In VFX3,error is for GL requires an assignment to a cost object eventhough

In VFX3, while releasing billing docu for Accounting  error is for GL40000000 requires an assignment to a cost object
The below are Checked points :
1.In OKB9 for this cost element  40000000 cost center assignments are there with Business area wise.
2.Cost center Valid period is from 1.4.2007 to 31.12.9999
in the begining  while releasing in VFX3, system throwed  error as that cost center  blocked for revenue postings,
We deselected that check box(Actual Revenues in KS02)
now the error is GL 4000000 requires  an assignment to a cost object
Even though cost center assignments are there but why system is asking cost object  not able to understand.
Please any one help me to solve this issue.
Thanks

Nope, no other ways.
The cost center in question will receive a statistical posting - revenues aren't costs, and can't be carried in CCA as primary postings.  If they could, they'd be able to be included in rate calculation, allocations, etc, which is nonsensical.
You'll have to have another receiver in CO that can receieve a real posting.  That's pretty much an internal order, WBS element, or profitability segment.  Profit center doesn't count; all postings to PCA are statisticial (PCA is a special-purpose special-purpose-ledger, if you get my meaning.)
Two questions:
1) Do you have costing-based CO-PA active in your system?
2) Have you verified the business scenario?  Why do you want to record revenues in CCA in the first place?

Similar Messages

  • Error message KI235 "Account & requires an assignment to a CO object

    Hi,
    I am in the SAP Release SAP ECC 6.0 and I can not make a GOOD RECEIPT for a PURCHASE ORDER (transacction:MIGO); the system displays the error Message KI235.
    In another hand, I have checked the cost Account and I is possible to make an invoice using this account, so I don't know what could be the problem.
    Thanks in advance,

    Hi Juan,
    Which kind of purchase order is it? Is it a subcontracting purchase order? If not, are you buying a standard price controlled material and the purchase order price is different than the standard price? Are you posting the goods receipt into the previous period?
    Please, let me know.
    Esther.

  • Account 410100 requires an assignment to a Co object

    Hi Team,
    I am Trying to post one entry T code F-02 ( fast entry screen) , In the fast entry screen we require WBS element  as Co object ,
    we added  WBS element  but system still gives  error message  Account 410100 requires an assignment to a Co object
    Account number 410100 is also Revenue Cost element , while posting the entry this account number has 50 posting key,
    if i post entry using normal process with WBS element  system was accepted   only Fast data entry is the problem
    I found posting key field status and Account number fields status field status group both are having  WBS element is optional entry
    can any one Guide me where I am Doing mistake
    thanks
    Rana

    Hi,
    Check if you WBS is true or statistical, because revenure accounts require true CO objects for posting.
    Regards,
    Eli

  • Account 6311010 requires an assignment to a CO object Account 6311010 requ

    Hi All,
    I assigned different cost center in asset class. Then i removed default cost center in OKB9 for below GL account.
    While running the AFAB i am getting below error.
    Account 6311010 requires an assignment to a CO object
    I checked below configuration everything looks fine. But still i am getting error message.
    Checked in field status group OBC4 Cost center is optional and also checked OB41 for posting  key 40 Cost center is optional.
    a. spro-Finacial Accounting-Asset accounting-Integration with General ledger-Additional account assignment objects-activate account assignment objects- ACSET
    Activated the Cost cenet(KOSTL)
    b. spro-Finacial Accounting-Asset accounting-Integration with General ledger-Additional account assignment objects-SPECIFY Account assignment type for account assignment objects
    After maintaining the above steps still error message.
    Can you please let me know what could be the reason?
    Thanks!

    Hi Amit,
    Below are details which i mapped in ACSET:
    Acc *** obj:   KOSTL  cost center
    Transaction:   500       post deprecation
    Acc *** type: depreciation run
    Acc assignment: Check box tick marked.
    Also : Activate Account Assignment Objects  KOSTL  cost center 'Active and Agreement check box tick marked.
    Pl correct me anything wrong in the above configuration.
    Thanks!

  • Account 6100011( Forex-gain/loss) requires an assignment to a CO object

    Hello,
    Can any one explain how to resolve this issue while posting of an invoice to customer in New GL.
    I have assigned Cost center to the revenue cost element still i am getting the following error.
    Account 6100011 requires an assignment to a CO object
    Message no. KI248
    Diagnosis
    All given account assignment objects (order, project) are defined as statistical.
    System Response
    Statistical orders or projects are ignored when FI and CO are reconciled. You must enter a cost center, order, project, or cost object to which the costs are posted for CO postings.
    Procedure
    Enter a cost center, an order, a project, or a cost object that is not statistical. The posting row affected is 001 and the account is 6100011
    Thanks in advance,
    Warm Regards,
    Aswin

    Hi,
    As already suggested, as your account is a Cost Element and every cost element should be charged to Cost Object, you need to enter cost center/network/wbs to charge particular cost element. For automatic postings, system doesn't prompt to enter cost center, therefore you need to manually derive cost object (cost center) to charge particular cost element. For such configuration, you need to enter Cost Center/WBS in transaction OKB9 which would be assigned to the combination of Company Code and Cost Element, entered in the configuration.
    BR

  • Posting Advances gives error :  requires an assignment to a CO object

    Hi,
    When I am posting trip advance through PRRW, it gives the error "account XXXXX requires an assignment to a CO object" but when I am posting expenses it dose not give such error.
    Any possible reason for such behavior.
    Thanks
    Rohit

    This I believe is because advances are not included in the FM update process triggered from travel management. This is a missing functionality but previously advances reduced the budget in the posting process of a trip request if the wagetype for the advances was customized with a CO receiver.
    This was an error because in this case the handling of the commitment item for advances was not correct.
    With the introduction of the note  1096393 in the support package, the advances are no longer taken in consideration for the FM
    integration, they are not updated in FM at all.
    So I think this is why it works correctly for expenses but you get error for advances.

  • MB1B - Account requires an assignment to a CO object error

    Hello SAP Gurus,
    I encountered an error when trying to enter tranfer posting through transaction MB1B.
    After I entered the defaults for Document Items (Movement Type, Plant, and Storage Location), I put data to the Material, Quantity, UnE, and Batch fields and then press Enter. After that, I pressed Enter again and I got this error: Account 1520220 requires an assignment to a CO object.
    What does this error mean? How can I correct it?
    Thank you.

    Hello Rob,
    Thank you for your immediate reply.
    At what particular field in transaction MB1B should I enter the cost center? I am not really familiar with MB1B.
    Thank you.

  • Requires an assignment to a CO object for revenue cost element

    Hi All,
    I am posting directly in FI revenue entry through FB70. For that I am using the revenue GL Code 62200030 and same has been created as a cost element using cost element category 11 Revenue under controlling area...
    Now when I am posting the transaction I have already given profit center at line item level (& not a cost center as it will never takes credit entries). But after giving all the data at line item level system is giving me the following error "Account 62200030 requires an assignment to a CO object-Message no. KI235". I am using SAP ECC 6.0
    I can not use cost center in revenue entry as my cost center has been blocked for revenue posting.
    Kindly help to resolve this issue.
    For helpful answer points will be surely assign & thanks in advance.
    Regards,
    Sandeep

    Hi Sandeep
    First of all, do not offer points.. Edit your post and remove those words.. Else, your thread might get locked....You can give points for helpful answers as per your discretion, but pls do not offer them in your thread
    You need to enter an Internal Order or a Prof Segment to a revenue line item...
    If you do not want to do this, then convert this message into Warning message in OBA5
    Regards
    Ajay M
    Edited by: Ajay Maheshwari on Jan 17, 2011 10:01 AM

  • F110 AutoPayment KI 248 Account Requires an assignment to a CO object

    Hi Guru,
    I have found a problem that when run F110 proposal, several accounts shows the following error message in job log. I have searched other webpage on the same problem but it doesn't work.
    Tried solution: OKB9 assign cost center to the account. KA02 assgin default cost center to the account. But all the above can't solve the problem.
    The error message is:
    Account 658215 requires an assignment to a CO object  KI 248
    I found the account 658215 was for revaluation gain/loss. But it is confusing that the open item for vendors are all posted in local currency. No foreign currency is used in auto payment also.
    I tested the same vendor in QA system but it gave me no errors. Only in PRD it has the error message on proposal.
    Could you please help to throw some light on the problem?
    Emma

    Hi,
    Kindly check the cost element 658215 (i.e) what cost element category assigned, since you said in QA it has been successfully posted, you can compare the same.
    Also, try to simulate the document in PRD through FB01 for the GL account 658215 and assign the cost center manually and check whether the same error is appearing. If not, then your assinment in OKB9 is wrong or the cost center is deactivate or block.
    Let me know if the issue is solved.
    Thanks and Regards
    Gopinath

  • KI 235 Account requires an assignment to a Co object during GR/IR clearing

    Hi All,
    I have an above issue during GR/IR clearing.  The scenario is below
    We have maintained three currencies
    AED-Company code currency
    USD-1st parallel currency
    INR-2nd parallel currency
    At the time of GR/IR clearing, it is giving the above error for the Exchange Gain / Loss GL account maintained.  There is no difference in the company code currency, but the difference of 0.01 is appearing in the USD amount which is posted to Exc Gain/Loss account.  But at the time of doing the automatic clearing account vide transactin code f.13 it is giving the above error.  We have already done the setting in OKB9 and have assigned the cost centre to the respective GL account as per different profit centre.
    Kindly inform if anybody has come accros this issue and how it was resolved.
    Thanks
    Mahesh

    Hi Raheem,
    I am running transaction code f.13 GR/IR clearing account.  We have maintianed 3 three currencies. 1st AED-co code currency, 2nd usd- parallel currency, 3rd INR- parallel currency.  At the time of clearing system is giving above error of account requires an assignment to a co object for GL account of Exchange Gain/Loss account.  The exchange rate difference is coming for the 2nd currency ie USD.  In the leading ledger there is no problem.  We have done the setting in OKB9 and assigned the co object for Gl account of Exchange gain and loss.  Hope you have understood the issue.  Is there any solution apart from the setting in OKB9.
    Mahesh

  • Error while doing MR11 as enter Profitability segmet as Cost object

    Hi All,
    While doing MR11, we noticed a error message (ZC - 001) as "Enter Profitability segment as Cost object for Revenue and COGS posting".
    The specified Material account is created as Cost element (CE Category 11) and in OKB9 configuration this cost element is choosed (ticked) with the option "profitability segment". Also there is no substitution rule to derive profitability segment in OBBH substitutions.
    However there is a validation (GGB0), where the above specified Material account is included in the range of accounts in the Prerequisite, and Check as "Profitability segment is > (greater than) 0000000001 and with the message maintained as "Enter Profitability segment as Cost object for Revenue and COGS posting".
    Can any please help why this error has come at the earliest.
    Thanks & Regards
    Karun

    Hi Eli,
    Thank you very much for reply.
    I hope the note 184987 is not applicable in our case as the Field status of specified Material account does not have required entry for Profitability segment.
    Can you please let me know if we have entry in OKB9 and existance of entry in Validation creates the problem and throws the above error message?
    With regard to other note 134484 which you have specified on "error in Account assignment check in MM transactions" says "A detailed default account assignment (for example profitability segment) was defined in Transaction OKB9. However, the profitability segment is not set up correctly for goods movements: the characteristics material, plant, business area are missing. A later check of the profitability segments against material, plant and business area then generates an error message since the profitability segment is inconsistent".
    Is there any way to confirm whether this situation is leading to our error before implementing this note.
    Thanks & Regards
    Karun

  • Account 555555 requires an assignment to a CO object

    I am receiving following error in posting:
    account 555555 requires an assignment to a CO object
    please help

    Hi,
    For  the GL account  Cost center is the mandatory feild for posting to accounts.
    Check IT0001or IT0027 if cost center is attached to the employees associated to the GL account.
    Regards,
    Hemant V. Mahale

  • Account 1910116 requires an assignment to a CO object

    Hi,
    I had error: Account 1910116 requires an assignment to a CO object when i tried to post to GL Account 1910116.  Then I input the cost center.  Then i got Enter a true account assignment object with revenues error.
    Please advice me on the matter.
    I would appreciate if also can advice where is the setting for tru account assignment.

    Hi,
    it shows that ,You made an account assignment for A/C 1910116, a revenue element, in controlling area 4444 to a cost center or profit center.
    Cost centers and profit centers can carry revenues in the SAP system as statistics only. To ensure reconciliation between FI and CO for revenue element 1910116, a CO account assignment object must record the revenues as a real value. This object type is used for updating to the reconciliation ledger.
    In principle, it is possible for the SAP system to automatically derive this CO account assignment object, the reconciliation object. However, all postings made in CO for costing-based Profitability Analysis are logged in the reconciliation ledger under "reconciliation object". In this manner, the reconciliation ledger identifies the exact values flowing into the operating profit. If you post reconciliation objects during revenue postings to cost centers or profit centers, you must do so while keeping the interpretation of the reconciliation ledger reports in mind. The sums of revenue postings to profitability segments, cost centers, and profit centers cannot be broken down further.
    To avoid posting to reconciliation objects, make account assignments to a real CO account assignment object.
    or else, you can change the message controll ,following below mentioned path :
    Controlling --> General Controlling --> Change message control
    Hope it helps.
    Dhara.

  • Account 300000 requires an assignment to a CO object  while I am trying to

    Dear Experts,
    Account 300000 requires an assignment to a CO object  while I am trying to do posting from billing doc to acc doc .
    When I am  trying in KA01 to create  cost element  then sym will ask  in default acc asst  cost centre .After when I do trying create cost centre in KS01 sym giving error message u2018  Controlling area XXX does not have a standard hierarchy (please assign one)u2019
    Again if I trying to create  std hierarchy in (OKEON u2013 Change) getting message u2018
    u2018You have not yet created a cost center standard hierarchy for COAr xxxx
    So  wt should I do  for this error to clear.?
    Regards
    Ishikesh

    Hi Ishikesh,
    First of all are you using a make-to-order scenario or scenario where there is linkage to controlling?
    This is an error because the G/L account which you have assigned in the customisation is requiring an assignment to any of the parameter which can relate it to the Controlling for e.g. Cost center or WBS element.
    For this you have to have some guidance of Controlling customisation as this is not the directly an issue of SD module.
    If the G/L is for Revenue then it will be a secondary cost element and not primary. If the G/L is a revenue element , then account needs a profit center. If a cost element , then account needs a cost center.
    Please check first the field status of the account in Transaction: FS00.
    If this account requires CO object as mandatory then check whether a cost element is created or not , this error normally occurs when CO object is mandatory but relevant cost element is not created.
    You have a cost account defined in accounts determination (Transaction: OBYC), and every cost account must have a cost object associated (say, internal order, cost center, etc..).
    You must decide what is the cost object to 'receive' the cost value on the account
    Now, Look at Transaction: OKB9 - Display View "Account assignment" : Overview
    In OKB9 specify weather this cost element give impact to cost center or profitability segment. If it is give impact to cost center then assign cost center against to cost element or assign it to PA.
    OR, Alternatively -
    Go to, Transaction: KA04 and delete the cost elements for your g/l accounts.
    Regards,
    Karthik.

  • Account 715090 requires an assignment to a CO object

    Hi Friends,
    During Release of an invoice document system is prompting an error as follow.
    Account 715090 requires an assignment to a CO object
    LongText
        Detail
         Diagnosis
             You have not defined a CO account assignment for an account
             that is relevant to cost accounting.
         System Response
             Account 715090 is defined as a cost element.
             This means that you must always specify a CO account
             assignment.
         Procedure
             Enter one of the following CO account assignments
             o   Order
             o   Cost center / cost center/ activity type
             o   Sales order item (for a project or cost relevant)
             o   Project / WBS element
             o   Cost object (Process manufacturing)
             o   Network/ Network activities
             o   Business process
             o   Profitability segment
             o   Real estate object
             The posting row affected is 0000001004, account 715090.
    Technical data
        Tech. data details
         Client
         Group Number
         Sales Document Number                  0064002233
         Item Number of the SD Document         000000
         Schedule Line Number                   0235
         Counter in Control Tables              00
         Message Identification                 KI
         System Message Number                  235
         Output Type                            E
         Message Variable 01                    715090
         Message Variable 02                    0000001004
         Message Variable 03
         Message Variable 04
         Group Type
    We are having Profit Center assignment with each line item and is also having configurations in VKOA Transaction.
    Can you please suggest how can we post this document in G/Ls.
    Rgds, Krishan Raheja

    Hi Krishan,
    There are four possibilities, please check
    Go to T-code: KA02: enter G/L account (Cost element) ---> default acct assignment TAB -->assign the Cost Centre ---> save.
    Now try your transaction.
    OR
    Check the field status of the account in FS00. If this account requires CO object as mandatory then check whether a cost element is created or not, this error normally occurs when CO object is mandatory but relevant cost element is not created.
    Example: CO object may be cost centre, cost element, WBS element
    OR
    Use t.code OKB9 --> assign G/L account to cost object with your company code ---> save.
    OR
    Go to your biiling document --> Item level --> On item detail page --> check the "Profit center --> If its not ther then maintain the require entry in GGB1 and Material master
    OR
    For more check the link
    http://www.sap-img.com/financial/requires-an-assignment-to-a-co-object.htm
    Hope this helps,
    Regards,
    MT

Maybe you are looking for

  • Clearing the GR/IR - for experts !

    Hello, We have a problem in clearing the GR/IR The scenario is this: We entered a PO with invoice based GR and posted good receipt, Then we changed the valuation class of the material. In the new valuation class the GR/IR GL is different from the one

  • Export Appleworks to Pages

    I thought I could export a mailing list set up for labels in AppleWorks to Pages but everytime I try to import the AppleWorks file I get the message that it's "not a word processing document". Thanks for any help.

  • Migration Values on assets as investment measure

    Hi Gurus, I have a problem about AS92 for asset as investment measure. I have created a WBS in PS module with an investment profile and, when a have realised the WBS elements, the system has created assets as investment measure. I tried to migrate va

  • Something Interesting about Ref Cursor

    Hi All, An extract from Standard package type "<REF_CURSOR_1>" is ref cursor; function '=' (LEFT "<REF_CURSOR_1>", RIGHT "<REF_CURSOR_1>") return BOOLEAN; pragma BUILTIN('=', 1, 1, 1); pragma FIPSFLAG('=', 1450); function '!=' (LEFT "<REF_CURSOR_1>",

  • 'mpc playlist' + pipe = *** glibc detected **

    Hello, I'm having an issue with 'mpc' (the command-line interface to the Music Player Daemon). Alone, it works OK, but when I pipe its output to grep, I get this: (17) [renan@orion:~]$ mpc playlist | grep -i zappa *** glibc detected *** mpc: free():