In srm 5.0 but upgraing from ecc 5.0 to ecc 6.0

Hi,
   can any one help me in guiding what are the various settings that have to be made if i maintain in srm 5.0 server itself and upgrade my back end system from ecc5.0 to ecc 6.0.
thanks,
rose.

Hi Rose,
it should be a normal upgrade situation for you, where you have to check / adjust
the backend related settings. Nothing specific special as far as I know of.
Thanks,
Claudia

Similar Messages

  • Does SRM support Vendor Partner Functionality from ECC?

    Does SRM support or sync up with Vendor Partner functions in ECC such as OA, VN, PI, etc.?
    Initial look at SRM does not suggest that SAP has made it easy to replicate partner functions in SRM.

    Hi,
    See these related threads:
    Partner function Payee in SRM
    Adding Partner Function to R/3 PO from SRM in Classic using BADI
    BR,
    Disha.
    <b>Pls reward points for useful answers.</b>

  • Data Retractors from BPC 7.5 to ECC 6.0

    We are looking for customers who can share infomation that have successfully built automated data retractors from BPC 7.5  to ECC  6.0.
    There is one whitepaper titled "How to... Retract data from BPC 7.5 NetWeaver to SAP ERP Cost Center Accounting, Part I" posted back in July of 2010?
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/c029accf-6d95-2d10-79aa-cc291180bf73
    This document is a template that has some assumptions built into it for it to work.   I know customers will have different requirements, but I would like any comments from anyone who is "Live" with this.  How long it took to develop and any issues that you encountered?   How often do you run the retractor?
    We are also looking at moving parts of the budget in BPC back into Cost Based PA.  Can anyone share their experience in creating this retractor (interface) as well?
    Thanks in advance,
    Steve Boening

    Hi
    Go through eh below link for Best Practices
    http://help.sap.com/bp_hcmv1600/HCM_US/HTML/master_data.htm
    [Risk Factors|http://www.informatica.com/INFA_Resources/article_sap_netweaver_mag_data_migration.pdf]
    [Different Methods|http://www.sap-img.com/general/what-are-the-methods-to-migrate-data-from-a-legacy-system-to-sap.htm]
    [Best Practices|http://partners.netapp.com/go/techontap/NGS_migration.pdf]
    Regards
    Pavan

  • Issues during technical upgrade from  version 4.6C to ECC 6.0

    Dear All,
    We have done a technical upgrade from version 4.6C to ECC 6.0 and encountered following issues -
    In the t-code ABZE (acquisition with in house production) there is a check-box for reversal posting on screen with version 4.6C. However, this field is missing in ECC 6.0. Why so?
    In the report s_alr_87012327, there is a field "only with creation block" in version 4.6C. However, this field is missing in ECC 6.0. Why so?
    Request to kindly suggest the alternative to carry out the same in ECC 6.0.
    Thanks in advance.
    Regards,
    Dhawal

    Hi Akshya,
    Please find answers below.
    1) 4.6c is NON-UNICODE system, Can I upgrade it into ECC 6.0 UNICODE system?
    Yes you can.
    If you are on a single code page system then you can give a gap between your uprade and unicode conversion. There is no problem with the singlecode upgrade and conversion.
    But if your system is MDMP then you will have to do the CUUC method that is both upgrade and unicode conversion together. Though you can give a gap and sign an disclaimer with SAP it is still not recomended way.
    2) 4.6c does not have any ITS system installed. If we upgrade it to ECC6.0 ABAP only, then Can I activate WAS internal ITS?
    Yes you can activate it.
    3) 4.6c does not have any JAVA stack. When I upgrade it to ECC 6.0, can I upgrade it to dual stack (ABAP+JAVA)? If yes, then how?
    After the upgrade and unicode conversion you can install the java stack.
    Regards,
    Ravi.

  • Regarding Upgradation From 4.6 C To ECC 6.0-Urgent

    Hi all
    can anybody let me know what is procedure to upgrade the SAP From 4.6 C To ECC 6.0 from MM and CIN point of view
    --is Up gradation is just like an implementation or Enhancement process
    any help would be appreciable
    thanks in Advance
    Edited by: JAM SAP on Feb 27, 2008 8:47 AM

    Upgrading project mostly involves testing with the existing system with the new system.SAP already released the release notes for this Upgrading ECC 6.0.
    (1). YOu have to do unit test/Integration test/Regression test in your new system based on the business process documents prepared for your present system.
    (2). You mostly encounter Interface issues(If exist)/Authorization issues/Enhanced naming issues/Usage issues.
    (3). In 46C you have to do external configuration for CIN.However In ERP 2005, It is already in built.Hence Knowledge of CIN will be more than sufficient to manage the CIN issues.
    (4). More over you must be very confident in the business process.Unless you will receive many UAT issues.
    (5). I strongly advice you based on my experience, Whenever you do unit test and Integration test, use your user id to.When you do regression testing, get the user id from user copy all the roles from the user id and create new id.Using this new id you do the Regression testing.This will avoid many problems.
    (6). Another Imprtant big issue is patch work infomation.After release of 46C, SAP released many patches for 46C.However these patches are all not updated in to your present 46C system.These patches are already in in built in ECC 6.0, hence you will get diff.result when you do testing.If such a case, advice the user about the patch work, and proceed. In most of my cases , SAP enjoyed with 46C without patch scenario, but in ECC6.0 they started to complain, b'cas the new patches.
    (7).Give me your mail id ,I will send you the release notes.
    (8).Note down my forum discussion to know about the some of the issues.
    Hopefully it will be helpful, Let me know, If you need more Information.Thanks
    Reward If useful!

  • Right SAPup version for upgrade from ECC 5.0 to ECC 6.0

    Dear Expert!
    I am upgrading from ECC 5.0 to ECC 6.0 , but i have a erro, with SAPup tool, I don't know to select right SAPup version, please show me about that, thank you very much!
    Tru Hang

    Hi,
    As anil you have to download the Upgrade guide, therer you could see the clear information -about SAPup.
    they have mentioned the issues with SAPup and they have asked us to use new SAPup version due to the issues of Old SAPup version.
    have a look at the below notes
    821032  Corrections for SAPup release 7.00
    1056649  Corrections for SAPup release 7.10
    48184  Upgrade: Stopping a running R3up or SAPup
    1070771  Do not use SAPup version 7.00/2, build 24.094 !
    You can see lots of threads in SDN lot of threads talks about SAPup issues.
    -Srini

  • Tips / Lesson Learn: Upgrading from ECC 5.0 to ECC 6.0 w/ Unicode

    Hi
    We are looking into moving from ECC 5.0 to ECC 6.0 w/ EP7 and doing the unicode path on as well.
    What are some lesson learn you guys could share in potential issue may occur in the HCM realm?
    We don't currently have inhouse payroll, using PU12 to interface that information out.
    If you could share some past experiences on what could occur during this upgarde caused by going to ECC 6 or even by the unicode patch would greatly be appreciated.
    Thanks,

    THe guru of ECM on SDN
    nice to see you around. came across your tips and tricks regarding SAP HCM.and also for ECM.
    you have dne a good job . i am new in this field but soon would have skills like you
    Regards
    Waqas Anwar

  • US Payroll upgrading from Ecc 5.0 to Ecc 6.o

    Hi Experts
    My client want to upgrade from Ecc 5.0 to Ecc 6.0 for all modules including US payroll.
    please advise me what are the tables in i need to take care? means i need to have copy for double check?
    Is any tables which was there in Ecc 5.0 and not available in Ecc 6.0?
    I know that we need to have the backup of table T512w and T5uj tables, Apart from these table what other tables i need to check and have backup for double check?
    Thanks in advance
    Regards

    Use following...Good luck...
    Tables:
    T52D2     This table is used to store processing class values
    T512W     In this table, we want to check if someone made changes to the wage types in the SAP name range. We will therefore compare the wage types (only for country code = 10) in the SAP name range (/, M, B*) between two systems.
    T512T     In this table, we want to check if someone made changes to the wage types in the SAP name range. We will therefore compare the wage types (only for country code = 10) in the SAP name range (/, M, B*) between  two systems
    T77S0     For table T77S0, we want to compare the switches that were changed in the SAP name range between  two systems.
    T511K/P     For these tables, we want to check which constants in the SAP name range were changed that may be reset back to standard.
    T591A     For table T591A, we want to check which time constraints and subtypes have been changed, created and deleted
    T52EL/Z     For these tables we want to check if any posting attributes of wage types in the SAP name range have been altered.
    T556U     This table has a delivery class of E which means that SAP and the customer shares this table but with separate name ranges.
    T52D7     This table has a delivery class of E which means that SAP and the customer shares this table but with separate name ranges. Customers are supposed to use name range /9** and 1*** - 9***. This table is used to group wage types.
    T54C3     This table has a delivery class of E which means that SAP and the customer shares this table but with separate name ranges. Customers are supposed to use name range /9** and 1*** - 9***. This table is used cumulate wage types.
    T52OCR     This table is used to store off-cycle reasons.
    Tax Reporter tables     Verify the tax reporter configuration tables to make sure that the standard entries were not changed and overwritten.
    Programs:
    RPUMKG00     Re-generate all features
    RPUBTCU0     Validate BSI connectivity for tax calculation
    RHTTCP77     Table configuration needed for process models
    RHSOBJCH     Table configuration needed for process models
    RPUCT700     Generate all payroll functions and operations
    Arti

  • Transports from ECC 5.0 to ECC 6.0

    Hello,
    We are considering using transports from the 5.0 system to make configuration changes in the 6.0 system (and even some workbench items). Besides, the obvious issues with conflicting configuration, is there a technical reason why they should not attempt this? I look for notes to know it, and there are the note NOTE 1090842, but there are no answer for transports between realese ECC 5.0 to ECC 6.0. Do you know if it is a special case?
    Thanks in advance for your answer,
    Xènia

    Hello,
    This is always a bad idea.
    However, if you feel like that, I only recommend it if you are transporting Z objects that you know perfectly. This way you can make corrections at the very moment the potential problem happens.  Before the import, please compare both objects, in release 5.0 and 6.0, and look for the differences. Plan what would happen if the 5.0 object replaces the 6.0 one.
    Don't do it with standard objects.
    Regards
    Francisco

  • Upgradation from ECC 5.0 to ECC 6.0

    Hi Friends,
    As an SD Consultant what would be the roles and responsibilities in the upgradation projects(from 4.6C/4.7E/ECC 5.0 to ECC 6.0)
    with regards

    HELLO,
    Search the form you will get few links.
    Also many companies have gone technical upgradation , but not functional upgradation.
    Thanks
    RK

  • Product Replication from CRM 5.0 to ECC 6.0

    Hi,
        My requirement is to replicate newly created product master from CRM  to ECC.
       For this I created subscription with publication name <b>Product Materials (MESG)</b>.
       Nest created product in CRM,  but this product is not replicated to ECC. But  BDoc generated successfully with status green.
       Where as new sales orders,change sales orders, BP changes, Product master changes are replicated in ECC from CRM and Vice Versa.
        Appreciate, if some one could tell me the steps I need to do in ECC & CRM to replicate new products created in CRM into ECC.
    Thanks & Best Regards,
    SAP CRM MW.
    Message was edited by:
            SAP CRM

    Hi BPB,
    Have you created a number range for materials in CRM?
    If you create materials in the R/3 system and the CRM system in parallel, duplicate numbers for different materials may occur if the number ranges in the R/3 system and the CRM system are overlapping. Duplicate numbers do not cause errors because each material gets an internal unique identifier in addition. To avoid duplicate numbers you have to make sure that the number ranges for materials in the CRM system and the R/3 system do not overlap.
    Remove the subscription in Adminconsole that is not required for the product upload.
    The upload function is only active in product processing if this was allowed in Customizing.
    The corresponding path in the SAP reference IMG is 'Customer Relationship Management -> Master Data -> Product -> Settings for Product Type -> Allow Upload for a Product Type'.
    <b>Reward points if it helps!!</b>
    Best regards,
    Vikash.
    Message was edited by:
            Vikash Krishna

  • Push data from sap business one to ECC with XI

    Hi,gurus:
    Have you ever configured the scenario?We wanna push data from sap business one to ECC with XI,and vice versa.
    We know that b1i have this funtion,but in our scenario,we need to create some addon table both in b1 and ecc,so does it mean that I can't use b1i in my special scenario?
    We wanna utilize XI to solve our issue,then the scenario may be abapproxy to soap,or soap to abapproxy.But the problem is, how to program in the b1 side both in sender and receiver.Do you have any information about that?

    Xinjiang,
    The method to connect SAP Business One and ECC 6 using XI would be B1iSN2007.  You could of course develop something your self using ABAP, IDoc and the Business One SDK, but B1i does this today and has 6 built in Business Scenarios.  You can of course customize the existing scenarios and/or create your own much easier and faster than creating the whole thing from scratch.
    If you are specifically interested in not using B1i ... you would want to post your question in the XI forum here on SDN.
    Hope that helps,
    Eddy

  • Uodate Freight/Booking order from SAP TM to SAP ECC

    Hi All,
    Iam an SD consultant and new to SAP TM. We have the follwoing requirement.
    The delivery proposal is sent from TM to ECC and in ECC it will create a delivery. The delivery proposal  from TM does not  carry the freight/booking  order no from TM. we need to send booking order no in the outbound message from SAP TM to ECC. And then we want the booking order number to store in delivery in ECC.
    questions are
    1) how  TM communciates with ECC. we have been told that there are two interfaces
    OutboundDeliveryBulkCreateRequest_ (for sending delivery proposal from TM to ECC )
    OutboundDeliveryBulkConfirmation_In (for sending back delivery creation message from ECC to TM )
    2 ) I need to know what are these interfaces. Are these idocs. How to enchance the same in TM and ECC to achieve  the above regarding booking order. That is how to inlcude booking order no in  delivery proposals message so that it is sent from TM to ECC.
    3 ) In ECC,  how the booking order no will be captured from TM and how it will be updated in delivery ?
    regards
    Pamela

    hi Pamela,
    sap erp communicates with tm using XML Messages (so called Enterprise Services).  the Standard way to update erp would be to create freight orders and have those create erp shipments. But, you certainly have your reasons why you want to update only deliveries. Enhancing the Enterprise Service and modifying the update is certainly the best way. If you do not get help on this. Here is an alternative:
    To get the booking number/freight order Number for the FU, I would use the save document prepare user Exit in the delivery and write the Fo number into LIFEX. You can use a remote function call to call tm, alternatively, you can store the FO number in the FU with a custom save strategy.
    Step 1: get the sales orde number (VGBEL) within Exit in sd delivery
    Step 2: read the Fu related to the sales order (if ist 1:1), you can use the field LABELTXT in the ROOT node of the TOR object.
    Step 3: get the FO related to the relevant stage (following coding).

  • Passing Filed Values from CRM CIC Webclient into ECC thru Transctn Launcher

    Dear Experts,
    I am a CRM Consultant, working for IC Webclient implementation (Call Center Application from SAP). We are creating an Interaction record (a CRM transaction) after receiving a call from customer.
    in the same IC Webclient screen we are calling ECC transaction using a CRM concept scenario Transaction Launcher.
    Now the requirement is to pass the information like priority, reason, employee responsible and Text from Interaction record into the ECC transaction (IW51) which will be availabe in same screen but belongs to CRM and ECC systems respectively.
    there is no standard configuration available for this, and a development is strongly required.
    I dont know which functionality can be used to achieve this requirement. can we use RFC Function Module for this? what could be the best solution for this.
    kindly help me to resolve this issue. Your suggestions will be highly appreciated.
    Best regards
    Raghu ram

    Hello Raghu,
    Try see if the ITS link it is OK. For me, note 917302 was very useful to understand what service to use, and how to fill the link at 'crms_ic_cross_sys' transaction.
    A FAQ-style note is also available. Check note 990216.
    Kind regards.
    Bruno

  • HP officejet Pro 8100 will print from an Iphone but not from my windows laptop

    HP officejet Pro 8100 will print from an Iphone but not from my windows laptop. I get an error stating "unable to communicate with printer"

    Hi Melatina66,
    Welcome to the HP Support forums.  I understand that when trying to print from your laptop that you get a communication error message.
    To better assist you, would you please provide some further information:
    1)       How is the printer connected (USB cable, ethernet or wireless)?
    2)      When you installed the printer on your laptop did you set it up with a USB cable?  If  yes, did you switch the connection type on the laptop from USB cable to ethernet/wireless?
    3)      What version of Windows operating system are you running on the laptop (Windows XP, Windows Vista, Windows 7, or Windows 8, etc)?
    4)      When printing from your iPhone are you using Apple's AirPrint or HP's ePrint app?
    Thank you.
    Regards,
    Happytohelp01
    Please click on the Thumbs Up on the right to say “Thanks” for helping!
    Please click “Accept as Solution ” on the post that solves your issue to help others find the solution.
    I work on behalf of HP

Maybe you are looking for

  • FM "GUI_UPLOAD " File type 'DAT' with UNICODE

    Hi all,         We’re using UNICODE  and we have developed a FM  which upload the data from application server as well as  from presentation server. Its based on selection screen options.  We are using GUI_UPLOAD FM in our function module. We have ha

  • Make a Backup of CS3

    Hello, Can anyone tell me how one would make a backup of CS3 Design Premium on Vista. I have to run Adobes clean script to fix an issue with my serial number and do not want to lose all of my plugins, fonts, brushes, settings, etc. Any help would be

  • Navigating to new page when flash movie stops in DreamWeaver

    Hey Folks I have a page in DreamWeaver that is an introductory movie built in Flash. I would like to automatically navigate to the first page of my website when the movie finishes without using buttons. So when you open my web site the movie plays, t

  • What's the best way to print pictures from my iPhone?

    I have a lot of pictures on my iPhone 3G and iPhone 4S and a few on my iPad 2 and they're taking up a lot of space, what's the best way for me to print them out?

  • HD Enhanced Box same as X1 Box?

    We have to upgrade to the HD enhanced box.  Can you get X-1 service on this box or do you need to get an X-1 box?Can you get the X-1 service WITHOUT phone service?  When I ordered the HD enhanced box today I was offered the X-1 box and no mention of