In process Inspection  Lot Qty and Actual Lot quantity difference.

Hi Experts,
In case of  In process Inspection
Scenario : 1. Production Order created, released but before saving the qty is changed.
                2. Production Order created released and saved. Then qty is changed in Change Prod order txn.
These scenarios are causing a discrepancy in  Inspection  Lot Qty and Actual Lot quantity. Is there any method to avoid this ?
This can be made correct in  Inspection lot by resetting the sample calculation. But once confirmation has started for Prodn Order (not necessarily QC operation) or  RR has been done  resetting is not possible.
Is this the std behavior ? Disallowing the resetting once RR done seems OK, but even if any of the operation in Prodn Order is confirmed it still give status error while resetting. Canceling all the confirmation all the way back  also does not solve the problem.
Any suggestions ?
Regards
Joe

Hi
Although your suggestion is valid, it is not practical from user point of view.
Moving this thread to QM forum.
Rgds

Similar Messages

  • QM Inspection Lot Qty vs Actual Lot Qty

    Gang,
    What is the difference between Inspection Lot Qty vs Actual Lot Qty. And which one of these should get updated when more than one receipt is against the same Material/Batch/SLoc?
    Thanks
    Bruce

    Inspection lot Qty & actual lot qty as I remind are most of the time same but when you do the QTy correction through QAC1 ,they come into picture...or may be when you have inspection control defined in the QM view
    Inspection lot qty has significance for inspection & calculation of sample size.
    When more than one receipt is against the same Material/Batch/SLoc the inspection lot QTy will be Qty for which he material document is created,

  • Inspection Lot Qty Vs Actual Lot Qty

    Hi All;
    I am posting multiple GR's against a Process Order for Eg 1st GR 100 Qty, 2nd GR 200, 3rd GR 300 and after doing this in the Inspection Lot the Inspection Lot Qty shows as 100 and the Actual lot Qty of 600 (sum of GR's) hence the Inspection lot Qty is always less then the actual lot Qty.... is this standard,I was thinking the Inspection Lot Qty gets updated with the Actual Lot Qty and they should match.
    Thanks & Regards

    What is the process order quantity when Inspection lot was created? It should be 100.Usually the process order qty will be shown as the inspection lot qty and the GR qty will be shown as the actual lot qty. That's the reason the actual lot qty is equal to your GR qty. Most of the times, these two quantities are same.
    As said in the earlier response, for incoming goods the GR qty will be shown as the inspection lot qty and during inspection if you find the received qty is higher or lesser than the GR qty, using QAC1 the actual lot qty is corrected. So, always the actual lot qty is the qty received.
    Hope it helps.
    Thanks,
    Ram

  • Actual lot Qty and inspection stock

    Hi,
    We are using early inspection for 04 inspection lot. When I release my process order the inspection lot is created. As usual, the first inspection doesn't have Actual lot qty and Insp. stock is checked. Now, when I create new inspection lot for same process order, the inspection lot has Actual lot qty and Insp. stock is unchecked.
    In material master Post to insp. stock is checked.
    Thanks for your help in advance.
    Bhavesh Patel

    Dear
    U need to go for Order Change Management For doing This As u said ur Changing the Qty and it should reflect in the inspection lot
    Please Follow this Link :
    [http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0002c1c-f07c-2c10-3c93-b053715529b4?QuickLink=index&overridelayout=true]
    With Regards
    Pushpalas

  • Difference between Fixed order qty and Fixed Lot multiplier

    Hi All,
    Can someone explain me the difference between Fixed order qty and Fixed Lot multiplier in general planning tab at item level with example.

    Hi,
    Thanks for the reply. Just bit more clarification i need to understand the difference.
    Like for example let us assume two cases.
    Case 1:- order less than Fixed order qty (Fixed order qty =50 and the FIxed lot multiplier =50)
    Let us assume that we have set Fixed order qty equal to 50. We have a physical order of 40 then still MRP will place a order of 50 only. In case of tumhi snagaSame is the case of Fixed lot multiplier it will place a order of 50
    Case 2:- order greater than Fixed order qty (Fixed order qty =50 and the FIxed lot multiplier =50)
    Let us assume that we have set Fixed order qty equal to 50. We have a physical order of 60 then still MRP will place a order of 50 twice. Same is the case of Fixed lot multiplier it will place a order of 100.
    eventually we are doing the same in both the case so what is the exact differnece.

  • Rounding Value,Minimum Lot Size and Maximum Lot Siz parameters

    Hello Gurus,
           Please explain me the what is the use of the parameter Rounding Value
    ,Minimum Lot Size and Maximum Lot Size parameters in the product master and how does it in impact during the Heuristic Run?
    Thanks.

    Rounding value is the incremental quantities in which the order can be produced/procured. Eg. if orders are possible with quantities 40,60, 80, 100 etc..then rounding value is 20.
    Min lot size is the minimum quanity in which order can be produced eg. 40 in above example
    Max lot size is the maximum quanitity in which the order can be produced/procured. eg. 100 in our example
    Impact on Heuristic run: heuristics takes all the above parameter to plan supply order. eg. if requirement is 55, it will supply plan for 60. If requirement is 120, it will produce two orders - one for 100 and the other for 20. if the reuqirement is 10, the order size will be 40.
    Hope this helps.

  • Issuance (pack size) Qty and Minimum Lot Size

    Hi Experts,
    I have a problem, I have to maintain Minimum Lot Size and issuance (pack size) in the material master. Suppose Minimum Lot size of one material is 2000 and Pack size vendor provides is 400.
    Means, when we place order, minimum order can be made for 2000 Nos and when we issue the material to WIP from Main Store the minimum issue quantity should be 400.
    How can we map in the system.
    Please help me.
    GR

    Dear,
    I would like to suggest as :
    Maintain the Base unit of measurement for material as PAK/CARTON/EA.
    In additional data, unit of measurement mention 400pc = 1 ea/carton.
    Whenever issue the material from stores, the quantity should be 1 ea (i.e 400 pcs) basing on base unit of measurement.
    Now comes to minimum order quantity should be 2000 pcs.
    Maintain ORDER UNIT in purchase tab of material master as PC.
    To restrict the order quantity must be 2000 pcs, In that vendor master
    Order optimisation restrictions u2013 quantity. This is useful while ordering the vendor.
    For example if the quantity to shipped from this vendor you enter as 2000 pcs. When creating purchase order, if quantity is less than 2000 the system will give message.
    Try this in quality with a full cycle of documents.
    Regards,
    Syed Hussain.

  • Fixed lot size and Minimum lot size

    Dear senior,
    My client has the following scenario. His supplier provides the item in a fixed lot size of 100. The minimum lot size to be ordered is 300.
    The supplier is a fixed vendor.
    I tried to maintain this information in the Material Master MRP views. Lot size  - FX, Fixed lot size - 100, Minimum lot size - 300.
    However, everytime, the minimum lot size will get reset.
    Is there any way , I can maintain this scenario via configuration or any other method?
    Thank you.

    Hi,
    Fixed lot size - 100 means for every 100 quantity system will create one purchase document.
    If you selected Lot size - FX - Fixed order quantity , then no need to maintain Minimum lot size & Maximum lot size fields.
    Then you have to maintain Fixed lot size filed only.
    Ex: 
    Lot size = FX
    Fixed lot size = 100
    There is a requirement of 300. Then system will create 3 PO's with quantity of 100 each.
    If Lot size is Ex - Lot-for-lot order quantity, then only need to maintain Minimum lot size & Maximum lot size fields in the MRP 1 view.
    Ex: Lot size = EX
    Minimum lot size = 60
    Maximum lot size = 100
    There is a requirement of 250. Then system will create 3 purchase documents, two documents with the quantity of 100 and third one with the quantity of 60.
    That's why, in your case system is reseting Minimum lot size every time.
    If you want to maintain Minimum lot size, then maintain
    Lot size as EX
    Minimum lot size = 100
    Max lot size = 300
    It will solve your problem.
    Regards
    KRK

  • Update Qty and Value in Quantity Contract

    Hi,
    With reference to Quantity Contract when we i create release order the status of quantity Contract should l be changed.
    Example
    Order Qty in Quantity Contract    100 pc             Value 10000
    One Release order is created  with Order qty 20   Value 2000
    Now in the contract where can i see open order qty and open order value.
    in VTAA item category KMN -
    TAN the setting has been checked for "Update Doc Flow"
    Regards
    Jyoti

    Hi,
    Just try this and let me know your expected result.
    1. Go to VA42 to VA43.
    2. Enter your contract number and press document flow button.
    3. See whether the Qty and value is getting displayed or not.
    4. If not getting displayed. Do execute the below steps.
    5. In document flow screen, select your contract document.
    6. In top menu : Documen flow->View-> Items.
    7. Now, the systme will display the Qty and value of delivered/not delivered information.
    Regards,
    Vijay

  • Relation between PO Qty and Minimum Lot size of material master

    I have maintained "100" in minimum lot size ( MRP1 View, table MARC and field BSTM) for the material.
    I am also succssed to create the Purchase order for 2.5 Qty for the same material. '
    I wanted to know, how system is allowig to create the PO with lesser qty or is this view is maintained only for sales?
    Please give your expert comments on the same.
    Thanks,
    Vikas
    99301 03991

    Used for claculate the procurement qty during MRP and depends on the lot size procedure you select. quota arrangement also uses this lot size.
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d26ad44af11d182b40000e829fbfe/content.htm]
    Edited by: Karthik on Jul 8, 2011 9:47 PM

  • Combination of Fixed Lot size and Period lot size

    Dear all
    I have scenario as follows:
    1. My supplier's standard packing size of a raw material is 1000 EA.
    2. I want to follow period based lot size to optimise my order and inventory cost. But I don't want to use dynamic lot size which will propose dynamic quantity.
    So my requirement is like I want to fix lot size as 1000 at material master and Period is Week. My proposal quantity must be 5000 EA for the following demand pattern:
    Week 1:1200
    Week 2: 1000
    Week 3: 1100
    Week 4: 1000
    System must consider period as well as fixed quantity.
    Kindly throw some light on this.
    Advance thanks.

    Hi
    1.As you are looking for Weekly demand demand quanityt , you have to assign Weekly Lot Size : WB.
    2. Goto OWD1   and Create a Rounding Profile which will rounds into Weekly Demand quantity for that plant and simulate .
    3.Assign this rounding profile in MMR in MRP1
    3.DO NOT assing  rounding valu as 1000 .Rather keep it blank
    Hope this will solve the problem
    Regards
    JH

  • Difference in actual qty & inspection lot qty

    Dear gurus
    i am in a situation.in the sales order the oty is 3000kg and the delivery made is alos 3000 kg . but when i checked the inspection lot (qa03) in the tab inspection lot qty the actual qty is 3000kg but the inspection lot qty and sample size is showing 2382 kg.what might be the reason.
    sam

    Hi Sam,
    3.There is one tab "correct actual Qty" in QA02.Have you made any chnages hee.
    have you checked it,
    Once you change this quantity and save, the lot quantity will also set accordingly.
    To track the changes for the same for inspection lot, press Cntr + F12 in either QA03 or QA02
    Regards,
    Shyamal

  • Rounding value and Minimum lot size

    Hi all,
    Finish material is X and Raw material is Y.
    Bom- For Preparing Xu2019s 1 Qty, 1 Qty of Y is required 
    In Material Master of Y - Rounding value and minimum lot size is 10,
    Project needs 5Qty of X.
    When MD51 for Project execute u2026 PR of Y must be of 10 as per rounding value and minimum lot size, but it is creating PR of 5 qty.
    Above scenario working properly if I take MRP run with MD02 for material X for 10qty, after MRP PR of Y will be created for 10qty.
    With Regards,
    Ashish

    Dear,
    By default, the lot size works as lot-for-lot quantity in the make-to-order and project scenario.
    Go to OMI4 select your Lot size and define Lot Size: SOP  1 or 2Lot-for-lot with rounding. Better create new Lot size as ZX with these setting.
    If you always want lots to be created for the multiple of the rounding value, you must specify a minimum a multiple of the rounding value.
    Example: minimum lot size: 10 and rounding 10.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Lot for lot(EX) with minimum lot size

    Hi Experts,
    Is it possible to have Ex with minimum lot size. I have a situation where an FG cannot be produced over a certain qty but can be produced in any numbers beyond that. Please explain.
    Regards,
    Sachin

    Hi,
    You can use Lot size key EX- lot for Lot order and Minimum lot size as per the requirement. If the lot size is smaller than the Minimum lot size qty procurement proposals will be created for the minimum lot size quantity.
    Hope it resolve your issue. Kindly revert for further clarification.
    thanks and regards
    muru

  • In process Inspection and Rework Qty Issue

    Hi,
    There is Production Order for 100 qty.  There are 5 in process operations like 0010 Cutting, 0020 Welding, 0030 Inspection, 0040 turning, and 0050 Inspection
    (1)0010 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (2)0020 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (3)0030 operation: Quality inspected and entered results as 25 as yield and 25 as rework. For defects Q3 notification is
         triggered.( ie CO11N transaction is called in QM)
    (4)Production opened rework order CO07 and confirmed the rework operation and booked material and labor cost on cost
         center instead of orginal order.
    (5)0040: Operation production could confirm only 25 qty as earlier 0030 operation of inspection  yield was only 25 qty.
    (6)Inspection already in 0030 operation 25 qty  was entered as rework. Now after rework how results recording will be done 
         and qty will be posted in yield. Unless yield is entered under 0030 operation for 25 qty , production cannot confirm the 0040
         operation for pending 25qty.
    (7)Business requirement is what ever the qty production manufactures it has to be entered in system. Based on quality
         inspection incentive will be paid to only qty which is passed by quality.
    Settings Made:
    (a)100 Free Inspection, No Qty Relation, Quantity Valuation and Confirmation in Production for only inspection work center
         without any cost capturing.
    (b)Confirmation parameters settings with error for over and under delivery tolerance, error if inspection sequence not adhered,
         error message if no inspection results exists
    Any suggestion or any other way of handling this requirement.
    Thanks & Regards,
    RSR

    Hi RSR,
    Your way of mapping is absolutely fine, few points to be clear...
    03 inpection type and enable inspection characterisitics for operation 030
    04 inspeciton type to be enabled and operation 050 shall be eliminated if possible, material stock posting will be done from 04 inspection lot for 25 nos.
    let me know if you have questions..
    regards,
    Lenin. A