In Production Return & Rejected Qty Prod Order wise required

Hi Experts,
In Production, Parent Item to be produced 100. Two Child items are there for the parent Item.
Parent Item A- 100 Qty
Child Item A1- 100 Qty -- Issue method Back flush
Child ItemA2 -100 Qty -- issue method Manual
Child Item A2 Issued Manually. Production Completed........
In the receipt from Production
Parent Item A -90 Qty completed
Child Item A1- 8 Qty Returned (Good Raw Material Returned)
Child Item A2- 3 Qty Returned (Good Raw Material Returned)
Child Item A1 -2 Qty rejected (To be scraped)
Child Item A2 - 7 Qty rejected (To be scraped)
We would like to take query/Report......... Production Order Wise, Child Item Issued, Component Returned, Component Rejected.
Plz Guide Me,
Thanks and Regards,
Manikandan

Hi,
In SAP, for items defined as Back-flush, you cannot change the issue qty of Raw Material components. This will always correspond exactly to the qty of Finished Goods and the relation between the FG qty and the component qty in BOM. In you example, the RM Item A will be issued as 100 qty as the FG produced is 100 qty.
Or if you are recording 90 qty then RM Item A will be consumed automatically equal to 90 qty.
In SAP, the FG reject is prodcued only for numerical record and is recorded in the Receipt from Production screen. Total prodcued qty will be reject qty + completed qty.
The scrap of FG item is not possible as FG item. Fixed qty of Scrap can be defined in the BOM or the production order as a row with negative qty. This will be prodcued automatically based on the qty relationship between Scrap item and the FG item.
Say if in the Production Order for a FG of 100 qty, scrap is produced equal to 20 qty, then this srap item will be entered in the Production Order as a row of -20 qty. When production of X qty is recorded, scrap will be prodcued in the following ratio:
Scrap produced = X * (20/100)
Regards

Similar Messages

  • Link between Prod Order and Sale Order schedule line

    Dear all,
    Ours is a MTO (81).
    In Scheduling Agreement / Sale Order , there are multiple schedule lines for a single item .
    Production Orders are generated for every schedule line of the Item.
    The client wants to know (for a custom developed report) , against which schedule line of the Sched Agreement/ Sale Order, the Production Order is generated ?
    This Information can be seen in MD04.But  I am not able to fetch from the tables .
    The schedule line field (KDEIN ) is not updated in AFPO table & the order no (AUFNR) is not updated in VBEP table .
    Say,
    Sale Doc No : 42000506
    Schedule line/Dely date            Order qty          Prod Order No
    06.10.09                                    500kg               100170
    15.10.09                                    300kg               100171
    Pls give your valuable inputs.
    Regards,
    Sheik

    Hi,
    Only Sales Order No & Sales Order Item No is updated in the table.
    Whereas , I want to know the Sales Order Schedule Line no.
    Regards,
    Sheiki

  • Report to view Production order wise atcual cost when PO is assigned to PCC

    Hi All,
    Can anyone help me to get the report for production order wise actual cost incurred when that Production order is assigned to PCC (Product cost collector).
    Is it possible through Summarization hierarchy or Product drilldown?
    If yes, can u explain the steps.
    Regards,
    Durga.

    Hi Bhaskar
    You are in Alaska and you wanna eat vegetarian food
    You cant get values at Prod order level if you have chosen PCC as cost object.... You will only get Qty at Prod order level
    To get a bird's eye view of costs incurred in PCC, execute report MCRY with PCC as the input...  MCRX shows only Qty info for components
    br, Ajay M

  • How to get Production Order wise Actual Values

    Dear CO Experts,
    How to get Actual Values (Raw Material Issue, Activity Confirmations & OH Calculations & Goods Receipts from Production) each Production Order wise ?
    My Scenario is Product Cost Collectors (PCC)  with Production Orders.
    If we select above scenario Production Order is Statistical and PCC is real cost object.
    For PCC is Period wise we can track the cost Periodically in individual Material.
    But my client is asking how to see the each Production Order wise Actual values. Is there any T.Code ??
    In Production Order I am able to see only Plan values (CO03).
    Waiting for your favorable reply.
    Regards,
    KBR.

    Hi Bhaskar
    You are in Alaska and you wanna eat vegetarian food
    You cant get values at Prod order level if you have chosen PCC as cost object.... You will only get Qty at Prod order level
    To get a bird's eye view of costs incurred in PCC, execute report MCRY with PCC as the input...  MCRX shows only Qty info for components
    br, Ajay M

  • Rejected Qty reference in Purchase order

    Dear Gurus
    I have created PO of 100 qty ,i have taken GRN of 100 qty ,in Quality rejection i have rejected 10 qty and accepeted 90 qty
    ========>>>
    Now if you will do the normal rejection i.e Return Delivery
    You will get the reference of this in the PO Created earlier i.e 100 qty PO created ,100 qty GRN done and ret delivery 10
    ==========>>>>
    But here i am doing the return delivery through SD i.e I am sending this 10 qty which is rejected by creating return Order (Return PO)
    i.e i have created PO of 10 qty and marked the return DElivery tick so that th shipping tab in item detail gets activated. and in delivery tab i have to select the block qty.
    I have saved the no and the PO no gets genereated.
    I have to give this PO reference no to SD person and through VL04 he will create delivery and do the POST GOODS ISSUE.
    Till now i think everybody must have understood the scenario.
    ==================
    Now the problem is my cleint wants that he should have the rejected good's reference in the Earlier PO which i have created for 100 goods.So that the Vendor will come to know that he has received the rejected goods against this PO............CAN ANYBODY HELP ME IN THIS ISSUE
    THANKZ IN ADVANCE
    Good reward points will be awarded for all the goods answer
    SHAILESH

    do one thing
    change the same PO
    add the same line item below 100 qty
    which ur rejected qty and tick it as return delivery
    u have the reference in the same PO
    regards,
    snb

  • Qty withdrawn is not updating in prod order.

    Hi gurus,
        Qty wihdrawn is not updating in prod order , when i issuing
    raw material through tcode mb1a 261 movement type.
        What could be the possible reasons.Pls suggest.
    Thanks in adv.
    Sudarshan

    Dear
    you are issuing the materials in MB1a w/o reference to the reservaton.
    You need to do as below
    In MB1a ---follow the menu path -Goos issue -->create w.referenec to order.
    Enter the order number. execute the report
    system will default matrerial no and qty/storage loc from order. Here you enter the qty requuired and post. This qty you posted in this way will refect/update the withdrawl qty in the production order.
    You are not entering the order the way I suggested, hence it is going as a unplanned issue...hence the problem.
    come back if required

  • Rejection qty stock at operation wise

    Dear All
    I have a problem for getting the Rejected quantity stock at each operation wise.
    Material 'A' has 10 operations in the routing.
    At each operation some qty may get rejected.
    How to account the stock of rejected quantity at each operation level?
    If i enter in the Rework / Scrap field in the confirmation screen, i can't getting the stock anywhere because there is no seperate material code for that operation.
    I tried by creating a Seperate material code for the Rejection qty and assign it to the BOM. But it is not viable that creating seperate material code at each operation level.
    Please explain me what is the standard procedure to follow.
    Thanks & Regards
    Bala

    yes
    stock will not be upadate unless until u maintain the material as negative qty in the bom if u know rejection qty is knwon before planed order creation.
    i think in your case  rejection qty is known at the time of confirmation, for this u declare rejection qty as scrap in scrap filed at the time of each operation,after that clcik on goods movemnt button,there u can add manually material  name and storage location and movement type is 531 ,on which material u want to post the stock.
    Edited by: sukendar neelam on Jan 22, 2009 8:22 AM

  • Amending order qty in prod order

    Hi, We need to amend the prod order qty incase of any rejections or scrap during manufacturing. How toimplement the same.

    YS,
    You can amend the order quantity whenever required, untill it has following statuses, either DLFL, TECO, LKD, CLSD.
    You can change the order quantity in the order change mode i.e. CO02.
    As soon as the order quantity increases the corresponding component quantity will be effective for the order.
    Also the operation will be needed to be confirmed for this extra quantity.
    Another option is of rework order.
    Hope this helps you.
    SmanS

  • Standard report for leading prod. order with variance  value  & qty.

    Hi Gurus,
    I am searching for  a standard Tcode to get the variance value/Qty against all the leading production orders which are settled in a particular period.
    Note: If a leading production order contains more than one sub orders then the qunatity of sub orders should merge with the leaing order and all the variance from individual sub orders should also merge with the leading production order.
    Please suggest the tables and fileds are used for storing the leading and non leading production order and its corresponding Planned/Actual and Variance values.
    Please guide me.
    Regards,
    Ramakant.

    Hi,
    Thanks for your early response.
    Actually i am unable to use tcode: KKBC_ORD rather able to use KKBC only.
    Using KKBC (Target/actual/production variance) and activating collective order from setting option only able to see the details for a particular leading production order only relating toa  particular period .
    My requirement is to display all the production orders settled in a particular period along with (Material code /order number/ Qty/Actual value and variance value).
    Note: If any leading order exists then that should be collective order i.e.(value and Qty should come against the leading order number).
    If there is any standard tcode exists please let me know else provide the tables and logic to bui;d up such a report.
    Regards,
    Ramakanta

  • To restrict Issue for production than planned qty in production order

    Hi Experts,
    In my scenario, the production staff will prepare production order and right click in production order document and select "Issue Components" option to Issue raw materials for production floor. After issuing the raw materials to production floor closes the "Issue for Production" document and now we have "Production Order" document open in screen. When he again select "Issue Components" option and issues the raw materials once again. Materials are issued once again wrongly. This happens since the production order document is not getting refresh after "Issue for Production" document is done.
    Is there any way to restrict issue of raw materials than the planned qty.?
    I have tried lot of ways to restrict this through SP. Please revert me an solution to this issue.
    The procedure should trigger immediately when the "Issue Components" option is selected second time (If the raw materials are issued in full in first time itself). And it should allow only the qty which is to issued to production order qty (if they issue part issue to production order)
    Thanks in advance
    Raja.S

    Hi Neetu,
    Thanks for your quick response. I have tried this query. But it is not blocking the issue for production document even the raw materials are issued already for the production order.
    I'll explain my work flow again. The Production staff will prepare production order and then release the same and update the production order after changing  the status for "Release". Then he will right click the Mouse button and select "Issue Components" option and perform the Issue for Production process. He will issue the required raw material completely in one shot and add the Issue for Production document.
    After adding the Issue for Production document he will close that document and now we will be in Production order document. Now our production order document will not get refreshed. Now the Production staff go for "Issue components" option, then it should not allow him to issue the components once again. But it is allowing him to issue components any number of times. there is no control.
    If we browse the production order document to previous record and browse back to the same record then my Production order document get refreshed and now we can control the issue. But what should i do to control in the earlier case. Since they want to perfrom lot of production order, there is a chance to issue components for same production order more than one time before the production order document get refreshed.
    Please provide me the SP to control this scenario.
    Thanks in advance.
    Raja.S

  • Production order wise report  of  all component.

    dear all
    I want production order wise report  of  all component.
    1) quantity required 2)issue quantity3)currect stock
    I got  quantity required and issue quantity field in co24 but i didnt get currect stock field(unrestricted stock) in that t-code
    Is any t-code is available ?
    rgds
    Surendra

    Hy Surendra,
    In any of the standard SAP reports you will not find the Goods Movements of Particular order along with available Component stock.
    Goods movements report of the Production / Process order is static report once the order is close.While Stock report is variable report and may be change Time to Time.
    I think if you wish such kind of report then you have to go for Z reorts.
    You can find all the Goods Movements of Order in COOISPI/COOIS/IW3M but there is not available stock report.
    Regards,
    Dhaval

  • Production order wise stock

    Dear Experts ,
    I have a requirement that i want to check production order wise stock in hand.its a bit urgent.
    Can anybody just help me out by some Tcode or some tables by which i can get the required data.
    Regards
    Sarfraz

    Hi,
    If the Stock is not referring to any special stock (sales order, Project etc..), it is not possible to get the production Order stock.
    This is with referenve to the FG.
    If you want to have the Stock for Components of the production order, then with reference to the Reservation no. you can findout the components..
    Regards,
    siva

  • FM which get component and order status & return prod. orders

    Hi all
    does any one know a FM which get component and order status & return prod. orders?
    thanks

    see the transcation COOIS , i think it will be the details required by you
    in the selection at component level block
    enter the material no(component) , if required plant and storage location and then execute
    hope it will solve ur purpose
    so u can suggest for this TCode still u need a custom program u can submit these details from your z program
    and get the output
    table i am not sure see all these tables AUFK,AFKO,AFPO
    cheers
    s.janagar
    Edited by: janagar sundaramoorthy Nadar on Jul 13, 2009 12:18 PM

  • Production Order wise List for  Target cost v/s Actual cost

    Dear Sir,
    We have make to order scenario . We want to have a list giving Production Order wise "Target Cost" and "Actual Cost" . The purpose of list is to analyze the Variances Production Order wise .
    I request to kindly guide us , how can the above list be generated please .
    Regards
    B Mittal

    KKBC_HOE - With Defined Summarization Hierarchy
    S_ALR_87013104 - Sales Order Selection
    KKAC - For Sales Order with Assigned Orders
    KVBI - Actual Costs
    KOB3 - Variances

  • Production in other plant, Sloc determination for prod. order

    Experts,
    we are using production in other plant. Demand in plant A, Router & BOM in plant B. Mfg. should be done in plant B. The components in plant B are Prod.stor.location 0003 (MRP 2 View).
    If I create a production order the system always uses Stor.Loc 0001 in component overview and for with draw material.
    My expectation was that system uses Sloc out of MM of plant B. What might be the reason for that behaviour ?
    Thanks in Advance
    Jörg
    Even if I put Stor.loc 0003 in BOM line Item system goes with 0001 in prod.order.

    JORG,
    I am assuming you have raw materials in plant B. In the BOM of material in plant B, maintain storage location as 0003 for all line items and do read PP master data for the production order on current date so that correct storage location is picked up.
    Also check if production versions are maintained and what is the issue storage lcoation maintained in production version?
    check and revert,
    Santosh Sarda

Maybe you are looking for

  • "The application was unable to start correctly (0x000007b) with borderlands on bootcamp

    Hi ! First, excuse my english : I'm french. I'm trying to run Borderlands (the first, not the 2) on bootcamp with Windows 7 but when I lunch it, I have a textbox wich says : "The application was unable to start correctly (0x000007b)." I have a MacBoo

  • User Defined Fields & Tables Problem

    After the upgrade to B1 2007 and converting our database to 2005 compatibility as per the upgrade directions, we’re having some weird issues with our user defined fields and tables.  •     Our user defined fields that used to be alpha-numeric when se

  • Imac g4 keyboard on new imac 24"?

    Can I use the wired keyboard from my imac 17 g4 on the new imac 24" alum? I love the feel of the old keyboard and was wondering if I could just plug it in? Both are usb and should work....?? Thanks in advance Rich

  • Copy/Paste/Clipboard Problem; Pastes only as SVG Code

    I have Illustrator CC installed, as well as Illustrator CS6, running Windows 7 x64, latest patchlevel. When I try to copy and paste objects in Illustrator CC, I always get a SVG code. I draw a simple rectangular, copy it, paste it, it's not pasted as

  • Submit button on adobe forms

    Is there a way to ensure the submit feature (using the interactive button) will work in all  browsers?  I have created optimized PDF forms and the submit button works only in Explorer.