IN R/3 SYS logical system creation

Hi people
         in idoc2file scenario i created logical system for 2 clients
          1. is for r/3 system for example 800 (LS800)
          2. is for pi system for example 100(LS100)  in r/3 system only i created this two LS
so creation is completed
         after that what i did, assigned clients  this client should be a cross are not means
   we have to assign          800 to LS100
                      and           100 to LS800   this is correct are not 
pls tell me to ASAP
regards
shekar

we have to assign 800 to LS100
and 100 to LS800 this is correct are not
No. There is no such cross assignment. For a particular client, u have to assign the logical system name and thats it
Regards,
Prateek

Similar Messages

  • Logical system creation in BD54

    hey guys
    i have a very silly question,i m really confusing myself.
    well i m doing a IDOC to File scenario.
    on the R/3 side i have RFC dest(SM59) and Port(we21) in place,both pointing to the XI system.Port is SAPXD1(XD1 is system ID of the XI system).
    i m confused in BD54 and WE20.
    i go in BD54 to create a logical system with the name XD1CLNT100(XD1 is the system ID of the XI system and 100 is the client)
    then i go in WE20 and create a partner profile,with the same name as Logical system(XD1CLNT100),then in the outbound side i enter the IDOC i m gonna send and give the Port name as SAPXD1.
    lemme know if the above steps are right?
    now my stupid question is,when we create a logical system in BD54,is that the logical system for R/3 or for XI?
    is this the same logical system name which i have to use in SLD to create a business system for the sender service?
    i have gone through lots of blog and links and m really confused.
    please dont send any links.
    appreciate ur help
    thanx
    ahmad

    Ahmad,
    Get in touch with the Basis Team. They should be able to give you the Logical System name of your R3 system . Normally it always is , SID"CLNT"ClientNumber.
    You will only create on Business System and this will be the One for the R3 system using the R3's logcial system name.
    When the Idoc is sent from R3, it will search in the SLD with its logical system name to find what the correspionding Bsuiness System is. After it finds the Business System it will fill the SOAP header with details like Sender Service and Sender Interface and Sender NameSpace and with these values deterkine the receiver.
    As you are doing a file to Idoc, the receiver can be a thrid party business system or a business service.
    The Receiever System is also a WebASABAP business system in case you are doing an Idoc to Idoc and that is a different case altogether
    Regards
    Bhavesh

  • Logical System Creation & JCO Connection.................

    Hi,
    I have configured ESS in my portal 6.0 but I am confused with some concepts.
    I have created System in portal System Landscape with alias "SAP_WebDynpro_XSS" . & also i have created JCO Connection SAP_R3_HumanResources (Appln data/Metadata).These are the steps in configuration guide.....
    My backend system is ECC 5.0.
    If i can access my backend for my webdynpro iview through JCO connectiones why i need to create system in portal ????
    Thanks in advance!!!
    Smita.

    Hi,
    All the Standard iviews use this System for calling the JavaWD Application.
    This Java WD Application in turn uses the JCo to communicate with backend to get the application sensitive data to the application and display it.
    Regards,
    <i><b>Raja Sekhar</b></i>

  • BI Logical System Creation

    Hi Guru's,
    I have two systems ECC 6 and Netweaver2004s.For BI7.0 in Netweaver2004s i want to Extract the data from ECC6 into Netweaver2004s BI 7.0.
    1.How can i make ECC6 as a Source System for the Netweaver2004s.
    2. In Netweaver2004s for BW 3.5 i am getting the Administrator Workbench but objects are still showing the 7.0 properties. How can i over come this issue.
    Kindly help me out on this issues.
    Thanks in Advance
    Regards
    Prem

    hi,
    1. How can i make ECC6 as a Source System for the Netweaver2004s.
    <b>Ans:</b>To create a new source system you will have to goto rsa1-source system.right click on the source system(right window section) and click and Create.Select the appropriate system(r/3 in your case) and move ahead.You will have to provide the respective background user & password of both the system.
    2. In Netweaver2004s for BW 3.5 i am getting the Administrator Workbench but objects are still showing the 7.0 properties. How can i over come this issue.
    <b>Ans:</b> i could not understand this line but may be you can try tcode rsa1old and you can view the objects like d way they were in 3.5  , if that's your problem.
    hope it helps,
    regards,
    Parth.

  • Logical systems assignment when SRM and ECC are on 2 different servers

    Hi SRM guru's,
    What is the standard practice for Logical system creation and assignment when  ECC and SRM are on 2 different servers.
    I could not able to find which i created a logical system  in SRM server which i created in ECC
    Same for the ECC also.
    how do i assign logical system of SRM to ECC
    vice versa.
    your prompt response is appreciated.
    Regards

    Hi Sai,
    Logical System Naming/Creation procedure is not dependent on the servers but it is just a logical representation of a system.
    As you are trying to name logical systems for ECC & SRM, please follow the below procedure which is usually recommeded by SAP and followed.
    Logical System : <SID>CLNT<Client Number>
    For Example if you have a client 300 in system DE0 (also called SID), the logical system name will be DE0CLNT300. And it will be same for SRM system.
    You can refer the below document which eplains the creation of logical system and RFC destinations etc
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAALEQS/CABFAALEQS.pdf
    Note: Only while configuring the RFC Destination, the servers will play a crucial role.
    Regards
    Kathirvel

  • Error while source system creation/Source system transport

    Hi,
         In our BW implementation, the system landscape is only 2 servers. One is BW Dev, another is BW Prd. All configurations are done in BW Dev and I extracted the data from QAS for this BW Dev system.
         Since we can’t create the source systems in the BW Production system, I tried to create the source system for the SAP R3 Production system in BW Dev and trying to transport this to BW Production Instance.
         I have two queries.
    1.  Is this way is correct for creating the Source System for BW Production system?
    2. When I tried to activate the source system I am getting the following error messages. (I tested the RFC Destinations. There is no problem, I also done the configurations for logical system creation and client assignment in both the systems).
    Error in source system GWPCLNT900
         Message no. RSAR502
    Diagnosis
         With Remote Function Call to system GWPCLNT900 error connection closed
         (no data)  ccurred.
    Procedure
         Remove the cause of the error.
    When tried again I got the following error message
    Basic type ZSBB030 doesn’t exist. EA 447
    Result of the destination check: Timeout RSAR 375.
    Could anyone throw some light on these errors?
    Thanks in advance.
    Krishna

    Hi,
    you need to maintain the logical systems on both R/3 and BW. You also need to set up the RFC connection with users that can log in to the other system. The R/3 system must be open for customizing in scc4.
    In transaction se03 the system change options for 'Business Information Warehouse: SAP Namespace' and 'Business Information Warehouse: Customer Namespace' may need to be modifiable. I am not completely sure about this.
    The last thing I will mention is that I have seen source system creation fail when the RFC-users are system users, and the source system creation worked if the RFC-users was display user while creating the source system. The RFC-users must be changed back to system user later...
    Please look at best practice documents on a more step-by-step guide...
    Best regards,
    Christian Frier

  • How to create logical system

    Hi,
    How to create logical system.
    Please help me with the steps for logical system creation in R3 system.
    Thanks,
    Kelly

    Hi,
    First make your client modifiable, then follow the below procedure.
    Go to transaction SALE or BD54 -> Sending and Receiving Systems -> Logical Systems -> You'll see "Define Logical System" and "Assign Client to Logical System".
    For more information use below link.
    http://help.sap.com/saphelp_nw70/helpdata/en/da/5990df015b5b43a36f6ce7fa1ee8c0/content.htm
    Thanks,
    Mano

  • Creation of new logical systems in IS Retail

    Hi All,
      "For every new store opened, create one Logical System"...i have come across this sentence in 1 of the documents which spaeks about creation of logical systems
    So should i create one Logical System for every store and if i am sending Gift Vouchers to POS so should i create Logical systems for it
    Regards

    Hi,
    Logical system is a System in which applications sharing a common data basis run. In SAP terms, a logical system is a client in a database. Messages are exchanged between logical systems.
    Now the context you are talking about is not clear. Can you point out the specific information about the statement
    "For every new store opened, create one Logical System"
    It depesnds upon the background discription in that document.
    Thanks
    swarup

  • Logical Systems in Business Services

    Hi
    In Business Service creation, for Adapter Specific Identifiers, the parameter for the Logical System. It is only possible to assign one logical system to one Business Service ?.
    i.e. to do
    MyBusServ1, Z_LS_1 
    MyBusServ2, Z_LS_1
    is not possible ?
    When trying to assign Z_LS_1 to MyBusServ2 I get the error that Z_LS_1 is already assigned. Is there a way to circumvent ?, I do not want to create two logical systems in R/3 as the IDOCS types submitted by the Business Services are the same.
    Thanks
    Damien

    Thanks for the replies
    Sarvesh - The Business service is the sender of the information \ IDOC. If I remove the Adapter specific config then how will XI know what Logical system to apply to the IDOC ?.
    Jaishankar - I am creating two IDOC's in SAP. MATMAS and PORDCR. The input file are coming from two different source systems. lets say sys1 and sys2. Both of thse for clarity are created in my scenario as Business Services. sys 1 creates MATMAS and PORDCR IDOC's int he syatem, sys2 creates PORDCR IDOC's in the system. As sys1 and sys2 are related in that they created the IDOC's as part od the same project then I would like to collect in the same partner profile in SAP e.g. Partner Profile ZPP_IDOC with IDOC types MATMAS PORDCR that serve as input for both systems. Logically I would assume that I can assing the logical system ZPP_IDOC to both the adapter specific parameter in both sys1 and sys2.
    Thanks
    Damien

  • Logical System in IDOC-XI scenario

    Hi,
         I need help to understand few things in IDOC-XI scenario, could any one help me in this regard.
        we use Adapter specific identifiers to map services, we have following type of identifiers 1) Sys.ID & Client No.  2) Logical System. 
    my questions are
    a) Are we use Logical System in B to B scenario ?
    b) Are we use LS in reference to the SAP system or Non SAP system ? if a non SAP system....how a non SAP system send an IDOC and why a non SAP system receive an IDOC ( conversion is possible in XI ) ?
    Thanks and Regards
    Mahesh.

    Hay Kumar,
    Logical systems can also be used for SAp sytems wich are not installed yet as a virtuall placeholder.
    a) yes. if on of your business is a non sap system or a propritery system that you developed yuo'll ue LS.
    b) non SAP system can send and recieve IDOCs. so it's possiable to get an IDOC from a system and turn it into an RFC for SAP or get an IDOC from an SAP system and then turn it into something else for another system.
    Have a Good One,
    Uri Lifshitz.

  • Logical System and Client copy

    Hi Gurus ,
                 I just now finished ECC 6.0 successfully , I want to take the client copy . But i hacve one doubt , In client creation one TAB logical system is there , Kindly advice me how to create Logical system and steps .
    Regards
    Selvan

    Hi Manjula ,
                  Below i mentioned the full detail about the error .
        RFC destination for client copy in systems with Financials Basis     (FINBASIS) component.    
    The system could not find any suitable RFC destination for processing     for client 000.     This note also appears if an RFC destination was found but this does not     work.     o   RFC destination: FINBTR@ID3CLNT000     o   Error text: Error during the retrieval of the logon data     Proceed as follows to eliminate this error:    
    1.  Start the wizard to create a new RFC connection     or perform the following steps manually:     1.  Create an RFC destination with the target ZK>source client of client         copy (in this case 000).   
    2.  Check whether the RFC destination works in transaction SM59.         To avoid errors when assigning the password or the authorizations of         the RFC user, use the authorization test Test -> Authorization.   
    3.  Enter the RFC destination:         -   Transaction: FINB_TR_DEST (Destinations for Transport Methods of             the Financials Basis)         -   Client: 000    
    4.  Start the client copy again.
    Kindly advice me
    selvan

  • R/3 Logical Systems in BW

    Hi All,
    I have an idea that we have to create logical systems(SALE) for all BW clients and R/3 clients in BW system. After that, we will assign the BW logical systems to the respective BW Clients in SCC4. But we are not using the logical systems of R/3 system in BW anywhere(please correct me if I am wrong). Then what is the point in creating the logical systems for R/3 in BW?
    Thanks,
    RPK.

    Hi RPK,
    I think here you are getting confused..
    You have to create logical system for R3 in R3 system only , and Logical system for BW in BW only.
    The name you used for the source system (logical system) must be used again for the creation of the source system in the Administrator Workbench for the BW and vice versa..so that BW and R3 can understand each other...
    I hope i am clear to you now ..please let me know If I am not....
    Regards,
    BRB

  • Logical systems in ALE iDoc

    Hi,
    For exchanging data between two systems(not between two clients of the same system) using ALE iDoc , logical systems should be maintained in both the systems?
    For eg: there are two systems, system A and system B.
    i have maintained the logical systems as SYSA (for system A)  and SYSB ( for system B) in the system A using the transaction 'SALE'. Should this need to be maintained in system B also?
    Thanks & Regards,
    Soumya.

    Hi,
    In both the systems you have to Define the Logical systems,
    but in you assign only one to the client,
    i.e. in system A you assign the Logical Sytem of of A to the Client in SALE
    transaction the same goes for B.
    and you don't need to create a distribution model for both the systems,
    you can create it in one system and send it to the other system.
    Regards,
    Samson Rodrigues.

  • RPM_FIN02 - Receiver of IDoc is its own logical system

    For one particular portfolio item, I run the RPM program RPM_FIN02.
    This results in an IDoc creation.
    Next, I checked the status of the IDoc (RPM > Base System Interfaces > SAP Financial and Controlling Integration > Data Distribution From SAP FI-CO to SAP xRPM > Check Inbound Processing).
    This shows the status "29 - Receiver of IDoc is its own logical system".
    As a result, the Internal Order costs (including the ones posted from cProjects) do not get pulled into RPM Financial Planning.
    Please advise.
    I do not have the technical understanding of this issue, and would therefore need a little more than the mere technical jargons and terms to be able to resolve this.
    Thanks for understanding.

    Hi,
    Very briefly,
    -Assuming your RPM system is independent of your ECC box. But RFC connected.
    -RPM_FIN02 is for pulling in financial data onto RPM item from (object linked) Internal Order(IO)/PS Project(PSP).
    -RPM_FIN02 do not recognize/goto cProjects for financials.
    -cProjects can have its own account assigned IO/PSP
    -cProjects Dashboard, (if all is well incl. evaluation) should display costs from assigned IO/PSP
    -This cost does not reach RPM item
    -Source of cProjects- if it is created within cProjects or from RPM Item, does not matter.
    thanks,Mathavan

  • Confusion in Logical System, port & RFC Destination

    hi,
    I have still few doubts regarding Logical System, port and RFC destication
    My SAP ECC6.0 and XI configuration is:
    For ECC 6.0 : Logical system name : T03CLNT400
    Client : 400
    RFC Dest : XIDEST
    Port : XIPORT
    For XI 3.0 : Logical System name : WXI
    client : 400
    RFC Dest : ECCDEST
    Port : SAPEC3
    now my confusion is, in t-code WE19, when sending IDOC to XI (idoc - file scenario), which entry i've to use in prot and Partner No in Receiver side and which port and partner no i've to use in Sender Side.
    also in XI side when creating Technical sys for web as ABAP which logical system name i've to use and in File to Idoc Scenario which logical system i've to use as sender business system (third party file business system)
    If possible please give me detail idea to clarify my cofusion.
    thanks
    ritesh

    Ritesh,
    <b>now my confusion is, in t-code WE19, when sending IDOC to XI (idoc - file scenario), which entry i've to use in prot and Partner No in Receiver side and which port and partner no i've to use in Sender Side.</b>
    If you are sending from R3 then give the sender details as R3 and the receiver side as XI where you have created the port from R3 to XI etc.
    Check this help for clear understanding on all this settings:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/xi/sapR3%28Idocs%29ToXI--Steps+Summarized&
    Also can you check this weblogs on the same:
    /people/swaroopa.vishwanath/blog/2007/01/22/ale-configuration-for-pushing-idocs-from-sap-to-xi
    /people/venugopalarao.immadisetty/blog/2007/01/24/troubleshooting-file-to-idoc-scenario-in-xi
    /people/michal.krawczyk2/blog/2005/03/29/xi-error--unable-to-convert-the-sender-service-to-an-ale-logical-system
    /people/ravikumar.allampallam/blog/2005/02/23/configuration-steps-required-for-posting-idocsxi
    /people/saravanakumar.kuppusamy2/blog/2005/01/20/configuration-tips-for-a-business-serviceintegration-process-to-send-back-ale-audit-idoc
    ---Satish

Maybe you are looking for

  • How to Transfer the iPhone from one computer to another Win XP

    All I got my wife a new macbook pro, running Windows XP prof. She has an iphone 3G with 16 GB memory running 3.0.1. So..she wanted to transfer the sync function from her PC to her macbook. Of course, Apple was of NO help at all (but did want to charg

  • How to transfer a single Application from an old Time Machine backup

    Hi My old G5 unexpectedly died so i picked up a new iMac. When I set it up I used migration assistant to transfer everything but was told by a Genius not to "check" applications as I would need to re-install any apps that used a key anyway and there

  • HP Photosmart B109n-z (printing problem) please help

    Hi all, I have the HP Photosmart B109n-z printer and have it set up wirelessly and it works fine I've had no problems with it.  The other day the black ink stopped working - the cartridge isn't empty but it's no longer prinking black on any documents

  • Why does my iphone 4 take soooo long to stream video?

    Why does my iphone 4 take soooo long to stream a video???  I will have an iphone 3GS next to it, and we will play a youtube video at the same time, and the 3GS goes significantly faster.  Any advice??

  • TV-Bluray Help!

    Insignia TV: NS-39L240A13 (Best Buy purchase). Panasonic BR player. Generic HDMI cables. Bluray picture sometimes goes (gradually) snowy and POPS out. No pic, TV error message "No signal" while Bluray continues to play (the movie clock keeps going).