hi,
We are using cor6n for process order confirmation, where we can put down time  with confirmation text at once,
if there is two different down time, then user has to again  run cor6n with 0 yield  for put another down time, which gets more time.
for this reason i have customised single screen entry profile by mentioning two down time & confirmation rows in screen.
when i going for confirmation i put two different down time  after goods movemnt order get confirmed & settled.
but when i see report in COOISPI  there is only one down time against order.
system only considers last down time.
hows the system consider down time?
thanks in advance.
regards
sanjay.

Hi,
The report COOISPI considers only one line of the down time, it is not considering the 2nd row of the down time. You need to change the COOISPI program to read the 2 lines of the down time. You need to change the standard program to read the 2 down time lines.
Thanks & Regards,
V. Suresh

Similar Messages

  • Process Order Confirmation Screen

    In CORK, the Shift field is coming but in COR6N the shift field is not displaying.
    can anybody tell me that do I am missing anything in customization.
    Thanks
    SD

    Dear,
    I have faced the same problem in one of my project.
    This is because the you have not  activated the business function LOG_PP_SRN_CONF  completely because business function LOG_EAM_CI_2 does not provide the 'Shift reports and shift notes for technical objects' function. Take help from Basis person.
    Also check the setting of OPK4N.
    You have defined the Customizing settings for shift notes and shift reports for technical
    objects, under Plant Maintenance and Customer Service --- Maintenance and Service
    Processing --- Shift Reports and Shift Notes
    Regards,
    R.Brahmankar

  • Product Delivered Status Date should be there in Standard Search and Result screen of Service Order. Product Delivered Time should be Available in Result screen and In Result screen there should be facility to filter on basis of Time

    Hi team,
    Product Delivered Status Date should be there in Standard Search and Result screen of Service Order. Product Delivered Time should be Available in Result screen and In Result screen there should be facility to filter on basis of Time.
    How to add this in search result screen.configuration is it possible? or any changes in development.
    Compnent - BT116S_SRVO
    Thanks
    Kalpana

    Hi Kalpana
    Please reread my comment. I said to try and populate "Requested End" Date.
    Make sure the date profile assigned to the transaction includes this Date Type.
    If you can populate this either manually or programmatically the solution should be quite forward.
    If you cannot do this, only then should you look at making any significant sort of enhancement.
    Regards
    Arden

  • Problem during Process Order Confirmation - COR6N

    Dear All,
    We are into process industries
    Till now we are creating different BOM for each section and different process orders for each BOM.
    For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
    Now we have created new BOM for FG - showing all input/output of  RM, SFGs.  In Recipe, define operation for each section. and assign operation to material.  I have attached screenshot of Recipe Operation.
    During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
    I have checked in Recipe, control key is ok i.e. Automatic GR,  in OPK4 setup is also correct.
    We have created new BOM and Recipe. There is no change in other configuration parameter.
    Thanks and Regards,
    Nirav

    Hi Nirav
    The automatic goods receipt is defined by the operation/phase control key.
    Control key PI03 has the automatic goods receipt setting by defaul.
    Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
    For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
    BR
    Caetano

  • Update Process Order Confirmations Back to SAP ECC

    Hi,
    Is there a document or step by step guide which explains how i can update  SAP EARP with process order confirmations from my shopfloor?  Below is the scenario i am looking for help in
    1. There is a SQL server table where the SHOP floor update the quantity manufactured against a Process order.
    2. I need to pick up that data from the SQL server table and update the ERP against that Process order.
    Can any one explain how this can be achieved.
    I checked the sample's and the templates in SDN but none of them actually show how to update any ERP?
    Please advice!!.
    Regards
    Suraj

    Check this one
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/60ac6bb8-a684-2b10-208d-b90883004a5e
    https://www.sdn.sap.com/irj/scn/downloads?rid=/library/uuid/204a13d0-399d-2b10-ec84-9c254cd7efd4
    You use this component to enable the shop floor operators to record their production order and process order confirmations using a touch screen user interface. In SAP ERP Central Component (SAP ECC) operators must complete many steps to confirm orders. Instead, you can use this interface, on a touch screen to enter the production performance easily and effectively. You can also use this component to obtain operators' work lists and information on their current activities.
    Regards
    Ram Upadhyay

  • Process order confirmation

    Dear Experts,
    In process order confirmation can we make a kind of restriction through configuration  in which system should not allowed a confirm quantity of phase 20 is not greater than previous confirmed quantity of  phase 10 there is no relationship between this two phases.
    Regards,
    Murari Shah

    Hi.
    Just my 2 cent , Not sure about standard SAP configuration perhaps there's but i don't know.
    But i very sure , you can implement this with the user exist below:
    ===============================================================
    CONFPI01 |Process order conf.: Calculate cust.specific default values
    CONFPI02 |Process order confirmation: Customer spec. input checks 1
    CONFPI03 |Process order conf.: Cust. spec. check after op. selection
    CONFPI04 |Process order conf.: Customer specific input checks 2      
    CONFPI05 |Process order conf.: Cust. spec. enhancements when saving  
    CONFPI06 |Process order confirmation: Actual data transfer       
    Customise with ABAP , please check with your abaper.
    Thank you.

  • Process order confirmation related issue

    When a confirmation is of the process order executed the open reservations for this order should be closed but it will only do so for a limited number of items.
    When looking at process order xxxxxx it will show a final issue for materials say A, B and C but it will leave all the other items open and will therefore generate requirements for these items in MRP.
    How to solve this?

    Dear Sosal,
    use Mr. Bramhankar's proposal, if u want system to propose by default in confirmation screen. if u set this for partial confirmation also it will be final and confirmation and reservation gets cleared.
    one more option is while confirming the order either in CORK/COR6N select manully automatic final confirmation and clear reservations. ur issue will be resolved
    sree

  • Set loss quantity to a fixed percentage in Process Order Confirmation - C0R6N

    Hi Experts,
    How it is fixed the loss qty percentage at the time of process order confirmation.
    I want to set the loss quantity to a certain percentage when compared to the Total Process order quantity.
    For Example:
    If the Total processed quantity = 100
                            Yield Quantity = 20.
                             Loss              = 80.
    This kind of scenario should not happen, since Loss quantity is very much higher that the yield quantity.  I want to set the loss quantity  to a particular percentage ( say 20-30 %) of the total processed quantity so that the yield quantity will be higher than the loss quantity by a substantial amount. Are there any possibilities of doing this through configuration. If not what are the other options?
    NB: Scrap quantity is not maintained at the time of  process order confirmation.
    Regards,
    Umapathy.

    Hi Umapathy,
    Yield and Scrap are user entry fields where you can have restriction on entered qty by changing  under delivery and over delivery to error through OPK4 config as shown below. Agree that any qty can be entered in any field (Yield or Scrap)
    OR
    You can define the operation scrap. Read the below doc for more details.
    http://scn.sap.com/docs/DOC-52834
    OR
    Another option is to use exit and write your logic based on input yield and loss.
    Thanks & Regards,
    Ramagiri

  • OPK4 Process Order Confirmation parameter

    Dear All,
    In process order confirmation i want do a configuration like
    Operation 10     
    Phase      20     0010(supr.ope)
    Phase      30     0010(supr.ope)
    Operation 40
    Phase      50     0040(supr.ope)
    now I maintained a relationship between 50 & 30 like "30 is predecessor of 50"
    I required during confirmation if confirmed quantity of phase 30 is 50 and now if I go for phase 50 confirmation system should not allowed confirmed quantity >50 of previous confirmed operation 30
    for that i have done setting in OPK4 like
    Checks
    Operation sequence " E Error when operation sequence is not adhere to"
    but system is allowed to do a confirmation more than 50 qty of operation 30
    so what is the meaning of operation sequence check in PPPI
    Regards,
    Murari Shah
    Edited by: murarisap1986 on Apr 6, 2011 7:50 AM

    Dear Murari shah,
    "E Error when operation sequence is not adhere to" This is to avoid the operation confirmation if it's not in sequence.
    For example,assume there are 5 operations in an order,directly i can't confirm the operation 0050 unless it's prior operation is
    confirmed.So the system checks whether the prior operation is first confirmed,if not the system proposes an error.
    So for this reason, we can make the necessary seetings in OPK4 for plant and order type combination.
    check and revert.
    Regards
    Mangalraj.S

  • Restriction during process order confirmation

    Hi,
    I want one validation during process order confirmation (mile stone) through t code COR6N  if resource capacity & shift intervals not maintained ( t code CRC2) then process order should not confirmed &  there should be error message. Plz advice how it is possible through customization.
    regards,
    sps.

    Dear shukla,
    Check with this User Exit,
    CONFPI02                                Process order confirmation: Customer spec. input checks 1
    CONFPI03                                Process order conf.: Cust. spec. check after op. selection
    CONFPI04                                Process order conf.: Customer specific input checks 2
    CONFPI05                                Process order conf.: Cust. spec. enhancements when saving
    If the above is not working then check with this BADI
    WORKORDER_CONFIRM at the time of saving,
    Regards
    S Mangalraj

  • Setting of tolerance limit while Process Order confirmation

    Dear Experts,
    I want to set tolerance limit onto the components of Process Order while doing the Process Order confirmation, Please teach me what all the steps do i need to follow for doing that.
    Thanks!
    Regards
    Sumit Kalyan

    Tolarance limit what you are speaking about is for the components. In wS view what you are setting up is the for the product, not for component.
    As I am aware we cannot set any tolarance limit for the component as such.
    I am not sure what actually you want.
    example - component  A, as per the planned qty in production order is lets ussay 10, now when doing confirmation user can enter 10+ or - 1, if he neters moer than 11 or less than 9 system should not allow? is that you are trying to implinment?
    If so that mayn not be possible unless otherwise you impliment some user exit.
    In OPK4 what settings are there is for product and not for raw material/component

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Process Order Confirmation and Pallet

    Hi,
    Would appreciate if you can pitch in to get information on below requirement.
    Say for eg., for the 1000 CA of header quantity in a BOM, one (1) Pallet (PAL) is required and assume the pallet's are back flushed.
    - if you confirm 1000 CA, then SAP post 1 Pallet
    - if you confirm partial pallet, like 800 CA - then SAP posts 1 Pallet
    - but, if you confirm partial pallet, like 400 CA - then SAP posts 0 Pallet,
    I believe that's the nature of SAP design in rounding up / down. However in this unique circumstance of a Pallet, everyone would always like to Round up rather than round down.. so, in the example above confirm 400 CA should also post 1 Pallet.
    I couldn't find a solution in SAP with it, and I guess a user-exit might help to round up, but not sure which user-exit at process order confirmation will help.
    Any pointers would be a great helpu2026
    Thanks in advance,
    Nitin

    Is HU enabled for your location? if that case, you could post by pallet.

  • ABAP Programming Error when saving the Process Order confirmation in COR6N

    Hello,
    We have an issue related to Process Order confirmation using Tcode COR6N. When we enter all the inputs to confirm( Activity, yield and phase) and click on save it gives ABAP Programming Error (Exception condition "SEQ_NOT_FOUND" raised).
    Any inputs in this regard, would be appreciated.

    Hello
    I can observe that you have implemented the report ZOPSECRE and that an inconsistency was found.
    This repor corrects inconsistent orders which do not have an operation or a sequence, or the two of them.
    The report checks whether there is at least one operation or one sequence and creates both including status objects.
    Therefore, you need to have the default valus for the operation generation defined on OPJG for this order type/plant.
    BR
    Caetano

  • Loss % in process order confirmation

    Dear all,
    During process order confirmation,loss should not to take above 10%.
    It should be within 10%.
    Kindly let me know hat customization to be done for this scenario
    Regards
    Rajasekaran

    Hi,
    In the confirmation parameters in OPK4 in the checks option in the under delivery maintain error when quantity falls below under delivery tolerance and in the material master in work scheduling view in tolerance data maintain under Underdely tol as percentage and check...
    Thanks
    Kumar

Maybe you are looking for

  • Floating point arithmetic

    Hi everybody, This line: System.out.println((0.1+0.7)*10);outputs 7.999999999999999 This is due to how floating point numbers are stored. When writing a code, sometimes it behaves in an intended way, sometimes it doesn't (like the one above). Is ther

  • Wireframe

    Would their be a third party plug-in that allowed me to manipulate wireframes beyond four edges and four corners and perhaps something that supported bezier curves would be nice. Or is there something entirely different that would allow me to do this

  • Making material short text grade out while creating PR

    dear all while making pr for materials,by t-code me51n, the system does not make the material short text diable/grade out. eg if i select material from material master say material code 1000055-----& short text is --cement 53 grade. then at the time

  • I need to upgrade from Mac OS x 10.6 8 what is the next step?

    I need to upgrade from Mac OS x 10.6 8 what is the next step?

  • ITunes view options dialog missing

    Hello, brand new Macbbok 13.3. When I select "View Options" in menu, or ⌘J, the View label flashes blue, but no dialog appears. Chris