Importing EDL project frame rate is always 23.98

Hi There,
I'm importing a 24 frame EDL. All of the import settings are set to 24 fps. However on import, the project frame rate is always 23.98.
I have added the number 24 to the defaulteframerate section of the preferences file, but no luck.
Anyone found a solution to this?
Thanks

Just a wild guess since I don't normally work in 24 fps... all of us NTSC-biased types accept that 23.98 (more accurately, if not absolutely precisely expressed as 23.976) is the "pull-down" frame rate that results from a telecine transfer, and is the rate that is assumed, corresponding to 29.97 or 1000/1001.
This framerate is emulated in a number of "Digital Cinema" electronic origin formats.
Absolute 24.0000 fps is a bit rare in these parts and in reality probably would only come up if one were working with a dpx image sequence properly scanned, not telecined.
Not saying that 24.000 does not exist -- I'd say that it is just as uncomfortable a fit in 25 fps-land as it is here! And Color / Final Touch has been notoriously bad with 25 fps.
good luck and merry christmas....
JPO

Similar Messages

  • Any way to make AI import obey project frame rate?

    HI
    apologies if this has been asked before but the search facility does not seem to be after effects only focussed.
    I keep getting caught out by 1080P dimensioned AI files always being imported as 29.97 fps even though my import prefs and Project settings are 25 fps.
    Is there a way I can hack this into working
    (freelance at a place with version CS5 today)
    Tristan

    When you create a new comp it should follow the last composition that you created. IOW, create a new NTSC D1 Comp that's 30 seconds long and the next new comp you create will be the same.
    When you import an Illustrator or Photoshop file as a Composition the frame size, if it's a standard frame size, sets the frame rate of the composition. IOW, Import a PSD that 720 X 480 as a comp and it will come in as a DV comp with a frame rate of 29.97. Import a file as a comp that's pal frame size and it should come in as a PAL composition at 25 fps.
    I haven't looked but I suspect that this may be set somewhere deep in the preferences file. You can edit the prefs file with a text editor. Someone smarter than me may be able to tell you where the setting is, or you may be able to find it by doing a search of the prefs file.

  • After Effects CC import "Sequence Footage" frame rate settings in "Import" preferences

    Just started using the new AE CC (v12 as Adobe will not refer to it as) I noticed one thing that seems to work differently from CS6 and that is in the preferences for import Sequence footage settings.  It doesn't seem to work normally, at least for me.  I don't know if this is an issue related to how AE CC works with the cloud but the dfault frame rate for sequence footage importing is 30fps.  I am trying to import footage that is natively 23.97 at 24 fps.  So like in CS6 I go to Preferences - Import - Sequence Footage - frame per second and change it from 30 to 24 frames per second.  Closed the software, opened it back up, checked the settings and saw that they took, it still says 24 frames per second like I told it.  But when I import a piece of 23.976 footage, it comes in at 23.976 as opposed to the 24 fps I set it as.  Same goes for 30 fps footage, it comes in at 30 fps and not 24.  User error is always my first assumption, I'm not proud i just want it to work, am I doing something wrong or just confused?  Thanks for any help.  p.s.  help is not someone responding with, "I don't know" or "I don't have AECC yet".  I know somebody is going to!

    Hi Tim,
    WOW!  Thanks for the super-fast reply!  As soon as I posted this I realised I should have mentioned that I am importing DPX files.  I do import quicktimes as well but know that the footage import does not apply to a single file, only a sequence of files.  But I still wonder if I may be either doing something wrong or am just a little confused.  I have been using After Effects since CS3 doing compositing for film and I always use DPX sequences.  I did a bunch of comparing and back and forth with AE CS6 and AECC while trying to figure this out.  I always set my preferences up when I upgrade before I start working and I always set them up the same.  I have been using CS6 since last July and it still works the same.  What I did is imported five or six different DPX sequences, some were rendered out as 24 fps, some at 30 and some at 23.976.  Assuming AE looks at the metadata to decide how to auto interpret, AE CC opened them all at their native frame rates of the just mentioned 24, 30 and 23.976 respectively, even though I told it to import at 24fps in the preferences.  I also imported the same files in AE CS6 and they all opened at 24 fps like always.  I know I can change the frame rate in the "Interpret footage" option, that is what I have been doing today so that I can work with footage in 24fps but since I have it set in the preferences to import image sequences at 24fps, I am perplexed as to why it does not do so, so I do not have to interpret the footage to my preferred frame rate, as is the case in AE CS6 as well as it was in CS 5.5 and CS 3.  Since I was lucky enough to have an Adobe employee chime in Tim, I would be curious to see what you may find if you recreated this scenario.  Would it be possible for you or someone at Adobe to set the sequence footage import frame rate to 24 fps in the preferences then try to open a piece of footage that is natively 23.976 fps in both AE CS6 and AE CC?  Like I said, I certainly beleive I may be doing something wrong but I would be very curious to see what you find on your side.  I would not be suprised if it imported at 24 fps in AE CS6 and 23.976 fps in AE CC.

  • Converting a projects frame rate

    Within FCP v. 5.0.4HD is there any way to convert a 29.97 sequence to a 23.97 sequence? Here is the prob -HDCAM masters shot at 23.97, dubbed to DVCAM for offline... The project/sequence was setup for 29.97 instead of 23.97. The online must be done at 23.97 to injest the master tapes at their true frame rate. How, oh how can i convert that sequence to batch the HDCAM. Video editor on a film project!

    What stage of the project are you at?
    Were the dubs made digitally (meaning do they have pulldown flags)?
    You can't change the sequence time base to 23.98 when 29.97 clips are on it.
    If there are pulldown flags you can remove the pulldown with (Cinema Tools or Compressor - Shane?).
    If there aren't pulldown flags on the DVCam tapes, you're out of luck if you want an exact offline. You may be able to make it work by transferring your 29.97 files to 23.98 via Compressor and editing with those on a 23.98 timeline, but it won't be exact. You will have to check your edit points once you reach the online.
    I'm just guessing, by the way. Having converted 23.98 footage to 29.97 for Analong Tape delivery, I'm thinking it should work to do my work flow backwards...but I'll probably be ridiculed into the ground...

  • Slow-motion from iPhone not importing at correct frame rate

    Hi everyone. I'm noticing that video shot in slow mo (120 fps) on my iPhone 5 is not importing into FCPX.1 at 120 fps. Nor does FCP give me an option to keep the 120 fps.  I'm sure I'm just overlooking something. Tried making a preset but that didn't work either. Net result is I'm just hitting the timeline with a duration change.
    What does anyone else recommend.  I'm hoping to get that delicious 6Plus with 240 fps so I want to make sure I've got my workflow set.
    Thanks so much!
    Viddy

    Here we go--just happened again. Screen shots here. The video plays what looks like 29.97 fps despite having more data available. Obviously no setting to put that timeline at 120 fps but I thought at least 60 fps would stick. ...... hmmmmm.

  • Are different frame rate clips automatically conformed to that of the project?

    I have a 25p project and have dropped in some clips shot at 30p.
    I thought I would have to conform those clips to play at 25p but they appear to be doing that already and to my surprise there is no orange render line above them.
    Is this correct and if so, would any other frame rates (50p or 60p etc.) be conformed to 25fps with no rendering required?

    YYes, clips conform to the project frame rate.

  • Help with TIFF image sequence frame rate?

    I'm working on an animation sequence, its a 24p project.  Whenever I import an image sequence, Premiere automatically interprets this at 29.97 (though, per the help files, it should automatically interpret at the project frame rate, but it's not).  In the project panel, I use interpret footage so that it interprets at 24p.  However, when I bring this image sequence into the timeline it shows at the right duration, but the end of the sequence is cut off (essentially, premiere is still reading in at 30p, but gives it the duration of 24p).
    CS4 is the first version I've had this problem with.. usually, I just bring in the image sequence and it's fine.
    Any suggestions?
    Thanks.

    Hi, I have the same problem as my workflow is to import R3D into AE CC and render it into Tiff sequence. At first I had changed every setting to 24, and it rendered out choppy and clipped off a few frames in the end.
    Now I have tried this
    Once you import Tiff, right click> Interpret Footage > Main
    Then you will see black box. In this column box, there is Frame Rate column, then tick Assume this frame rate: 24 frames per second.
    You have to type in 24 yourself, then it works out fine.
    My guess is that Tiff is sequence image, and it DOES NOT have frame rate. So you have to tell AE to assume the imported image sequence's frame rate. Otherwise it always assumes 30 by default.
    Hope it works.
    DDH111

  • 23.98 frame rate

    I have HD footage that has a frame rate of 23.98 fps. Can I edit Final Cut Express 4.0.1 without it converting the frame rate to 25fps? There's no setting in the Esy Setup for 24fps, so I am assuming it will have to re-render everything to 25fps every time I import? Or how do I set the project frame rate to 24?
    thanks

    FCE does not handle 24fps (23.98 fps) material.  Never did.  FCE only handles certain frame sizes/rates/codecs, and you cannot make specific settings other than what is available in the Easy Setups.
    24 fps is a progressive mode; for editing in FCE you would have to convert it to an interlaced mode; or to 720p 25 or 30.  If you are in North America then that would be 60i or 30p.  The 25 fps/50i Easy Setups are PAL (European) settings.
    My main suggestion is to upgrade to Final Cut Pro X.   All other ways of editing the video in FCE involve converting the frame rate, which is not a great thing to have to do as there is always some loss of quality.  You might look into JES Deinterlacer or MPEG Streamclip to convert the frame rate to one that is supported in FCE.

  • Export XML in right frame rate  for resolve?

    Hi!
    I'm in serious need for some help! When I import my exported XML sequence from premiere in to DaVinci Resolve 10 lite, I get an error message saying "The imported sequence frame rate (25) must be the same as the project frame rate (23,976)." All of my settings in Premiere that I can think of is set to 23,976fps, but if I understand the error message right, DaVinci claims the XML is 25fps... doesn't make any sense at all. I've tried for several hours now getting this to work, but it won't.
    I would really appreciate some help with this one, I'm in a hurry (as always, we're behind schedule). Worked with Davinci many times before, never had any problem with it.
    Regards
    /Patrik

    I am not a Resolve user, but could it be that Resolve has been set up for a 25fps project? And maybe the lite version restricts your frame size?
    Just curious.

  • What frame rate should you build your Flash file at?

    Every second of video has 30 frames. But Flash animations can
    be done at any frame rate, which raises a couple of important
    questions:what frame rate should you work at, and second, if you
    choose to work at a rate other than 30 frames per second (fps), how
    do you convert to 30 fps? I deal with the question of frame rate
    conversion below.
    You can create a Flash movie at 30 fps. But if is going to be
    played back on a computer, a 30 fps .swf file will generally
    produce unacceptably high data rates, unless the image is very
    small and simple, or the computer it is playing on is very fast. It
    can also create a lot of extra animation work if you want to draw
    in-betweens for all 30 frames. Fortunately, there is no need to
    build your Flash movie at 30 fps, even if you are planning to
    transfer it to video.
    I usually build animation that needs to work on the web or
    video at 12 fps. This gives us a good balance of lower data rates
    and smoother animation. When creating cartoon style animation, it
    also keeps our work consistent with the majority of broadcast
    animation. While some high end cel animation is done at 24 frames
    per second (the rate that film is projected at), much broadcast
    animation is created at 12 fps. This is because it is drawn on
    "2's." In other words, each image holds for 2 frames. Do the math
    and it becomes clear why--half the amount of frames to draw each
    second. While Disney and Dreamworks may have virtually unlimited
    budgets to create their epic animations, most broadcast (and even
    more so, Internet) productions are on very tight budgets. But even
    the big studios do a lot of character animation on 2's. It looks
    good that way, so why create twice the work?
    If we are using flash to build a cartoon solely aimed at
    broadcast or film, however, we build it at 24 fps. That way we can
    animate on 2's for most of the character animation, but do animate
    on 1's for segments or particular motions that require smoother
    animation.
    If we are using Flash to build graphics for broadcast use
    only, and so won't be hand drawing in betweens, we usually build
    the file at 30 fps. This will give us the smoothest motion, and
    data rate won't be an issue for you. It is also possible to even
    build it at 60 fps, and convert this to a 30 fps video with fields
    In the end, you can decide to build it at any rate you want.
    The lower the rate, the smaller the file size, data rate and number
    of frames to animate, but the less smooth the animation.
    Conversely, the higher the frame rate, the higher the file size,
    data rate and number of frames to animate, but with smoother
    animation.
    now I use
    FLASH VIDEO MX PRO
    to covnert Video in multiple formats to FLV or SWF, I set the frame
    size just as above, I always get soomth Flash
    at the meantime, I have to set video rate when I use
    FLV To Video Convert
    Pro to play the video in my iPod, if you set the wrong frame
    rate, your iPod and other devices may not support the frame rate

    Usually video quality has nothing with frame rate, but when
    you convert flash to iPhone or other devices, you should think of
    which frame rate video can your device play. when I convert .swf to
    iPhone with
    SWF to Video
    Converter, as you know, iPhone can only support frame rate from
    2 to 15 or a little more, I always choose 15. In this scare, frame
    rate is higher, the quality is better.

  • Intro Movie at slower frame rate when uploaded

    The intro movie I created for my photography site plays too
    slow when uploaded, thus making the music finish long before the
    animation is done; needless to say, this makes for a very tacky
    intro!
    Does anybody know what I'm doing wrong?
    Thanks

    The frame rate is always set to the "prefered" frame rate.
    The actual frame rate depends on the server, the speed and the size
    of the swf file. The best you can do is to fully optomise the
    images before you import them into flash.
    As you are into photography I can understand the need for
    good quality images thefore it is a case of what do you prefer?
    Good images or good speed!

  • FCE frame rate problem?!

    Hi, if someone could help me with this asap that would be so helpful?!
    Basically I'm having a problem with the frame rate in Final Cut Express. I was using 3 different Sequences to edit different clips/audio in. I then wanted to put them all in to the same Sequence but when I did the clips were flashing different colours and wouldn't play properly. All of the clips were 30fps however the project frame rate was 29.97fps? How did the frame rate of the project change because I didn't know you could change it and how can I change it back?! Thansk :-)

    29.97fps is the actual frame rate for NTSC (North American) video.  It has historically been called "30fps" for convenience sake.  However in recent years true 30fps capability has appeared even in some consumer camcorders.  This can result in some subtle problems if you mix real 30fps material in a standard 29.97fps sequence.  The "change" you refer to could occur if your clips were recorded at a real 30fps and you put them in a 29.97fps sequence.  FCE will try to conform the clips to the sequence settings.
    For completeness, here is what FCE supports:
    SD video at the following frame rates.  FCE imports DV video as QuickTime/Apple DV during capture from your camcorder
    DV-NTSC @ 29.97 fps
    DV-PAL @ 25 fps
    HD video at the following frame rates.  FCE transcodes all HD video (HDV and AVCHD)  to QuickTime/Apple Intermediate Codec during capture from your camcorder.
    720p25,
    720p30
    1080i50
    1080i60

  • How to export a flash project with a changing frame rate to a video

    I have a Flash project that is a series of roughly 1000 images.  The result of the images is a simple animation, and there is music imported on a separate layer.
    There are moments in the music that I wanted to line up with certain frame changes, and there are sections of the music that I wanted to match up with a faster (double-time) frame rate.
    I used this code in several places in the a code layer:
    stage.frameRate = x;
    The result is exactly what I want in SWF -- the animation speeds up and slows down at the exact right moments to match up with the music track, but it seems like it's just not possible to export this variable frame rate project to a video file?
    According to the accepted answer on this post: http://forums.adobe.com/message/4019538, it seems that:
    The export function in Flash Pro doesn't transcribe *frames*, rather it plays the Flash animation and records it like a camcorder
    If that's true, then I would think there is a way to record a variable frame rate project into a video -- does anybody know if this is possible?

    That or Premiere would both get the job done. After Effects might be more desirable as it has a feature called Time Remapping (right-click on the video layer, Time->Enable Time Remapping). You can add keyframes to any point in a video and then drag them around to speed up or slow down the video. That'll allow for very precise tweaks.
    Finally all I'd suggest is when you jump into your next project, make a quick dummy test project to see if the software you're using is easily capable of producing what you want. It'll solve the headache of completing the project only to land where you are now. Now you know Flash won't play nicely with scripts and Export Movie. If your desired end result was always a video I'd probably use video editing software to make the video. There's some free stuff out there if you really look, but no, it won't be as nice as After Effects or Premiere by any stretch. Although when you see how amazing After Effects is, you'll probably want to buy it .

  • Speedgrade frame rate issue when loading reels. EDL from Premiere CS6

    We have a short film, cut in Premiere (time base in sequence is set to 23.976 and display format is set at 24fps) I imported the EDL into Speedgrade for coloring. My Speedgrade edit settings have a base frame rate of 24fps and the option "both edits have current base frame rate as set above or within the EDL itself" is selected. However when I go to load reels from desktop I am getting an error that says "some of the reels do not match your current frame rate." In turn this is causing our exported Quicktime (TIFF uncompressed at 24fps) to not sync up with our audio back in premiere. It looks as if we are missing frames.
    Is this an EDL issue with Premiere? Or is it a Speedgrade frame rate settings issue? Any feedback is greatly appreciated!
    Some details on the project:
    Shot at 4K on Red Scarlet, at 24fps.  Edited in Premiere CS6.
    Premiere Settings:
    Editing Mode: Custom
    Timebase: 23.976 frames/second
    Display Format: 24fps Timecode
    Speedgrade Settings:
    Timeline FPS: 24fps

    aaronfronk wrote:
    Shot at 4K on Red Scarlet, at 24fps.  Edited in Premiere CS6.
    Premiere Settings:
    Editing Mode: Custom
    Timebase: 23.976 frames/second
    Display Format: 24fps Timecode
    Speedgrade Settings:
    Timeline FPS: 24fps
    I don't have had problems if the frame ratio is the same in all process, and in this case it isn't. If the Scarlet footage is to 24 fps, why to use 23.976 in Premiere?

  • Relink project clips with different frame rate

    Somehow the clips in my project sequence ended up with a different frame rate (25) than the original media files (23.95), and they are no longer linked -- maybe this happened during import from iMovie.  When I try to relink project files to source media, I get an error message saying they cannot be relinked because they have a different frame rate.  I changed the sequence framerate to 23.95 (by creating a new project with 23.95 as the frame rate, then copying and pasting the other timeline into it), but all the clips remain at 25, so the problem remains. 
    How can I change the clip properties to frame rate 23.95 so I can link to the original media?
    Thanks.

    The media got unlinked importing the project and events from iMovie to Final Cut.
    I've attached screen shots with all the specs.

Maybe you are looking for

  • Will Windows 7 damage rescue & recovery option?

    I have installed Windows 7 on my X300 which is running XP. I can boot into XP or Windows 7 but pressing the ThinkVantage button just gives me the option to choose boot device (as F12), BIOS config or normal boot - no recovery option. As it is a secon

  • Posting VAT only invoices

    Hi Experts, Please help me post VAT only invoices. I would like to post the invoices only with VAT amount and to see the same in VAT report. Can anybody has come across these type of situations, if then please help me. Regards

  • Was using the maps feature, it crashed and then my phone went black and won't turn on now. :-(.

    I Don't know what happened to it. I'm also having the problem of calls going straight to voicemail.

  • A few java functions i dont understand.

    The following functions i need translated into VB6 i have tried so very hard to this but i cant figure it out so i was hoping the people here on the sun forums could possibly help me i thank anyone who can remotely help me with this problem. private

  • Does Logic respond to CC's 34 and 43?

    My copy of Logic Pro is from the Studio 1 Box, so is it the same as the $199 version in the app store? I was allowed to update via the APP Store to 9.1.8 but the AU plug in I use sends CC7 which causes the faders to go crazy because CC7 is the defaul