In-Process Quality Inspection in Rep Mfg

Hi..
We have Rep Mfg scenario , and we want to chk the material while in-process.
In the Mtl Mastr we have maintained Insptn type as 13 .
In Rate Routing we have maintained a operation with  control key which requires Insptn characteristics n MIC is assigned in routing.
We have created a Planned order .
Now , requirement is dat system should not allow backflush activity until in-process inspetion rresult is recorded.
Whether Inspetion Lot gets created in Rep Mfg as soon as Planned Order is created..? 
How to make the system to accomodate in - process inspection before backflush..?
Please guide me with soln
With Regards,
LN

Hi
Try by selecting reporting point in the rem profile.
suppose u have 10 operations ok
first 3 operations are production operation then 4th u want to go for inprocess inspection then for the 3rd operation select the control key as milestone key and 4th is quality control key with milestone confirmation.
Then when ever u go for backflush(MFBF)  first u have to confirm the up to 3rd operation then 4th operation confirmation.
by this u can do the inprocess inspection scenario for REM

Similar Messages

  • Quality inspection in repetitive mfg

    Hi
    I have some queries in quality inspection setup for REP MFG.
    1. Setting up inprocess inspection
    2. GR Inspection from production
    3. At what stage the QM lot is generated .
    The inspection types used for PP-P1 03 and 04 hold good for above or should I take other inspection type.
    Best wishes
    Murali

    Hi Bhramankar,
    I have not got chance to work on the REM Live environment. But I am very anxious to work over it if I will have chance.
    I have posted the thread regarding the same about the Order when I read the process scenario form the Library material on [Repetitive Manufacturing|http://help.sap.com/saphelp_46c/helpdata/en/8a/1a1eff4e4211d182be0000e829fbfe/frameset.htm].
    Where the last line have link to capture the Quality inspection for REM.
    The [Link|http://help.sap.com/saphelp_46c/helpdata/en/8a/1a1d794e4211d182be0000e829fbfe/content.htm] may have leaded me to write such.
    If have misguided him, I sincerely APOLOGIES for that. And deeply regretted for the same.
    I truly request you to posture some focus over in process inspection in REM and cultivate our information.
    I again thank you for your inputs.
    Dear Dharam,
    The SAP standard inspection type is 13 for REM.
    How to capture it? I have a [Document|http://help.sap.com/saphelp_46c/helpdata/en/8a/a5aadd4adc11d189740000e8322d00/frameset.htm] it may help you.
    Regards,
    Shyamal

  • In process quality inspection in operation of a process order

    Hi,
    PP-PI inprocess quality inspection at operation level
    I am creating a process order having two operation. the first is quality inspection (inprocess inspection) & last is related to consumption of some materials.
    The control key in operations are pi02,pi03(miles stone confirmation). i am using insp type 03 in material master 
    user needs  insp. happen first then consumption of material.
    my question is
    1.when operation first get triggered  quality lot generated i enter RR & do UD.but here i can not see the insp lot stock as subscreen. why? then how can i block defect qty in block stock?
    2.how can i consume material in the same quality operation? 
    With Regards,
    Kareena

    Hi Kareena,
    I think the thread is going in other direction. You were asking for some solution to mentioned the consumption.............
    That can be taken care..........
    For 03 - "In process inspection" lot as yield confirmation by activating the STD function of SAP as I have mentioned in my last post.
    For 04 - "Inspection against GR form Production" lot, by stock posting.
    For any lot you can do customization in "EXIT_SAPLQEEM_011", to post the material consumption at each MIC/Operation valuation.
    But now the entire scenario what you are asking is bit confusing.
    You wrote
    I think for process order,
    quality activity confirmation we are talking
    & for this i have not maintained inspection
    point or inspection point identification.
    i am doing RR from qe11.
    It seems you we are talking about 03 type inspection lot. that you can relate with the option I have mentioned in the beginning of this reply.
    in my inspection plan for the material
    i have maintained 5 different characterstics
    in that row i can not see the sampling
    procedure,base unit of measure,
    base quantity all these field are gray in color
    i have defined sampling procedure also
    i have not maintained inspection point identification.
    Where you have mentioned these 5MICs?
    If it is inspection plan, then it will go with 04 Type.
    If it is Master Recipe/Routing, then it will go with 03 Type.
    Now the other point you wrote the MIC Line item have the fields GREY for Sampling Procedure,&...........&.......So to activate them,
    Select the line item for MIC, click on the Control Indicator (Sampling Procedure) and then you will be able to assign the Sampling Procedure to MIC.
    The fields "Inspect" & "Inspected" are related with the "Insp. Scope" with the MIC. The scope is define at the Control indicators for the MICs (On Page2 for the Indicators). There are four Radio Buttons to define the Inspection Scope.
    Scope not Fixed
    If you set this indicator, the number of inspected units is defined by the user for results recording.
    This number does not have to agree with the precalculated number of inspected units.
    E.g. If the the sample size for that particular MIC is not fixed ever and you will supposed to enter it at the time of RR you should define this indicator and the field will open for entry in QE11.
    Fixed Scope
    If you set this indicator, the number of inspected units must correspond
    to the precalculated number of units to be inspected for results
    recording.
    The system can perform a valuation for the inspection characteristic based on the number of nonconforming units or the number of defects in the sample.
    And the field will be GREY, non - modifiable.
    Similarly the larger and smaller scopes work.
    Best Regards,
    Shyamal

  • In - Process Quality inspection process

    HI Gurs,
    I have multiple operation in the routing. 010, 0240 .0250
    0240 is the Quality operation  .
    I do the production confirmation in in co11n for operation 010 .
    I do the Quality confiramation for the operation 0240  using Qa32 first result recording QE01 then  Usage decision .
    but when go for the
    confirmaion of operation 0250 system not allowing me to do .
    Please suggest me your expert comment how should i do it.
    Sanjay Sharma
    SAP PP consultant

    Dear,
    You can do this with OPK4 setting here slect your plant and process order type go in details here change the setting to
    Results Rec. (QM) = Warnning message if no inspection result exist.
    Regards,
    R.Brahmankar

  • No Sampling Procedures in In-Process Quality Inspection (origin 03, insp. points 100)

    Hi
    I am facing a problem while attaching master inspection characteristics etc. in a master recipe (C202). I first specify inspection points as 100 in the recipe header (quality data section) and then I go to the operations section, select a phase and go into the area where I can attach MICs, methods and procedures. Now, no matter what kind of MICs I add there ( ones that require a sampling procedure, of course, as it is my need) it does not let me browse (F4) on the mandatory sampling procedure field. I have created all kinds of sampling procedures (freely defined inspection points, without inspection points, manual valuation, spc, fixed, 100% - all combinations) but the mandatory sampling procedure field does not let me browse for sampling procedures. If I directly type a name, it says that the procedure is not suitable for inspection points (100 that I defined) despite the sampling procedure being a freely defined inspection points one or any other. This is only in the case of inspection points/in-process/master recipe. otherwise normal GR usage 5 plans are working fine. Any help? It's urgent. Thank you!
    Regards,
    Bilal

    No, I'm using 100 inspection points, freely defined (both in my master recipe header and sampling procedure)
    And yes, the sampling procedure does have the radio button selected for freely defined inspection points, manual valuation and fixed sample.
    Like I said above I did get half of it working by making a setting in SPRO in the section that says Inspection for manufacturing order. In the process order section, I selected something related to production order in one of the tabs. That now enables me to assign a sampling procedure to a characteristic (SP with freely defined insp points) but it still doesn't let me browse (F4) for a sampling procedure eventhough there are 3-4 suitable procedures. I directly have to type them and press enter. Cannot F4/browse procedures.

  • Picking of Quality Inspection Stock in Process Order

    Hey All,
    In Process Order system will pick the stock which is lying in Quality Inspection. Some one please help / guide HOW TO STOP THE PICKING STOCK in process order which is lying in quality inspection.
    With Regards
    Paramjit

    CAn you describe in more detail. In what transaction does this picking of Q-stock appear?

  • Exclude quality inspection batche from Batch Determination in process order

    Dear Gurus,
    When doing batch determination in process order, the system taking quality inspection batches for selection.
    I have checked in OPJJ , quality inspection stock is select but if i remove , it will effect MRP process
    How to exclude quality inspection batches from Batch Determination?
    Thanks in anticipation.
    Regards,
    Sandy

    Hello,
    I also have the same requirement. Can some one provide solution.
    Regards,
    Naren

  • Invoice payment blocked for material is under quality inspection

    hi,
    how to prevent invoice being processed (MIRO)  when the materials are booked in quality inspection stock, Is this possible without the help of QM. 
    thanks

    Hi,
    Go to material master , check the QM View active.
    If QM View is active , go to this view and change the QM control Key as 000 and remove the tick mark for QM Proc active Field.
    Regards,
    Andra

  • Rejected material in quality inspection

    Dear Guru's,
      Is there any report to find out the rejected quantity in quality inspection with reference to the GR and PO.
    Rgds,
    cherukuri

    Dear Guru,
    we can generate or standard reports are available.
    If u tell me the processes how u feed the data for rejections , i can give a better solution.
    two methods are there
    1) Notifications
    2) GR Processes
    more clarity is required.
    shridhar
    9880644496

  • What are the settings for  rework order  quality inspection

    HI,
    Iam doing production order confirmation at the GR time some oprations are rejected.that operations i want too rework order CO07 process without GR ,i want to Quality inspection in REWork order.
    What are the settings for rework order Quality inspection?

    Refer beautiful document
    http://wiki.sdn.sap.com/wiki/display/HOME/ReworkInProduction

  • Plant to Plant trasfer in Quality inspection Status

    Hi All,
    I would like know how can I transfer quality inspection (Q) stock from plant 1 to plant 2 and receive in quality inspection (Q) status as well.  Movement type 301 is only helpful for unrestricted stock.  Is there any way this can be possible? If you can help me with the steps or any documentation will be very much appreciated.
    Thank you for your help!

    Hi,
    You can only transfer the material  from unrestricted stock  to unrestricted stock. If you need to transfer the stock from QI to Qi inspection you can follow this process.
    you can use mvt type 321 to transfer the material from quality inspection to unrestricted within plant.
    After this is done you can use mvt type 301 to transfer the material from unrestricted stock of plant 1 to unrestricted stock of plant-2.
    Now use mvt type 322 to transfer the material from unrestricted to quality inspection stock
    Br,
    Tushar Patankar

  • How to scrap specail stock in quality inspection...

    hi guys:
    I have a query, Is there any possible way to scrap the sale order stock in quality inspection without transferring it to the unrestricted stock and that also through inventory count(mi01,04,07),
    Actually we have damage lighting stock which is received against sale order(automatically transferred to quality inspection), and customers are replaced with new units, then this stock is called back in head office, for this we have a complicated process in use, first this stock is scraped from suppose "a" storage location after transferring it to unrestricted, then loaded back to "a", to make an STR for it from Head Office.
    So is there any way to scrap all special stock(complete storage location) against different sale orders at one go. whether the stock is available in unrestricted, quality inspection or blocked stock.
    I hope I am understood.
    Please help me to get through this complicated process.
    Regards
    Salar...

    Thx you guys are fantastic; I appreciate your help;
    below given is the post which has helped me, but there is some problem at the end, after the click of this point "11. (Click) in the gray box next to the session name and click . " there was nothing to proceed with, though I have posted the count through mi24 and post the difference with mi07, but still want to know what goes wrong with mi31, I have given the appropriate time for back ground processing....one thing to note there were 2 old inventory documents seen to be pending of the same storage location I was posting the count off, is this the reason of problem in processing of mi31,,,,,,please guide...
    Hi Buddy This transaction is used to create physical inventory documents for multiple materials in your plant and storage locations. Inventory documents may be created and printed prior to the count date; however, the posting block should not be set until the day of the actual physical inventory count. 1. From the SAP R/3 System screen, enter transaction code MI31. 2. Click or press Enter. The Selected Data for Phys. Inventory Docmts w/o Special Stock screen displays. 3. Enter or select a value for each of the following required fields: - Plant (enter plant code) - Storage location (do one storage location at a time) - Name of session Remove the checkmark from the Materials marked for deletion field will exclude items previously marked for deletion from the inventory document. The default session name is MB_MI01. Enter your initials and the session number after the default session name to identify it as your own. Example: MB_MI01_WW1 - Max. no. items/doc - use 99 for main storage location; - use 300 for truck storage locations. - Planned count date - enter date of inventory count - Physical inventory number - enter fiscal year followed by plant number and storage location. Example: 2004FY60118071. MI31 Create Physical Inventory Documents (in batch) - Set posting block - check if count is immediate; do not check if creating batch documents ahead of the inventory count date. - Sorting u2013 click on and select Plnt- Stor.bin description-Material. 4. Erase any variants under u201CDisplay optionsu201D. 5. Click . The Batch Input Created for the Creation of Phys. Inv. Docmts screen displays. Enter through any system information messages or errors. 6. Click . The Batch Input: Session Overview screen displays. 7. Click in the gray box next to the session name to highlight row. Click . The Process Session {Session name} dialog box displays. 8. Select the Background radio button. 9. Click . The following message displays: u201CX session(s) transferred to background processingu201D. It takes approximately 5 to 6 minutes for the system to process a batch session. Please wait at least 5 minutes before continuing with Step 10. 10. Click in the gray box next to the session name and click . The Batch Input: Log Overview screen displays. 11. Click in the gray box next to the session name and click . The Batch Input Log for Session {Session name} screen displays. If the batch processing is completed the last line in the Message column should read u201CBatch input processing endedu201D. If this message does not appear on the last line adequate time was not provided for the batch process to be viewed. SAP continues the batch processing in the background. Use transaction MI24 to retrieve a complete list of Physical Inventory Documents created. 11. Record the physical inventory document numbers created. You will need the document numbers to print the inventory documents. Clicking on can print this list. 12. View the log for any errors generated. A material master record being blocked for updates at the time of processing may cause errors. Add the material to a physical inventory document using transaction code MI02. Regrds Yogesh
    Thanks & Regards
    Salar...

  • Vendor return material to quality inspection.

    Hi,
    I have send Raw materials to vendor for processing. Here we received the final product from vendor
    and some Raw materials are left with the vendor.
    I want to take back the  balance Raw materials from vendor and the balance material, when I take back,
    it should  go to quality inspection.
    What movement i have to use .
    Rgs
    Vijay.

    Hi
    Inform your QM Consultant to add 542 movement in quality inspection parameter.... he will be able to do it the similar way how he would have done for movt type 101....he just needs to add 542 in the list...
    Award if u find it useful
    Regds
    santosh

  • Purchase order GR need to post to Quality inspection stock

    Hi all,
    How to post stock to Quality inspection directly for a PO. Even though in GR i make sure that its posting in Quality inspection, by default it is going to Urestricted stock. How to fix this by posting stock to Quality inspection directly?
    Thanks,
    Avani.

    Hi Avani,
    Pre-requesite:-
    QM should be live at plant level.
    Data toeb maintained in QM view.
    You need to activate inspection type 01 (For GR against Purchase Order) and 04 (For GR from Production, against Process Order) in QM view of Material Master. Doing this all the GR quantity will be posted in Quality stock automatically.
    If QM is not live, you need to activate the "Post to insp. Stock" inidicator in Materail master QM view.
    Update us to help you more, reward points to help you better!!!
    Regards,
    Shyamal

  • How to move the stock after quality inspection in wm

    hi ,
       if i am posting GR with PO  for the material XXXX quantity of 10  it should not be posted in Warehouse. after completion of stock inspection in QM then only it moved to warehouse . But the problem is when i post gr in migo the transfer requirement created automatically...if i make this  TR manual, two posting occurs one for gr posting  and another one for manual tr...how to control this....
    ex: matxxx-10 quantity
    migo posted(no stock should be posted in wm)
    after qc--8 quantity o.k
    then we need to move this 8 quantity to storage bin.
    how to achive this process in WM. (i already working manual TR it will create two posting)
    Thanks
    Muthuraman.D

    Hi,
    Use movement type 103 for GR. so, the goods will posted in to blocked stock.  you deselect the auto TR creation for 103 movement type.
    once the Quality inspection over the do the 105 to release blocked stock to unresticted stock. in 105 you activate the auto TR creation.
    Now you may avoid double tr creation.
    this you have to discuss MM consultant also. because of 103 & 105 movement type using.
    SAM

Maybe you are looking for