Importing dictionary project from SDA file?

Is it possible to import an SDA file (containing a dictionary definition) into a dictionary project? I have lost the original project I was working with, but stil have the SDA.
Thanks,
Martin

Hi Martin,
Not sure if you are aware but you can open the SDA using a zip tool and import the contained par.
Cheers
Daniel

Similar Messages

  • Can I import a project from laptop which has same file names as existing

    Im about to import a project from Aperture on my on-road laptop to my main Aperture library on my studio Mac when i realised that the new camera i purchased for the road trip has named the files exactly the same as some files (but different pictures) which already exist in my studio Mac. Even though they exist in different projects, what will happen if i import the new project into my main Aperture Library?

    Hi Sunspeaks;
    I just had a similar problem. Since I had my MBP on the trip, we were downloading our photos to Aperture there in projects. When I returned home I discovered we had with photos with the same names but different project names. I was able to import everything into Aperture without any trouble. For my own sanity I did a batch rename to change the photo names in Aperture after the import.
    Allan

  • Importing a project from RH 6 to 9

    Hi There
    I am trying to import a project from RH 6 to 9. I have managed to do it successfully once but when click to Open a Recent file Online Help HHP file I get an error message "No current file". I have tried to Import HTML Help Project I get the same message. Any ideas?
    Thanks
    Melissa

    Opening the .xpj file should just work. Can you provide detailed steps of what you are doing?

  • Is there a way to import a project from iOS iMovie 2.0 to OSX iMovie 10.0.3?

    Is there a way to import a project from iOS iMovie 2.0 to OSX iMovie 10.0.3?
    I can get the project file on my MacBook desktop, but can't find a way to import it into iMovie 10.0.3

    No you can not.
    You can connect USB 3 components to you MB if you wish to use them but will only run at USB 2 specs.

  • I am trying out Final Cut Pro X and trying desperately to import a project from iMovie 11 (version 9.0.9). There is no export to FCPX in iMovie 11 nor is there import from iMovie in FCPX.

    Can someone please help me?
    I am trying out Final Cut Pro X on a 30 day trial. So far so good.
    I am now trying desperately to import a project from iMovie 11 (version 9.0.9) into FCPX.
    I have read multiple posts on this subject and they all recommend File/import/ from iMovie project in FCPX
    However there is NO such option under File/import in FCPX - nor is there an option to export to FCPX in iMovie 11
    Can anyone please enlighten me.

    The current version of FCPX does not work with that version of iMovie. You need version 10.0.3, which allows you to send a project to FCP.

  • How to import a logo from flat file to SAP in SMARTFORM.

    how to import a logo from flat file to SAP in SMARTFORM. i need to know whether TIFF format is used and also the full steps.
    Thanks,

    Hi,
    You can not directly use a logo from a file into a Smart form. First you will have to upload it to SAP. This has to be done only once. Once it is imported into SAP then you can use it in smart form. To import a logo to SAP, goto SE78. Open the tree under GRAPHICS. Select the file type and click on the Import (first button on the toolbar, just before delete button). Select the logo file and give it some appropriate name along with description. Select appropriate type of the image and click Continue. Your logo will be uploaded into SAP from a file. Now in your smartform, Create a Graphic Node, give the name of the logo along with other properties. In this way you can import a logo from a flat file into SAP and consequently in a smart form.
    Reward points if the answer is helpful.
    Regards,
    Mukul

  • Transitions don't work after importing a project from Premiere to AE

    I've imported a project from Premiere CS3 to AE CS3 and all my transition (fade + wipes) are now solids and they don't work on timeline or on exports, but they still show in my sequence.
    How can I make AE use those transition again so I don't have to go through all project and keyframe transitions.
    Notice that I use Cineform and that those transition are Cineform's one; hope that doesn't cause the problem since AE uses CF too.
    Thnak you for your time and interest in my problem.

    fredou_79 wrote:
    Notice that I use Cineform and that those transition are Cineform's one; hope that doesn't cause the problem since AE uses CF too.
    Exactly the problem. AE is only to able to translate a few transitions, which include the normal cross-disolve, linear wipe, dip-to-color and a few others, but since those routines are hard-coded in the Premiere Pro Importer, they have no way f doing the same for third-party products. So more or less you will have to rebuild your stuff, either by using the proper transitions in PPro or in AE.
    Mylenium

  • How do i import XML-project from imovie with the clips being apart? And not imported as one big clip...

    Hello!
    I have a problem with my final cut express. I want to import my project from iMovie (multiple clips in one project) without the clips together as one big clip.
    Important: XML-from imovie
    This had worked before but one day a note showed up at the screen saying:
    If i choose yes the project becomes one big clip and if i choose no this error shows up:
    and the project wont be imported.
    Help me please! This has never been a problem before.
    Sorry for the bad english, i am from sweden.
    Thanks!   //Karl Ekdahl

    Hello!
    I have a problem with my final cut express. I want to import my project from iMovie (multiple clips in one project) without the clips together as one big clip.
    Important: XML-from imovie
    This had worked before but one day a note showed up at the screen saying:
    If i choose yes the project becomes one big clip and if i choose no this error shows up:
    and the project wont be imported.
    Help me please! This has never been a problem before.
    Sorry for the bad english, i am from sweden.
    Thanks!   //Karl Ekdahl

  • Import SAPUI5 project from Eclipse to Appbuilder

    Hello everyone,
    Is it possible to import a project from Eclipse into Appbilder? I have tried but I can not manage to get it to work. I read somewhere online that Appbuilder only supports HTML view, is that why I can't import my project?
    I also tried to create a new eclipse project with HTML view just because I wanted to try to import it...it didn't work though.
    I just want to know if it's me doing something wrong or if if it just isn't supported :-)

    For your information:
    I have searched and come to the conclusion that it is not possible to import projects from other IDE's into AppBuilder.

  • Need a script to import the data from flat file

    Hi Friends,
    Any one have any scripts to import the data from flat files into oracle database(Linux OS). I have to automate the script for every 30min to check any flat files in Incoming directory process them with out user interaction.
    Thanks.
    Srini

    Here is my init.ora file
    # $Header: init.ora 06-aug-98.10:24:40 atsukerm Exp $
    # Copyright (c) 1991, 1997, 1998 by Oracle Corporation
    # NAME
    # init.ora
    # FUNCTION
    # NOTES
    # MODIFIED
    # atsukerm 08/06/98 - fix for 8.1.
    # hpiao 06/05/97 - fix for 803
    # glavash 05/12/97 - add oracle_trace_enable comment
    # hpiao 04/22/97 - remove ifile=, events=, etc.
    # alingelb 09/19/94 - remove vms-specific stuff
    # dpawson 07/07/93 - add more comments regarded archive start
    # maporter 10/29/92 - Add vms_sga_use_gblpagfile=TRUE
    # jloaiza 03/07/92 - change ALPHA to BETA
    # danderso 02/26/92 - change db_block_cache_protect to dbblock_cache_p
    # ghallmar 02/03/92 - db_directory -> db_domain
    # maporter 01/12/92 - merge changes from branch 1.8.308.1
    # maporter 12/21/91 - bug 76493: Add control_files parameter
    # wbridge 12/03/91 - use of %c in archive format is discouraged
    # ghallmar 12/02/91 - add global_names=true, db_directory=us.acme.com
    # thayes 11/27/91 - Change default for cache_clone
    # jloaiza 08/13/91 - merge changes from branch 1.7.100.1
    # jloaiza 07/31/91 - add debug stuff
    # rlim 04/29/91 - removal of char_is_varchar2
    # Bridge 03/12/91 - log_allocation no longer exists
    # Wijaya 02/05/91 - remove obsolete parameters
    # Example INIT.ORA file
    # This file is provided by Oracle Corporation to help you customize
    # your RDBMS installation for your site. Important system parameters
    # are discussed, and example settings given.
    # Some parameter settings are generic to any size installation.
    # For parameters that require different values in different size
    # installations, three scenarios have been provided: SMALL, MEDIUM
    # and LARGE. Any parameter that needs to be tuned according to
    # installation size will have three settings, each one commented
    # according to installation size.
    # Use the following table to approximate the SGA size needed for the
    # three scenarious provided in this file:
    # -------Installation/Database Size------
    # SMALL MEDIUM LARGE
    # Block 2K 4500K 6800K 17000K
    # Size 4K 5500K 8800K 21000K
    # To set up a database that multiple instances will be using, place
    # all instance-specific parameters in one file, and then have all
    # of these files point to a master file using the IFILE command.
    # This way, when you change a public
    # parameter, it will automatically change on all instances. This is
    # necessary, since all instances must run with the same value for many
    # parameters. For example, if you choose to use private rollback segments,
    # these must be specified in different files, but since all gc_*
    # parameters must be the same on all instances, they should be in one file.
    # INSTRUCTIONS: Edit this file and the other INIT files it calls for
    # your site, either by using the values provided here or by providing
    # your own. Then place an IFILE= line into each instance-specific
    # INIT file that points at this file.
    # NOTE: Parameter values suggested in this file are based on conservative
    # estimates for computer memory availability. You should adjust values upward
    # for modern machines.
    # You may also consider using Database Configuration Assistant tool (DBCA)
    # to create INIT file and to size your initial set of tablespaces based
    # on the user input.
    # replace DEFAULT with your database name
    db_name=DEFAULT
    db_files = 80 # SMALL
    # db_files = 400 # MEDIUM
    # db_files = 1500 # LARGE
    db_file_multiblock_read_count = 8 # SMALL
    # db_file_multiblock_read_count = 16 # MEDIUM
    # db_file_multiblock_read_count = 32 # LARGE
    db_block_buffers = 100 # SMALL
    # db_block_buffers = 550 # MEDIUM
    # db_block_buffers = 3200 # LARGE
    shared_pool_size = 3500000 # SMALL
    # shared_pool_size = 5000000 # MEDIUM
    # shared_pool_size = 9000000 # LARGE
    log_checkpoint_interval = 10000
    processes = 50 # SMALL
    # processes = 100 # MEDIUM
    # processes = 200 # LARGE
    parallel_max_servers = 5 # SMALL
    # parallel_max_servers = 4 x (number of CPUs) # MEDIUM
    # parallel_max_servers = 4 x (number of CPUs) # LARGE
    log_buffer = 32768 # SMALL
    # log_buffer = 32768 # MEDIUM
    # log_buffer = 163840 # LARGE
    # audit_trail = true # if you want auditing
    # timed_statistics = true # if you want timed statistics
    max_dump_file_size = 10240 # limit trace file size to 5 Meg each
    # Uncommenting the line below will cause automatic archiving if archiving has
    # been enabled using ALTER DATABASE ARCHIVELOG.
    # log_archive_start = true
    # log_archive_dest = disk$rdbms:[oracle.archive]
    # log_archive_format = "T%TS%S.ARC"
    # If using private rollback segments, place lines of the following
    # form in each of your instance-specific init.ora files:
    # rollback_segments = (name1, name2)
    # If using public rollback segments, define how many
    # rollback segments each instance will pick up, using the formula
    # # of rollback segments = transactions / transactions_per_rollback_segment
    # In this example each instance will grab 40/5 = 8:
    # transactions = 40
    # transactions_per_rollback_segment = 5
    # Global Naming -- enforce that a dblink has same name as the db it connects to
    global_names = TRUE
    # Edit and uncomment the following line to provide the suffix that will be
    # appended to the db_name parameter (separated with a dot) and stored as the
    # global database name when a database is created. If your site uses
    # Internet Domain names for e-mail, then the part of your e-mail address after
    # the '@' is a good candidate for this parameter value.
    # db_domain = us.acme.com      # global database name is db_name.db_domain
    # FOR DEVELOPMENT ONLY, ALWAYS TRY TO USE SYSTEM BACKING STORE
    # vms_sga_use_gblpagfil = TRUE
    # FOR BETA RELEASE ONLY. Enable debugging modes. Note that these can
    # adversely affect performance. On some non-VMS ports the db_block_cache_*
    # debugging modes have a severe effect on performance.
    #_db_block_cache_protect = true # memory protect buffers
    #event = "10210 trace name context forever, level 2" # data block checking
    #event = "10211 trace name context forever, level 2" # index block checking
    #event = "10235 trace name context forever, level 1" # memory heap checking
    #event = "10049 trace name context forever, level 2" # memory protect cursors
    # define parallel server (multi-instance) parameters
    #ifile = ora_system:initps.ora
    # define two control files by default
    control_files = (ora_control1, ora_control2)
    # Uncomment the following line if you wish to enable the Oracle Trace product
    # to trace server activity. This enables scheduling of server collections
    # from the Oracle Enterprise Manager Console.
    # Also, if the oracle_trace_collection_name parameter is non-null,
    # every session will write to the named collection, as well as enabling you
    # to schedule future collections from the console.
    # oracle_trace_enable = TRUE
    # Uncomment the following line, if you want to use some of the new 8.1
    # features. Please remember that using them may require some downgrade
    # actions if you later decide to move back to 8.0.
    #compatible = 8.1.0
    Thanks.
    Srini

  • Importing personal certificate from pfx file

    Using iPhone configuration utility 3.5.0, Is it poosible to import a perosnal certificate using a .pfx file.
    When I try to miport it only lists certificates in the personal certificate store on windows machine? It doesn't allow me to import a certificate from a file.

    I am pretty sure that you can mail this certificate to an email account you can access on your iPad. Then when you open the certificate file it will be imported

  • Importing a project FROM Premiere Pro to FCP - Any alternative to EDL ?

    Hi, when I google this issue - trying to get a project from Adobe Premiere Pro (for instance CS4) to Final Cut I am always terribly frustrated to find only references to the fact that APP imports XML (and now in 4.01 with better support for Final Cut Pro XML). But APP only exports EDL, and that is a very limited platform for talking accross the programs. Does any one have a better solution? Is there any external software for converting an APP project into XML? Can anyone hint as to why Adobe doesn't include "export to xml" in the export menu (like Final Cut Pro so elegantly does) other than fear of people taking their projects and running away to Final Cut Pro (which doesn't make any sense at all, and is no way of dealing with users' needs). Because it would seem that they only want us to be able to move stuff from FCP to APP. But what about us, who desperately need to move in the other direction?! Any light on this matter would be greatly appreciated.
    Cheers and a happy 2009.

    +I would indeed like to do this test. To what email do I send a zipped file to?+
    http://www.automaticduck.com/contact/
    +And also, if I may keep bothering you on this issue: Granted that APP projects are XML, still, Final Cut Pro projects and Avid Projects are NOT XML, they can just interact well with certain forms of XML (type 1,2,3 etc, but apparently not prproj), correct? (a curiosity)+
    Correct, Final Cut Pro project files and Avid project and bin files are not XML. Final Cut Pro has the ability to export and import XML files that are formatted as XML. XML is a flexible file format, the files can web pages, preference files, document files, just about anything. Apple has defined an XML format that can be used to interchange project data with Final Cut Pro. For a lot of good reasons it doesn't make sense for third parties to write or read FCP project files directly so Apple developed a method to write and read project data through another format. XML is an excellent choice because it is so easy to work with, XML files are simply text, easily read and edited and written. Avid systems use another file format for interchange with other manufacturers, AAF. AAF is not XML.
    A lot of editors first heard of "XML" via Final Cut Pro's use of it as an interchange format, so it isn't surprising that these editors equate XML with FCP. It is a bit pedantic of me to drive home the point, but I just want you to clearly understand the issue.

  • Importing archived project from DVD

    I used burn disk to arcive a project to a DVD. That seemed to work fine.
    I then started a new project and tried to import the "archived project from the DVD and I keep getting this error:
    The file could not be imported: The file “Macintosh Hard Disk/Volumes/Media Drive/Home movies/Billie Jo awards” can’t be imported; QuickTime couldn’t parse it: -43
    So far I am unable to import this DVD or anything else into iMovie
    Any Ideas?
    David

    Your Archived DVD Project will only open in iDVD.
    To access the video you will need the burned copy of the DVD
    To import your DVD you will need a DVD ripper. I use Mac the ripper http://www.versiontracker.com/dyn/moreinfo/macosx/22715.
    If you want to only import the video (to edit or watch on your computer) chose in mode chapter extraction and select the ones you want (yes you can select them all). Then you will need to condvert the .VOB file (found in the video_TS file) to a .MOV or H264 using FFMpegX http://ffmpegx.com/download.html. If the binaries dont work just press cancel (you dont need them for this conversion). Then import your .MOV or .MP4 file into iMovie.
    That should do it
    eMac   Mac OS X (10.4.8)   1.42Ghz PPC G4

  • Error messages during XML import of Project Pro 2010 files

    Hi folks,
    I'm trying to diagnose a couple of sick Project Pro 2010 files loaded from Project Server by saving them locally as XML files and then reimporting (not connected to the server during import).  The anomalous behavior exhibited by both files
    is that one takes 15 minutes to load from the server, while another takes over 20 minutes. These are not typical load times for this server.  In both cases, Project consumes about 25% of the CPU during the load process. There's little network I/O
    while this goes on, and when externally linked schedules are loaded to the cache, they load very quickly.  Other than the long load times, the schedules appear to be behave normally, except for some very odd print preview behaviors in one of the schedules
    that I asked about in a different thread (among other things, the default print preview start date is 17 years after the default finish date, and the finish date is about 11 years before the schedule actually starts).
    The questions I'm asking here are about errors I see when I try to import the files exported as XML, and whether they might provide any clues as to what's causing the load time issues.
    When attempting to import one of the files saved as XML, a pop-up appears that says, "The actual finish date is before some of the previously entered timephased actual work values. If  you continue with this operation, Project will truncate
    some of the previously entered timephased actual work values. To continue, click OK..."
    When attempting to import the other file saved as XML, I get a series of pop-ups identifying a series of tasks that say, "The timephased edit will cause 'Develop Requirements Review Meeting Mi...' to start before 'Conduct Requirements Review"
    finishes.  As a result the task link cannot be honored.  You can: () Continue. Keep the timephased edit and ignore the link.  () Cancel. Ignore the timephased edit.  (OK/Cancel/Help)".
    Interestingly, both files contain external Project Server predecessor / successor links.  In the case of the first file, the XML import just appears to strip those out.  In the case of the second file, I get a long series of pop-ups (with
    some buggy text inserts) in pairs.  The first message in the pair is typically "An import error occurred.  The element <PredecessorLink> in the <Task> element with <UID>=611 has invalid data.  Verify that the file
    name and path are correct, and then try again. (OK)", where the indicated UID varies. The second pop-up in the pair appears to have a buggy text constructor and looks like this, with "[stet]" indicating the apparent buggy text inserts,
    "An import error occurred.  The element [stet] Verify that the file name and path are correct, and then try again. [stet] in the 309 element with <UID>=7 has invalid data. [stet] ^4 (OK)"
    In the second pop-up of the pair, the "xyz element" varies, but the "<UID>=7" reference and "^4"  are consistent. In the XML, UID 7 appears to refer to a calendar, a task which includes a number
    of entries similar to:
    <TimephasedData>
    <Type>24</Type>
    <UID>7</UID>
    <Start>2014-10-03T08:00:00</Start>
    <Finish>2014-10-04T08:00:00</Finish>
    <Unit>2</Unit>
    <Value>PT8H0M0S</Value>
    </TimephasedData>
    ... and to an assignment:
    <Assignment>
    <UID>7</UID>
    <TaskUID>10</TaskUID>
    <ResourceUID>-65535</ResourceUID>
    <PercentWorkComplete>100</PercentWorkComplete>
    which includes blocks like:
    <TimephasedData>
    <Type>2</Type>
    <UID>7</UID>
    <Start>2014-10-17T08:00:00</Start>
    <Finish>2014-10-17T17:00:00</Finish>
    <Unit>2</Unit>
    <Value>PT8H0M0S</Value>
    </TimephasedData>
    Eventually, the second file also does load with no external file links indicated.
    Again, I'm just looking for anything that might be a clue to the long Project Server load times.
    Thanks in advance,
    LP

    Slow performance can come from a number of different things. Without knowing more detailed information about your setup or workflow, it's difficult to accurately troubleshoot.
    -What kind of Mac are you using?
    -What is your source format?
    -Where is your source footage located?

  • HT202276 import iMovie Project from iphone iOS8 into iMovie 11  with os 10.8.5 MBP failed

    My import of iMovie Project from iphone to  rMBP iMovie 11 failed.
    I began an iMovie Project on my iPhone 6+ ios 8.1.2. I imported it through iTunes into my rMBP 10.8.5 Mountain Lion, but cannot import it into iMovie '11 v9.0.9, get error message.
    Must I have Yosemite?
    I am not ready to upgrade to Mavericks or Yosemite until February because of Parallels older software.
    I do have Final Cut Express.v 4.0.1, could i do it there?
    A possible workaround:
    I do have access at home to my partner's MBP 13" with iMovie and Yosemite. But if I put the iOS iMovie Project file on her computer, and edit in in her iMovie, will I be able to transfer all the files and links of the movie back to my rMPB 15"

    I've been having a similar issue but for me I have tried several things:
    1. Import directly from Iphone 6.  - Left it over night and it imports some but not all
    2. Import from usb drive - I copied the photos off my phone to a usb drive. This imported into Photos and I was left with approx 12 that had the incorrect date. They said data taken was the date of import. I can lvie with this.
    3. After no.2 worked I then connected my Iphone to import any new pics and it said that I had approx 11,000 photos to import....these are the same photos that had already been imported!!!
    Can I reinstall Iphoto on my Macbook Pro (Early 2011)....??? Please?

Maybe you are looking for

  • Am unable to see all COLUMNS of my_ALV in SPOOL from a BACK GROUND JOB, Why

    hi experts, pls. clarify m ysimple doubt that, Am running a ALV report in my_BACK GROUND..........this ALV contains 16 comuns...........I ´got the SPOOL from the scheduled my_BACK GROUND.......I noticed that, ONLY 9 columns are showing up????????????

  • Address Book - Birthdates

    I am fairly new with the imac and learning how to use the address book.  Previously we had an adddress book on Windows where we could list every person in the family including the children with their birthday. If I want a family contact and list the

  • Can't Access Tutorials in PSE 7

    I can only access a few of the (NON-Plus) tutorials in my Elements 7 that I could access before the current update I  got today. (I don't have PLUS).  I get the tutorial screen, sometimes it says it's loading, sometimes not, then, nothing. I'm new to

  • Automatic Credit Memo

    Hi Experts, we have a problem, standard process of vendor rejection is return delivery (122 or 161) then credit memo. But our company wants to post credit memo first (automatically) as soon as QA person reject the mateiral thru Usage decision, financ

  • Agent cannot go to ready state after lunch or break without loggin out and back in.

    UCCX 8.5 I have a small contact center group.  One of the agents I just recently setup is having an issue.  She is telling me that when she selects work offline and then goes to lunch or break or something and comes back, it will not let her log back