In sub contract PO no error shown for without BOM material..

Dear All,
I am creating subcontracting PO with item catagory "L" for material "XYZ" and for material "XYZ" i have not created any BOM.
Then also system is not giving any error while saving PO.
Generally it should give the error "Not possible to determine any components"
Also in mesage determination i have assigned mesage ME154 as error still it is not showing as error.
What could be the reason and what need to do to solve the same.
Naren

Dear Jurgen,
If it is giving an error i will able to use the notes...
Here i am not getting an error which is my concern
what i should do to get the error if i am putting material without BOM in PO andnot entering any components..
Naren

Similar Messages

  • BAPI to create Purchase Requisition for selective BOM Material

    Dear Experts,
    I need ur help, Actually I am developing a module Pool prg to create Purchase Requisition for selective Bom Material .
    Actually, standard T.Code (ME21N) create PR for a multiple BOM Materia lwhich are used to create a prepared material. But my requirement is PR should be generate for selective BOM material .
    Multiple BOM Material is used to prepared a complete Material .
    I have checked a particular BOM Material, for this matrial Purchase Requisition should be genrate.
    Please suggest me the related code and Bapi which helps me .
    Thanks & Regards,
    Swapnika

    Hi
    you can Use BAPI   BAPI_REQUISITION_CREATE
    Hope Its  help You.
    Regards
    Ajit

  • Sub Contracting PO- Table and Fields for Materials sent

    Dear Friends,
    I am preparing a functional spec for the sub contracting PO.
    Can you pls provide information about the tables and fields from where the data about the materials to be sent to subcontractor are picked?
    Its picking from the structure MDPM. But pls throw some light on the same how the data is picked and printed in PO from certain tables.
    Thanks in advance
    Shashidhar

    Dear Shash,
    Here some details of table infirmation not only your related feild available in all feilds
    http://www.erpgenie.com/sap/abap/tables_fi.htm
    Hope this helps you
    Prem.

  • Schedule Lines for Sales BoM Material

    Hi All,
    When i trying to maintain the multiples schedule lines for the Sales BoM Material(Both Header and Item), system is not allowing to maintain it.Please guide me how to achieve this?

    Hi,
    "Schedule Line allowed" is enabled at Item category. The Requirement is If we have multiple schedule lines for BoM Line Item, we are not able to maintain. Suppose the Order Quantity is 50 Units and we need schedule line of 10 Quantity each month. We are not able to maintain. System takes the complete 50 quantity and do the availability check and proposes the availablity Date. We are not able to maintain different schedules manually.

  • VOV4 settings for return BOM material

    Dear Experts,
    The scenario is related to Bill Of Material(BOM). PGI is done  with mov type 601 with  sch line category CP for main material and CT for components.
    Now what settings is required in VOV4 for return BOM item and what movement type is required.
    1.    For ERLA  -
       TAQ
    1.1  For NORM -
       TAE
    2     For LUMF -
    TAP
    2. 1  For NORM -
    TAN
    Regards
    Jyoti

    Dear Jyoti,
    Did you check this thread
    Return sales  of header level BOM subcomponents
    Here Mr Jonathon has answered similar question very fanatstically.
    Thanks,
    Raja

  • Error in Releasing Contracts in SRM-Error Log for user WF-BATCH

    Hi,
    When we are releasing contracts in SRM, an error log is being generated for a user WF-BATCH with message :
    "Recipient not found
    The error ocurred by processing event RELEASED_NEWLY with GUID 4530EA86C23B007700000000B0000023 and object_id= 4400000238"(Where 4400000238 is our contract no)
    Also our contract is not being transported to CCM even though all the relevant configurations have been done in XI.
    Is this because of the error log?? What is the issue??
    Any Useful answers would be suitably rewarded..
    Regards,
    Puneet

    Hello Puneet,
    Please check whether u have released that contract or not.
    if u need to release purchase order from the contract, it needs to be released first.
    from ur problme statement, it seems u haven't released that contract.
    Sarabjeet

  • Sub contracting Challan closing error

    Dear All,
         I am facing problem while doing challan closing in J1IF13 Error message i am getting is Document 0000005560 2010  is not released for accounting. Message no. 8I267
    Please help me to solve this issue.
    Vengatesh.S

    Just try it in J1IF T.Code

  • MIGO Error WRX for Non-valuated Material for AUC

    Hi Expert,
    While Doing MIGO getting error see the screen shot below, in this scenario wht i did , i want to purchase two laptop we have made Purchase Order Capital and Given Material Non-Valuated no Valuation Class, and in this purchase order i ve assign the AUC Asset number along with Investment order No. once we we settlement the Order AUC to Main Asset thru AIAB & AIBU.
    system should suppose to give the Accounting Entry while MIGO Post.
    PK 70 217200 WIP Others as well 21720001 A/c Debited   Rs. 125000
    PK 96 150500  GR/IR Clearing a/c               A/c  Credited  Rs. 125000-
    but i don know where i done mistake why nt system allow to Post.

    By definition UNBW's are ony qty updating and have no value assoicated with them. Since the system needs to stock this qty somewhere it by deafult asks for a Sloc.

  • Process Order -Batch determination for a BOM material(same batch)

    Hi Friends,
    Thanks in advance.
    Let us say, a material (ROH) has so many batches as A,B,C & D. Whenever we create a new process order, system has to pick only the particular batch( say -C here)  in the process order BOM through batch determination.  (during process order creation stage)
    1.How to achieve the same ?
    2. What are the ways are there to achieve the same ?
    3.Is there any Exit for this?
    Regards,
    Mani

    Hi Velmurugan & Vishwas,
    Thnaks for your feed back.
    1. Is there any other ways without batch classification ? ( Because there are so many material without MM-classification view.....and client wants without extending the Classification view for MM master as it suggests same batch for all GI for delivery & GR for purchase.....)...We want only for process order batch determination.....
    2. Is there any exit for this ?
    3. Is it possible through any kind of Characteristic assignment in the Sort sequence? How?
    Regards,
    Mani

  • How to find out the link for the tables for sub contract PO

    Dear All,
    How to find out the link for the tables for sub contract PO, I am looking for the fields Material, Unit, Batch no., quantity.
    Please provide the solution for the Table related to ABAP.
    Thanks,
    V.V.

    Hi,
       Make use of the table EKKO, EKPO...
    For subcontract please select the option in EKPO-PSTYP.
    Regards
    GK.

  • ERROR IN SUB CONTRACTING

    Hi frnds,
                         im facing a error while im posting the quantity reconciliation for sub contracting challan..

    error is that "challan not valid, material docuement is valid for another scenario".
    we sent the material outside for sub contracting and now we received the deliverable goods from vendor, so we posted the goods receipt. but while reconciliating the error is coming........
    every thing is perferct that maintained the posting dates, movement types.
    thanks in advance

  • Any configuration required from SD about Sub-contracting PO

    Dear All,
    Need your assistance.I am SD connsultant.
    1.   MM team can directly create an outbound delivery from ME2O now.
    2.    It creates an outbound delivery and delivery note in the system
    3.    The create delivery process is not reducing any inventory in the system until and unless you are not doing any “Post goods issue”.
    Now I have some question –
    1.    This delivery is  an open delivery and we are not posting PGI against this delivery. So what are the next steps should be to handle this delivery?
    So from SD point fo view any configuration is required.. Because this has involvement for both SD and MM.
    Thanks
    Sits

       this delivery is  an open delivery and we are not posting PGI against this delivery. So what are the next steps should be to handle this delivery?
    So from SD point fo view any configuration is required.. Because this has involvement for both SD and MM.
    Don't know where did you read that SD involvement is required in Subcontracting PO.
    This is purely related MM.
    If you had posted this in MM forum then you  would have been answered correctly whether SD involvement is required or not.
    Subcontracting PO process is something like we provide raw materiel to the Vendor and he will do the finishing and make a Finished a product and send it to us and for this company pay some labour charges, in this case raw material is kept at Vendor location but the stock is validated in the books of company.
    1.Basic requirement for this is BOM should exist in system and we create this using t code CS01.Item category is L in PO and special stock type is O.
    2. Maintain info records in ME11 by checking the field sub contracting.
    3.Create PO for the finished good with item category L
    4. in ME20 Issue the raw materials to Vendor, the move type 541( issue raw material to vendor).
    once the raw materials issued then the qty will be shown at Vendor this you can observe in the same t code or you can check this MBLB t code.
    5. in MIGO we do receipt (mov type 101) with ref to PO here when the Vendor provide the finished good the raw material gets consumed this happens with mov type 543. This you can observe in MIGO against this raw materials.
    This is what exactly Subcontract process happens, in this where exactly you will come across the SD involvement?
    Please let me know if you are talking about something different?
    thanks,
    Srinu.

  • SCC u2013 Sub contracting with Chargeable components

    we need to use SCC u2013 Sub contracting with Chargeable components.
    For that, Activated u2018SCCu2019 at Client level and Valuation area level.
    Any further config process required to use this process?
    I did not find any difference in postings between normal Sub-con process and SCC.
    Please advise what is the difference?
    Advance THANKS for replies.
    V. RAMAN.

    Hi,
    This procedure provides the way of manual payment for Subcontract expense.
    I want to clear Accrued revenue by deduction AP using T code /n/SAPNEA/JSCR19
    While posting, I am getting error message “Amount too large to clear", maybe the system set the limit for the tolerance value for clear document. Please suggest me, where to change the settings.
    Rahul

  • Sub-contract process with T.codes..?urgent

    Hi
    can anybody explain me ,
    what are all procedures to be followed to carry Sub-contract process with T.codes.
    From sub-contract PO to Subcontract challan output
    Explain me step by step process with t.codes
    Thanks
    sap-mm

    Hi,
    Sub Contracting Process with t.codes are:
    (1) You have create material in MM01(Finished Goods ,mat type FERT) that can be procured externally, and you have maintained BOM (CS01) with components (Raw Materials , Mat type ROH). Any waste generated as scraps or by products received during subcontracting process can be maintained as component with negative quantity or in % basis  in the BOM in CS01.
    (2) Create a subcontracting PO (ME21N, Item Category L). Maintain Purchase Info Record (ME11)for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components(Raw Materials) for SC PO(In ME2O directly or by MB1B with 541 Movement type). Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" .So no accounting document generated by supplying raw material to Sub Contracting Vendor.
    (4) You receive (MIGO) finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    FG BSX acc. Debit Acc.
    GR/IR Cle.acc. WRX acc. Credit Acc.
    FRL Acc. Debit Acc.
    BSV acc. Credit Acc.
    BSX acc. of components Credit Acc.
    GBB - VBO Acc. Debit acc.
    PRD acc. Some time Credit &
    Some time Debit
    (5) Invoice Verification (MIRO) for SC Invoice.
    (6) Payment in F-53
    If you are activate Price Diff. Acc. for SC-Vendor in....
    OLMB -
    > GR -
    > Price diff. acc.for SC order while you do GR for your Plant......then Price Diff. Acc. also will be trigered...
    Regards,
    Biju K

  • Sub-contracting operation.

    Hi, we have one sub-contracting operation in between in-house production order operations. For sub-contracting operation only the in-process semi finished material which is the result of previous operation will be sent to vendor. While I am trying to convert pr into po, gives the message that u201Cno component assignedu201D. Please note that no roh will be sent to vendor except that previous operation completed material for which we do not do gr for the previous operation. Please advise how to handle this. Thank you.

    HI Raju,
    Subcontracting: Operation Wise:
    10, 20 & 30 total 3 operations. 10& 30 are internal, i.e., in-house and Operation 20 is External i.e. sending material for external processing u2013 subcontracting
    The control key PP02 meant for external processing is to be allocated to the operation 20 in the routing.
    Once you allocate PP02, in the operation detail screen Activate Subcontracting, then system will ask for the Purchase info record no.
    (Create Purchase Info Record TC: ME11, Give Details of Vendor, Purchase Organization, Plant and Select Subcontracting Press ENTER, maintain the required data)
    Next MD61, MD02, MD04. Then after confirm Operation 10,
    Then external processing has to be started.
    Go to operation overview in the prod order, choose operation 20 & double click.
    Get the Purchase Requisition number from the external processing tab. Then convert into Purchase Order. (Using TC: ME58)
    Send the Material to the Subcontractor using TC: ME2O or TC: MB1B with Movement Type: 541.
    Then receive Material from Subcontracting Vendor by using TC: MIGO with Movement Type: 101.
    (Goods Receipt with Reference to Purchase Order)
    Then confirm Operation 20 &
    Continue with Operation 30, Confirm Operation 30. Do GR by TC: MB31 Movement Type: 101.
    Regards,
    Jagadeesh K

Maybe you are looking for

  • Error at report designer while opening the query

    Hi in report designer i am trying to open query i am getting error like error while loading query meta data check the query and portal settings i am getting this error only this report only Diagnosis An error occurred in the BI components on the SAP

  • Microphone dont work in win 8.1 and win 10 tech preview works fine in win 8 and below

    my microphone works fine in win 8 but when i upgrade to win8.1 it doesn't work my motherboard is Asus P5KPL-CM i don't know is that a driver problem or not because the speakers work fine only the microphone doesn't work in any voice related apps. i a

  • Mail attachment problem with 10.8.3

    Since upgrading to 10.8.3 ....  Mail has now been playing up badly. I cannot drag and drop files onto emails anymore, and even if i attach the long way its still no guarantee it will actually be attached when I send. Anyone else having this problem?

  • JFX fxml: custom cellfactory for CheckBoxTableCell throwing exception

    Hi, I am trying to create a custom cell factory for inserting a CheckBoxTableCell in a TableView through fxml. But its giving me an exception as shown below. The cell factory class i have created and the fxml is also put below Can somebody help? SEVE

  • Scripting Error

    I made a tutorial on working on a PLAY ALL button with scripts (a PLAY ALL, PLAY NEXT and RESET scripts). The PLAY ALL function works fine. Problem comes when I individually play any videoclip: after the first one, playback returns to the corresponde