Impossible to create process order by MD04

Hi friends
My scenario is that I have a material that can be produced in-house and some times procured externally by subcontracting
in material master:
Procurement Type = 'X' and Special procurement = '30'
The problem is that in transaction MD04 the only posibility is convert the planned order to purchase requisition and I need to convert to process order also.
Regards

Javier,
As you have maintained the special procurement key 30 i.e. subcontracting, you will be having option of only creating purchase requisition & not process order in MD04.
Remove the special procurement key, rerun the MRP & then check the requirement list in MD04.
Hope this helps you.
SmanS
Edited by: SAP PP Consultant on May 28, 2009 10:57 AM

Similar Messages

  • Error in manual batch determination while creating process order

    Hi Expert,
    Manual batch determination is happening for some of material and for some material it is working firne  when creating process order,
    Pleae assist
    Thanks
    Intekhab

    Dear,
    please open this prd order in change mode CO02 then press tab button cost calculation near release button in order header screen now do not save this order go to edit >log> cost calculation
    There it will show the error tht occured during costing
    Please refer this thread,
    Cost error when saving production oredr
    Regards,
    R.Brahmankar

  • Problem on creating process order

    Dear Team,
    I have a problem on creating process order thru COR1 where the basic start date only accept and follows current date. Basic finished date, no problem. Previously, i can set the basic start date using previous date / date in the past (in the same current month). I'm using "Only capacity requirements" for scheduling type.
    is there anywhere in the SAP config that i can check?
    and why this problem occured?
    Thanks

    Dear Tallha,
    Here is screenshoot of my process order. the basic finished date is automatically changed to current date. (date entered 1/5/2014)
    Thanks

  • Problem with creating Process order confirmation using BAPI

    Hello,
    While creating Process Order confirmation using BAPI_PROCORDCONF_CREATE_TT, material document is getting created. But a line item is inserted in the table AFRU without material document number. When it is created manually using the transaction COR6, the table is getting updated with material doc in the line item. Can anyone let me know what other attributes to be passed in order the update the same?
    Thanks in Advance.
    Regards, Senthil G.

    Hello , I am working with the same Bapi, can you please send me the code to fill the parameters, if I find the same error like you, I will send you the solution if I correct that.
    Thanks for your help.
    [email protected]
    Guatemala, Cempro ADATSA

  • Problem creating process order with ref of sale order

    Dear all,
    Kindly give solution for this scenerio..............................
    I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is assigned to that order only.
    My problem was suppose if sale order is created for 10 tonns, but my batch size and resource capacity is 2 tonns only. so first time i change my batch quantity 2 tonns instead of 10 tonns and created my order and confirmed.
    if i go to second time the same process i am doing creating process order with ref of same sale order but it comes again 10 tonns instead of 8 tonns. why it comes like this already i confirmed 2 tonns in this sale order?
    my requirement is if any process order is created with ref of any sale order and again if i am creating any process order with ref of same sale order left quantity only system should show.
    for this what i have to do kindly help to this
    regards,
    s.sakthivel

    Dear KK,
    Pls check whether ZKIN, ZKQT, ZKOR have all the properties similar to IN, QT, OR respectively. If they are different, please ensure that you know the reason why they are different. This check has to be done at tcode VOV8
    Some fields like sales document category, Transaction group, screen seq group, Doc pricing procedure need to be similar to the parent document unless you know why you have changed them.
    Once this check is done, check the copy controls in VTAA. Before that try creating these documents separately without reference. This shoudl work fine only after which you need to check copy control. If this is not working fine, then there is some problem with the document type settings in VOV8. Testing this is possible only if Reference mandatory field is left empty. Make sure that is properly configured.
    Once this is done, check copy controls in VTAA. You can just copy the copycontrol between IN and QT and QT and OR and create for ZKIN to ZKQT and ZKQT to ZKOR.
    Once this is done, check whether your item category settings are properly done , also the schedule line settings. The tcodes are VOV7, VOV6, VOV4, VOV5 etc.
    Now check whether your material master and customer master are consistent with the item category settings(Item category group).
    Now create the transaction. It shoudl work fine.
    Reward if this helps.

  • Create Process Order by BAPI (COR6)

    Hi,
    I am looking for BAPI to create Process Order (Order category = 40),
    Instead of doing BI to transaction COR6.
    I try <b>BAPI_PRODORDCONF_CREATE_HDR</b> but with no success,
    because it works only with Production Order (Order category = 10).
    I get the following error: <i>“Orders of the order type YI01 cannot be confirmed“</i>
    (YI01 is a Process Order type).
    Thanks in advance,
    Gilad.

    Hi Gilad, I the same problem, I am using the bapi 'BAPI_PRODORDCONF_CREATE_TT',
    please if you find the correct BAPI, send me,
    If I find it first, I send you.
    Thanks for your help.
    Leonel Saavedra
    Guatemala.

  • Need BAPI for COR1(Create process Order)

    Hi Gurus,
    I need a BAPI or Function module for create process order (Tcode - COR1)
    for which i am passing Plant, storage location,produced material number, quantity to produce,
    received material,quantity to recived.
    Regards,
    Vijay Mekala

    Hi,
    is there any other BAPI or function module for COR1...
    Regards,
    Mekala Vijay

  • COR1 create process order change field value when save(PPCO0001)

    Dears
    When tcode: COR1 create process order, i want to change some fields value on the tab: "Goods Recpt", for example the field: Goods Recipient:                     , anyone konws how to do this? now i am trying to using the exit: PPCO0001( EXIT_SAPLCOBT_001)
    in thie eixt tables POSITION_TABLE : has this field: WEMPF (Goods Recipient) , i add some coding to change this field and save , but the change is not affect on the order . that is when open the order just create , this field is still empty.
    do i need some other process or call some other functions or some other exit to do this?
    thanks a lot for your posting.
    Edited by: Jackyguoguo on Mar 11, 2010 3:51 AM
    Edited by: Jackyguoguo on Mar 11, 2010 4:21 AM

    1. Use BADI: WORKORDER_UPDATE--> Method: BEFORE_UPDATE
    2. Use ASSIGN "(SAPLCOBT)AFPO_BT[]" statement to access and modify the desired fields.
    Regards,
    Suraj

  • Create process order confirmation

    Hello,
    I use the Bapi 'BAPI_PROCORDCONF_CREATE_TT' to create a confirmation in our Z program to replace 'COR6N'.
    The only problem I meet is that it makes a material document for the good movements but don't write it in the table AFRU (field WABLNR).
    Do I miss something in the BAPI??
    I run the BAPI like that:
      CALL FUNCTION 'BAPI_PROCORDCONF_CREATE_TT'
        IMPORTING
          return                   = lwa_return
        TABLES
          timetickets              = gt_timetickets
          goodsmovements           = gt_goodsmovements
          detail_return            = lt_detail_return
    The tables gt_timetickets & gt_goodsmovements are filled with relevant values.
    Could anyone help me to know what make the doc no. to be written in AFRU?!!!
    Thanks in advance,
    Fariba

    Hi Fariba,
    I am facing the same kind of issue that you faced long back. If you have resolved this issue, can you help me by replying back to the thread Problem with creating Process order confirmation using BAPI
    Thanks in Advance.
    Regards, Senthil G.

  • Stop Creation of reservation while creating process orders....

    Hi All,
    THe requirement is to stop creation of reservations on creation of process order.
    have done the configuration in order type dependent parameters to stop creation of reservations on creation of process order.
    After this configuration the reservations have stopped appearing in the MMBE for components although there are reservation created.
    The above case appears only when i am creating process orders manually through transaction COR1....But when process orders are created by converting Plann order then in this case although the order type is same there are reservations visible in the MMBE transaction for the components.
    Request you to please guide through the reason for creation of reservations when a process order is created by converting a plan order.
    Thanks in advance for your help.
    Vinit

    Hi All,
    We are using the planning strategy 40 where in we produce only when the sales order is received.
    For a material we are using SPK as stock transfer from other plant.
    The requirement for this material is triggered due to 1)dependent reservation(as this component is used as a component to manufacture other material 2)Sales requirement for this material.
    On MRP the requirement is transferred to the supplying plant and we receive the stock in our plant.
    Now this stock is the total of requirement generated to fulfill the sales requirement and the consumption requirement.We cannot differentiate which stock was called in for sales order and which for fulfilling the production requirement of the superior material.
    Whenever a production order for the superior material is created reservation for this material are created because of which the stock will not be available for creation of deliveries for sales orders.(This is because of the av checking rule)
    Is there a way to differentiate these stocks.
    We thought about creating MRP areas to manage the requirements differently but this will lead to creation storage locations and thus affect our global template.
    Thus we thought of blocking of creation of reservations......this we thought as all the materials are already available by the time the process order is created so there is no point in creating reservations for the same.
    Let m know if you need any further information .......Help me providing a proper solution to the issue.
    Thanks in advance

  • Creating Process Orders Without a Material and Without a Master Recipe

    Hi PP experts, anyone knows if it is possible and how to do create Process Orders Without a Material and Without a Master Recipe?
    Thanks!!

    Dear,
    If you want to use a cleanout recipe
    T code CORO
    create a order w/o material for rework qty
    Make the same entries as described under Creating a Process Order With a Material. Use OPJG config to have a default operation defined for the plant and order type combination.
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Oct 13, 2008 5:12 PM

  • Creating Process Orders using batch processing

    Hi :
    I am creating process orders automatically by using batch processing.I have a custom T.code and custom table.The batch program should be build based on custom table.From where will i get the data for batch processing? from custom table? if so how can i prepare a file for that.
    I have to submit this batch program to the custom T.Code so that it creates Process Orders automatically.
    Can u guide how to procede in this.
    Thx.
    Raghu

    Hi Raghu,
      What i think is u have a custom program which creates Process Orders using some user data. this user data is posted to a custom tabel.
    Now if i am right then u want to create a batch program around this custom program so as to achieve benifits of batch processing.
    yopu can check these links to better understand how to create a BDCprogram.
    http://www.sapdevelopment.co.uk/bdc/bdchome.htm
    http://www.sap-img.com/abap/learning-bdc-programming.htm
    http://www.sappoint.com/abap/bdcconcept.pdf
    http://www.sappoint.com/abap/bdcconcept.pdf
    http://www.sap-img.com/abap/learning-bdc-programming.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/fa/097022543b11d1898e0000e8322d00/frameset.htm
    http://www.planetsap.com/bdc_main_page.htm
    http://searchsap.techtarget.com/ateQuestionNResponse/0,289625,sid21_gci1068429_tax293481,00.html
    Hope this helps.
    Award rewar points if its useful.

  • Stop user creating process order with material for specific order type

    Hey Team,
    Is there a way where I can stop creating process order with material for specific order type says Z*. We are using ZNMA  order type to create trial batch and we do not want to create process order with material for this order type.
    Any ideas?
    Thanks
    Bhavesh Patel.

    You can restrict the order creation in CO01 based on authorization, Remove the authorization for Z order type for the particular user,  Check with your basis Guy

  • Error while creating process order

    Hi,
    While creating a process order I am getting an error.
    The error is :
    Error while calculating costs for order xxxxxxx.
    how to solve this?

    Dear,
    please open this prd order in change mode CO02 then press tab button cost calculation near release button in order header screen now do not save this order go to edit >log> cost calculation
    There it will show the error tht occured during costing
    Please refer this thread,
    Cost error when saving production oredr
    Regards,
    R.Brahmankar

  • Dump while creating Process Order -COR1

    Hi,
                    I am getting dump while creating a Process Order thru COR1. the dump error discription GETWA_NOT_ASSIGNED .

    HI omprasath rajendiran,
    Do you solve the problème, because i get the same problème with COR1 ?

Maybe you are looking for

  • Streaming problems with MacBook Pro, iPhone 5 works fine

    If I try to listen music via airplay from iTunes (Mac Book Pro 2009) it stops every 20 seconds for 2-5 seconds and then continue. It is impossible to listen music like that. If I do the same with my iPhone 5, everythink works fine for hours. I am sit

  • JDBC Connection Issue in Weblogic 10.3

    Hi, We have upgrade from Weblogic 10.0 to Weblogic 10.3. We are having the ojdbc6.jar in the server classpath, the JDK being the 1.6. The DB is Oracle 10g. In an cluster environment, we are getting this error, while passing the connection to an Array

  • £30 Activation Fee BT Sports - Sky

    Just enquired about getting BT Sports added on as I am now a Sky customer.  I have previously been with BT and well, the old adage if you've got nothing good to say don't say anything at all definatley applies. Sky are simply on another planet for TV

  • Mavericks and password protected WiFi

    I upgraded to Mavericks on early 2011 MacBook Pro 13 inch.  My basic WPA(2) is working fine. However I tried to connect to password protected WiFi on inflight GoGo internet and the hotel internet and neither would bring up the webpage to login. The W

  • Exporting video for use in website

    I know this topic has been addressed before, but after using the search feature, I wasnt able to really get anywhere for my particular situation. I have used FCP HD to edit a 3.5 minute video. Now I want to export it so that it can be posted on a web