
    Now the problem here is I do not know how to do the sales order costing without going thru sales order/quotation. Please provide the FM, or related table for this report.
    Waiting for you reply.
    Regards,
    Niranjan

    Hi
    Check the table KONV, with respect to VBAK-KNUMV. the table KONV keeps the record of all the Condition type of a documet and KNUMV no is a unique no. generated by the sytem for avery document.
    Hope it will help.
    Regards
    AA

  • BOM not picking correctly in Sales Order Costing

    Hi,
    During Sales Order costing of configurable material Say ABC is configurable material(finished material) and it has 4 components. I am using standard sales order costing variant as PPC4. During sales order costing from VA22(quotation) of the material ABC(finished material) system take its first two components during costing. Remaining two components system does not take. It shows correctly BOM usage as 2. But two components are missing during calculation.. What may be reaon or special configuration is required for sales order costing ?
    Best Reagrds,
    Samrat

    Dear,
    please check your condition type : Ek02
    It is used for statistical posting. If you use this condition type, the result of unit costing is simply a statistical value which you can compare with the price. So, this can be can used instead of VPRS to calculate the profit margin for the assembly item.
    Please note the following points:
    1) The condition type must have condition category 'Q' (costing).
    2) The condition type must agree with the condition type defined for unit costing in the pricing procedure.
    So, EK01 & EK02 are the condition type that will display the results of the unit costing for certain type of sales document and can be used in Make To Order scenario.
    Sales order cost estimate can be flow to COPA. Where you have to maintain setting in COPA in Define access to Standard cost estimate for costing key select sales order cost estimate.
    For transfer SD to COPA you have to use Transaction KE4I here enter SD conditions with COPA Value fields.
    So, whether EK01 or EK02, these will determine from Requirement class configuration. Requirement class in turn there is requirement type and requirement type is determined by item category and MRP type when you cost a sales order (valuated/non valuated sales order) at that time when save the cost estimate then the cost value automatically gets populated in your condition tab. Hence, if the item is not relevant to sales order costing then the cost comes from VPRS.
    For more details please check below links
    http://wiki.sdn.sap.com/wiki/display/ERPLO/VPRS%2C+EK01%28ActualCost%29andEK02%28Calculated+Cost%29
    Std Cost Calculation in Sales Order - EK02 and by T-Code CK11N
    Thanks,
    Ram

  • In which scenario sales order costing is needed ?

    Is it mandatory to have every time for a sales order to have sales order costing?
    is it mandatory to have SO costing in MTO scenerios always?
    in which scenerio SO costing is not applicable in MTO scenerio ?

    Dear ,
    POC is a Cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a materia.
    Product cost collectors are independent of the production type. This means that you can collect actual costs on product cost collectors in the following production environments:
    In order-related production (that is, when you are using production orders) when you want to analyze the costs by period rather than by lot
    In process manufacturing (that is, when you are using process orders) when you want to analyze the costs by period rather than by lot
    Repetitive manufacturing : In repetitive manufacturing you always use product cost collectors as cost objects.
    Few important points from Forum Experts 
    u2022 Object in cost accounting used in Repetitive Manufacturing.
    u2022 A separate product cost collector can be created for each production version or material. The collected costs are settled to inventory at the end of the period.
    u2022 The functions performed for product cost collector during the period end closing process include :
    u2022 Work in process (WIP) caculation
    u2022 Variance calculation
    u2022 Settlement
    u2022 In Repetitive Manufacturing, all costs attributed to the production of a material are collected on a product cost collector and settled periodically (period-based Controlling).
    u2022 The product cost collector is settled periodically according to the posting period (for example monthly) .
    u2022 For a material , product cost collector is made for each version
    u2022 The actual cost collected can be viewed through product cost collector
    you cannot use product cost collectorsfor the following:
    - Production orders or process orders that are manufactured for a sales order stock or project stock
    - Production orders or process orders that are part of a collective order
    - Joint production environments
    Hope this will give you an idea .
    Regards
    JH

  • Open Balance on Sales Order Cost Report

    Hi SAP Group -
    I have a couple questions about the settlement of manufacturing variance to COPA.
    When our settlement process is complete (production order and sales order both settled to COPA), there is a balance remaining on the sales order cost report which is equal to the manufacturing variance on the production order.
    It seems that the manufacturing variance is posting from the production order to the sales order, but is not being assigned to the PSEG and flowing to COPA.
    I am looking for advice in two areas:
    First, how do we "clear" these balances on old orders that are already settled?
    Second, how do we prevent this from happening on future orders?
    Thanks !!!

    Refer to OSS 183250 and note 186485.
    If you don’t specify in the settlement profile for the production order that the variances are not transferred from the production order into CO-PA, you will settle the variances to <b>CO-PA twice</b>: once from the production order (broken down into variance categories), and once from the sales order item. The settlement rule still references the material and not the sales order item.
    Special Features of Product Cost by Sales Order with Valuated Sales Order Stock
    <a href="http://help.sap.com/erp2005_ehp_02/helpdata/en/90/ba66cc446711d189420000e829fbbd/content.htm">Read the topic on 'Special Features of Product Cost by Sales Order with Valuated Sales Order Stock'</a>
    You may want to check the period of the variance settlement from mfg order to sales order and ensure the settlement of sales order is also done the same period, if the type is PER.

  • User Exit or BADI on saving of Sales order cost estimate (CK51N)

    Hi,
    Can any one share with me what are the User Exit or BADI that gets triggered on saving of Sales order cost estimate (CK51N).
    Regards,
    Bijay

    Hi
    Check the link
    Need Enhancement Spot or BADI for transaction ck51n
    Regards
    Sanil

  • Sales Order Cost Estimates -- Versions?

    In our MTS plant we are creating cost estimates each month with different version numbers so they can easily be compared to review cost changes.
    This concept in our MTO plant is (of course) a problem.
    We would like to create a dummy sales order and on each line list a KMAT and build an "average" configuration.  We use variant config, so the sales order bom is built automatically.  It also costs automatically.  We would like to save this cost estimate and compare it with a cost estimate of the same configuration next month.   I do not have an option for version CK51n, nor do I see a Costing Date in KEKO table.  Either of these items for MTS would create a second cost estimat and allow comparison.
    Is there a way to compare Sale Order Cost Estimates across periods?
    Any other suggestions as to how to obtain the required data??
    Thank you for all suggestions!!

    Any one think of a solution?
    thanks

  • Sales order cost objective vs OKB9  Internal order cost object.

    Hi All,
    we facing an  issue with sales order cost objective vs OKB9 cost object.
    For IC PO service material, we assigned account assignment category 4.Reasonis Service material was not showing on G\R account.
    The G\L account 7898788, we assigned to Service Item (material type DIEN)  , for G\Cost 7898788 cost element is assigned in OKB9. Combination business + order 3478787.
    Now conflict with sales order cost objective vs OKB9  internal order cost object.
    While posting intercompany IR posting system thronging below error messageu2026
    Enter only one true account assignment
    Message no. KI249
    Diagnosis
    You made assignments to several objects in CO (cost center, order, project etc.). 2 of these have been created as true objects.
    System Response
    You are allowed only one account assignment for each cost-relevant account
    How to resolve this issue.. Do I make any config changes in the system to overcome this issue?
    Or any sub account to assin in VKOA config for internal orderu2026
    Regards,
    Adi

    Hi Waman,
    Thanks for your inputs.
    Issue :  IR failed to post for wax  Sales Order -> ICPO  - Error:  Enter only one true account assignmentu2019.
    Background:
    Original setup  in  Test system   & Productionu2013 account determination for servive (DIEN) account assignment category u20184u2019 was linked to G/L Account  34444444, As part of project orange u2019, account determination was linked to account u201889710100u2019.
    Account u20188970100u2019   34444444 was replaced with 8970100 ,is not linked to any cost center & always post with reference to IC Sales Order as per config in OKB9 based on company code (US99) + cost element (89701100) + business area (9yyy). This caused a conflict while posting IR, system could not determine exact order for posting financial value.
    Conflict:  Actual Sales Order 34789343 is  linked to PO via account assignment category & IC dummy sales order (8014331) is determine via config setting. Two cost objects cannot be linked to one IR G/L account booking.
    Regards,
    Adi

  • Sales order cost estimate

    hi,
    While saving the sales order cost estimate its getting the GL account from GBB-ZG0.
    as we assigned Balance sheet account its asking the cost element.
    can you please explain what is link to get the gl from GBB-ZGO, can we change this to pick from GBB-VBR.
    Thanks,
    Sudha

    Hi,
    Are you are working with unvaluated special stock ?  In this case, the system is looking for a consumption account via the account assignment category. For example if you are using requirement class ZPJ which uses account assignment category Q. In account assignment Q, you entered account modification VBR. Therefore, the system is looking for an account via the keys GBB / VBR.
    regards
    Waman

  • Sales order cost estimate not happening because of GIT B/S account

    Hi,
    Requirement is to have Goods in Transit account in PGI and reverse it in Invoice no issues iwth it.
    For the same sales order user wants to get cost using sales order cost estimate.
    When i run that am getting following error
    Item 00001 : Cost element 14001212 does not exist in CO area 0010 for 10/07/2011
    Message no. KK689
    Even though i maintain the CE for Balance sheet account with Cost element category 90 its not accpeting.
    Can you please help me on how to proceed for sales order cost estimate.
    Thanks,
    sudha

    hi,
    if you give a balance sheet account in obyc , you will not be able to create a cost elementin category 01 , accordignly system will give error in sales order costing , as its not able to get correct cost element in cost planning.
    if your requirement is just to post  cogs to a balance sheet account which is goods in transit and when invoice is done cogs to be posted.
    you should actually use  revenue based RA functionality on sales order instead of assinging a balance sheet account in obyc.
    in this approach;
    - first assign a p/l account in obyc and create cost element in cateogry 01.
    - create revenue based RA and assign RA key in requirement class.
    - in OKG8 for RA category  WIPR and your ra key assign , goods in transit account and give a offsetting account which is not cost element (credit entry in offsetting account nullify debit in account given in OBYC when GIT is posted , when billing is done system will automatically post a oppsite entry in both account).
    -in OKG8 for RA category COSR give the COGS account and a offsetting account without cost element (credit entry in offsetting account nullify debit in account given in OBYC when COGS is posted).
    regards
    rajesh

  • Plan value(break up) not appearing in sales order cost report

    hi
    I have done sales order bom in cs61,operation in ca01,in va02 for sales order costing in itemization showing like
    material 100
    actity      10
    total 110
    saved and if I see in cost report it show only revenue , cogs(110),but it is not show raw materials and operations.
    please advise me what to do?
    Thanks and Regards,
    Nagesh

    Dear Nagesh,
    Probably, you need to check the status of the BOM and the Routing in the Header. It should be active/released.
    Kind Regards
    Umapathi G
    Edited by: Umapathi Naidu G on Aug 11, 2011 3:26 PM

Maybe you are looking for

  • Ordering moment integration with Active Directory or LDAP

    ServiceLink can only be used in the Authorization moment and Service Delivery moments. We have use cases where in the ordering moment we need to make web service calls to AD or query LDAP. We are currently looking at purchasing AJAX libraries or get

  • External monitor flashes on and off randomly after wake from sleep

    I have a Mid-2009 13" MacBook Pro 2.26GHz hooked up to a Samsung SyncMaster 2033 External monitor via the MiniDisplayPort-DVI connector. After waking from sleep, the external monitor will go blank for a fraction of a second at random intervals (displ

  • HTML tags in Hidden Item not displaying correctly

    I have created a HTML Text Region which includes a Javascript function. The function references a Hidden Item also created and linked to the region. The Hidden item returns a text field from the database with concatenates multiple rows together into

  • CS3 or Dremaweaver 8.0

    We are looking to purchase Dreamweaver. Our Web Designer is using 8.0. We are looking at buying CS3. Are there any potential issues between us using a more up-to-date version than that being used by our web designer?

  • Is there any Java support for RFC 3229?

    Hi, RFC 3229 appears to be the modern form of HTTP DRP. Is there any Java support for this at all? Are there any Java HTTP servers, HTTP client libraries that support it? Thanks, Curt RFC 3229 Delta encoding in HTTP http://www.ietf.org/rfc/rfc3229.tx