Importing Program from Production System to DEV and QAS.

Hi All,
I have 3 Systems in my Landscape.
DEV-> QAS-> PRD
One of my Z program is running in the Production system.
This Z program is got deleted in the DEV and QAS.
How can I import the Program from Production System to QAS and DEV.
Regards,
Viji.

hi Vijaya laxmi,
you can goto Production system ---> SE38/ SA38 and copy the program and create the same in program using SE38 in Development system  and then transport it to Quality system.
You can also Re-Import the Request from Production to Dev system.
Thanks,
Nelson
Edited by: Nelson karunakar on Sep 18, 2008 7:15 AM

Similar Messages

  • PRD installation in a differenet domain than DEV and QAS

    Dear Experts,
    I need to install SAP ECC 6 and PI 7.1 on production servers.Our dev and qas servers are running in the domain X(for eg) and the PRD servers are in the domain Y(for eg).All the servers are supposed to be in the same landscape.Do I have to include the prd servers also in the same domain as dev and qas or will it cause any issues running them in different domain ?If it gives issues pls let me know the the kind of issues  it will be as I need to give my IT team proper reasons to run all the servers in the same domain.
    I know some reasons like servers should be in the same domain if we use common transport directory.
    Please let me know if there are any other reasons.
    Regards,
    Dinakar
    Edited by: mutnuru dinakar on Apr 13, 2011 7:19 AM

    Hi Sunny,
    Thanks.your notes are helpful.From PI point of view,running dev PI and prd PI in different domains will cause any issues?
    Suggestions of others will also be appreciated.
    Regards,
    Dinakar
    Edited by: mutnuru dinakar on Apr 18, 2011 1:44 PM

  • How we can monitor while import request in production system?

    dear friends,
    will you please explain me
    how we can monitor while import request in production system?
    and
    what are the things we have to monitor during the transport?
    thanks
    regards
    zaheer

    Hello Zaheer ,
    I would always recommend to check that you have the latest transport tools, tp and R3trans in use in the system to avoid import errors.
    Check with
    tp -v
    R3trans -v
    if either are more than around 4 months old, I would strongly recommend to download the latest for your release from the SAP service marketplace. This avoids needlesly encountering issues that have been resolved in more recent patch lebels of these tools.
    During the import, it is important to check the contents of the directories
    usr/sap/trans/tmp
    and
    usr/sap/trans/log
    that they are being continously updated which shows import is progressing.
    Most important, keep checking the latest entries in the alog, uloag and slog to see which phases and trasnports are currently being imported.
    If a transport fails, check these logs and the latest ones updated in usr/sap/trans/log for further details on the failure.
    If there is an error please NEVER manual run any commands wihtout contacting SAP and having them analyse the issue.
    When opening a message, be sure to include the latest alog, ulog and slog, along with the last few files most recently updated in usr/sap/trans/log and if possibel open an R3 connection to the import system.
    Best regards,
    Paul

  • Issue whilel transporting from production system to quality system

    Hi All,
        I am facing issue in process chain when I transport it from production system to quality system. Process chain is related to deleting PSA logs. When transported to quality system object_type and object_name fields in display variant becomes blank. In production system it is showing 8ZXXX_CA, it should become 8ZXXX_HA in quality system.
       Thanks for your help.
    Regards,
    Shankar

    Hi,
        sorry it was frm dev system to quality system, not prod to quality.
    Regards,
    Shankar

  • How to make inactive ABAP Program in production system

    Dear Expert,
    I have a lot abap program in production system which are not used anymore and my company plan to upgarde our SAP system, therefore to reduce the effort for the SAP upgarde I will  deactivate the unused ABAP program.
    My question how to change the active abap to inactive in production system ?
    Thank you in advance.
    Best regrads,
    Tjandiagung

    Program details are stored in the table REPOSRC.
    Primaray keys are PROGNAME and R3STATE.
    Suppose if the program zxy is in active state, then enry will be
    ZXY  A
    Suppose if we made some changes to it and saved, so the program is in inactive state. so one more entry will be there in the table
    ZXY A
    ZXY  I
    So if you add like this for the program which you want in the table REPOSRC, then that programs will be in inactive state.
    Regards,
    Nikhil

  • Is it possible to Delete BP's from production system

    Hi All,
    Is it possible to delete old BP numbers from production system?
    if yes please let me know the procedure and impact on the system.
    if no please let me know ,how to prevent user from entering old BP number into order.
    Thanks in advance for your help.
    Regards,
    Shaik

    Hi Shaik,
    You can delete the BP using transaction BUPA_DEL.
    Just enter the number of the BP you want to delete and then execute.
    Make sure that all the checkboxes on the selecton screen are clear.
    In case the BP has dependencies and deletion is not alowed, you will get an error message informing you of the same.
    Best Regards,
    Rishu.

  • Startrfc - SAP utility to invoke ABAP programs from External systems

    We have used the startrfc uitlity that comes along with the SAP Presentation CD. This is bundled with the SAP RFC SDK kit. The startrfc utility can be used to invoke ABAP programs from external systems or servers.
    When using the startrfc from the SAP server using the parameters
    startrfc -h 10.60.0.31 -s 01 -c 100 -u USERNAME -p PASS -F <Function Module> -E TPPARAM=\usr\sap\trans\bin\tp_domain_<SID>.PFL -T LIST,300,w=list.txt
    the desired results are achieved.
    However when using the same startrfc with the exact parameters from another server we get the message " Incorrect user or password". If we use the SAP GUI from this server to connect to the SAP server using the same username and password we are able to connect to the SAP system.
    Has anyone encountered any similar issues with Startrfc? Any suggestion will be appreciated.
    Thanks,
    ~Nilesh

    Hi NIlesh,
    Did you check that the password and user ID entered are in capita letters?
    Thanks and Regards,
    RK

  • DEV and QAS copy from PRD

    Hi,
    We have ERP 2004 on Windows 2003 with SQL 2005.
    Due to some corrections(config changes and abap corrections) were made directly made in our PRD System, we now need to completely refresh our DEV and QAS system with PRD.
    As we do not have enough space to make a system copy, please suggest me a way to do a complete refresh without PRD data getting into DEV and QAS servers.
    Thanks and Regards
    Dev

    Hi Mukund,
    In your scenario , better to go for client export / Import process in order to refresh .
    Select the appropriate profile :
    SAP_ALL    All Client-Specific Data w/o Change Documents
    SAP_CUST   Customizing
    SAP_CUSV   Customizing and User Variants
    SAP_CUSX   Customizing w/o Authorization Profiles and Roles
    SAP_EXBC   Customizing, Users and Cross-Client Customizing
    SAP_EXPA   SAP_ALL with Cross-Client Customizing
    SAP_EXPC   Customizing Including Cross-Client Customizing
    SAP_PROF   Only Authorization Profiles and Roles
    SAP_RECO   Recovery (Only if Source Client = Target Client)
    SAP_UCSV   Customizing, User Master Records and User Variants
    SAP_UCUS   Customizing and User Master Records
    SAP_UONL   User Without Authorization Profiles and Roles
    SAP_USER   User Master Records and Authorization Profiles
    I think you need   SAP_EXPC    " Customizing Including Cross-Client Customizing " .
    Do not go for  SAP_ALL as it contains all config and data .
    Regards,
    Nibu

  • Import RFC from SAP System to XI

    Hi
    It is taking more time ( 5 to 10 mins) to list the RFC from SAPsystem ,When i try to Import RFC from SAP System to XI.
    Please let me know your ideas on the same
    Regards
    Madhan D

    Hi,
    Could you pls check the following sap notes..
    SAP Notes  718320,767091 and 212011 for a better idea on difference in performance while extracting data from R/3 backend.
    Regards,
    Madhu

  • Upload Opening balance of G/L accounts from legacy system to SAP, and also

    Hi Gurus,
    How to upload Opening balance of G/L accounts from legacy system to SAP, and also Vendor and Customer balance.
    My Doubt is when you upload the customer balance and vendor balance will it effect the sundry debtor account and sundry creditor account if not the how will the sundry debtor account and sundry creditor account will be posted with the balance. Please send me the general entry passed for posting the same.
    What I understood is that when we are uploading the customer and vendor balances through LSMW, no entry will be passed and it will update the customer and vendor sub ledger in FBL1N and FBL5N but it will not affect the sundry debtor account and sundry creditor account.
    To give effect to sundry debtor account and sundry creditor account we need to manually pass a journal entry as follows.
    1)  Sundry debtors account A/c -
    DR
          TO clearing account A/c
    2)     clearing account A/c -
    dr
         Sundry creditor account A/c
    Please let me know whether iam correct
    Also please tell me what will be the scenario for uploading of the assets balances through LSMW.
    THANKS AND REGARDS
    MV

    Hi,
         When you uploading any data from legacy system to sap normally we will be using LSMW or BDC,thru this we will be uploading master data like G/L,vendor,Customer and asset master these are the some examples and we will upload transaction data also that is P&L Account and Balance sheet.When we do uploading data thru LSMW system will update all the values of vendor,customer and asset values as well as subsidary ledger also.No need to do manully.
    Regards,
    satya,
    FICO

  • What is CTS ? what is the role of CTS in between DEV and QAS?

    Dear
    What is CTS ? what is the role of CTS in between DEV and QAS?
    Thanx & Regards
    Mohamamd Nabi
    [email protected]

    hello, friend.
    actually, you can search for subjects like this in the threads archive.  you will be pleasantly surprised to find that there are already many threads with similar issues and that you can find answers to even more otherwise unrealized questions.  and you don't have to wait for anyone to reply.
    it looks like the issue is urgent for you, and this is why i am attaching this feed from Sadhu Kishore, which was posted some time ago... (if he replies to your thread, you may choose to award him points).
    "Hi,
    The transport workflow provides a framework for transporting enhancements or new developments of existing business functions in a system landscape. It provides a direct connection between development and transport administration. The transport workflow manages the transport process, determines the user for each individual step automatically, and then displays an interface which they can use to perform the task directly.
    It is an efficient method of transporting a selected number of requests into a group of transport targets, and uses clearly defined approval steps to ensure the quality of your target systems. The requests can be transportable change requests, Customizing requests, relocation transports or transports of copies. The transport targets do not need to be located on defined transport routes. However, the transport workflow can involve some risks, caused by the dependencies between transport requests:
    Import sequence
    It is important that you import requests in the correct order, so that development work is up-to-date in the target system.
    Incompleteness
    It is important that the functions transported in the transport proposal are complete; otherwise errors may occur in the import system.
    A request is not imported, but it contains an important data element. You use another request to transport a table that references this data element. Since the referenced data element does not exist in the target system, activation errors will occur when you import the second request.
    The transport workflow is a generic workflow. Its ability to process the transport route configuration in TMS enables it to adapt itself to any system landscape. This means you can transport multiple requests into multiple targets, even if these targets are not located on the transport routes.
    This reduces the amount of work for the transport administrator significantly. The automated nature of the workflow also reduces the likelihood of errors during transports.
    You can use the transport workflow in two different ways.
    Transport workflow as a transport strategy
    If you have production systems in your landscape that can only accept approved transports, we recommend that you use the transport workflow to organize and coordinate the transport process.
    To do this, set Workflow-controlled transports as your transport strategy and configure the transport workflow.
    When you release a transport request, the transport workflow starts automatically and the screen Create Transport Proposal appears. The requests are then released implicitly when the transport proposal is sent to the transport administrator.
    Special transport workflow (mass transports)
    You can use the special transport workflow to make transports that do not follow the defined transport routes or that take place outside the normal transport schedule (part of the mass transport strategy). These transports may be corrections made in the development system that have to be transported into the production system without delay.
    To use the special transport workflow, set Mass transports as your transport strategy and configure the transport workflow."
    thanks.  you have been most generous.
    regards.

  • Special Characters issue in DEV and QAS

    Hi,
    I am uploading a file that has special characters (Japanese).
    In the DEV system the special character is converted to #. Which the business wants.
    In QAS system the special character is not converted and is as it is, which makes the business users difficult to find out if any speical characters are there and they don't want the special character as it is
    The file consists millions of record with a possibility of four or five records with special characters
    The special characters on keyboards is not an issue.
    The programs in DEV and QAS system are same and the file tested is also the same but different results.
    Tried in Tcode SNLS to find something but didn't know what and where to look into.
    What could be the issue in this? Looks like this is Basis issue but would like to know if anyone can let me know.......
    Regards
    Sandeep

    Hi ,
    i want to check ur open dataset statement in the program which is being used here if at all in ur case.
    Can you please check the relavant code page in both the D and Q systems and search with the appropriate hexa decimal values(for the special characters ) in both the systems ..
    u can use code page by tcode scp ..
    ex -> as u say a special char sp1 is having entry in q and code page which is being used (like 4200 )
    is not having in d03 .
    then if in d03 this page has no entry then it shows as # , since it is showing in q then it has an entry over there. this is my guess..
    so if at all the client wants not to see this special char's , u need to remove them from this code page.. and check ..
    Cant say if this can solve but u can take this as one more way of dealing with code pages  and special chars....
    br vijay..

  • Sort Dumps All Over in DEV and QAS While Applying Patches - Help Pls

    Applying about 80 patches on DEV and QAS over the weekend with the "Minimize Downtime" option. I got failure at the "TEST_IMPORT" phase and tried to backout and ignore the error but now I keep getting short dumps for any tcode that I use. I can't get past short dumps.
    Here is a sample of short dump that I got when I try to execute SPAM and reapply just one patch. I does not load the patch, it just generates a short dump. I opened an OSS note with SAP and they refused to consider that as high priority. Since my DEV and QAS systems are down, the developers will not have any system to work on today and there will be a lot pressure on me today. Please help.
    Short Dump text below                                                                        
    The following syntax error occurred in the program SAPLKKBL :           
    "The field "GFLG_NESTED_PRINT_ON" is unknown, but there is a field with"
    Error in ABAP application program.                                                                               
    The current ABAP program "CL_GUI_ALV_GRID===============CP" had to be   
    terminated because one of the                                          
    statements could not be executed.                                                                               
    This is probably due to an error in the ABAP program.                                                                               
    What can you do?                                                                               
    Please eliminate the error by performing a syntax check                 
    (or an extended program check) on the program "SAPLKKBL ".              
    You can also perform the syntax check from the ABAP/4 Editor.           
    If the problem persists, proceed as follows:                            
    Print out the error message (using the "Print" function)                
    and make a note of the actions and input that caused the                
    error.                                                                               
    To resolve the problem, contact your SAP system administrator.          
    You can use transaction ST22 (ABAP Dump Analysis) to view and administer
    termination messages, especially those beyond their normal deletion

    Hi
    Please check the following link, it may help you:
    Re: Can not lanche workflow with event
    Can you give me some more details like whether the patch application is complete or its hung in between? Did u tried to restart the patch application? Can you tell me what error you got while patch application in import_proper phase?
    Regards
    Sumit

  • Using same webdypro iview with DEV and QAS

    Dear Sir,
    We have the webdynpro program iview in EP 7.0 , however, I would like to change the same webdynpro iveiw with different client in Sap DEV and QAS,  Is it possible? Or how to change the connection to SAP system.
    Please kindly advise.
    Thank you and best regards,
    Vimol

    Vimol,
    Yes, you can do it.
    Procedure :
    Logon to NWDS : -> Windows-> Preferances->J2ee Engine
    First mention the QAS system on which you want to deploy the application.
    Then change these parameters and point to the DEV system.
    Now, you have finished deploying the application in both the servers successfully.
    1.Logon to the QAS system
    http://fqdn:portnumber/sld
    2.login as a J2ee_admin
    3.Create a technical system and test the jcos that you are using in your application there. After the JCOs are tested and pinged successfully, run the application and test.
    4. Finally, create a web dynpro iview and assign it to the users or roles you want.
    Repeat the same steps for your DEV system and you are good to go.
    Hope this helps.
    Cheers,
    Sandeep Tudumu

  • Compare SPRO between DEV and QAs

    Hi there,
    I'm in GoLive eve and all consultants are desperate with the future problems.
    Is there a way that I can compare the customizing (SPRO) between DEV and QAS or another system?
    Thanks,
    Dany Anderson
    Edited by: Dany Anderson Alves on Mar 4, 2008 9:03 PM

    Hi,
    Use comparison tool in SCU0.
    Select SAP Reference IMG and ssay compare.
    This will show the differences if any.
    You can also compare at component level.
    cross system visibility should be maintained in SCC4 settings for the client
    Regards,
    Revathi

Maybe you are looking for

  • New computer, new itunes, do i have to erase everything on my itouch and iphone just to sync it with my new computer??

    Hello,      I recently purchased a new windows laptop because i needed a new one. My old laptop ive had for quiet awhile and i've had it for like 7 years. Anyways, i have a iphone 3GS and itouch 4 generation. I installed itunes onto my new HP laptop

  • CRS 2008 - Failed to open the connection.

    I just recently installed the evaluation of CRS 2008 onto my server. I can access every function in CMC and can see all reports that were published in InfoView. However, when I attempt to view a report, I get an error that states "Failed to open the

  • Help With Zen Vision:M 30G, lost alot of music, "rebuilding" progress bar doesnt fin

    I purchased my Zen Vision:M 30GB player about 5 months ago and its been great untill today I turned it on and it froze, so i hit the reset button. Heres the thingI reset it and that "Rebuilding" progress bar poped up like it has in the past when i hi

  • Oracle Drivers Problem

    I am facing unique problem. I am connecting to Oracle using Oracle Inproc server 3.0 type library(Set Session = CreateObject("OracleInProcServer.XOraSession")). After establising the connection when we execute the a stored procedure using the datbase

  • Graphical screen painter Not working

    Hi: When I am trying to access Graphical screen Painter in the transaction SE51,an error message is getting displayed with text "No response from graphical screen painter-exiting". And Alpha numeric editor is getting opened instead of GUI Editor. Can